CN107268994A - 墙体铝模板与顶板木模板相交处模板连接结构 - Google Patents

墙体铝模板与顶板木模板相交处模板连接结构 Download PDF

Info

Publication number
CN107268994A
CN107268994A CN201710516874.6A CN201710516874A CN107268994A CN 107268994 A CN107268994 A CN 107268994A CN 201710516874 A CN201710516874 A CN 201710516874A CN 107268994 A CN107268994 A CN 107268994A
Authority
CN
China
Prior art keywords
plate
plank sheathing
aluminum alloy
alloy pattern
pattern plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710516874.6A
Other languages
English (en)
Inventor
赵玉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710516874.6A priority Critical patent/CN107268994A/zh
Publication of CN107268994A publication Critical patent/CN107268994A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements

Abstract

本发明涉及一种墙体铝模板与顶板木模板相交处模板连接结构。包括墙体铝模板、顶板木模板,墙体铝模板与顶板木模板之间的缝隙处设置有竖向木模板,竖向木模板背面为混凝土接触面,竖向木模板正面设置木方,木方与墙体铝模板之间通过对拉螺栓组件连接,竖向木模板与顶板木模板、木方之间分别通过长钉固定。采用本发明加固结构,可保证混凝土表面的观感,加快工期,降低成本。

Description

墙体铝模板与顶板木模板相交处模板连接结构
技术领域
[0001] 本发明涉及建筑工程中铝模板与木模板综合施工时交接处拼缝处理技术,具体是 一种墙体铝模板与顶板木模板相交处模板连接结构。
背景技术
[0002] 目前,50m以上高层建筑基本采用核心筒剪力墙结构,剪力墙长度基本每层固定, 因此越来越多的高层建筑倾向使用铝合金模板,但遇到楼板及框架梁层层变化,顶板模板 不得不使用木模板,这样,墙体铝模板与顶板木模板相交处连接加固处理尤为重要。墙体铝 模板与顶板木模板大多预留100-200mm缝隙,这种通长的并且窄小的缝隙处理不当,易引起 模板涨模,严重影响观感质量。
发明内容
[0003] 本发明旨在解决建筑工程铝模板与木模板综合施工时交接处拼缝的处理问题,而 提供一种墙体铝模板与顶板木模板相交处模板连接结构。
[0004] 本发明解决该技术问题,采用的技术方案是: 一种墙体铝模板与顶板木模板相交处模板连接结构,包括墙体铝模板、顶板木模板,墙 体铝模板与顶板木模板之间的缝隙处设置有竖向木模板,竖向木模板背面为混凝土接触 面,竖向木模板正面设置木方,木方与墙体铝模板之间通过对拉螺栓紧固连接,竖向木模板 与顶板木模板、木方之间分别通过长钉固定。
[0005] 采用上述技术方案的本发明,与现有技术相比,其有益效果是: 由于墙体变化较少,因此墙体使用铝模板可以加快工期且墙体平整度效果较好;而顶 板梁板变化较大,使用木模板可以根据顶板变化任意调整。而接缝处采用本发明加固,保证 了混凝土表面的观感,加快了工期,降低了成本。
附图说明 _
[0006] 图1是本发明实施例中墙体铝模板与木方连接的立面示意图; 图2是图1中A-A剖视图; 图中:1-墙体铝模板;2-木方;3-对拉螺栓组件;4-顶板木模板;5_长钉;6-竖向木模板。
具体实施方式
[0007] 以下结合附图及实施例详述本发明。
[0008] 参见图1、图2, 一种墙体铝模板与顶板木模板相交处模板连接结构,涉及的是墙体 铝模板1与顶板木模板4之间缝隙处的模板连接结构,通常此处的缝隙为10〇-200mm。具体连 接结构是:墙体铝模板1与顶板木模板4之间的缝隙处设置竖向木模板6,竖向木模板6背面 为混凝土接触面,竖向木模板6正面设置木方2,木方2与墙体铝模板1之间通过对拉螺栓组 件3紧固连接,对拉螺检组件3包括通丝拉杆3-1和燕尾卡扭3-2,采用热尾卡扭3-2方便墙体 铝模板1与木方2间的紧固与拆卸。竖向木模板6与顶板木模板4、木方2之间分别通过长钉5 固定。
[0009]施工上述结构时,首先进行墙体铝模板1、顶板木模板4的支设,然后测量墙体铝模 板1与顶板木模板4之间的净尺寸,由此确定竖向木模板6、木方2的具体规格,木方2根据墙 体铝模板1原有预留口钻孔,使用通丝拉杆3-1固定木方2,并使用燕尾卡扭3-2固定;最后再 使用长钉5将顶板木模板4与竖向木模板6固定,同时使用长钉5将竖向木模板6与木方2固 定。
[0010]以上所述仅为本发明较佳可行的实施例而己,并非因此局限本发明的权利范围, 凡运用本发明说明书及附图内容所作的等效结构变化,均包含于本发明的权利范围之内。

Claims (2)

1.一种墙体铝模板与顶板木模板相交处模板连接结构,包括墙体铝模板、顶板木模板, 其特征在于:墙体铝模板与顶板木模板之间的缝隙处设置有竖向木模板,竖向木模板背面 为混凝土接触面,竖向木模板正面设置木方,木方与墙体铝模板之间通过对拉螺栓组件连 接,竖向木模板与顶板木模板、木方之间分别通过长钉固定。
2.据权利要求1所述的墙体铝模板与顶板木模板相交处模板连接结构,其特征在于:所 述的对拉螺栓组件包括通丝拉杆和燕尾卡扭。
CN201710516874.6A 2017-06-29 2017-06-29 墙体铝模板与顶板木模板相交处模板连接结构 Pending CN107268994A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710516874.6A CN107268994A (zh) 2017-06-29 2017-06-29 墙体铝模板与顶板木模板相交处模板连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710516874.6A CN107268994A (zh) 2017-06-29 2017-06-29 墙体铝模板与顶板木模板相交处模板连接结构

Publications (1)

Publication Number Publication Date
CN107268994A true CN107268994A (zh) 2017-10-20

Family

ID=60071351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710516874.6A Pending CN107268994A (zh) 2017-06-29 2017-06-29 墙体铝模板与顶板木模板相交处模板连接结构

Country Status (1)

Country Link
CN (1) CN107268994A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202139841U (zh) * 2011-06-30 2012-02-08 深圳汇林达科技有限公司 建筑模板体系
CN105604314A (zh) * 2016-01-25 2016-05-25 中国建筑第八工程局有限公司 工具式快拆模架组合体系
CN105696789A (zh) * 2016-02-24 2016-06-22 中建三局第建设工程有限责任公司 一种竖向铝模建造系统及其施工方法
CN105971277A (zh) * 2016-06-06 2016-09-28 中建局集团第三建筑有限公司 一种新型铝木混合模板

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202139841U (zh) * 2011-06-30 2012-02-08 深圳汇林达科技有限公司 建筑模板体系
CN105604314A (zh) * 2016-01-25 2016-05-25 中国建筑第八工程局有限公司 工具式快拆模架组合体系
CN105696789A (zh) * 2016-02-24 2016-06-22 中建三局第建设工程有限责任公司 一种竖向铝模建造系统及其施工方法
CN105971277A (zh) * 2016-06-06 2016-09-28 中建局集团第三建筑有限公司 一种新型铝木混合模板

Similar Documents

Publication Publication Date Title
CN104153555B (zh) 含水平固定组件的可拆卸式悬挑型钢梁预埋固定装置
CN204492190U (zh) 铝合金模板背楞固定装置
CN206928651U (zh) 墙体铝模板与顶板木模板相交处模板连接结构
CN205077862U (zh) 一种用于混凝土反坎施工的铝合金模板结构
CN204001702U (zh) 一种丁字墙塑料模板
CN206667741U (zh) 一种建筑施工用模板
CN203795589U (zh) 基于轻钢结构的集成房屋
CN107268994A (zh) 墙体铝模板与顶板木模板相交处模板连接结构
CN102061806B (zh) 一种建筑用模板
CN209163138U (zh) 一种用于爬模施工的楼板预留钢筋的预留装置
CN105442832A (zh) 一种混凝土导墙的模板
CN205777463U (zh) 一种铝合金顶板模板
CN202937003U (zh) 建筑用铝合金易拆模板
CN206784924U (zh) 一种组合式构造柱钢模板
CN206135325U (zh) 一种用于走线架的主梁
CN205712174U (zh) 一种基础底板导墙预防烂根的施工装置
CN203795851U (zh) 一种可调节窗洞模板装置
CN204040301U (zh) 一种弧形圈梁模板砌块
CN207277825U (zh) 洞口模板加固系统
CN203475302U (zh) 铁路湿接缝模板
CN207277839U (zh) 洞口模板加固结构
CN211447787U (zh) 一种电井内桥架预留洞边模固定支架
CN208310193U (zh) 一种墙体的阳角模板
CN207224219U (zh) 一种生产预制叠合板用模具的固定装置以及模具
CN205894678U (zh) 一种钢木结合式楼梯踏步加固模板

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020