CN107227749A - A kind of oblique template slope control instrument - Google Patents
A kind of oblique template slope control instrument Download PDFInfo
- Publication number
- CN107227749A CN107227749A CN201710414636.4A CN201710414636A CN107227749A CN 107227749 A CN107227749 A CN 107227749A CN 201710414636 A CN201710414636 A CN 201710414636A CN 107227749 A CN107227749 A CN 107227749A
- Authority
- CN
- China
- Prior art keywords
- level
- base
- ruler
- vertical
- control instrument
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/02—Making or lining canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0275—Retaining or protecting walls characterised by constructional features cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
一种斜模板坡度控制工具,涉及一种工具。在山地和丘陵等地区建造变电站相对复杂,仰斜式挡土墙及冲沟沟壁都具有一定坡度,施工单位支设斜模板难度较大,坡度控制困难。本发明包括底座、设于底座上前后向的水平尺、与水平尺呈90度夹角的竖尺,所述的竖尺竖向设于水平尺的前端,所述的水平尺和竖尺均设有水平平准装置,所述的水平尺的后端和竖尺的顶端分别设有可伸缩的水平伸缩尺和竖向伸缩尺,所述的水平伸缩尺和竖向伸缩尺的端部均设有拉线环,所述的底座上设有多个用于调节底座水平的调节螺栓。本技术方案结构简单、容易操作,能够精准的控制施工坡度,施工效率高,并且可以重复使用。
The utility model relates to a slope control tool of an inclined formwork, relating to a tool. The construction of substations in mountainous and hilly areas is relatively complicated, and the inclined retaining walls and gully walls have a certain slope. It is difficult for the construction unit to support the inclined formwork, and it is difficult to control the slope. The invention comprises a base, a front-and-back level arranged on the base, and a vertical ruler at an angle of 90 degrees to the level. The vertical ruler is vertically arranged at the front end of the level. Both the horizontal ruler and the vertical ruler A horizontal leveling device is provided, and the rear end of the level and the top of the vertical ruler are respectively provided with a telescopic horizontal telescopic ruler and a vertical telescopic ruler, and the ends of the horizontal telescopic ruler and the vertical telescopic ruler are both A wire loop is provided, and the base is provided with a plurality of adjusting bolts for adjusting the level of the base. The technical solution has a simple structure, is easy to operate, can accurately control the construction slope, has high construction efficiency, and can be used repeatedly.
Description
技术领域technical field
本发明涉及一种工具,尤其是一种斜模板坡度控制工具。The invention relates to a tool, in particular to a tool for controlling the slope of an inclined formwork.
背景技术Background technique
在山地和丘陵等地区建造变电站相对复杂,特别由于场地高低不平,在变电站建设初期需进行场地平整,形成高填方区域,在该区域及山坡坡脚一般采取仰斜式挡土墙,以维持回填土稳定;有些地方还需对山地溪流进行改造,新建冲沟改变水流流向,以免水流对变电站围墙或挡墙进行冲刷,影响变电站安全。然而仰斜式挡土墙及冲沟沟壁都具有一定坡度,施工单位支设斜模板难度较大,坡度控制困难。The construction of substations in mountainous and hilly areas is relatively complicated, especially because of the unevenness of the site. In the early stage of substation construction, site leveling is required to form a high fill area. In this area and at the foot of the hillside, an inclined retaining wall is generally adopted to maintain The backfill soil is stable; in some places, mountain streams need to be reconstructed, and new gullies are built to change the flow direction of the water flow, so as to prevent the water flow from scouring the enclosure wall or retaining wall of the substation and affecting the safety of the substation. However, both the inclined retaining wall and the gully wall have a certain slope, and it is difficult for the construction unit to support the inclined formwork, and it is difficult to control the slope.
发明内容Contents of the invention
本发明要解决的技术问题和提出的技术任务是对现有技术方案进行完善与改进,提供一种斜模板坡度控制工具,以精准控制坡度、提升施工效率为目的。为此,本发明采取以下技术方案。The technical problem to be solved and the technical task proposed by the present invention are to perfect and improve the existing technical solutions, and to provide a slope control tool for inclined formwork, with the purpose of precisely controlling the slope and improving construction efficiency. For this reason, the present invention takes the following technical solutions.
一种斜模板坡度控制工具,包括底座、设于底座上前后向的水平尺、与水平尺呈90度夹角的竖尺,所述的竖尺竖向设于水平尺的前端,所述的水平尺和竖尺均设有水平平准装置,所述的水平尺的后端和竖尺的顶端分别设有可伸缩的水平伸缩尺和竖向伸缩尺,所述的水平伸缩尺和竖向伸缩尺的端部均设有拉线环,所述的底座上设有多个用于调节底座水平的调节螺栓。在模板支设前,将底座设于垫层上,并通过调节螺栓的调节和利用水平平准装置的水平参考对本工具进行调平,调平后,再调节水平伸缩尺与竖向伸缩尺长度,直至符合所支模板坡度,最后通过拉线环形成坡度控制轴线,进行精确支模。A tool for controlling the slope of an inclined formwork, comprising a base, a spirit level arranged on the base in front and rear directions, and a vertical ruler at an angle of 90 degrees to the level ruler, the vertical ruler is vertically arranged at the front end of the level ruler, and the Both the level ruler and the vertical ruler are provided with a leveling device, and the rear end of the level ruler and the top of the vertical ruler are respectively provided with a telescopic horizontal telescopic ruler and a vertical telescopic ruler, and the horizontal telescopic ruler and the vertical The ends of the telescopic ruler are all provided with pull wire rings, and the base is provided with a plurality of adjusting bolts for adjusting the level of the base. Before the formwork is supported, the base is set on the cushion, and the tool is leveled by adjusting the adjustment bolts and using the horizontal reference of the leveling device. After leveling, adjust the length of the horizontal telescopic ruler and the vertical telescopic ruler , until it conforms to the slope of the formwork to be supported, and finally the slope control axis is formed by the guy ring for precise formwork support.
作为对上述技术方案的进一步完善和补充,本发明还包括以下附加技术特征。As a further improvement and supplement to the above technical solutions, the present invention also includes the following additional technical features.
所述的底座包括2根前后平行排列的底座横杆,所述的水平尺的两端连接于2根底座横杆的中间顶面。2根底座横杆组成的底座,把水平尺连接于2根底座横杆的中间顶面,结构简单,制造方便,成本低。The base includes two base cross bars arranged in parallel front and back, and the two ends of the level are connected to the middle top surfaces of the two base cross bars. The base composed of two base cross bars connects the spirit level to the middle top surface of the two base cross bars. The structure is simple, the manufacture is convenient, and the cost is low.
水平尺的水平平准装置设于水平尺前后向的中间;竖尺的水平平准装置设于竖尺高度向的中间。把水平平准装置设于中间能够较好的实现水平测量。The leveling device of the level is arranged in the middle of the front and rear directions of the level; the leveling device of the vertical ruler is arranged in the middle of the height of the vertical ruler. Setting the leveling device in the middle can better realize level measurement.
所述的水平平准装置为水准泡。水准泡结构简单,成本低,操作简单、方便易用。Said leveling device is vial. The level bubble has the advantages of simple structure, low cost, simple operation and convenient use.
每根底座横杆的左右两端各设有一个与调节螺栓连接的连接孔,2个连接孔与底座横杆两端的端面距离相等,所述的调节螺栓的上端与连接孔连接,调节螺栓的下端用于与垫层施工时的预埋螺栓连接。通过4个调节螺栓与垫层施工时的预埋螺栓连接,便于精确稳定的进行调平。The left and right ends of each base cross bar are respectively provided with a connecting hole connected with the adjusting bolt, and the distance between the two connecting holes and the end faces of the two ends of the base cross bar is equal, and the upper end of the adjusting bolt is connected with the connecting hole. The lower end is used for pre-embedded bolt connection during cushion construction. The 4 adjusting bolts are connected with the pre-embedded bolts during the construction of the cushion, which is convenient for accurate and stable leveling.
有益效果:结构简单、容易操作,能够精准的控制施工坡度,施工效率高,并且可以重复使用。Beneficial effects: the structure is simple, easy to operate, the construction slope can be accurately controlled, the construction efficiency is high, and it can be used repeatedly.
附图说明Description of drawings
图1是本发明俯视结构示意图。Fig. 1 is a schematic top view of the structure of the present invention.
图2是本发明侧视结构示意图。Fig. 2 is a schematic side view of the structure of the present invention.
图中:1-底座横杆;2-水平尺;3-竖尺;4-竖向伸缩尺;5-水平伸缩尺;6-水准泡;7-拉线环;8-调节螺栓。In the figure: 1-base cross bar; 2-level ruler; 3-vertical ruler; 4-vertical telescopic ruler; 5-horizontal telescopic ruler; 6-level bubble;
具体实施方式detailed description
以下结合说明书附图对本发明的技术方案做进一步的详细说明。The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings.
如图1-2所示,一种斜模板坡度控制工具,包括底座、设于底座上前后向的水平尺2、与水平尺2呈90度夹角的竖尺3,竖尺3竖向设于水平尺2的前端,水平尺2和竖尺3均设有水平平准装置,水平尺2的后端和竖尺3的顶端分别设有可伸缩的水平伸缩尺5和竖向伸缩尺4,水平伸缩尺5和竖向伸缩尺4的端部均设有拉线环7,底座上设有多个用于调节底座水平的调节螺栓8。As shown in Figure 1-2, a slope control tool for inclined formwork includes a base, a level 2 set on the base in front and rear directions, and a vertical ruler 3 at an angle of 90 degrees with the level 2, and the vertical ruler 3 is vertically set At the front end of the level 2, the level 2 and the vertical 3 are provided with a leveling device, and the rear end of the level 2 and the top of the vertical 3 are respectively provided with a retractable horizontal telescopic ruler 5 and a vertical telescopic ruler 4 , The ends of the horizontal telescopic ruler 5 and the vertical telescopic ruler 4 are provided with a backguy ring 7, and the base is provided with a plurality of adjusting bolts 8 for adjusting the level of the base.
为了简化底座结构,底座包括2根前后平行排列的底座横杆1,水平尺2的两端连接于2根底座横杆1的中间顶面。2根底座横杆1组成的底座,把水平尺2连接于2根底座横杆1的中间顶面,结构简单,制造方便,成本低。In order to simplify the base structure, the base includes two base cross bars 1 arranged in parallel front and back, and the two ends of the level bar 2 are connected to the middle top surface of the two base cross bars 1 . The base composed of two base cross bars 1 connects the spirit level 2 to the middle top surface of the two base cross bars 1, which has simple structure, convenient manufacture and low cost.
为了较好的实现水平测量,水平尺2的水平平准装置设于水平尺2前后向的中间;竖尺3的水平平准装置设于竖尺3高度向的中间。把水平平准装置设于中间能够较好的实现水平测量。In order to better realize level measurement, the leveling device of the spirit level 2 is arranged in the middle of the front and rear directions of the level ruler 2; the leveling device of the vertical ruler 3 is arranged in the middle of the height direction of the vertical ruler 3. Setting the leveling device in the middle can better realize level measurement.
为了简便易用,水平平准装置为水准泡6。水准泡6结构简单,成本低,操作简单、方便易用。For ease of use, the leveling device is vial 6. The level bubble 6 is simple in structure, low in cost, simple in operation, convenient and easy to use.
为了实现精确调平,每根底座横杆1的左右两端各设有一个与调节螺栓8连接的连接孔,2个连接孔与底座横杆1两端的端面距离相等,调节螺栓8的上端与连接孔连接,调节螺栓8的下端用于与垫层施工时的预埋螺栓连接。通过4个调节螺栓8与垫层施工时的预埋螺栓连接,便于精确稳定的进行调平。In order to achieve accurate leveling, each left and right ends of the base cross bar 1 are respectively provided with a connection hole connected to the adjustment bolt 8, the distance between the two connection holes and the end faces of the two ends of the base cross bar 1 is equal, and the upper end of the adjustment bolt 8 and The connecting hole is connected, and the lower end of the adjusting bolt 8 is used to connect with the pre-embedded bolt during cushion construction. The four adjusting bolts 8 are connected with the pre-embedded bolts during the construction of the cushion layer, which is convenient for accurate and stable leveling.
在实际施工过程中,首先在垫层浇筑时,精确放置预埋螺栓,待垫层强度达到要求后,对构筑物进行定位放线,同时在垫层两端通过调节螺栓8各安装一个斜模板控制工具,在模板支设前,通过调节螺栓8的调节和利用水平平准装置的水平参考对本工具进行调平,调平后,再通过两个工具的横向、竖向拉线环7进行拉线,形成坡度控制轴线,再调节水平伸缩尺5与竖向伸缩尺4长度,控制模板水平直线度和坡度,直至符合所支模板坡度,进行精确支模。In the actual construction process, firstly, when the cushion is poured, the pre-embedded bolts are accurately placed. After the cushion strength meets the requirements, the structure is positioned and laid out. At the same time, an inclined formwork is installed at both ends of the cushion to control Before the formwork is supported, the tool is leveled by adjusting the adjustment bolt 8 and using the horizontal reference of the leveling device. After leveling, the wire is pulled through the horizontal and vertical wire rings 7 of the two tools to form The slope controls the axis, and then adjusts the length of the horizontal telescopic ruler 5 and the vertical telescopic ruler 4 to control the horizontal straightness and slope of the formwork until it meets the slope of the formwork to be supported, and the formwork is accurately supported.
以上图1-2所示的一种斜模板坡度控制工具是本发明的具体实施例,已经体现出本发明实质性特点和进步,可根据实际的使用需要,在本发明的启示下,对其进行形状、结构等方面的等同修改,均在本方案的保护范围之列。A kind of inclined formwork gradient control tool shown in above Fig. 1-2 is the concrete embodiment of the present invention, has embodied the substantive characteristic and progress of the present invention, can according to actual use needs, under the enlightenment of the present invention, to its Equivalent modifications in aspects such as shape and structure are all within the scope of protection of this scheme.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710414636.4A CN107227749A (en) | 2017-06-05 | 2017-06-05 | A kind of oblique template slope control instrument |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710414636.4A CN107227749A (en) | 2017-06-05 | 2017-06-05 | A kind of oblique template slope control instrument |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107227749A true CN107227749A (en) | 2017-10-03 |
Family
ID=59935458
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710414636.4A Pending CN107227749A (en) | 2017-06-05 | 2017-06-05 | A kind of oblique template slope control instrument |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107227749A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111664833A (en) * | 2020-07-08 | 2020-09-15 | 安徽理工大学 | A tensile crack gradient measuring device |
| CN111778928A (en) * | 2020-06-19 | 2020-10-16 | 中国一冶集团有限公司 | Masonry slope control device and method |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2336322Y (en) * | 1998-05-19 | 1999-09-01 | 广深铁路总公司房屋建筑工程公司 | Limitation calliper rule for railway platform |
| CN201662385U (en) * | 2010-05-04 | 2010-12-01 | 青岛市胶州建设集团有限公司 | Multifunctional measurement scale for buildings |
| CN202885752U (en) * | 2012-11-23 | 2013-04-17 | 中建海峡建设发展有限公司 | Template perpendicularity measurement device |
| CN202915850U (en) * | 2012-11-05 | 2013-05-01 | 上海航天设备制造总厂 | Measuring tool for measuring the assembly size of special products |
| CN103322875A (en) * | 2013-05-28 | 2013-09-25 | 国家电网公司 | Spirit level for power transmission line n-shaped rod construction |
| CN203286971U (en) * | 2013-04-16 | 2013-11-13 | 天津二十冶建设有限公司 | Measuring device for perpendicularity and parallelism |
| CN203464893U (en) * | 2013-06-21 | 2014-03-05 | 上海宝钢工业技术服务有限公司 | Adjustable gauge stand for coaxiality alignment of large couplings |
| CN204000923U (en) * | 2014-08-27 | 2014-12-10 | 山东送变电工程公司 | Embedded part installation position finder |
| CN204831290U (en) * | 2015-06-26 | 2015-12-02 | 国家电网公司 | Level |
| CN205079698U (en) * | 2015-10-15 | 2016-03-09 | 浙江江山化工股份有限公司 | Alignment instrument of acting as go -between of two forked tail structures |
| CN206752503U (en) * | 2017-06-05 | 2017-12-15 | 浙江省送变电工程公司 | A kind of tiltedly template slope control instrument |
-
2017
- 2017-06-05 CN CN201710414636.4A patent/CN107227749A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2336322Y (en) * | 1998-05-19 | 1999-09-01 | 广深铁路总公司房屋建筑工程公司 | Limitation calliper rule for railway platform |
| CN201662385U (en) * | 2010-05-04 | 2010-12-01 | 青岛市胶州建设集团有限公司 | Multifunctional measurement scale for buildings |
| CN202915850U (en) * | 2012-11-05 | 2013-05-01 | 上海航天设备制造总厂 | Measuring tool for measuring the assembly size of special products |
| CN202885752U (en) * | 2012-11-23 | 2013-04-17 | 中建海峡建设发展有限公司 | Template perpendicularity measurement device |
| CN203286971U (en) * | 2013-04-16 | 2013-11-13 | 天津二十冶建设有限公司 | Measuring device for perpendicularity and parallelism |
| CN103322875A (en) * | 2013-05-28 | 2013-09-25 | 国家电网公司 | Spirit level for power transmission line n-shaped rod construction |
| CN203464893U (en) * | 2013-06-21 | 2014-03-05 | 上海宝钢工业技术服务有限公司 | Adjustable gauge stand for coaxiality alignment of large couplings |
| CN204000923U (en) * | 2014-08-27 | 2014-12-10 | 山东送变电工程公司 | Embedded part installation position finder |
| CN204831290U (en) * | 2015-06-26 | 2015-12-02 | 国家电网公司 | Level |
| CN205079698U (en) * | 2015-10-15 | 2016-03-09 | 浙江江山化工股份有限公司 | Alignment instrument of acting as go -between of two forked tail structures |
| CN206752503U (en) * | 2017-06-05 | 2017-12-15 | 浙江省送变电工程公司 | A kind of tiltedly template slope control instrument |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111778928A (en) * | 2020-06-19 | 2020-10-16 | 中国一冶集团有限公司 | Masonry slope control device and method |
| CN111664833A (en) * | 2020-07-08 | 2020-09-15 | 安徽理工大学 | A tensile crack gradient measuring device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104389313B (en) | The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof | |
| CN209129395U (en) | A kind of control device for the control of built-in fitting absolute altitude | |
| CN106121236A (en) | Floor bar protective layer and structural elevation integrated control method | |
| CN103821071A (en) | Weak foundation soil high-fill embankment fabricated building method and device in peneplain regions | |
| CN107227749A (en) | A kind of oblique template slope control instrument | |
| CN106049207A (en) | A CRTSⅢ type ballastless track self-compacting concrete construction tooling and construction method | |
| CN213575951U (en) | Fixing device for water conservancy and hydropower construction embedded pipe | |
| CN206752503U (en) | A kind of tiltedly template slope control instrument | |
| CN116122296B (en) | Construction and design method of newly-built foundation pit support structure adjacent to existing foundation pit | |
| CN211899669U (en) | Building construction template reinforcing and opposite-pulling device | |
| CN107063213B (en) | A surface monitoring point and layout device and method suitable for loess geological tunnel | |
| CN202595758U (en) | Batter post foundation structure for overhead transmission line | |
| CN205348209U (en) | Complicated topography photovoltaic square matrix stake justification structure | |
| CN108951655A (en) | Basement construction method for supporting in the case of prestressed stretch-draw | |
| CN209162880U (en) | A kind of photovoltaic bracket basis for heavy grade landform | |
| CN109629465A (en) | It is a kind of for cover board culvert or the trolley of passage construction | |
| CN206737445U (en) | The vertical dual-purpose adjuster of Simple horizontal | |
| CN208618287U (en) | A cast-in-place bracket of a cantilever T-shaped rigid frame | |
| CN202466590U (en) | Ground grouped regularly-distributed pipe pile construction device | |
| CN206308961U (en) | A kind of floor tile Level tune part | |
| CN214116620U (en) | Adjustable support for accurate positioning of permanent double-steel-pipe column | |
| CN205116182U (en) | Simple and easy excavation supporting system | |
| CN205142087U (en) | Flexible photovoltaic support of single -upright -column | |
| CN204343294U (en) | The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column | |
| CN203361020U (en) | Full framing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |
|
| RJ01 | Rejection of invention patent application after publication |