CN107287375A - A kind of method of molten iron pretreatment slag skimming - Google Patents

A kind of method of molten iron pretreatment slag skimming Download PDF

Info

Publication number
CN107287375A
CN107287375A CN201610192135.1A CN201610192135A CN107287375A CN 107287375 A CN107287375 A CN 107287375A CN 201610192135 A CN201610192135 A CN 201610192135A CN 107287375 A CN107287375 A CN 107287375A
Authority
CN
China
Prior art keywords
molten iron
slag
pretreatment
iron
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610192135.1A
Other languages
Chinese (zh)
Inventor
李彦萍
段富春
刘哲
张治国
孔令雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Information Technology Co Ltd
Original Assignee
Potevio Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Information Technology Co Ltd filed Critical Potevio Information Technology Co Ltd
Priority to CN201610192135.1A priority Critical patent/CN107287375A/en
Publication of CN107287375A publication Critical patent/CN107287375A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C1/00Refining of pig-iron; Cast iron
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D43/00Mechanical cleaning, e.g. skimming of molten metals

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

本发明涉及铁水预处理扒渣领域,具体为一种铁水预处理扒渣的方法。该方法的工艺流程是:铁水进入预处理站→测温取样→投入物料→喷吹→测温取样→铁水扒渣→铁水入转炉。本发明方法通过改变预处理后渣系组成的方法,在预处理工序采用加入一种物料改变预处理后渣系组成减少扒渣带铁量的操作方法,进行预处理后扒渣操作,可以满足预处理后炼钢对铁水少带渣的要求,满足预处理工艺的要求,同时有利于减少渣中带铁量,提高入炉铁水质量。采用该工艺方法可实现预处理扒渣后带铁量减少至20%~30%。The invention relates to the field of slag removal for molten iron pretreatment, in particular to a method for slag removal for molten iron pretreatment. The technological process of the method is as follows: molten iron enters the pretreatment station → temperature measurement and sampling → input of materials → injection → temperature measurement and sampling → molten iron slag removal → molten iron enters the converter. The method of the present invention adopts the method of changing the composition of the slag system after pretreatment, and adopts the operation method of adding a material in the pretreatment process to change the composition of the slag system after pretreatment and reduce the amount of iron in the slag stripping, and the slag stripping operation after the pretreatment can meet the requirements Steelmaking after pretreatment requires less slag in the molten iron, which meets the requirements of the pretreatment process, and at the same time helps to reduce the amount of iron in the slag and improve the quality of molten iron in the furnace. By adopting the process method, the amount of strip iron after pretreatment and slag removal can be reduced to 20%-30%.

Description

一种铁水预处理扒渣的方法A method for removing slag in molten iron pretreatment

技术领域technical field

本发明涉及铁水预处理扒渣领域,具体为一种铁水预处理扒渣的方法。The invention relates to the field of slag removal for molten iron pretreatment, in particular to a method for slag removal for molten iron pretreatment.

背景技术Background technique

预处理后铁水扒渣结束要求:普通钢种入炉[S]≤0.015wt%~0.020wt%,铁渣残厚≤50mm;入炉[S]≤0.003%~0.005%的,铁渣残厚≤20mm;入炉[S]≤0.002%,铁水液面裸露达80%以上。铁水预处理扒渣的常规生产方式为:铁水按规程要求进行脱硫处理后,进入铁水扒渣站,根据钢种要求对铁水进行扒渣操作,铁水经扒渣操作后,达到规程要求的铁渣残厚,然后进行转炉冶炼。Requirements for the end of slagging of molten iron after pretreatment: ordinary steel into the furnace [S] ≤ 0.015wt% ~ 0.020wt%, residual thickness of iron slag ≤ 50mm; furnace [S] ≤ 0.003% ~ 0.005%, residual iron slag ≤20mm; into the furnace [S] ≤0.002%, the exposed molten iron level is more than 80%. The conventional production method of molten iron pretreatment and slag removal is: after the molten iron is desulfurized according to the requirements of the regulations, it enters the molten iron slag removal station, and the molten iron is subjected to slag removal operations according to the requirements of the steel type. After the slag removal operation, the molten iron reaches the iron slag required by the regulations Residual thick, then carry out converter smelting.

然而,按常规方法扒渣的铁水不能满足炼钢对铁水渣残厚(铁渣残厚20mm~50mm)的要求。铁水扒渣站因渣耙型式、铁水罐罐口形状、铁水车倾翻等原因,决定了扒渣后铁水残渣不满足供给炼钢的铁水高质量控制,炼钢必须进行相应补救处理,也就是必须对不满足的铁水进行多加辅料减少回硫处理(实际生产多加部分活性灰)。按常规方法进行扒渣的铁水,因带铁量达到40%~50%以上,增加钢铁料消耗,因渣罐运输限制,无法保证扒渣效果,致使生产运行中使用渣罐数量增加现象而导致无法正常摆布渣罐,无法满足炼钢对入炉铁水精料的要求。Yet, the hot metal that removes slag according to conventional method can't meet the requirement of steelmaking to molten iron slag residual thickness (iron slag residual thickness 20mm~50mm). Due to reasons such as the type of slag rake, the shape of the mouth of the molten iron tank, and the tipping of the molten iron car, the hot metal slag removal station determines that the molten iron residue after slag removal does not meet the high quality control of molten iron supplied to steelmaking. Corresponding remedial treatment must be carried out for steelmaking, that is, The unsatisfactory molten iron must be treated by adding more auxiliary materials to reduce sulfur return (adding more active ash in actual production). Molten iron with slag removal according to the conventional method will increase the consumption of iron and steel materials due to the amount of iron that reaches 40% to 50%, and the slag removal effect cannot be guaranteed due to the limitation of slag tank transportation, resulting in an increase in the number of slag tanks used in production and operation. The slag tank cannot be arranged normally, and the requirements of steelmaking for molten iron concentrate cannot be met.

发明内容Contents of the invention

本发明的目的是提供一种铁水预处理扒渣的方法,以满足转炉对铁水精料入炉的要求,实现转炉连续生产优质钢,并有助于降低渣中含铁量,达到降低钢铁料消耗的目的,改善钢水质量,降低转炉辅料消耗。The purpose of the present invention is to provide a method for pretreatment of molten iron to remove slag, so as to meet the requirements of the converter for the molten iron concentrate to be fed into the furnace, realize the continuous production of high-quality steel by the converter, and help reduce the iron content in the slag, so as to reduce the iron and steel material. The purpose of consumption is to improve the quality of molten steel and reduce the consumption of converter auxiliary materials.

本发明的技术方案是:Technical scheme of the present invention is:

一种铁水预处理扒渣的方法,该方法的工艺流程是:铁水进入预处理站→测温取样,明确铁水初始条件,作为脱硫及喷吹前加入物料的依据→投入物料→喷吹,在铁水进站后,处理前根据铁水温度和渣量状况先加入铁水稀渣剂再行喷吹→测温取样,作为提供给下道工序--转炉的物料,明确入炉S是否满足转炉要求,同时转炉根据铁温和成分进行辅料及废钢加入计算→铁水扒渣→铁水入转炉。A method for removing slag during pretreatment of molten iron. The process flow of the method is: molten iron enters the pretreatment station → temperature measurement and sampling, the initial condition of molten iron is determined, as the basis for adding materials before desulfurization and injection → input materials → injection, in the After the molten iron enters the station, add molten iron thin slag agent according to the temperature of the molten iron and the amount of slag before processing, and then spray → temperature measurement and sampling, as the material provided to the next process - the converter, to determine whether the furnace S meets the requirements of the converter, At the same time, the converter calculates the addition of auxiliary materials and scrap steel according to the temperature and composition of the iron → molten iron slag removal → molten iron into the converter.

所述的铁水预处理扒渣的方法,具体步骤如下:The method for the described molten iron pretreatment slag removal, concrete steps are as follows:

①首先进行正常铁水预处理入站处理;① First, carry out normal molten iron pretreatment inbound treatment;

②进行脱硫前加料操作,利于铁水预处理进一步处理;②The feeding operation before desulfurization is beneficial to the further treatment of molten iron pretreatment;

③进行铁水预处理脱硫控制,经铁水预处理后,完成铁水硫的控制,为铁水扒渣做相应准备;③ Carry out the desulfurization control of molten iron pretreatment, complete the control of molten iron sulfur after the molten iron pretreatment, and make corresponding preparations for the slag removal of molten iron;

④进行铁水扒渣操作,倾翻的铁水罐经渣耙对预处理后铁水进行扒渣处理;④ Carry out the slag removal operation of the molten iron, and the slag removal treatment of the pretreated molten iron by the slag rake on the tipped molten iron tank;

⑤扒渣后铁水提供给转炉进行冶炼。⑤ After slag removal, the molten iron is supplied to the converter for smelting.

所述的铁水预处理扒渣的方法,步骤①中,铁水预处理使用氮气作为载体,采用向铁水罐内联合喷吹镁粉和石灰粉工艺进行脱硫,喷粉结束后,用扒渣耙将铁水罐上部铁渣按规程要求扒出后,再将处理后的铁水吊至转炉使用。In the method for removing slag in the pretreatment of molten iron, in step ①, the pretreatment of molten iron uses nitrogen as a carrier, and adopts a process of jointly spraying magnesium powder and lime powder into the molten iron tank for desulfurization. After the iron slag on the upper part of the molten iron tank is scraped out according to the regulations, the treated molten iron is hoisted to the converter for use.

所述的铁水预处理扒渣的方法,步骤②中,在铁水进站后,处理前根据铁水温度和渣量状况,先加入占铁水重量0.02wt%~1wt%的铁水稀渣剂再行喷吹。In the method for removing slag in the pretreatment of molten iron, in step ②, after the molten iron enters the station, according to the temperature of the molten iron and the amount of slag before the treatment, first add the molten iron thin slag agent accounting for 0.02wt% to 1wt% of the weight of the molten iron, and then spray blow.

所述的铁水预处理扒渣的方法,步骤③中,待进行铁水脱硫的铁水到达铁水预处理站后,根据铁水预处理站初始S、铁水量、铁水温度及转炉钢种对入炉铁水S的要求,进行喷吹镁粉数量计算,并通过在计算机屏幕上发出喷吹命令,采用PLC控制喷吹系统自动进行粉剂喷吹过程,脱硫喷吹完成后,将铁水倾翻车开至扒渣位进行扒渣操作。In the method for removing slag from molten iron pretreatment, in step ③, after the molten iron to be desulfurized arrives at the molten iron pretreatment station, the S According to the requirements, calculate the quantity of magnesium powder to be injected, and issue the injection command on the computer screen, and use the PLC to control the injection system to automatically carry out the powder injection process. After the desulfurization injection is completed, the molten iron dumper is driven to the slag removal position Carry out slag removal operation.

本发明的优点及有益效果是:Advantage of the present invention and beneficial effect are:

1、本发明方法通过改变预处理后渣系组成的方法,在预处理工序采用加入一种物料改变预处理后渣系组成减少扒渣带铁量的操作方法,进行预处理后扒渣操作,可以满足预处理后炼钢对铁水少带渣的要求,满足预处理工艺的要求,同时有利于减少渣中带铁量,提高入炉铁水质量。采用该工艺方法可实现预处理扒渣后带铁量减少至20%~30%。1. The method of the present invention adopts the method of changing the composition of the slag system after pretreatment, and adopts the operation method of adding a kind of material to change the composition of the slag system after pretreatment to reduce the amount of iron in the slag removal in the pretreatment process, and carry out the slag removal operation after the pretreatment, It can meet the requirement of less slag in molten iron for steelmaking after pretreatment, meet the requirements of pretreatment process, and at the same time help to reduce the amount of iron in slag and improve the quality of molten iron in the furnace. By adopting the process method, the amount of strip iron after pretreatment and slag removal can be reduced to 20%-30%.

2、采用该方法可实现为炼钢冶炼高级别钢水提供少渣铁水,同时适用于常规生产各类钢种,并有利于提高入炉铁水质量。2. The method can be used to provide low-slag molten iron for steelmaking and smelting high-grade molten steel. It is also suitable for conventional production of various types of steel and is conducive to improving the quality of molten iron entering the furnace.

具体实施方式detailed description

在具体实施过程中,为了满足转炉连续生产优质钢,完善预处理扒渣操作,采用本发明有效进行预处理后扒渣操作,该方法从控制预处理后渣系组成(降低铁渣粘度,增加渣中铁水回落等)及铁渣的流动性能的工艺角度出发,创造性地开发出铁水预处理扒渣工艺方法,以满足转炉对铁水的要求。其工艺流程是:铁水进入预处理站→测温取样(明确铁水初始条件,作为脱硫及喷吹前加入物料的依据)→投入物料→喷吹(在铁水进站后,处理前根据铁水温度和渣量状况先加入占铁水重量0.02wt%~1wt%的铁水稀渣剂再行喷吹)→测温取样(作为提供给下道工序--转炉的物料,明确入炉S是否满足转炉要求,同时转炉根据铁温和成分进行辅料及废钢加入计算)→铁水扒渣→铁水入转炉,具体如下:In the specific implementation process, in order to meet the continuous production of high-quality steel by the converter, and improve the pretreatment slag removal operation, the slag removal operation after the pretreatment is effectively carried out by using the present invention. From the technical point of view of the molten iron in slag falling back, etc.) and the flow properties of iron slag, the molten iron pretreatment and slag removal process was creatively developed to meet the requirements of the converter for molten iron. The process flow is: molten iron enters the pretreatment station → temperature measurement and sampling (determining the initial conditions of the molten iron, as the basis for adding materials before desulfurization and injection) → inputting materials → injection (after the molten iron enters the station, before processing according to the temperature of the molten iron and The slag amount status is to add molten iron thin slag agent accounting for 0.02wt% to 1wt% of the weight of molten iron before spraying)→Temperature measurement and sampling (as the material provided to the next process--converter, to clarify whether the furnace S meets the requirements of the converter, At the same time, the converter calculates the addition of auxiliary materials and scrap steel according to the temperature and composition of the iron) → molten iron slag removal → molten iron enters the converter, the details are as follows:

①首先进行正常铁水预处理入站处理。①Firstly, carry out normal molten iron pretreatment inbound treatment.

铁水预处理使用氮气作为载体,采用向175吨铁水罐内联合喷吹镁粉和石灰粉工艺进行脱硫,喷粉结束后,用扒渣耙将铁水罐上部铁渣按规程要求扒出后,再将处理后的铁水吊至转炉使用。The pretreatment of molten iron uses nitrogen as a carrier, and adopts the process of spraying magnesium powder and lime powder into the 175-ton molten iron tank for desulfurization. Lift the treated molten iron to the converter for use.

②按新方法进行脱硫前加料操作,利于铁水预处理进一步处理。②The feeding operation before desulfurization is carried out according to the new method, which is beneficial to the further treatment of molten iron pretreatment.

在铁水进站后,处理前根据铁水温度和渣量状况先加入100kg~300kg的铁水稀渣剂再行喷吹。After the molten iron enters the station, 100kg-300kg of molten iron thin slag agent is added according to the temperature of the molten iron and the amount of slag before treatment, and then sprayed.

③进行铁水预处理脱硫控制,经铁水预处理后,完成铁水硫的控制,为铁水扒渣做相应准备。③ Carry out desulfurization control of molten iron pretreatment, complete the control of molten iron sulfur after pretreatment of molten iron, and make corresponding preparations for slag removal of molten iron.

待进行铁水脱硫的铁水到达铁水预处理站后,操作员根据铁水预处理站初始S、铁水量、铁水温度及转炉钢种对入炉铁水S的要求,按模型进行喷吹镁粉数量计算,并通过在计算机屏幕上发出喷吹命令,PLC将控制喷吹系统自动进行粉剂喷吹过程,脱硫喷吹完成后,将铁水倾翻车开至扒渣位进行扒渣操作。After the molten iron to be desulfurized arrives at the molten iron pretreatment station, the operator calculates the amount of magnesium powder to be injected according to the model according to the initial S of the molten iron pretreatment station, the amount of molten iron, the temperature of the molten iron, and the requirements of the converter steel type for the incoming molten iron S. And by issuing an injection command on the computer screen, the PLC will control the injection system to automatically carry out the powder injection process. After the desulfurization injection is completed, the molten iron tipping car is driven to the slag removal position for slag removal operation.

④进行铁水扒渣操作,倾翻的铁水罐经渣耙对预处理后铁水进行扒渣处理。④ Carry out the slag removal operation of the molten iron, and carry out the slag removal treatment on the pretreated molten iron through the slag rake on the tipped molten iron tank.

在脱硫过程中,联合喷吹中使用石灰粉吹造成喷吹后渣层碱度明显增加,铁渣粘度较大,这不仅给预处理扒渣操作带来困难,而且随着扒渣过程因渣铁混淆,大量铁水随着炉渣流失,检测结果表明伴随扒渣的同时带走铁量高达渣量的50%,铁损严重,直接影响了产量及钢铁料消耗指标。另一方面由于渣粘而导致喷粉枪、渣耙粘渣严重、清理困难、耐材寿命降低。由于石灰用量大,会造成热损失增加,使铁水温度下降,故只有采用钝化方法,一方面增加石灰流动性,另一方面也避免了石灰水化反应,此时配合加入适量的降低铁渣熔点的稀渣剂则能较好保持铁渣的流动性,以利于扒渣操作。铁水稀渣剂的投入使用,有效的改变了预处理后铁渣的碱度,促进渣的流动性,使得扒渣操作易于进行,减少扒渣过程中带铁量,减少铁水损失。In the desulfurization process, the use of lime powder in the combined injection will cause the alkalinity of the slag layer to increase significantly after the injection, and the viscosity of the iron slag will be relatively high. The iron is mixed, and a large amount of molten iron is lost along with the slag. The test results show that the amount of iron taken away with the slag removal is as high as 50% of the slag, and the iron loss is serious, which directly affects the output and steel material consumption indicators. On the other hand, due to the slag sticking, the powder gun and the slag rake are seriously stuck to the slag, difficult to clean, and the service life of the refractory material is reduced. Due to the large amount of lime used, it will cause increased heat loss and lower the temperature of molten iron. Therefore, only the passivation method can be used to increase the fluidity of lime on the one hand and avoid the hydration reaction of lime on the other hand. The thinner slag agent with melting point can better maintain the fluidity of iron slag to facilitate the slag removal operation. The use of the molten iron slag agent effectively changes the alkalinity of the pretreated iron slag, promotes the fluidity of the slag, makes the slag removal operation easy, reduces the amount of iron in the slag removal process, and reduces the loss of molten iron.

⑤按新方法扒渣后铁水提供给转炉进行冶炼。⑤ According to the new method, the molten iron is provided to the converter for smelting after slag removal.

实施例结果表明,本发明入炉铁水带渣量少,减少转炉造渣料消耗。铁渣中含铁量减少,铁水带渣量控制及控制渣罐数量的方法。操作简单、工人劳动强度降低的扒渣方法。扒渣操作及防回硫控制。The results of the examples show that the amount of slag carried by the molten iron in the furnace is small in the present invention, which reduces the consumption of converter slagging material. The method for reducing the iron content in iron slag, controlling the amount of slag in molten iron and controlling the number of slag pots. It is a slag removal method with simple operation and reduced labor intensity. Slagging operation and anti-sulfur control.

Claims (5)

1. a kind of method of molten iron pretreatment slag skimming, it is characterised in that the technological process of this method is:Molten iron enters Enter preprocessing station → thermometric sampling, specify molten iron primary condition, be used as the foundation that material is added before desulfurization and injection Material → the injection of → input, after molten iron enters the station, before processing first adds molten iron according to molten iron temperature and quantity of slag situation Shoddye agent capable injection → thermometric sampling again, as being supplied to next procedure -- the material of converter, clearly entering stove S is It is no to meet converter requirement, while converter carries out auxiliary material according to the gentle composition of iron and steel scrap adds calculating → molten iron drossing → molten iron enters converter.
2. according to the method for the molten iron pretreatment slag skimming described in claim 1, it is characterised in that specific steps are such as Under:
1. normal molten iron pretreatment inbound processing is carried out first;
2. feeding operation before desulfurization is carried out, beneficial to the further processing of molten iron pretreatment;
3. molten iron pretreatment desulfurizing control is carried out, after being pre-processed through molten iron, the control of molten iron sulphur is completed, is molten iron Skim and do corresponding preparation;
4. molten iron drossing operation is carried out, the hot-metal bottle tumbled is harrowed through slag to carry out taking off Slag treatment to molten iron after pretreatment;
5. molten iron is supplied to converter to be smelted after skimming.
3. according to the method for the molten iron pretreatment slag skimming described in claim 2, it is characterised in that step 1. in, Molten iron pretreatment uses nitrogen as carrier, is carried out using the joint blowing magnesium powder into hot-metal bottle and lime powder craft Desulfurization, after end of dusting, after hot-metal bottle top scum is clawed by regulatory requirements with slag rake, then by after processing Molten iron be hung to converter and use.
4. according to the method for the molten iron pretreatment slag skimming described in claim 2, it is characterised in that step 2. in, After molten iron enters the station, before processing added according to molten iron temperature and quantity of slag situation, first account for weight of molten iron 0.02wt%~ The row injection again of 1wt% Slag fluxing agent.
5. according to the method for the molten iron pretreatment slag skimming described in claim 2, it is characterised in that step 3. in, The molten iron of pending desulfurizing iron is reached after molten iron preprocessing station, according to the initial S of molten iron preprocessing station, iron water amount, Molten iron temperature and converter steel grade carry out injection magnesium powder quantity and calculated to entering stove molten iron S requirement, and by meter Injection order is sent on calculation machine screen, pulvis injection process, desulfurization are carried out using PLC control injection systems automatically After the completion of injection, molten iron tipping car is opened to position of skimming and carries out taking off slag operation.
CN201610192135.1A 2016-03-30 2016-03-30 A kind of method of molten iron pretreatment slag skimming Pending CN107287375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610192135.1A CN107287375A (en) 2016-03-30 2016-03-30 A kind of method of molten iron pretreatment slag skimming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610192135.1A CN107287375A (en) 2016-03-30 2016-03-30 A kind of method of molten iron pretreatment slag skimming

Publications (1)

Publication Number Publication Date
CN107287375A true CN107287375A (en) 2017-10-24

Family

ID=60087163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610192135.1A Pending CN107287375A (en) 2016-03-30 2016-03-30 A kind of method of molten iron pretreatment slag skimming

Country Status (1)

Country Link
CN (1) CN107287375A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108588319A (en) * 2018-05-31 2018-09-28 中冶南方工程技术有限公司 A kind of efficiently online KR desulphurization systems
CN110205435A (en) * 2019-06-04 2019-09-06 甘肃酒钢集团宏兴钢铁股份有限公司 A method of the molten iron pretreatment desulfurizing in converter
CN111206134A (en) * 2020-02-24 2020-05-29 本钢板材股份有限公司 Method for improving desulfurization effect by adding limestone in molten iron desulfurization by blowing method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52126601A (en) * 1976-04-16 1977-10-24 Nippon Kokan Kk <Nkk> Preliminary treatment of molten metal
CN101444843A (en) * 2008-12-30 2009-06-03 本钢板材股份有限公司 Slag skimming method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52126601A (en) * 1976-04-16 1977-10-24 Nippon Kokan Kk <Nkk> Preliminary treatment of molten metal
CN101444843A (en) * 2008-12-30 2009-06-03 本钢板材股份有限公司 Slag skimming method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李艳萍: "铁水预处理稀渣剂的生产应用效果探讨", 《本溪冶金高等专科学校学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108588319A (en) * 2018-05-31 2018-09-28 中冶南方工程技术有限公司 A kind of efficiently online KR desulphurization systems
CN110205435A (en) * 2019-06-04 2019-09-06 甘肃酒钢集团宏兴钢铁股份有限公司 A method of the molten iron pretreatment desulfurizing in converter
CN111206134A (en) * 2020-02-24 2020-05-29 本钢板材股份有限公司 Method for improving desulfurization effect by adding limestone in molten iron desulfurization by blowing method

Similar Documents

Publication Publication Date Title
CN112481551B (en) Steel WB36V for power station and smelting and continuous casting production process thereof
CN102337378B (en) Process for removing non-metallic inclusions in molten steel
CN105506226B (en) Method for carrying out pre-desiliconization, pre-decarburization and pre-dephosphorization on molten iron in molten iron tank
CN112921148B (en) A kind of ultra-low sulfur silicon steel smelting process method
CN108531807A (en) A kind of heavy wall heavy caliber X80M pipelines clean steel and smelting process
CN108998613A (en) Method for controlling free oxygen in ultra-low carbon low aluminum steel
CN111349743A (en) Energy-saving and emission-reducing method for recycling thermal-state casting residues
CN102766723B (en) Limestone slagging steelmaking lance position control method for basic oxygen furnaces
CN107365890A (en) Method for controlling inclusions in X80 pipeline steel
CN107287375A (en) A kind of method of molten iron pretreatment slag skimming
CN106636534B (en) The method for controlling Automobile Plate ladle top slag calcium aluminium ratio 1.2-1.8
CN108085448A (en) A kind of production method by continuous casting pattern smelting low-sulfur steel in converter directly
CN103555886B (en) Method for smelting ultralow-sulfur steel by using vanadium-containing molten iron
CN108396102A (en) The method of electric furnace smelting special steel molten steel
CN112458236B (en) Method for refining and deep desulfurization of molten steel, device for refining molten steel and application
CN104946850B (en) A kind of converter tapping uses low Al alumina balls wash heat method
JP2008285709A (en) Method for secondarily refining low-sulfur steel while inhibiting sulfur-returning phenomenon in vacuum degassing process
CN103773915B (en) Control method for steel tapping of converter
CN106148820A (en) A kind of method of smelting high-strength structural steel
CN108977623A (en) A method of desulfurization being carried out to high-sulfur molten steel with ladle refining furnace
CN103276143A (en) Automobile steel and production technology thereof
CN104099434A (en) Dust suppression treatment method for molten iron desulfuration residue and device utilized for method
CN114075619A (en) Fluorine-free CaO-SiO2Slagging method of refining slag in steelmaking process
CN102206726A (en) Method for removing desulfurizing slag from molten iron
CN105969939A (en) Titanium-containing low-nitrogen stainless steel production technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024

RJ01 Rejection of invention patent application after publication