CN107237496A CN201710570444.2A CN201710570444A CN107237496A CN 107237496 A CN107237496 A CN 107237496A CN 201710570444 A CN201710570444 A CN 201710570444A CN 107237496 A CN107237496 A CN 107237496A
Authority
CN
China
Prior art keywords
construction
building
working procedure
advance
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710570444.2A
Other languages
Chinese (zh)
Inventor
罗益军
邵云海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Junfeng Construction Technology Co Ltd
Original Assignee
Guangdong Junfeng Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Junfeng Construction Technology Co Ltd filed Critical Guangdong Junfeng Construction Technology Co Ltd
Priority to CN201710570444.2A priority Critical patent/CN107237496A/en
Publication of CN107237496A publication Critical patent/CN107237496A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of high-rise building construction process, this method uses following measure:1) the building step of all floors of same storied building is unitized;2) architectural process of individual layer flooring is divided into multiple tracks working procedure;3) all working procedures are standardized;4) construction personnel correspondence is divided into multiple construction groups, each construction group is responsible for one of working procedure;5) construction group is constructed by working procedure successively relay;6) constructed since the building bottom, it is successively upward successively;7) floor completed in advance is sold in advance.The present invention is conducive to improving the building efficiency of many high-rise buildings, shortens building cycle and sales cycle, improves the rate of capital turnover and utilization rate.

Description

A kind of high-rise building construction process
Technical field
The present invention relates to building field, and in particular to a kind of high-rise building construction process.
Background technology
Current high-story house is typically all built using conventional method, i.e., after first the framework of entire building has been built, then It is unified that the processes such as Installation of beam slab, wall construction, erection of doors and windows, hydropower installation are carried out successively to all floors, until last one Process completes, and could be sold.It is low that this method has efficiency, long in time limit, the defect such as sales cycle length.
The content of the invention
The invention discloses a kind of high-rise building construction process, until improving present in traditional high-rise building construction process Above-mentioned deficiency.
Technical scheme is as follows:
A kind of high-rise building construction process, using following measure:
1) the building step of all floors of same storied building is unitized;
2) architectural process of individual layer flooring is divided into multiple tracks working procedure;
3) all working procedures are standardized;
4) construction personnel correspondence is divided into multiple construction groups, each construction group is responsible for one of working procedure;
5) construction group is constructed by working procedure successively relay;
6) constructed since the building bottom, it is successively upward successively;
7) floor completed in advance is sold in advance.
Further, the working procedure of individual layer flooring is in turn divided into frame column construction, Beam-Slab Construction, wall construction, door Window construction, wall plastering, hydropower installation and interior decoration.
Further, the construction material of per pass working procedure is got all the ready in advance.
Further, hypogee is constructed in advance, is not included in this method.
Further, the last whole building of exterior wall finishing is carried out, not included in this method.
Further, personnel or the material between neighbouring two floor are alternately transported using double-deck climbing frame.
Compared to the construction process of traditional high-rise building, the present invention unitizes each layer building process of building, standard Change, and building troop is divided correspondingly by working procedure, building is carried out by layer, and each construction team sequentially enters, respectively Its duty is born, relay-type construction is carried out to each layer, one layer of completion is transferred to last layer.Some advantages that arise therefrom is:
1st, each working procedure divides clear, and each construction team's division of labor is clear and definite, is conducive to every construction to carry out in order, so as to improve Build efficiency;
2nd, the different working procedures between each floor can intersect progress, be conducive to shortening the duration;
3rd, the floor completed in advance can be sold in advance, be conducive to shortening sales cycle and occupation of capital cycle, improved fund Turnover rate and utilization rate.
Embodiment
With reference to specific embodiment, the present invention will be described.
A kind of high-rise building construction process, using following measure:
1) it is following process by the building step universal formulation of all floors of same Stall:
Frame column construction → Beam-Slab Construction → wall construction → door and window construction → wall plastering → hydropower installation → interior dress Repair;
2) above-mentioned all working procedures are standardized;
3) building troop is divided into frame column construction team, Beam-Slab Construction team, wall construction team, door and window construction team, metope Plastering construction team, hydropower installation construction team and interior decoration construction team, each construction group is each to be responsible for one of working procedure;
4) constructed since the building bottom, frame column construction team is recently entered, after this layer of frame column construction is finished, beam slab Construction team enters, and frame column construction team is transferred to last layer construction, and by that analogy, each construction group is applied by working procedure successively relay Work;
5) when frame column construction team, which is transferred to the 8th layer, to be constructed, first layer, which has been fitted up, to be finished, and can be sold in advance.
In addition:
A, the construction material of per pass working procedure can set up special troop and get all the ready in advance.
B, hypogee are constructed in advance, are not included in this method.
The last whole building of C, exterior wall finishing is carried out, not included in this method.
The individual layer climbing frame that D, abandoning tradition construction process are used, this construction process can be transported alternately using double-deck climbing frame Personnel or material between neighbouring two floor, with Lifting Convey efficiency.

Claims (6)

1. a kind of high-rise building construction process, it is characterised in that use following measure:
1) the building step of all floors of same storied building is unitized;
2) architectural process of individual layer flooring is divided into multiple tracks working procedure;
3) all working procedures are standardized;
4) construction personnel correspondence is divided into multiple construction groups, each construction group is responsible for one of working procedure;
5) construction group is constructed by working procedure successively relay;
6) constructed since the building bottom, it is successively upward successively;
7) floor completed in advance is sold in advance.
2. a kind of high-rise building construction method according to claim 1, it is characterised in that:The working procedure of individual layer flooring according to It is secondary to be divided into frame column construction, Beam-Slab Construction, wall construction, door and window construction, wall plastering, hydropower installation and interior decoration.
3. a kind of high-rise building construction method according to claim 1, it is characterised in that:The construction material of per pass working procedure Material is got all the ready in advance.
4. a kind of high-rise building construction method according to claim 1, it is characterised in that:Hypogee is constructed in advance, no It is included in this method.
5. a kind of high-rise building construction method according to claim 1, it is characterised in that:The last whole building of exterior wall finishing enters OK, not included in this method.
6. a kind of high-rise building construction method according to claim 1, it is characterised in that:Alternately transported using double-deck climbing frame Personnel or material between neighbouring two floor.
CN201710570444.2A 2017-07-13 2017-07-13 A kind of high-rise building construction process Pending CN107237496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710570444.2A CN107237496A (en) 2017-07-13 2017-07-13 A kind of high-rise building construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710570444.2A CN107237496A (en) 2017-07-13 2017-07-13 A kind of high-rise building construction process

Publications (1)

Publication Number Publication Date
CN107237496A true CN107237496A (en) 2017-10-10

Family

ID=59990599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710570444.2A Pending CN107237496A (en) 2017-07-13 2017-07-13 A kind of high-rise building construction process

Country Status (1)

Country Link
CN (1) CN107237496A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488030A (en) * 2018-11-07 2019-03-19 中建三局第建设工程有限责任公司 Quick interspersed construction method for frame structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262830A (en) * 2000-03-23 2001-09-26 Shimizu Corp Carpentry execution control system in multi-story building according to computer output document
CN105275207A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Up-down cyclic alternating construction method for external vertical face of high-rise building
CN106372787A (en) * 2016-08-30 2017-02-01 中建三局第建设工程有限责任公司 Progress plan quick compilation method based on BIM and big data

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262830A (en) * 2000-03-23 2001-09-26 Shimizu Corp Carpentry execution control system in multi-story building according to computer output document
CN105275207A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Up-down cyclic alternating construction method for external vertical face of high-rise building
CN106372787A (en) * 2016-08-30 2017-02-01 中建三局第建设工程有限责任公司 Progress plan quick compilation method based on BIM and big data

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
历光大: "装配式剪力墙结构工程施工管理及工期管理", 《施工技术》 *
巩建华: "应用统筹法确定流水施工的施工段", 《山东轻工业学院学报》 *
芦树理: "基于过程管理的建筑工程项目成本控制研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488030A (en) * 2018-11-07 2019-03-19 中建三局第建设工程有限责任公司 Quick interspersed construction method for frame structure

Similar Documents

Publication Publication Date Title
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
CN101538897B (en) Construction method for main project of reinforced concrete building
PH12016000200A1 (en) Urban forest garden building and building group and method for arranging hanging greenery platforms on multilayer structure
CN105275207A (en) Up-down cyclic alternating construction method for external vertical face of high-rise building
CN102888894B (en) Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN107237496A (en) A kind of high-rise building construction process
KR20190038984A (en) Method of Construction in Reinforced Concrete Wall Type Apartment, Mixed-use, Studio Buildings
CN104153576A (en) Construction method for building combined type building
CN103352579B (en) Adopt strengthening reconstruction masonry structure and the construction method of additional shelter bridge and additional elevator
CN205189288U (en) Novel high -rise building stair
CN207144359U (en) A kind of exquisite log wall decorative cover structure
CN103806657B (en) A kind of class brick mix structure construction method of frame structure building
US20210071434A1 (en) Integrated structural and architectural facade level-by-level construction system
CN207079892U (en) A kind of outer protective scaffold of novel architecture
KR101219466B1 (en) Method for constructing framework and outer window simultaneously
RU2353734C1 (en) Set of parts for erection of wall cladding of panel buildings
CN114182982B (en) Reinforced concrete roof opening reinforcing structure, reinforced concrete roof opening reinforcing method and building
CN202831587U (en) Integrated scaffold
EA201100828A1 (en) METHOD (VARIANTS) OF CONSTRUCTION OF MULTILEVEL BUILDING FRAME OF FRAMEWORK AND PANEL OF BURNING WALL DESIGN
CN207211603U (en) One kind divides lotus formula decorative brick patch to build adjustable connecting components
CN105275086A (en) Method for constructing all-concrete-structure external vertical face
CN207048111U (en) A kind of archaized building structure
CN105239737A (en) Novel high-rise building staircase
CN107165360A (en) A kind of exquisite log wall decorative cover structure
Piegza et al. Przekształcenia architektury poprzemysłowej na funkcje mieszkaniowe-analiza wybranych przykładów z terenu Polski w oparciu o kryteria definicji loftów

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171010