CN107230945A - Supporting wire rack device - Google Patents
Supporting wire rack device Download PDFInfo
- Publication number
- CN107230945A CN107230945A CN201710468299.7A CN201710468299A CN107230945A CN 107230945 A CN107230945 A CN 107230945A CN 201710468299 A CN201710468299 A CN 201710468299A CN 107230945 A CN107230945 A CN 107230945A
- Authority
- CN
- China
- Prior art keywords
- support bar
- lead frame
- wire
- lead
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Details Of Indoor Wiring (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种支撑引线架装置,属于引线支撑装置技术领域。The invention relates to a device for supporting a lead frame, belonging to the technical field of lead wire support devices.
背景技术Background technique
在10KV配网带电作业中“拆、搭引线”工作时,没有专门的工具来固定已经拆除的引线,一般作业方法都是通过调整绝缘斗臂车的上下工作位置,慢慢的将引线圈落下层横担支撑点。因为下层支撑点位置较低,而且还有其他线路,或空中障碍物,同时由于很多作业现场杆线复杂、紧凑,绝大多数都是高低压同杆架设,或者时柱上变压器的引线过长。在拆、搭工作时,工作人员固定和恢复引线极其不便,需要经常调整绝缘斗臂车,有时还需要借用到绝缘操作杆或绝缘绳,增加了作业步骤,工作强度增大,工作效率低。When "removing and connecting lead wires" in the 10KV distribution network live work, there is no special tool to fix the removed lead wires. The general operation method is to slowly drop the lead wires by adjusting the upper and lower working positions of the insulating arm truck Layer cross-arm support point. Because the support point of the lower floor is low, there are other lines, or obstacles in the air, and because many poles and lines on the job site are complex and compact, most of them are erected on the same pole with high and low voltage, or the lead wire of the transformer on the pole is too long . When dismantling and erecting work, it is extremely inconvenient for the staff to fix and restore the lead wires. It is necessary to frequently adjust the insulating arm truck, and sometimes it is necessary to borrow an insulating operating rod or an insulating rope, which increases the work steps, increases the work intensity, and lowers the work efficiency.
发明内容Contents of the invention
本发明的目的在于提供一种支撑引线架装置,以解决现有拆、搭引线工作时,没有专门的工具来固定已经拆除的引线,使得作业步骤增加、工作强度增大以及工作效率低的技术缺陷和问题。The purpose of the present invention is to provide a supporting lead frame device to solve the problem that there is no special tool to fix the dismantled lead wires when the existing lead wires are removed and taken up, which increases the work steps, increases the work intensity and reduces the work efficiency. bugs and problems.
为达到上述目的,本发明通过以下技术方案予以实现:To achieve the above object, the present invention is achieved through the following technical solutions:
一种支撑引线架装置,包括支撑条1以及一对导线挂杆2;A device for supporting a lead frame, comprising a support bar 1 and a pair of wire hanging rods 2;
支撑条1上水平设有至少一个引线固定孔11;一对导线挂杆2的固定端通过调节螺栓连接于支撑条1两端,并以调节螺栓为圆心做圆周运动。At least one lead wire fixing hole 11 is horizontally provided on the support bar 1; the fixed ends of a pair of wire hanging rods 2 are connected to both ends of the support bar 1 through adjusting bolts, and the adjusting bolts are used as the center to perform circular motion.
本发明的目的还可以通过以下技术措施来进一步实现:The object of the present invention can also be further realized by the following technical measures:
进一步地,所述支撑条1上水平对称设有宽度调节槽12;调节螺栓穿过宽度调节槽12,并在宽度调节槽12内左右移动;导线挂杆2通过调节螺栓以及宽度调节槽12相对支撑条1左右移动。Further, the support bar 1 is horizontally and symmetrically provided with a width adjusting groove 12; the adjusting bolt passes through the width adjusting groove 12, and moves left and right in the width adjusting groove 12; The support bar 1 moves left and right.
进一步地,所述导线挂杆2上竖直设有高度调节槽21;调节螺栓穿过高度调节槽21,并在高度调节槽21内上下移动;导线挂杆2通过调节螺栓以及高度调节槽21相对支撑条1上下移动。Further, the wire hanger 2 is vertically provided with a height adjustment groove 21; the adjustment bolt passes through the height adjustment groove 21, and moves up and down in the height adjustment groove 21; the wire hanger 2 passes through the adjustment bolt and the height adjustment groove 21 Move up and down relative to the support bar 1.
进一步地,所述引线固定孔11等间距设置。Further, the lead fixing holes 11 are arranged at equal intervals.
进一步地,所述导线挂杆2的挂钩内测设有防滑垫22。Further, the inside of the hook of the wire hanging rod 2 is provided with a non-slip pad 22 .
进一步地,所述支撑引线架装置是环氧树脂材质。Further, the supporting lead frame device is made of epoxy resin.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
在本发明中,通过导线挂杆将支撑引线架装置整体挂在导线上,将拆下的引线穿过引线固定孔,实现对引线的固定,减少作业步骤,降低作业难度,提高作业效率。In the present invention, the whole support lead frame device is hung on the wire through the wire hanging rod, and the removed lead wire is passed through the lead wire fixing hole to realize the fixing of the lead wire, reduce operation steps, reduce operation difficulty, and improve operation efficiency.
在本发明中,通过在支撑条上设置宽度调节槽,实现导线挂杆的左右移动,可以使支撑引线架装置适应不同线宽的作业环境。In the present invention, by setting the width adjustment groove on the support bar, the left and right movement of the wire hanging rod can be realized, and the supporting lead frame device can be adapted to the working environment of different line widths.
在本发明中,通过在导线挂杆上设置高度调节槽,实现对支撑引线架装置固定引线的高度,使得支撑引线架装置适应复杂作业环境。In the present invention, the height of the lead wires is fixed to the supporting lead frame device by setting the height adjustment groove on the wire hanging rod, so that the supporting lead frame device can adapt to the complicated working environment.
在本发明中,等间距设置引线固定孔可以提高作业安全性。In the present invention, setting lead wire fixing holes at equal intervals can improve operation safety.
在本发明中,通过在导线挂杆的挂钩内测设有防滑垫,可以避免导线挂杆在导线上滑动。In the present invention, an anti-skid pad is provided inside the hook of the wire hanging rod to prevent the wire hanging rod from sliding on the wire.
在本发明中,采用环氧树脂作为支撑引线架装置的制作材质,可以使支撑引线架装置满足高压作业的适用要求。In the present invention, epoxy resin is used as the manufacturing material of the supporting lead frame device, so that the supporting lead frame device can meet the application requirements of high voltage operation.
附图说明Description of drawings
图1是本发明支撑引线架装置的主视图;Fig. 1 is the front view of supporting lead frame device of the present invention;
图2是本发明支撑引线架装置的侧视图;Fig. 2 is a side view of the supporting lead frame device of the present invention;
图3是本发明支撑引线架装置上设有调节槽的主视图。Fig. 3 is a front view of the adjusting groove provided on the supporting lead frame device of the present invention.
其中,1-支撑条;11-引线固定孔;12-宽度调节槽,2-导线挂杆;21-高度调节槽;22-防滑垫。Among them, 1-support bar; 11-lead fixing hole; 12-width adjustment groove, 2-wire hanging rod; 21-height adjustment groove; 22-anti-skid pad.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
如图1、图2所示,本发明提供的支撑引线架装置,包括支撑条1以及一对导线挂杆2;As shown in Figures 1 and 2, the supporting lead frame device provided by the present invention includes a support bar 1 and a pair of wire hanging rods 2;
支撑条1上水平设有至少一个引线固定孔11;一对导线挂杆2的固定端通过调节螺栓连接于支撑条1两端,并以调节螺栓为圆心做圆周运动。At least one lead wire fixing hole 11 is horizontally provided on the support bar 1; the fixed ends of a pair of wire hanging rods 2 are connected to both ends of the support bar 1 through adjusting bolts, and the adjusting bolts are used as the center to perform circular motion.
由于使用调节螺栓将支撑条1与导线挂杆2连接,所以在支撑引线架装置不使用的时候,可以调整导线挂杆2的位置,将导线挂杆2与支撑条1折合在一起,方便作业人员携带。Since the supporting bar 1 is connected with the wire hanging bar 2 by using the adjusting bolt, the position of the wire hanging bar 2 can be adjusted when the supporting lead frame device is not in use, and the wire hanging bar 2 and the supporting bar 1 can be folded together, which is convenient for operation People carry.
在需要使用时,作业人员可将导线挂杆2拉开,垂直挂在有电的导线上,支撑引线架装置整体形成一个梯形。作业人员可以将拆卸下来的引线,穿过引线固定孔11进行临时限位固定,无需调整斗臂车以及将引线圈落在下层横担支撑点上,避免了空中障碍物的干扰,降低作业复杂度,待引线恢复搭头后,再撤除整个支撑引线架装置,完成作业。When needed to use, the operator can pull away the wire hanging rod 2 and hang it vertically on the live wire, and the supporting lead frame device forms a trapezoid as a whole. The operator can pass the removed lead wire through the lead wire fixing hole 11 for temporary limit and fixation, without adjusting the bucket arm and dropping the lead coil on the support point of the lower cross arm, avoiding the interference of obstacles in the air and reducing the complexity of the operation After the lead wires are restored to the joint, remove the entire supporting lead frame device to complete the work.
一般在支撑条1上水平设置三到四个引线固定孔11,引线固定孔11等间距设置,保证引线之间的绝缘隔离要求。Generally, three to four lead wire fixing holes 11 are arranged horizontally on the support bar 1, and the lead wire fixing holes 11 are arranged at equal intervals to ensure the insulation isolation requirements between the lead wires.
为了避免支撑引线架装置使用时在导线上滑动,在导线挂杆2的挂钩内测设置防滑垫22,可以增加摩擦系数。In order to avoid sliding on the wire when the supporting lead frame device is in use, an anti-skid pad 22 is set inside the hook of the wire hanging rod 2, which can increase the coefficient of friction.
为了满足10KV配网带电作业要求,支撑引线架装置可采用环氧树脂作为材质。In order to meet the live working requirements of the 10KV distribution network, the supporting lead frame device can be made of epoxy resin.
如图3所示,在图1的基础上,对本发明提供的支撑引线架装置进行了优化,包括:支撑条1上水平对称设有宽度调节槽12;调节螺栓穿过宽度调节槽12,并在宽度调节槽12内左右移动;导线挂杆2通过调节螺栓以及宽度调节槽12相对支撑条1左右移动;导线挂杆2上竖直设有高度调节槽21;调节螺栓穿过高度调节槽21,并在高度调节槽21内上下移动;导线挂杆2通过调节螺栓以及高度调节槽21相对支撑条1上下移动。As shown in Figure 3, on the basis of Figure 1, the supporting lead frame device provided by the present invention is optimized, including: a horizontally symmetrical width adjustment groove 12 is provided on the support bar 1; the adjustment bolt passes through the width adjustment groove 12, and Move left and right in the width adjustment groove 12; the wire hanger 2 moves left and right relative to the support bar 1 through the adjustment bolt and the width adjustment groove 12; the wire hanger 2 is vertically provided with a height adjustment groove 21; the adjustment bolt passes through the height adjustment groove 21 , and move up and down in the height adjustment groove 21; the wire hanging rod 2 moves up and down relative to the support bar 1 through the adjustment bolt and the height adjustment groove 21.
考虑支撑引线架装置对复杂作业环境的适应性,在支撑条1上设置了宽度调节槽12,在导线挂杆2上设置了高度调节槽21。作业人员可以根据作业时导线的具体宽度,通过宽度调节槽12调整一对导线挂杆之间的间距,从而让支撑引线架装置更好的挂在导线上。同时,由于杆线会出现复杂紧凑的情况,作业人员可以通过高度调节槽21调节支撑条的挂靠高度,以适应杆线复杂紧凑的作业环境。Considering the adaptability of the supporting lead frame device to the complex working environment, a width adjustment groove 12 is provided on the support bar 1 , and a height adjustment groove 21 is provided on the wire hanger 2 . The operator can adjust the spacing between a pair of wire hanging rods through the width adjustment groove 12 according to the specific width of the wire during operation, so that the supporting lead frame device can be better hung on the wire. At the same time, due to the complex and compact situation of the pole line, the operator can adjust the attachment height of the support bar through the height adjustment groove 21 to adapt to the complex and compact working environment of the pole line.
除上述实施例外,本发明还可以有其他实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围内。In addition to the above-mentioned embodiments, the present invention can also have other implementations, and all technical solutions formed by equivalent replacement or equivalent transformation fall within the scope of protection required by the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710468299.7A CN107230945A (en) | 2017-06-20 | 2017-06-20 | Supporting wire rack device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710468299.7A CN107230945A (en) | 2017-06-20 | 2017-06-20 | Supporting wire rack device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107230945A true CN107230945A (en) | 2017-10-03 |
Family
ID=59935956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710468299.7A Pending CN107230945A (en) | 2017-06-20 | 2017-06-20 | Supporting wire rack device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107230945A (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000166039A (en) * | 1998-11-26 | 2000-06-16 | Yoshitomo Yasugadaira | Sheave fixing universal machine |
| JP2010082780A (en) * | 2008-10-02 | 2010-04-15 | Nagaki Seiki Co Ltd | Working device for remote operation |
| CN202488043U (en) * | 2012-03-27 | 2012-10-10 | 河南电力工业学校 | Insulating bracket for folding adjustable distributing bypass lines |
| CN202550405U (en) * | 2012-04-21 | 2012-11-21 | 石家庄供电公司 | Special ladder for maintenance of strain insulator |
| CN202586162U (en) * | 2012-04-26 | 2012-12-05 | 辽宁省电力有限公司辽阳供电公司 | Adjustable wire hanging hook |
| CN102931612A (en) * | 2012-10-31 | 2013-02-13 | 国家电网公司 | Conducting wire fixer for 10kV live working |
| CN104134948A (en) * | 2014-08-05 | 2014-11-05 | 国家电网公司 | 500kV overhead line tangent tower lightning conductor lifting working device |
| CN104882825A (en) * | 2015-06-23 | 2015-09-02 | 国家电网公司 | High-voltage live lead disconnecting device and lead method, and high-voltage live lead connecting device and lead method |
| CN204706830U (en) * | 2015-06-23 | 2015-10-14 | 国家电网公司 | Electrification in high voltage breaking and connecting thread guide devices |
| CN206976931U (en) * | 2017-06-20 | 2018-02-06 | 国网江苏省电力公司镇江供电公司 | Supporting wire rack device |
-
2017
- 2017-06-20 CN CN201710468299.7A patent/CN107230945A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000166039A (en) * | 1998-11-26 | 2000-06-16 | Yoshitomo Yasugadaira | Sheave fixing universal machine |
| JP2010082780A (en) * | 2008-10-02 | 2010-04-15 | Nagaki Seiki Co Ltd | Working device for remote operation |
| CN202488043U (en) * | 2012-03-27 | 2012-10-10 | 河南电力工业学校 | Insulating bracket for folding adjustable distributing bypass lines |
| CN202550405U (en) * | 2012-04-21 | 2012-11-21 | 石家庄供电公司 | Special ladder for maintenance of strain insulator |
| CN202586162U (en) * | 2012-04-26 | 2012-12-05 | 辽宁省电力有限公司辽阳供电公司 | Adjustable wire hanging hook |
| CN102931612A (en) * | 2012-10-31 | 2013-02-13 | 国家电网公司 | Conducting wire fixer for 10kV live working |
| CN104134948A (en) * | 2014-08-05 | 2014-11-05 | 国家电网公司 | 500kV overhead line tangent tower lightning conductor lifting working device |
| CN104882825A (en) * | 2015-06-23 | 2015-09-02 | 国家电网公司 | High-voltage live lead disconnecting device and lead method, and high-voltage live lead connecting device and lead method |
| CN204706830U (en) * | 2015-06-23 | 2015-10-14 | 国家电网公司 | Electrification in high voltage breaking and connecting thread guide devices |
| CN206976931U (en) * | 2017-06-20 | 2018-02-06 | 国网江苏省电力公司镇江供电公司 | Supporting wire rack device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206288865U (en) | A kind of arm auxiliary traction system | |
| CN104201613A (en) | Device for replacing linear single-string insulators by remote operations and application method of device | |
| CN107834434A (en) | Crossing method for the construction of transmission line of electricity tension stringing | |
| CN203760908U (en) | Cement pole crossarm installation tool | |
| CN209029807U (en) | A kind of electric pole construction auxiliary body for expanding aerial condutor spacing | |
| CN105375391B (en) | Automatic-lifting type insulation temporary cross arm | |
| CN206976931U (en) | Supporting wire rack device | |
| CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
| CN104060939B (en) | A kind of ladder for large-scale grab bucket maintenance | |
| CN203596547U (en) | High voltage insulator suspension device | |
| CN105060154B (en) | Hang load formula transformer suspended fixing apparatus | |
| CN105375389B (en) | Wire fixing device | |
| CN110499951B (en) | Iron tower cross arm rope ladder hanging point extension device and application | |
| CN104283156B (en) | Wire lifting device for power distribution line | |
| CN209029806U (en) | A kind of rotary aerial condutor device for spreading | |
| CN205123134U (en) | Lead wire fixing device | |
| CN103683098A (en) | Method of replacing strain poles without laying down lines | |
| CN204349336U (en) | Overhead-groundwire lifter | |
| CN105790161A (en) | Omnibearing rotary telescoping insulating ladder and application method therefor | |
| CN104505771A (en) | Overhead ground wire lifter | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN205104846U (en) | A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable | |
| CN206307932U (en) | A kind of hitch in lifting device | |
| CN206307942U (en) | A kind of lifting device | |
| CN105262005B (en) | For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |
|
| RJ01 | Rejection of invention patent application after publication |