CN107299759A - A kind of method that template is adjusted in skyscraper - Google Patents

A kind of method that template is adjusted in skyscraper Download PDF

Info

Publication number
CN107299759A
CN107299759A CN201710554773.8A CN201710554773A CN107299759A CN 107299759 A CN107299759 A CN 107299759A CN 201710554773 A CN201710554773 A CN 201710554773A CN 107299759 A CN107299759 A CN 107299759A
Authority
CN
China
Prior art keywords
support
template
formwork
adjusted
longitudinal rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710554773.8A
Other languages
Chinese (zh)
Inventor
魏文翰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201710554773.8A priority Critical patent/CN107299759A/en
Publication of CN107299759A publication Critical patent/CN107299759A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/12Tying means; Spacers ; Devices for extracting or inserting wall ties with arms engaging the forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种高层建筑中调整模板的方法,根据模板板宽,确定支撑架的数量,当1.0m<板宽L<1.8m,安装一套支撑架,当1.8m≤板宽L≤4.5m,安装2套支撑架,当板宽L>4.5m安装3套或者3套以上支撑架;支撑架包括第一支撑和第二支撑,通过调节第一支撑的长度来调节模板的垂直度;第一支撑包括中部支撑和下调节部,通过调节中部支撑和/或下调节部可实现第一支撑的长度调节;第一支撑连接模板上部,第二支撑连接模板下部。本发明工艺简单、施工速度快、工程质量好,结构整体性和抗震性能好,混凝土表面平整光滑,可以减少装修抹灰湿作业量;能减少塔吊吊次及工人操作时间;施工周期短,而且可以较好的展开流水线施工。

The invention discloses a method for adjusting formwork in high-rise buildings. According to the width of the formwork, the number of support frames is determined. When 1.0m<slab width L<1.8m, a set of support frames is installed. When 1.8m≤slab width L≤ 4.5m, install 2 sets of support frames, install 3 sets or more than 3 sets of support frames when the plate width L>4.5m; the support frames include the first support and the second support, and adjust the verticality of the formwork by adjusting the length of the first support The first support includes a middle support and a lower adjustment part, and the length adjustment of the first support can be realized by adjusting the middle support and/or the lower adjustment part; the first support connects the upper part of the formwork, and the second support connects the lower part of the formwork. The invention has the advantages of simple process, fast construction speed, good engineering quality, good structural integrity and anti-seismic performance, and the concrete surface is smooth and smooth, which can reduce the wet work load of decoration and plastering; can reduce the number of tower cranes and the operation time of workers; the construction period is short, and The assembly line construction can be better developed.

Description

一种高层建筑中调整模板的方法A method for adjusting formwork in high-rise buildings

技术领域technical field

本发明涉及一种高层建筑剪力墙全钢大模板调整的方法,具体的说是一种对高层建筑剪力墙全钢大模板支撑系统进行快速调整的方法。The invention relates to a method for adjusting a large all-steel formwork for a shear wall of a high-rise building, in particular to a method for quickly adjusting the supporting system of a large all-steel formwork for a shear wall of a high-rise building.

背景技术Background technique

传统的模板(特别是木模板)强度相对较低,组合刚度相对较小,支拆时需要大量的劳动力,需要格栅、背楞等材料多且容易脱胶、起鼓、起壳、开裂,重新拼装时板缝难以处理,模板容易变形,从而导致砼面高低不平。Traditional formwork (especially wooden formwork) has relatively low strength and relatively small combined stiffness. It requires a lot of labor when it is disassembled. It requires a lot of materials such as grids and back corrugations, and it is easy to degumming, drumming, shelling, and cracking. When assembling, it is difficult to deal with the joints of the boards, and the formwork is easily deformed, resulting in uneven concrete surfaces.

发明内容Contents of the invention

本发明的目的在于克服现有技术的不足,提供一种工艺简单、施工速度快且工程质量好的高层建筑中调整模板的方法。The purpose of the present invention is to overcome the deficiencies of the prior art and provide a method for adjusting templates in high-rise buildings with simple process, fast construction speed and good engineering quality.

本发明的目的是通过以下技术方案来实现的:一种高层建筑中调整模板的方法,根据模板板宽,确定支撑架的数量,当1.0m<板宽L<1.8m,安装一套支撑架,当1.8m≤板宽L≤4.5m,安装2套支撑架,当板宽L>4.5m安装3套或者3套以上支撑架;The purpose of the present invention is achieved through the following technical solutions: a method for adjusting formwork in a high-rise building, according to the width of the formwork, determine the number of support frames, when 1.0m < plate width L < 1.8m, install a set of support frames , when 1.8m≤board width L≤4.5m, install 2 sets of support frames, and when the plate width L>4.5m, install 3 or more sets of support frames;

所述的支撑架包括第一支撑和第二支撑,通过调节第一支撑的长度来调节模板的垂直度;The support frame includes a first support and a second support, and the verticality of the template is adjusted by adjusting the length of the first support;

第一支撑包括中部支撑和下调节部,通过调节中部支撑和/或下调节部可实现第一支撑的长度调节;The first support includes a middle support and a lower adjustment part, and the length adjustment of the first support can be realized by adjusting the middle support and/or the lower adjustment part;

第一支撑连接模板上部,第二支撑连接模板下部。The first support is connected to the upper part of the formwork, and the second support is connected to the lower part of the formwork.

作为优选方式,根据模板板宽,确定支撑架的数量时,应注意协调避免支撑架相互干扰。As a preferred manner, when determining the number of support frames according to the width of the formwork, attention should be paid to coordination to avoid mutual interference of the support frames.

作为优选方式,根据模板板宽,确定支撑架的数量时,支撑架之间的距离应小于2.5m。As a preferred method, when determining the number of support frames according to the width of the formwork, the distance between the support frames should be less than 2.5m.

作为优选方式,模板底部设置定位装置。As a preferred manner, a positioning device is provided at the bottom of the template.

作为优选方式,所述的定位装置为定位筋,提前焊好定位筋,调入模板,摘钩前,迅速调节第一支撑的长度来调节模板的垂直度。As a preferred mode, the positioning device is a positioning rib, the positioning rib is welded in advance, transferred into the template, and before the hook is removed, the length of the first support is quickly adjusted to adjust the verticality of the template.

作为优选方式,在校正模板垂直度的时候安装穿墙栓,通过调节第一支撑的长度以及安装穿墙栓使模板处于垂直状态。As a preferred manner, when correcting the verticality of the formwork, the wall bolts are installed, and the formwork is in a vertical state by adjusting the length of the first support and installing the wall bolts.

作为优选方式,所述的模板采用86系列全钢大模板,内外模板高度均为2820mm,面板采用6mm厚钢板。As a preferred method, the formwork is 86 series all-steel large formwork, the height of the inner and outer formwork is 2820mm, and the panel is made of 6mm thick steel plate.

作为优选方式,所述的模板上设置纵肋。As a preferred manner, the template is provided with longitudinal ribs.

作为优选方式,所述纵肋为10#槽钢。As a preferred manner, the longitudinal rib is 10# channel steel.

作为优选方式,在模板顶部下800mm处设置纵肋,纵肋上预留螺栓孔,第一支撑与纵肋相连;As a preferred method, a longitudinal rib is set at 800 mm below the top of the template, bolt holes are reserved on the longitudinal rib, and the first support is connected to the longitudinal rib;

在离模板底部100mm处设置纵肋,纵肋通过型钢连接第二支撑。A longitudinal rib is set at 100mm from the bottom of the formwork, and the longitudinal rib is connected to the second support through section steel.

作为优选方式,第一支撑还包括上调节部。优选地,中部支撑与下调节部和/或上调节部螺纹连接,更优选地,中部支撑上设置内螺纹,下调节部和/或上调节部设置外螺纹。As a preferred manner, the first support further includes an upper adjustment part. Preferably, the middle support is screwed to the lower adjustment part and/or the upper adjustment part, more preferably, the middle support is provided with internal threads, and the lower adjustment part and/or the upper adjustment part is provided with external threads.

作为优选方式,中部支撑为螺母杆,下调节部和/或上调节部为支腿丝杆。As a preferred manner, the middle support is a nut rod, and the lower adjustment part and/or the upper adjustment part are leg screw rods.

作为优选方式,螺纹连接处(或者丝杆活动部位)应涂油润滑,并使连接处(或者活动部位)转动灵活。As a preferred method, the threaded connection (or the movable part of the screw rod) should be lubricated with oil, and the connection (or the movable part) should be rotated flexibly.

作为优选方式,调整模板的方法还包括模板拆除调整方法,模板拆除时,应先拆除出对拉螺栓(或者穿墙栓)及节点连接构件,利用斜撑(第一支撑)调整大模板向后倾斜并脱离混凝土墙体。As an optimal way, the method for adjusting the formwork also includes the formwork removal adjustment method. When the formwork is removed, the pull bolts (or wall bolts) and node connecting members should be removed first, and the large formwork should be adjusted backwards by using diagonal braces (first support). Lean and break away from concrete walls.

本发明的有益效果是:The beneficial effects of the present invention are:

1、此施工方法工艺简单、施工速度快、工程质量好,结构整体性和抗震性能好,混凝土表面平整光滑,可以减少装修抹灰湿作业量;1. This construction method has simple process, fast construction speed, good engineering quality, good structural integrity and seismic performance, and the concrete surface is smooth and smooth, which can reduce the amount of wet plastering work for decoration;

2、此种工艺模板幅面可以做得很大,能减少塔吊吊次及工人操作时间,缩短工期,减轻劳动强度,节约生产成本;2. The format of this kind of process template can be made very large, which can reduce the number of tower cranes and workers' operating time, shorten the construction period, reduce labor intensity, and save production costs;

3、此方法施工周期短,为快拆模系统,一套模板正常施工可达到四天一层,而且可以较好的展开流水线施工,大大提高施工进度,节约管理成本。3. This method has a short construction period. It is a quick-release formwork system. The normal construction of a set of formwork can reach one floor in four days, and the assembly line construction can be better launched, which greatly improves the construction progress and saves management costs.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图中,1-模板,2-第一支撑,2.1-中部支撑,2.2-上调节部,2.3-下调节部,3-第二支撑,4-定位装置。In the figure, 1-template, 2-first support, 2.1-middle support, 2.2-upper adjustment part, 2.3-lower adjustment part, 3-second support, 4-positioning device.

具体实施方式detailed description

下面结合附图进一步详细描述本发明的技术方案,但本发明的保护范围不局限于以下所述。The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.

如图1所示,一种高层建筑中调整模板的方法,根据模板1板宽,确定支撑架的数量(优选地,确定支撑架的数量时还可以考虑房间的开间进深,将房间的开间进深和模板1板宽作为确定支撑架的数量的影响因素),当1.0m<板宽L<1.8m,安装一套支撑架,当1.8m≤板宽L≤4.5m,安装2套支撑架,当板宽L>4.5m安装3套或者3套以上支撑架;As shown in Figure 1, a method for adjusting formwork in a high-rise building, according to the width of formwork 1, determine the number of support frames (preferably, the bay depth of the room can also be considered when determining the number of support frames, and the depth of the room bay and formwork 1 plate width as the influencing factors to determine the number of support frames), when 1.0m < plate width L < 1.8m, install a set of support frames, when 1.8m ≤ plate width L ≤ 4.5m, install 2 sets of support frames, When the board width L>4.5m, install 3 sets or more than 3 sets of support frames;

所述的支撑架包括第一支撑2和第二支撑3,通过调节第一支撑2的长度来调节模板1的垂直度;The support frame includes a first support 2 and a second support 3, and the verticality of the template 1 is adjusted by adjusting the length of the first support 2;

第一支撑2包括中部支撑2.1和下调节部2.3,通过调节中部支撑2.1和/或下调节部2.3可实现第一支撑2的长度调节;The first support 2 includes a middle support 2.1 and a lower adjustment part 2.3, and the length adjustment of the first support 2 can be realized by adjusting the middle support 2.1 and/or the lower adjustment part 2.3;

第一支撑2连接模板1上部,第二支撑3连接模板1下部,第二支撑3优选连接杆。优选地,第一支撑2上部可绕其连接点旋转,第一支撑2下部可绕其连接点旋转;第二支撑3两端均可绕其相应的连接点旋转。更优选地,上述旋转可以通过旋转结构实现,所述旋转结构包括在第一支撑2或者第二支撑3上设置连接通孔,连接点设置销轴或者螺栓,该销轴或者螺栓穿过连接通孔,故第一支撑2或者第二支撑3可绕相应的销轴或者螺栓旋转。The first support 2 is connected to the upper part of the formwork 1, the second support 3 is connected to the lower part of the formwork 1, and the second support 3 is preferably a connecting rod. Preferably, the upper part of the first support 2 can rotate around its connection point, and the lower part of the first support 2 can rotate around its connection point; both ends of the second support 3 can rotate around their corresponding connection points. More preferably, the above-mentioned rotation can be realized by a rotating structure, and the rotating structure includes setting a connection through hole on the first support 2 or the second support 3, and setting a pin shaft or a bolt at the connection point, and the pin shaft or bolt passes through the connection through hole. hole, so the first support 2 or the second support 3 can rotate around the corresponding pin or bolt.

优选地,根据模板1板宽,确定支撑架的数量时,应注意协调避免支撑架相互干扰。Preferably, when determining the number of support frames according to the width of the formwork 1, attention should be paid to coordination to avoid mutual interference of the support frames.

优选地,根据模板1板宽,确定支撑架的数量时,支撑架之间的距离应小于2.5m。Preferably, when determining the number of support frames according to the width of the formwork 1, the distance between the support frames should be less than 2.5m.

优选地,模板1底部设置定位装置4。Preferably, a positioning device 4 is provided at the bottom of the template 1 .

优选地,所述的定位装置4为定位筋,提前焊好定位筋,调入模板1,摘钩前,迅速调节第一支撑2的长度来调节模板1的垂直度。Preferably, the positioning device 4 is a positioning rib, the positioning rib is welded in advance, transferred into the formwork 1, and before unhooking, quickly adjust the length of the first support 2 to adjust the verticality of the formwork 1.

优选地,在校正模板1垂直度的时候安装穿墙栓(优选校正模板1与安装穿墙栓同步进行),通过调节第一支撑2的长度以及安装穿墙栓使模板1处于垂直状态。Preferably, when the verticality of the template 1 is corrected, the wall bolts are installed (preferably, the correction of the template 1 is carried out synchronously with the installation of the wall bolts), and the template 1 is in a vertical state by adjusting the length of the first support 2 and installing the wall bolts.

优选地,所述的模板1采用86系列全钢大模板,内外模板1高度均为2820mm,面板采用6mm厚钢板。改变传统的木模方式,设计、制作大钢模。Preferably, the formwork 1 adopts 86 series all-steel large formwork, the height of the inner and outer formwork 1 is 2820mm, and the panel adopts 6mm thick steel plate. Change the traditional wooden formwork, design and manufacture large steel formwork.

优选地,所述的模板1上设置纵肋。Preferably, the template 1 is provided with longitudinal ribs.

优选地,所述纵肋为10#槽钢。Preferably, the longitudinal rib is 10# channel steel.

优选地,在模板1顶部下800mm处设置纵肋,纵肋上预留螺栓孔,第一支撑2与纵肋相连;Preferably, a longitudinal rib is set at 800 mm below the top of the formwork 1, bolt holes are reserved on the longitudinal rib, and the first support 2 is connected to the longitudinal rib;

在离模板1底部100mm处设置纵肋,纵肋通过型钢连接第二支撑3。A longitudinal rib is set at 100mm from the bottom of the formwork 1, and the longitudinal rib is connected to the second support 3 through section steel.

优选地,第一支撑2还包括上调节部2.2。优选地,中部支撑2.1与下调节部2.3和/或上调节部2.2螺纹连接,更优选地,中部支撑2.1上设置内螺纹,下调节部2.3和/或上调节部2.2设置外螺纹。Preferably, the first support 2 further includes an upper adjustment part 2.2. Preferably, the middle support 2.1 is screwed to the lower adjustment part 2.3 and/or the upper adjustment part 2.2. More preferably, the middle support 2.1 is provided with internal threads, and the lower adjustment part 2.3 and/or the upper adjustment part 2.2 is provided with external threads.

优选地,中部支撑2.1为螺母杆,下调节部2.3和/或上调节部2.2为支腿丝杆。Preferably, the middle support 2.1 is a nut rod, and the lower adjustment part 2.3 and/or the upper adjustment part 2.2 is a leg screw.

优选地,螺纹连接处(或者丝杆活动部位)应涂油润滑,并使连接处(或者活动部位)转动灵活。Preferably, the threaded joint (or the active part of the screw) should be oiled and lubricated, and the joint (or the active part) can rotate flexibly.

优选地,调整模板1的方法还包括模板1拆除调整方法,模板1拆除时,应先拆除出对拉螺栓(或者穿墙栓)及节点连接构件,利用斜撑(第一支撑2)调整大模板1向后倾斜并脱离混凝土墙体。Preferably, the method for adjusting the formwork 1 also includes a method for removing and adjusting the formwork 1. When the formwork 1 is removed, the pull bolts (or through-wall bolts) and node connection components should be removed first, and the diagonal braces (first support 2) should be used to adjust the large Formwork 1 leans back and breaks away from the concrete wall.

本发明设计了一套能重复使用的钢大模板1支撑架的装置,根据模板1板宽,房间的开间进深,确定三角支撑架的数量,设计制作一个可伸缩的支撑调节螺杆,作为模板1支撑架的斜杆,来调节模板1的垂直度,钢制大模板支模前与支腿、挑架组装成一个整体,在施工中需来回拆装,支腿在施工中便于调节模板1的垂直度且起一定的支撑作用。The present invention designs a set of reusable large steel formwork 1 supporting frame device, according to the plate width of formwork 1 and the depth of the room, the number of triangular support frames is determined, and a scalable support adjusting screw is designed and manufactured as formwork 1 The inclined rod of the support frame is used to adjust the verticality of the formwork 1. The large steel formwork is assembled with the outriggers and the pick frame before the formwork is erected. It needs to be disassembled back and forth during construction. The outriggers are easy to adjust the formwork 1 during construction. Verticality and play a certain supporting role.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,应当指出的是,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. It should be noted that any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should include Within the protection scope of the present invention.

Claims (10)

1. the method for template is adjusted in a kind of skyscraper, it is characterised in that:It is wide according to template plate, the quantity of support frame is determined, As the wide L < 1.8m of 1.0m < plates, a set of support frame is installed, as the wide L≤4.5m of 1.8m≤plate, 2 sets of support frames are installed, as the wide L of plate > 4.5m install 3 sets or 3 sets of framves supported above;
Described support frame includes the first support and the second support, by the length of the support of regulation first come the vertical of adjusting template Degree;
First support includes midfoot support and lower adjustment portion, and first can be realized by adjusting midfoot support and/or lower adjustment portion The length adjustment of support;
First support connection template top, the second support connection template bottom.
2. the method for template is adjusted in a kind of skyscraper according to claim 1, it is characterised in that:According to template plate Width, when determining the quantity of support frame, it should be noted that coordination avoids support frame from interfering.
3. the method for template is adjusted in a kind of skyscraper according to claim 1 or 2, it is characterised in that:According to template Plate is wide, and when determining the quantity of support frame, the distance between support frame should be less than 2.5m.
4. the method for template is adjusted in a kind of skyscraper according to claim 1, it is characterised in that:Template bottom is set Positioner.
5. the method for template is adjusted in a kind of skyscraper according to claim 4, it is characterised in that:Described positioning dress Positioning bar is set to, positioning bar is welded in advance, template is called in, before decoupling device, the length of the rapid support of regulation first carrys out adjusting template Perpendicularity.
6. the method for template is adjusted in a kind of skyscraper according to claim 5, it is characterised in that:Hung down in calibration template Wall bolt is installed when directly spending, template is in plumbness by the length and installation wall bolt of the support of regulation first.
7. the method for template is adjusted in a kind of skyscraper according to claim 1, it is characterised in that:Described template is adopted With 86 serial all-steel big shutterings, inner and outer template is highly 2820mm, and panel uses 6mm steel plates.
8. the method for template is adjusted in a kind of skyscraper according to claim 1 or 7, it is characterised in that:Described mould Longitudinal rib is set on plate.
9. the method for template is adjusted in a kind of skyscraper according to claim 8, it is characterised in that:The longitudinal rib is 10# channel-section steels.
10. the method for template is adjusted in a kind of skyscraper according to claim 8, it is characterised in that:In die head Prepared screw-bolt hole in longitudinal rib, longitudinal rib is set at lower 800mm, and the first support is connected with longitudinal rib;
From longitudinal rib is set at the 100mm of template bottom, longitudinal rib is supported by shaped steel connection second.
CN201710554773.8A 2017-07-10 2017-07-10 A kind of method that template is adjusted in skyscraper Pending CN107299759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710554773.8A CN107299759A (en) 2017-07-10 2017-07-10 A kind of method that template is adjusted in skyscraper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710554773.8A CN107299759A (en) 2017-07-10 2017-07-10 A kind of method that template is adjusted in skyscraper

Publications (1)

Publication Number Publication Date
CN107299759A true CN107299759A (en) 2017-10-27

Family

ID=60132657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710554773.8A Pending CN107299759A (en) 2017-07-10 2017-07-10 A kind of method that template is adjusted in skyscraper

Country Status (1)

Country Link
CN (1) CN107299759A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763627A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 A kind of high-rise building elevator shaft construction structure and construction method
CN110126063A (en) * 2019-04-28 2019-08-16 中建二局第一建筑工程有限公司 A kind of tower crane counterweight producing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2616827A1 (en) * 1987-06-17 1988-12-23 Latappy Pierre Shuttering system for concrete floors
CN203626252U (en) * 2013-12-21 2014-06-04 中建四局第三建筑工程有限公司 Diagonal bracing reinforcing device applied to formwork system
CN106150087A (en) * 2016-08-24 2016-11-23 中国三冶集团有限公司 A kind of combined frame column template and construction method thereof
CN205822788U (en) * 2016-07-06 2016-12-21 郭榕来 A kind of attachment structure of composite material template bearing diagonal
CN106382007A (en) * 2016-11-10 2017-02-08 湖北森峰铝模科技有限公司 Template supporting system for construction
CN206144153U (en) * 2016-11-10 2017-05-03 湖北森峰铝模科技有限公司 Moulding board supporting system for building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2616827A1 (en) * 1987-06-17 1988-12-23 Latappy Pierre Shuttering system for concrete floors
CN203626252U (en) * 2013-12-21 2014-06-04 中建四局第三建筑工程有限公司 Diagonal bracing reinforcing device applied to formwork system
CN205822788U (en) * 2016-07-06 2016-12-21 郭榕来 A kind of attachment structure of composite material template bearing diagonal
CN106150087A (en) * 2016-08-24 2016-11-23 中国三冶集团有限公司 A kind of combined frame column template and construction method thereof
CN106382007A (en) * 2016-11-10 2017-02-08 湖北森峰铝模科技有限公司 Template supporting system for construction
CN206144153U (en) * 2016-11-10 2017-05-03 湖北森峰铝模科技有限公司 Moulding board supporting system for building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763627A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 A kind of high-rise building elevator shaft construction structure and construction method
CN110126063A (en) * 2019-04-28 2019-08-16 中建二局第一建筑工程有限公司 A kind of tower crane counterweight producing device

Similar Documents

Publication Publication Date Title
WO2024061351A1 (en) Construction formwork for arc-shaped overhanging eave of building
CN203939225U (en) Floor concrete casting operation platform is built in room
CN205100115U (en) Be used for pier stud bent cap concrete construction template
CN107299759A (en) A kind of method that template is adjusted in skyscraper
CN208734084U (en) A kind of aluminum dipping form that stability is strong hangs mould
CN211572514U (en) Scalable regulation outer wall scaffold frame
CN104018655B (en) A kind of assembly type monomer bracing frame
CN221645989U (en) A supporting corbel of an assembled prefabricated beam
CN112343330A (en) Cylinder wall construction method and cylinder wall template structure of large-diameter reinforced concrete cylinder
CN218374447U (en) Assembled ring beam and constructional column connection structure
CN106836255A (en) The integral prefabricated structure of basement bottom board catch pit bar-mat reinforcement and method of construction
CN207920085U (en) A kind of one side formwork adjustable bolt fastener
CN217439305U (en) Prefabricated building carrier plate of built-in steel bar truss of assembled
CN205857710U (en) Air-conditioning formwork support structure
CN109629425B (en) Cantilever support and construction method of concrete flange of steel-concrete combined bridge using cantilever support
CN204715756U (en) Inner corner trim angle mould
CN209128990U (en) A bolt-type detachable reinforcement cage hanging reinforcement device
CN209211619U (en) Prefabricated reinforced concrete beam-column joint structure
CN219973873U (en) A kind of prefabricated bamboo and wood frame template
CN204609291U (en) Formwork system
CN207277367U (en) Reinforcement of retaining wall structure
CN207110041U (en) A kind of half bolt construction of i-beam structure prefabrication and assembly construction building node
CN221799105U (en) Assembled construction platform
CN223577537U (en) A wall-connecting device for external scaffolding of an industrial plant
CN223577391U (en) Screw rod connection disassembly-free heat preservation wall template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171027

RJ01 Rejection of invention patent application after publication