CN107268444A - A kind of municipal construction road and bridge device for dotting - Google Patents

A kind of municipal construction road and bridge device for dotting Download PDF

Info

Publication number
CN107268444A
CN107268444A CN201710563449.2A CN201710563449A CN107268444A CN 107268444 A CN107268444 A CN 107268444A CN 201710563449 A CN201710563449 A CN 201710563449A CN 107268444 A CN107268444 A CN 107268444A
Authority
CN
China
Prior art keywords
ready
dotting
wheel body
housing
grades
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710563449.2A
Other languages
Chinese (zh)
Other versions
CN107268444B (en
Inventor
周瑞国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING ZHONGHUAN CONSTRUCTION Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710563449.2A priority Critical patent/CN107268444B/en
Publication of CN107268444A publication Critical patent/CN107268444A/en
Application granted granted Critical
Publication of CN107268444B publication Critical patent/CN107268444B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H7/00Marking-out or setting-out work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Rehabilitation Tools (AREA)

Abstract

The present invention relates to a kind of municipal construction road and bridge device for dotting, including housing, road wheel, driving wheel, transmission drum, driven pulley, device for dotting;The housing is hollow rectangle shape, and the housing lower surface is provided with walking hole, and the housing lower surface, which is located to be provided with the right side of walking hole, gets hole ready;The road wheel includes live axle, walking wheel body, first gear;The driving wheel includes drive sprocket axle, active wheel body, second gear;The transmission drum includes inclined ramp, the first dop, one-level screw rod, one-level nut, two grades of nuts, two grades of screw rods;The driven pulley includes follower shaft, driven wheel body, stirs inserted link;The device for dotting includes getting rotating shaft ready, getting cross bar ready, get probe ready.The adjustable integral point space type device for dotting is simple to operate, gently promotes device for dotting to cause the road wheel is rotated to can be achieved to get operation ready;The regulation of spacing can also be got ready by rotating the first nut, the realization of the second nut.

Description

A kind of municipal construction road and bridge device for dotting
Technical field
The present invention relates to technical field of municipal construction, and in particular to a kind of municipal construction road and bridge device for dotting.
Background technology
At present, in municipal construction road and bridge reinforcing steel bar laying spacing, prior art be typically all by workman take scale Sign or unwrapping wire are determined manually.So, it is random and time-consuming due to what is indicated manually, the quality of construction is not only influenceed, The progress of construction is also affected, and increases and is constructed into.
Applying date 2013.03.18, the patent of application number 201310084749.4 discloses a kind of construction reinforcing bar of knowing clearly Spacing marking device, it includes the road wheel for the hand-held promotion of a frame being made up of push rod, support, wheel rim, spoke and wheel shaft, its feature It is on wheel rim, by away from provided with getting pen ready, print cartridge to be provided with support, during wheel rim rolls walking, getting ready thereon The black contact one side inking of leaching of the pen by contacting print cartridge is while get sign ready.
But above-mentioned patent still suffers from problems with:It is unable to the point spacing that accurate adjustment is got ready, it is impossible to adapt to different apply Work environment.
The content of the invention
In order to solve technical problem present in background technology, the present invention provides a kind of municipal construction and got ready with road and bridge Device, it is simple to operate, the device for dotting is placed on to the construction part for needing to get ready, then gently promotes device for dotting to cause institute Road wheel rotation is stated to can be achieved to get operation ready;The tune of spacing can also be got ready by rotating the first nut, the realization of the second nut Section.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of municipal construction road and bridge device for dotting, is got ready, institute using a kind of adjustable integral point space type device for dotting Stating adjustable integral point space type device for dotting includes housing, road wheel, driving wheel, transmission drum, driven pulley, device for dotting;
The housing is hollow rectangle shape, and the housing right side wall is detachably connected by fixing bolt, under the housing End face is provided with walking hole, and the housing lower surface, which is located to be provided with the right side of walking hole, gets hole ready;
The road wheel includes:
Live axle, is located on the inside of the housing right side wall in left-right direction;
Walking wheel body, is rotatably set on the live axle, and the walking wheel body lower end passes through walking Kong Bingxian It is exposed at below housing, first gear has been arranged concentrically on the left of the walking wheel body;
The driving wheel includes:
Drive sprocket axle, is located on the inside of the housing left side wall, positioned at live axle rear in left-right direction;
Active wheel body, is rotatably set on the drive sprocket axle, and the active wheel body is in right-narrow and left-wide frustum, The second gear engaged with first gear is arranged concentrically on the right side of the active wheel body;
The transmission drum includes:
Inclined ramp, from the right side before be located to left back direction on the left of housing, on drive sprocket axle rear, the inclined ramp Rotation slot is formed, the inclined ramp inwall forms the first dop;
One-level screw rod, is slidably plugged in the inclined ramp, and the one-level screw rod side wall is axially arranged with along it to be used to The rotation inner chamber that left side opening is provided with the first stopper slot of the first dop, the one-level screw rod is installed with, the rotation inner chamber is left Side is detachably connected restraining position ring block, and rotation inner chamber right-hand member is provided with right opening, and the right opening inwall is provided with the second dop;
One-level nut, is rotatably plugged in the rotation slot, is spirally connected with the one-level screw rod;
Two grades of nuts, including be rotatably located at the nut body of intracavitary in the rotation, be located at the nut vertically Tapped blind hole on the right side of body, it is located at the torsion plug being plugged on the left of the nut body and rotatably in spacing ring;
Two grades of screw rods, are screwed onto in the tapped blind hole, and two grades of screw rods are open and provided with to be installed with through right Second stopper slot of the second dop, two grades of screw rod right-hand members are rotatably provided with Live roller;
The pitch of two grades of screw rods is less than the pitch of the one-level screw rod;
The driven pulley includes:
Follower shaft, is located at the housing inner left wall, positioned at the inclined ramp rear;
Driven wheel body, is rotatably set on the follower shaft, and the driven wheel body is in right wide left narrow frustum, The driven wheel body is connected by Live roller and active wheel body;
Inserted link is stirred, the driven wheel body its right end face is vertically located at;
The device for dotting includes:
Get rotating shaft ready, the housing right side wall is located in left-right direction;
Get cross bar ready, be hinged on it is described get ready in rotating shaft, the cross bar of getting ready is provided with to be installed with along its length State the slip through hole for stirring inserted link;
Get probe ready, be located at it is described get ready below cross bar not-go-end, it is described get probe lower end ready and be inserted with get pen ready, it is described to beat Probe is got hole ready described in and got ready.
Further, the torsion plug outer wall is densely covered with anti-skidding salient point.
Beneficial effects of the present invention:
First, a kind of municipal construction road and bridge device for dotting of the present invention, simple to operate, by the device for dotting The construction part for needing to get ready is placed on, then gently promotes device for dotting that the road wheel is rotated, and passes through driving wheel, biography Dynamic roller, driven pulley drive the device for dotting action, you can operation is got in realization ready.
2nd, rotating the one-level nut drives the one-level screw rod along the axial stepping of the inclined ramp, drives described pass Dynamic disk roller adjusts the frequency of the device for dotting along the axial stepping of inclined ramp:
When the Live roller stepping to the right, its move closer to the driving wheel body outer circumference smallest circumference and The largest circumference of the driven wheel body, the slewing rate of the driven wheel body declines, and the operating frequency of the device for dotting declines, Show as the point spacing increase that the device for dotting is got ready;
When the Live roller stepping to the left, its move closer to the driving wheel body outer circumference largest circumference and The smallest circumference of the driven wheel body, the slewing rate of the driven wheel body rises, and the operating frequency of the device for dotting rises, Show as the point spacing reduction that the device for dotting is got ready.
3rd, rotating two grades of nuts drives two grades of screw rods along the axial stepping of the inclined ramp, drives described pass Dynamic disk roller adjusts the frequency of the device for dotting along the axial stepping of inclined ramp:
Two grades of screw rods drive step motion of the Live roller along inclined ramp axial direction, add described one The motion shape journey of level screw rod so that the Live roller reaches the low order end and high order end of the active wheel body, realizes maximum model The regulation enclosed;
The pitch of two grades of screw rods is less than the pitch of the one-level screw rod so that rotation two grades of nuts one week The step distance of Live roller is less than the step distance of Live roller when rotating the one-level nut one week, and the device for dotting is beaten The point spacing regulation of point is sensitiveer.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of sectional view of embodiment of the device for dotting.
Fig. 2 is a kind of sectional view of embodiment of the device for dotting.
Fig. 3 is a kind of sectional view of embodiment of the device for dotting.
Fig. 4 is a kind of sectional view of embodiment of Section A-A in Fig. 1.
Fig. 5 is a kind of sectional view of embodiment of section B-B in Fig. 1.
Fig. 6 is a kind of sectional view of embodiment of the transmission drum.
In figure:
1. housing, 11. fixing bolts, 12. walking holes, 13. get hole ready;
2. road wheel, 21. live axles, 22. walking wheel bodys, 22a. first gears;
3. driving wheel, 31. drive sprocket axles, 32. active wheel bodys, 32a. second gears;
4. transmission drum, 41. inclined ramps, 41a. rotation slots, the dops of 41b. first, 42. one-level screw rods, 42a. first is limited Position groove, 42b. rotations inner chamber, 42c. spacing rings, the right openings of 42d., the dops of 42e. second, 43. one-level nuts, 44. 2 grades of nuts, 44a. nut bodies, 44b. tapped blind holes, 44c. reverses plug, 45. 2 grades of screw rods, the stopper slots of 45a. second, 45b. live-rollers Wheel;
5. driven pulley, 51. follower shafts, 52. driven wheel bodys, 53. stir inserted link;
6. device for dotting, 61. get rotating shaft ready, and 62. get cross bar ready, and 62a. slides through hole, and 63. get probe ready.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further detailed explanation.
A kind of municipal construction road and bridge device for dotting, is got ready, institute using a kind of adjustable integral point space type device for dotting Stating adjustable integral point space type device for dotting includes housing 1, road wheel 2, driving wheel 3, transmission drum 4, driven pulley 5, device for dotting 6;
The housing 1 is hollow rectangle shape, and the right side wall of housing 1 is detachably connected by fixing bolt 11, the shell The lower surface of body 1 is provided with walking hole 12, and the lower surface of housing 1, which is located to be provided with the right side of walking hole 12, gets hole 13 ready;
The road wheel 2 includes:
Live axle 21, is located on the inside of the right side wall of housing 1 in left-right direction;
Walking wheel body 22, is rotatably set on the live axle 21, and walking wheel body 22 lower end passes through walking Hole 12 is simultaneously emerging in the lower section of housing 1, and the left side of walking wheel body 22 has been arranged concentrically first gear 22a;
The driving wheel 3 includes:
Drive sprocket axle 31, is located on the inside of the left side wall of housing 1, positioned at the rear of live axle 21 in left-right direction;
Active wheel body 32, is rotatably set on the drive sprocket axle 31, and the active wheel body 32 is in right-narrow and left-wide Frustum, the right side of active wheel body 32 is arranged concentrically the second gear 32a engaged with first gear 22a;
The transmission drum 4 includes:
Inclined ramp 41, from the right side before be located at the left side of housing 1 to left back direction, positioned at the rear of drive sprocket axle 31, the inclination Rotation slot 41a is formed on slideway 41, the inwall of inclined ramp 41 forms the first dop 41b;
One-level screw rod 42, is slidably plugged in the inclined ramp 41, and the side wall of one-level screw rod 42 is set along its axial direction There is the rotation inner chamber that left side opening is provided with the first stopper slot 42a for being installed with the first dop 41b, the one-level screw rod 42 Restraining position ring block 42c is detachably connected on the left of 42b, the rotation inner chamber 42b, the rotation inner chamber 42b right-hand members are provided with right opening 42d, the right opening 42d inwalls are provided with the second dop 42e;
One-level nut 43, is rotatably plugged in the rotation slot 41a, is spirally connected with the one-level screw rod 42;
Two grades of nuts 44, including be rotatably located in the rotation inner chamber 42b nut body 44a, be located at vertically Tapped blind hole 44b on the right side of the nut body 44a, it is located on the left of the nut body 44a and is rotatably plugged in spacing Torsion plug 44c in ring 42c;
Two grades of screw rods 45, are screwed onto in the tapped blind hole 44b, and two grades of screw rods 45 are through right opening 42d and set There is the second stopper slot 45a for being installed with the second dop 42e, two grades of screw rods 45 right-hand member is rotatably provided with Live roller 45b;
The pitch of two grades of screw rods 45 is less than the pitch of the one-level screw rod 42;
The driven pulley 5 includes:
Follower shaft 51, is located at the inner left wall of housing 1, positioned at the rear of inclined ramp 41;
Driven wheel body 52, is rotatably set on the follower shaft 51, and the driven wheel body 52 is in right wide left narrow Frustum, the driven wheel body 52 is connected by Live roller 45b with active wheel body 32;
Inserted link 53 is stirred, its right end face of driven wheel body 52 is vertically located at;
The device for dotting 6 includes:
Get rotating shaft 61 ready, the right side wall of housing 1 is located in left-right direction;
Get cross bar 62 ready, be hinged on it is described get ready in rotating shaft 61, it is described to get cross bar 62 ready along its length provided with being used to It is installed with the slip through hole 62a for stirring inserted link 53;
Get probe 63 ready, be located at it is described get ready below the not-go-end of cross bar 62, it is described get 63 lower ends of probe ready and be inserted with get pen ready, The probe 63 of getting ready is got hole 13 ready and got ready through described.
Further, the torsion plug 44c outer walls are densely covered with anti-skidding salient point.
Specifically used method:
Step 1, road wheel 2 is promoted to walk:
The device for dotting is placed on to the construction part for needing to get ready, the construction for then making walking wheel body 22 be got ready with needs Location contacts, then cause the walking wheel body 22 is rotated to walk with device for dotting described in hand propelled;
Step 2, transmission drives device for dotting 6 to get ready:
The walking wheel body 22 drives the second gear 32a, active wheel body 32 to rotate by first gear 22a, described Active wheel body 32 drives driven wheel body 52 by Live roller 45b, stir inserted link 53 rotates;
The inserted link 53 of stirring acts on the slip through hole 62a so that described to get cross bar 62 ready and done around rotating shaft 61 is got ready Reciprocal swings up and down, described to get that probe 63 is descending to be got hole 13 ready and got ready through described ready;
Step 3, frequency is got in one-level regulation ready:
The one-level nut 43 is rotated, because the first stopper slot 42a of the one-level screw rod 42 is arrested by the first dop 41b Limit so that the one-level screw rod 42 is in the axial stepping of inclined ramp 41 described in the effect lower edge of one-level nut 43;
The Live roller 45b adjusts the frequency of the device for dotting 6 along the direction stepping of inclined ramp 41:
When the Live roller 45b steppings to the right, it moves closer to the smallest circle of the outer circumference of active wheel body 32 The largest circumference of all and described driven wheel body 52, the slewing rate of the driven wheel body 52 declines, the device for dotting 6 it is dynamic Working frequency declines, and shows as the point spacing increase that the device for dotting 6 is got ready;
When the Live roller 45b steppings to the left, it moves closer to the greatest circle of the outer circumference of active wheel body 32 The smallest circumference of all and described driven wheel body 52, the slewing rate of the driven wheel body 52 rises, the device for dotting 6 it is dynamic Working frequency rises, and shows as the point spacing reduction that the device for dotting 6 is got ready;
Step 4, frequency is got in two grades of regulations ready:
Two grades of nuts 44 are driven to rotate by twisting the torsion plug 44c, due to the of two grades of screw rods 45 Two stopper slot 45a are arrested limit by the second dop 42e and can not rotated so that two grades of screw rods 45 are made by two grades of nuts 44 With and threadingly blind hole 44b radial directions stepping, i.e., along the axial stepping of the inclined ramp 41;
The Live roller 45b is adjusted between the point that the device for dotting 6 is got ready along the direction stepping of inclined ramp 41 Away from;
Two grades of screw rods 45 drive step motions of the Live roller 45b along the axial direction of inclined ramp 41, increase The motion shape journey of the one-level screw rod 42 so that the Live roller 45b reaches the low order end and most of the active wheel body 32 Left end, realizes the regulation of maximum magnitude;
The pitch of two grades of screw rods 45 is less than the pitch of the one-level screw rod 42 so that rotation two grades of nuts 44 1 weeks Live roller 45b step distance is less than the step distance of Live roller 45b when rotating the one-level nut 43 1 weeks, The point spacing regulation that the device for dotting 6 is got ready is sensitiveer.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.

Claims (2)

1. a kind of municipal construction road and bridge device for dotting, it is characterised in that:Including housing (1), road wheel (2), driving wheel (3), transmission drum (4), driven pulley (5), device for dotting (6);
The housing (1) is hollow rectangle shape, and housing (1) right side wall is detachably connected by fixing bolt (11), described Housing (1) lower surface is provided with walking hole (12), and housing (1) lower surface, which is located to be provided with the right side of walking hole (12), gets hole ready (13);
The road wheel (2) includes:
Live axle (21), is located on the inside of the housing (1) right side wall in left-right direction;
Walking wheel body (22), is rotatably set on the live axle (21), and described walking wheel body (22) lower end passes through row Walk hole (12) and be emerging in below housing (1), first gear (22a) has been arranged concentrically on the left of the walking wheel body (22);
The driving wheel (3) includes:
Drive sprocket axle (31), is located on the inside of the housing (1) left side wall, positioned at live axle (21) rear in left-right direction;
Active wheel body (32), is rotatably set on the drive sprocket axle (31), and the active wheel body (32) is in right-narrow and left-wide Frustum, be arranged concentrically the second gear (32a) engaged with first gear (22a) on the right side of the active wheel body (32);
The transmission drum (4) includes:
Inclined ramp (41), from the right side before be located to left back direction on the left of housing (1), it is described to incline positioned at drive sprocket axle (31) rear Rotation slot (41a) is formed on inclined ramp (41), inclined ramp (41) inwall forms the first dop (41b);
One-level screw rod (42), is slidably plugged in the inclined ramp (41), and one-level screw rod (42) the side wall is along its axial direction Provided with the first stopper slot (42a) to be installed with the first dop (41b), turning provided with left side opening in the one-level screw rod (42) Restraining position ring block (42c) is detachably connected on the left of dynamic inner chamber (42b), the rotation inner chamber (42b), the rotation inner chamber (42b) is right End is provided with right opening (42d), and described right opening (42d) inwall is provided with the second dop (42e);
One-level nut (43), is rotatably plugged in the rotation slot (41a), is spirally connected with the one-level screw rod (42);
Two grades of nuts (44), including be rotatably located in the rotation inner chamber (42b) nut body (44a), set vertically Tapped blind hole (44b) on the right side of the nut body (44a), it is located on the left of the nut body (44a) and rotatably inserts It is located at the torsion plug (44c) in spacing ring (42c);
Two grades of screw rods (45), are screwed onto in the tapped blind hole (44b), and two grades of screw rods (45) are open (42d) simultaneously through right And the second stopper slot (45a) to be installed with the second dop (42e) is provided with, two grades of screw rods (45) right-hand member is rotatably provided with Live roller (45b);
The pitch of two grades of screw rods (45) is less than the pitch of the one-level screw rod (42);
The driven pulley (5) includes:
Follower shaft (51), is located at the housing (1) inner left wall, positioned at the inclined ramp (41) rear;
Driven wheel body (52), is rotatably set on the follower shaft (51), and the driven wheel body (52) is in right wide left narrow Frustum, the driven wheel body (52) passes through Live roller (45b) and active wheel body (32) and is connected;
Inserted link (53) is stirred, driven wheel body (52) its right end face is vertically located at;
The device for dotting (6) includes:
Get rotating shaft (61) ready, the housing (1) right side wall is located in left-right direction;
Get cross bar (62) ready, be hinged on it is described get ready in rotating shaft (61), it is described to get cross bar (62) ready along its length provided with using To be installed with the slip through hole (62a) for stirring inserted link (53);
Get probe (63) ready, be located at it is described get ready below cross bar (62) not-go-end, it is described get probe (63) lower end ready and be inserted with get ready Pen, the probe (63) of getting ready is got hole (13) ready and got ready described in.
2. a kind of municipal construction road and bridge device for dotting according to claim 1, it is characterised in that:Described reverse is inserted Head (44c) outer wall is densely covered with anti-skidding salient point.
CN201710563449.2A 2017-07-12 2017-07-12 A kind of municipal construction road and bridge device for dotting Active CN107268444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710563449.2A CN107268444B (en) 2017-07-12 2017-07-12 A kind of municipal construction road and bridge device for dotting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710563449.2A CN107268444B (en) 2017-07-12 2017-07-12 A kind of municipal construction road and bridge device for dotting

Publications (2)

Publication Number Publication Date
CN107268444A true CN107268444A (en) 2017-10-20
CN107268444B CN107268444B (en) 2018-05-29

Family

ID=60071845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710563449.2A Active CN107268444B (en) 2017-07-12 2017-07-12 A kind of municipal construction road and bridge device for dotting

Country Status (1)

Country Link
CN (1) CN107268444B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130860A (en) * 2017-12-22 2018-06-08 温州市创新市政建设工程有限公司 A kind of municipal construction road and bridge device for dotting
CN108294689A (en) * 2018-02-23 2018-07-20 于尔多 Push type double-cavity floor sweeping robot
CN108309154A (en) * 2018-02-23 2018-07-24 于尔多 Sweeping method of push type double-cavity sweeping robot
CN110700111A (en) * 2019-10-31 2020-01-17 河南城建学院 Bridge floor concrete layer reinforcing bar positioner
CN114654442A (en) * 2022-05-25 2022-06-24 昆明理工大学 Line drawing device for tunnel blasting drilling positioning

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107753059B (en) * 2017-12-01 2020-09-22 青岛大学附属医院 Ultrasonic probe handheld bracket for ultrasonic detection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2246656A1 (en) * 1998-09-17 2000-03-17 John Czegledi The groover(tm) an improved jointer device to efficiently and economically put radiused shouldered grooves in the surface of concrete as it is being poured and finished
CN101725112A (en) * 2009-12-18 2010-06-09 中铁大桥局集团第三工程有限公司 Construction method for piers
CN102418421A (en) * 2010-06-29 2012-04-18 黄增明 Construction method and used construction tool
CN103174297A (en) * 2013-03-18 2013-06-26 赵章富 Steel bar spacing indicator for construction
CN203145469U (en) * 2013-04-02 2013-08-21 大连民族学院 Lime dotting pay-off device
CN205955227U (en) * 2016-08-18 2017-02-15 苏州交通工程试验检测中心有限公司 Bar spacing marking device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2246656A1 (en) * 1998-09-17 2000-03-17 John Czegledi The groover(tm) an improved jointer device to efficiently and economically put radiused shouldered grooves in the surface of concrete as it is being poured and finished
CN101725112A (en) * 2009-12-18 2010-06-09 中铁大桥局集团第三工程有限公司 Construction method for piers
CN102418421A (en) * 2010-06-29 2012-04-18 黄增明 Construction method and used construction tool
CN103174297A (en) * 2013-03-18 2013-06-26 赵章富 Steel bar spacing indicator for construction
CN203145469U (en) * 2013-04-02 2013-08-21 大连民族学院 Lime dotting pay-off device
CN205955227U (en) * 2016-08-18 2017-02-15 苏州交通工程试验检测中心有限公司 Bar spacing marking device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130860A (en) * 2017-12-22 2018-06-08 温州市创新市政建设工程有限公司 A kind of municipal construction road and bridge device for dotting
CN108294689A (en) * 2018-02-23 2018-07-20 于尔多 Push type double-cavity floor sweeping robot
CN108309154A (en) * 2018-02-23 2018-07-24 于尔多 Sweeping method of push type double-cavity sweeping robot
CN110700111A (en) * 2019-10-31 2020-01-17 河南城建学院 Bridge floor concrete layer reinforcing bar positioner
CN114654442A (en) * 2022-05-25 2022-06-24 昆明理工大学 Line drawing device for tunnel blasting drilling positioning

Also Published As

Publication number Publication date
CN107268444B (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN107268444A (en) A kind of municipal construction road and bridge device for dotting
CN107151970B (en) A kind of urban construction gets method ready with road and bridge construction
DE19815483A1 (en) Apparatus and method for surface hardening of steel balls for a ball bearing
DE1237810T1 (en) LIFT
DE2735447C2 (en) Drum developing device
EP3969843B1 (en) Wheel holder
CN108672840A (en) A kind of internal tooth device for pre-positioning and internal tooth method for grinding
CN207209345U (en) A kind of body circumferential registration device of handle bottle
EP1122529A3 (en) Device for measuring the number of revolutions and torques as well for simulating of driving states on a driving shaft of a vehicle wheel
CN104712733B (en) Drive transfer part and cartridge
CN206810899U (en) Steel plate evener
DE3927664A1 (en) FRICTION ROLLER IN THE PRINTING MACHINE'S INK OR DAMPING
EP3615270B1 (en) Planetary reform roller and method of reforming a vessel cavity
DE102018101546B4 (en) rim
CN106864116B (en) A kind of ghost line double-purpose compasses and the method for drawing broken circle
DE1299539B (en) Device for gathering sausage casings
CN206713945U (en) A kind of device for being used to remove fish scale
DE2309720A1 (en) METHOD AND DEVICE FOR SHAPING HOSE SLEEVES
RU2524721C1 (en) Method of continuous feed of flexible pipe string into well
DE87823C (en)
US1143101A (en) Metal-drawing machine.
DE599143C (en) Conveyor belt drive drum with built-in gear
CN108655823A (en) A kind of method of pneumatic rotary device and change rotation angle
CN219944504U (en) Developing ring forging machine
DE255627C (en)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180321

Address after: 330114 Jiangxi city of Nanchang province Xinjian County Lehua Zhen Lao Wu Cun Xia Fang Village No. 107

Applicant after: Liu Meixiang

Address before: 255000 Shandong Province, Zibo city Zhangdian District Ma Shang Zhen Zhou Jia Zhuang Cun of No. 12 building 3 unit 201

Applicant before: Zhou Ruiguo

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Zhe

Inventor after: Zhou Shijun

Inventor before: Zhou Ruiguo

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180428

Address after: 401120 No. 291, Baosheng East Road, Hui Xing street, Yubei District, Chongqing.

Applicant after: Chongqing Zhonghuan Construction Co., Ltd.

Address before: 330114 No. 107, Lao Fang village, Lao Hua Village, Xinjian County, Nanchang, Jiangxi

Applicant before: Liu Meixiang

GR01 Patent grant
GR01 Patent grant