CN107227692B - Diagonal buckling and hanging installation system - Google Patents
Diagonal buckling and hanging installation system Download PDFInfo
- Publication number
- CN107227692B CN107227692B CN201710584174.0A CN201710584174A CN107227692B CN 107227692 B CN107227692 B CN 107227692B CN 201710584174 A CN201710584174 A CN 201710584174A CN 107227692 B CN107227692 B CN 107227692B
- Authority
- CN
- China
- Prior art keywords
- buckling
- cable
- plate
- arc
- buckle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 238000000034 method Methods 0.000 claims description 7
- 210000001015 abdomen Anatomy 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 15
- 238000003466 welding Methods 0.000 description 11
- 238000004873 anchoring Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a cable-stayed buckling and hanging installation system, which belongs to the technical field of steel pipe arch bridge construction and comprises a buckling cable tensioning end structure, a buckling and hanging installation structure, a steering cable saddle structure and a buckling cable; the buckle cable tensioning end structure comprises a first shoulder pole beam and a first anchor backing plate, and a plurality of first through holes are formed in the first anchor backing plate; the buckling and hanging mounting structure comprises a second shoulder pole beam, a supporting leg and a second anchor backing plate; a plurality of second through holes are formed in the second anchor backing plate; the steering cable saddle structure comprises a first arc-shaped plate, a second arc-shaped plate and a third arc-shaped plate, and the three arc-shaped plates form a third buckling cable channel; one end of the buckling rope penetrates through the first through hole and is fixed through the first anchorage device, and the other end of the buckling rope crosses the third buckling rope channel and then penetrates through the second through hole and is fixed through the second anchorage device; the invention solves the problems of inconvenient installation, poor practicability and unstable stress of the steel pipe of the inclined pull buckle hanging installation structure in the prior art.
Description
Technical Field
The invention relates to the technical field of steel pipe arch bridge construction, in particular to a cable-stayed buckling and hanging installation system.
Background
With the continuous innovation of the construction technology of the large-span bridge, the large-span bridge spanning reservoirs, navigation rivers, steep canyons and the like continuously emerges, in particular to a steel pipe arch bridge; in the construction process of a steel pipe arch bridge with a complex structure, multiple construction sections and overlarge weight, the form of temporary buckling points in a main arch rib cable-stayed buckling system has great influence on the operation in the construction process.
The traditional technology for obliquely pulling, buckling and hanging the steel tube arch rib segments mainly comprises the steps of directly binding steel wire ropes and welding lifting lugs on main arch steel tubes to complete cantilever installation. The steel wire rope sliding safety risk generated by the construction of the steel wire rope direct binding method is high, and welding damage, large deformation and complex disassembly are caused to the main arch rib by the construction of the welding lug, the stiffening rib and other structures on the main arch steel pipe by the lug welding method.
Patent 201610381238.2 provides a cable-stayed buckle-hanging mounting structure; although the buckling and hanging mounting structure improves the safety of construction to a certain extent, the following defects still exist: (1) the structure is complex and the installation is inconvenient; (2) The practicability is poor, if the diameter of the steel pipe is large, the hoop system is difficult to clamp the steel pipe, and when the hoop system applies a large clamping force to the steel pipe, the structure of the steel pipe is easily damaged; (3) One hoop system can only clamp one steel pipe, and the steel pipe has only one stress point and is unstable in stress; therefore, a new type of cable-stayed buckle mounting system is needed to solve the above problems.
Disclosure of Invention
The invention aims to solve the problems that in the prior art, an inclined pull buckle mounting structure is inconvenient to mount, poor in practicability and unstable in steel pipe stress.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a cable-stayed buckle mounting system comprising:
the buckle cable stretching end structure is arranged on the buckle ground anchor; the buckle cable tensioning end structure comprises a first carrying pole beam and a first anchor backing plate; the first carrying pole beam comprises a first bottom plate and a first top plate arranged above the first bottom plate; a first buckle cable channel for the buckle cable to pass through is arranged between the first top plate and the first bottom plate; the first anchor backing plates are symmetrically arranged on two opposite sides of the first shoulder pole beam and are fixedly connected with the first top plate and the first bottom plate; a plurality of first through holes are formed in the first anchor backing plate and communicated with the first buckle cable channel;
the buckling and hanging installation structure is arranged on a main chord tube of the arch rib, and a vertical belly tube is fixedly installed at the lower end of the main chord tube; the buckling and hanging mounting structure comprises a second shoulder pole beam, a supporting leg and a second anchor backing plate; the second shoulder pole beam is connected with the main chord pipe and the vertical belly pipe through the supporting leg; the second shoulder pole beam has the same structure as the first shoulder pole beam and comprises a second top plate, a second bottom plate and a second buckling cable channel; a second anchor backing plate is arranged on the side face, far away from the supporting leg, of the second shoulder pole beam, a plurality of second through holes are formed in the second anchor backing plate, and the second through holes are communicated with the second buckling cable channel;
the steering cable saddle structure is arranged on the buckling tower at intervals from high to low; the steering cable saddle structure comprises a first arc-shaped plate, a second arc-shaped plate and a third arc-shaped plate, wherein the second arc-shaped plate and the third arc-shaped plate are arranged on two sides of the arc surface of the first arc-shaped plate, and the arc surfaces of the second arc-shaped plate and the third arc-shaped plate are opposite; the first arc-shaped plate, the second arc-shaped plate and the third arc-shaped plate form a third buckle cable channel;
and one end of the buckling rope penetrates through the first through hole through the first buckling rope channel and is fixed through a first anchor, and the other end of the buckling rope crosses over the third buckling rope channel, penetrates through the second through hole through the second buckling rope channel and is fixed through a second anchor.
Preferably, the first top plate, the first bottom plate, the second top plate and the second bottom plate are all channel steel. The channel steel is steel commonly used in constructional engineering and is easy to obtain, and the middle part of the channel steel is hollow, so that the weight of the first shoulder pole beam and the second shoulder pole beam is greatly reduced, and the installation of the buckle cable tensioning end structure and the buckle hanging installation structure is facilitated.
Preferably, a plurality of stiffening plates are welded on a web plate of the channel steel, and the stiffening plates are perpendicular to the first anchor backing plate or the second anchor backing plate. The arrangement of the stiffening plates improves the strength and the bearing capacity of the first shoulder pole beam and the second shoulder pole beam, and prevents steel from being bent and deformed due to excessive stress.
Preferably, the first anchor backing plate is welded to the first top plate and the first bottom plate. By adopting a welding mode, the first anchor backing plate is more firmly and reliably connected with the first top plate and the first bottom plate, and the use safety is improved.
Preferably, the second anchorage is a pier head anchorage. And the pier head anchorage is adopted, so that the buckling rope is more firmly and firmly connected with the second anchor backing plate, and the risk of high-altitude operation is greatly reduced.
Preferably, the second anchor backing plate comprises an upper comb plate and a lower comb plate, and the upper comb plate is connected with the second shoulder pole beam through the lower comb plate; the lower comb-shaped plate is provided with a plurality of first notches which are vertically upward, the upper comb-shaped plate is provided with a plurality of second notches which are vertically downward, and the first notches and the second notches are matched to form second through holes for the buckling ropes to pass through and to clamp the pier nose anchorage device. The arrangement of the upper comb-shaped plate and the lower comb-shaped plate ensures that the connection between the pier head anchorage device and the second anchorage backing plate is more convenient; when the device is used, firstly, a pier head anchorage device is arranged at one end of the buckling rope penetrating through the second through hole, then when the pier head anchorage device penetrates through the second buckling rope channel, the upper comb-shaped plate and the lower comb-shaped plate are combined up and down, and a half round hole is reserved in the middle of each comb-shaped plate, so that the upper comb-shaped plate and the lower comb-shaped plate are matched to form a second through hole through which the buckling rope can pass and the pier head anchorage device can be clamped; then fixing the upper comb plate and the lower comb plate on the second shoulder pole beam in a spot welding or other modes; therefore, the anchoring stability is improved, a large amount of time is saved, and the working efficiency is improved.
Preferably, the steering saddle structures are arranged in pairs on the buckling towers, and two steering saddle structures at the same height have the third buckling cable channel facing the same direction. The arrangement is favorable for uniform stress of the buckling tower, and meanwhile, the force of the buckling cable is conveniently transmitted to the buckling tower.
Preferably, the thickness of the first anchor pad and the second anchor pad is not less than 20mm. By the arrangement, the strength of the first anchor backing plate and the second anchor backing plate and the use safety are improved conveniently.
Preferably, the distance between two adjacent first through holes and the distance between two adjacent second through holes are both 4-6 cm; the diameters of the first through hole and the second through hole are both 2-4 cm. The arrangement is convenient for maintaining the strength of the first shoulder pole beam and the second shoulder pole beam, meanwhile, the buckling rope can conveniently pass through the first through hole and the second through hole, and the first anchorage device and the second anchorage device can not pass through the first through hole and the second through hole.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
1. the buckling and hanging mounting structure is arranged on a main chord tube of an arch rib, and is provided with a second shoulder pole beam and a second anchor backing plate which are respectively provided with a second buckling cable channel and a second through hole for a buckling cable to pass through; during operation, after the buckling rope crosses the buckling tower, the second through hole is penetrated through the second buckling rope channel and is fixed through the second anchorage device; thus, the installation operation is simple and convenient; moreover, the buckling and hanging mounting structure can be stretched at multiple points, is safe and stable in stress, can provide great buckling and hanging force, and does not damage steel pipe arch ribs; to the knot of overweight steel pipe segment and hang the construction, this detain the use of hanging mounting structure and can ensure to detain the stability of hanging the construction.
2. The buckle cable tensioning end structure has the advantages of simple structure, easy material obtaining and strong practicability, and in addition, the buckle cable tensioning end structure can also be tensioned at multiple points, the stress is safe and stable, and the safety of the buckling and hanging construction process is improved.
3. The steering cable saddle structure comprises a first arc-shaped plate, a second arc-shaped plate and a third arc-shaped plate, wherein the second arc-shaped plate and the third arc-shaped plate form horizontal round-to-round transition, and the first arc-shaped plate forms vertical round-to-round transition, so that the resistance of a buckling cable during conveying is reduced, and the conveying of the buckling cable on a buckling tower is facilitated.
4. The arrangement of the upper comb-shaped plate and the lower comb-shaped plate ensures that the pier head anchorage device is more convenient to be connected with the second anchor backing plate, not only improves the stability of anchoring, but also saves a large amount of time and improves the working efficiency.
Drawings
FIG. 1 is a schematic structural view of a taut end structure of a lanyard of the present invention;
FIG. 2 is a schematic view of the mounting of the buckle mounting structure of the present invention;
FIG. 3 is a schematic view of the construction of the upper and lower comb plates of the present invention;
FIG. 4 is a schematic structural view of the steering saddle structure of the present invention;
FIG. 5 is a schematic view of the buckle connection of the present invention;
in the attached drawings, 1-a buckle cable tensioning end structure, 101-a first shoulder pole beam, 102-a first top plate, 103-a first bottom plate, 104-a first buckle cable channel, 105-a first anchor backing plate, 106-a first through hole, 107-a web plate, 108-a stiffening plate, a 2-buckle hanging installation structure, 201-a vertical web pipe, 202-a support leg, 203-a second shoulder pole beam, 204-a second top plate, 205-a second bottom plate, 206-a second buckle cable channel, 207-a lower comb plate, 208-an upper comb plate, 209-a second anchor, 210-a first notch, 211-a second notch, 3-a steering cable saddle structure, 301-a first arc plate, 302-a second arc plate, 303-a third arc plate, 4-a buckle cable, 5-a main chord pipe, 6-a buckle ground anchor, 7-a buckle tower and 8-an arch rib.
Detailed Description
The following further describes the embodiments of the present invention with reference to the drawings.
As shown in fig. 1-5, a cable-stayed buckling and hanging installation system comprises a buckling cable tensioning end structure 1, a buckling and hanging installation structure 2, a steering cable saddle structure 3 and a buckling cable 4.
The buckle cable tensioning end structure 1 is arranged on the buckle ground anchor 6, and the buckle cable tensioning end structure 1 comprises a first shoulder pole beam 101 and a first anchor backing plate 105. The first shoulder pole beam 101 includes a first bottom plate 103 and a first top plate 102 disposed above the first bottom plate 103, a first lanyard 4 channel 104 for the lanyard 4 to pass through is disposed between the first top plate 102 and the first bottom plate 103, wherein the first top plate 102, the first bottom plate 103, the second top plate 204, and the second bottom plate 205 are all channel steel. The channel steel is steel commonly used in constructional engineering and is easy to obtain, and the middle part of the channel steel is hollow, so that the weight of the first shoulder pole beam 101 and the second shoulder pole beam 203 is greatly reduced, and the installation of the buckle tensioning end structure 1 and the buckle mounting structure 2 is convenient. A plurality of stiffening plates 108 are welded on a web plate 107 of the channel steel, and the stiffening plates 108 are perpendicular to the first anchor backing plate 105 or the second anchor backing plate. In this embodiment, each channel is provided with eight stiffening plates 108. The stiffening plate 108 improves the strength and the bearing capacity of the first shoulder pole beam 101 and the second shoulder pole beam 203, and prevents the steel from being bent and deformed due to excessive stress.
The first anchor pads 105 are symmetrically disposed on opposite sides of the first shoulder pole beam 101, and are fixedly connected to the first top plate 102 and the first bottom plate 103. Preferably, the first anchor pad 105 is welded to the first top plate 102 and the first bottom plate 103. By adopting a welding mode, the first anchor backing plate 105 is more firmly and reliably connected with the first top plate 102 and the first bottom plate 103, and the use safety is improved. The thickness of the first anchor pad 105 is not less than 20mm, and in this embodiment, the thickness of the first anchor pad 105 is 25mm. The first anchor backing plate 105 is provided with a plurality of first through holes 106, and the first through holes 106 are communicated with the first buckle cable 4 channel 104. In this embodiment, the number of the first through holes is nine. The distance between two adjacent first through holes 106 is 4-6 cm, and in this embodiment, the distance between two adjacent first through holes 106 is 5cm. The diameter of the first through hole 106 is 2-4 cm, and in this embodiment, the diameter of the first through hole 106 is 4cm.
The buckling and hanging mounting structure 2 is arranged on the main chord tube 5 of the arch rib 8, and the vertical belly tube 201 is fixedly mounted at the lower end of the main chord tube 5. If the main chord 5 of the arch rib 8 includes an upper main chord and a lower main chord, the hooking and mounting structure 2 is provided at the lower portion of the upper main chord. The buckle mounting structure 2 includes a second carrying pole beam 203, a support leg 202, and a second anchor pad. The second shoulder pole beam 203 is connected to the main chord 5 and the vertical web pipe 201 via the support leg 202. The support leg 202 is formed by welding steel plates with the thickness of more than 10mm, in the embodiment, the thickness of the support leg 202 is 15mm, the contact surface of the support leg 202, which is connected with the main chord pipe 5 and the vertical web pipe 201, is arc-shaped, and the contact surface of the support leg 202, which is connected with the second shoulder pole beam 203, is parallel and level. The support legs 202 are connected with the main chord 5 by welding, and the connection with the second carrying pole beam 203 can adopt two modes of bolt connection and welding. The support legs 202 and the second spreader beam 203 of the buckle mounting structure 2 are fixed to the main chord 5 prior to the rib section being hoisted.
The second shoulder pole beam 203 is similar in structure to the first shoulder pole beam 101 and includes a second top plate 204, a second bottom plate 205, and a second lanyard channel 206. The side of the second shoulder pole beam 203 far from the support leg 202 is provided with a second anchor backing plate, the thickness of the second anchor backing plate is not less than 20mm, and in this embodiment, the thickness of the second anchor backing plate is 25mm. The second anchor backing plate is provided with a plurality of second through holes, and the second through holes are communicated with a second buckle cable channel 206. In this embodiment, the number of the second through holes is five. The distance between two adjacent second through holes is 4-6 cm, and in the embodiment, the distance between two adjacent second through holes is 5cm. The diameter of the second through hole is 2-4 cm, and in this embodiment, the diameter of the second through hole is 4cm.
On the tower 7 is detained to steering cable saddle structure 3 is located by high-to-low interval, steering cable saddle structure 3 includes first arc 301, second arc 302 and third arc 303, and the both sides of first arc 301 cambered surface are all located to second arc 302 and third arc 303, and second arc 302 is relative with the cambered surface of third arc 303, and first arc 301, second arc 302 and third arc constitute the third and detain 4 passageways of cable. The side of the second arc-shaped plate 302, which is back to the third arc-shaped plate 303, and the side of the third arc-shaped plate 303, which is back to the second arc-shaped plate 302, are both provided with triangular stiffening ribs, and the bottoms of the triangular stiffening ribs are fixedly connected with the first arc-shaped plate 301. The setting of triangle-shaped stiffening rib has improved the intensity and the bearing capacity of second arc 302 with third arc 303, prevents that second arc 302 and third arc 303 excessively atress from producing bending deformation. Preferably, the first arc-shaped plate 301 is connected and fixed with the tower exchange beam through a bolt.
In this embodiment, the steering saddle structures 3 are arranged in pairs on the buckling towers 7, and two steering saddle structures 3 at the same height have the third buckling cable 4 passage facing the same direction. The arrangement is beneficial to uniform stress of the buckling tower 7, and meanwhile, the force of the buckling cable 4 is conveniently transmitted to the buckling tower 7.
One end of the buckle cable 4 passes through the first buckle cable 4 channel 104 to be provided with a first through hole 106 and is fixed by a first anchorage device, and the other end of the buckle cable 4 passes through the third buckle cable 4 channel, then passes through the second buckle cable channel 206 to be provided with a second through hole and is fixed by a second anchorage device 209. Preferably, the second anchorage 209 is a pier head anchorage. By adopting the pier head anchorage device, the connection between the buckling rope 4 and the second anchor backing plate is firmer and firmer, so that the risk of high-altitude operation is greatly reduced.
In this embodiment, the second anchor pad includes an upper comb plate 208 and a lower comb plate 207, the upper comb plate 208 is connected to the second shoulder pole beam 203 through the lower comb plate 207, the lower comb plate 207 is provided with a plurality of first vertical upward notches 210, the upper comb plate 208 is provided with a plurality of second vertical downward notches 211, and the first notches 210 and the second notches 211 cooperate to form a second through hole for the lanyard 4 to pass through and to clamp the pier head anchorage. The arrangement of the upper comb-shaped plate 207 and the lower comb-shaped plate enables the connection between the pier head anchorage device and the second anchorage plate to be more convenient; when the device is used, firstly, a pier head anchorage device is arranged at one end of the buckling rope 4 which is connected with the second through hole, then when the pier head anchorage device passes through the second buckling rope channel 206, the upper comb-shaped plate 207 and the lower comb-shaped plate 207 are closed up and down, half circular holes are respectively reserved in the middle, so that the second through hole for the buckling rope 4 to pass through and clamp the pier head anchorage device is formed in a matched mode, then the upper comb-shaped plate 207 and the lower comb-shaped plate 207 are fixed on the second shoulder pole beam 203 in a spot welding or other modes, the situation that the pier head anchorage device cannot pass through the second through hole is avoided, and therefore after the arch rib section is hoisted in place, the buckling rope 4 only needs to pass through the second shoulder pole beam 203 and is clamped by the upper comb-shaped plate 208 and the lower comb-shaped plate 207, and then the second anchorage device 209 is used for anchoring, so that the anchoring stability is improved, a large amount of time is saved, and the working efficiency is improved.
Preferably, the first anchorage device used for fixing the buckle cable 4 on the buckle cable tensioning end structure 1 is a clamping piece anchorage device, a jack is used for tensioning and adjusting the cable force, and the conversion from the vertical force of the jack cable to the buckling and hanging stress of the buckle cable 4 during installation of the arch rib 8 is realized through loosening of the jack cable and tensioning of the jack cable. Before each segment of arch rib 8 is installed in place, corresponding arrangement of the buckling cables 4 needs to be completed in advance, the buckling cables 4 are arranged at one end of the buckling ground anchor 6, a clamping piece anchorage device is sleeved on the buckling ground anchor 6 and is arranged in a split mode, the buckling ground anchor device cannot be crossed and tangled, and pier head anchorage devices are installed at the other end of the buckling ground anchor device. The buckle cable 4 is pulled by a working cable running vehicle and a manual work, spans the steering cable saddle structure 3 and arrives at the arch rib 8 section to be installed to wait, and the buckle cable 4 is arranged by using a cable arranging appliance during the pulling process so as to avoid mutual winding. After the arch rib 8 is installed in place, the buckling rope 4 is fixed on the buckling and hanging installation structure 2 and tensioned and tightened. Since the anchor points of the lanyards 4 are located relatively close to the junction where the support legs 202 intersect the vertical belly tube 201 and the main chord 5, it is also often designed to pass the path of the lanyard 4 through the junction as much as possible, and the effect on the corresponding positions of the segments of the rib 8 is mainly compressive stress, which is advantageous for structural safety. That is to say, the lanyard 4 can pass through the two sides of the main chord 5 and be connected with the hanging mounting structure 2, or can pass through the main chord 5 and the support leg 202 and then be connected with the hanging mounting structure 2, so that the stress stability of the main chord 5 is greatly enhanced.
The invention has the advantages of simple and convenient installation operation, and the buckling and hanging installation structure 2 can be stretched at multiple points, is safe and stable in stress, can provide great buckling and hanging force, and does not damage the steel pipe arch rib 8; to the knot of overweight steel pipe segment and hang the construction, should detain the stability that the construction was hung in the knot can be guaranteed to the use of hanging mounting structure 2, has good development prospect.
The above description is intended to describe in detail the preferred embodiments of the present invention, but the embodiments are not intended to limit the scope of the claims of the present invention, and all equivalent changes and modifications made within the technical spirit of the present invention should fall within the scope of the claims of the present invention.
Claims (9)
1. The utility model provides a draw to one side and detain a mounting system, its characterized in that: the method comprises the following steps:
the buckle cable stretching end structure is arranged on the buckle ground anchor; the buckle cable tensioning end structure comprises a first shoulder pole beam and a first anchor backing plate; the first shoulder pole beam comprises a first bottom plate and a first top plate arranged above the first bottom plate; a first buckle cable channel for the buckle cable to pass through is arranged between the first top plate and the first bottom plate; the first anchor backing plates are symmetrically arranged on two opposite sides of the first carrying pole beam and fixedly connected with the first top plate and the first bottom plate; a plurality of first through holes are formed in the first anchor backing plate and communicated with the first buckle cable channel;
the buckling and hanging installation structure is arranged on a main chord tube of the arch rib, and a vertical belly tube is fixedly installed at the lower end of the main chord tube; the buckling and hanging mounting structure comprises a second carrying pole beam, a supporting leg and a second anchor backing plate; the second shoulder pole beam is connected with the main chord pipe and the vertical belly pipe through the supporting leg; the second carrying pole beam has the same structure as the first carrying pole beam and comprises a second top plate, a second bottom plate and a second buckling rope channel; a second anchor backing plate is arranged on the side face, far away from the supporting leg, of the second shoulder pole beam, a plurality of second through holes are formed in the second anchor backing plate, and the second through holes are communicated with the second buckling cable channel;
the steering cable saddle structure is arranged on the buckling tower at intervals from high to low; the steering cable saddle structure comprises a first arc-shaped plate, a second arc-shaped plate and a third arc-shaped plate, wherein the second arc-shaped plate and the third arc-shaped plate are arranged on two sides of the arc surface of the first arc-shaped plate, and the arc surfaces of the second arc-shaped plate and the third arc-shaped plate are opposite; the first arc-shaped plate, the second arc-shaped plate and the third arc-shaped plate form a third buckle cable channel;
and one end of the buckling rope penetrates through the first through hole through the first buckling rope channel and is fixed through a first anchor, and the other end of the buckling rope crosses over the third buckling rope channel, penetrates through the second through hole through the second buckling rope channel and is fixed through a second anchor.
2. A cable-stayed buckle mounting system according to claim 1, characterized in that: the first top plate, the first bottom plate, the second top plate and the second bottom plate are all channel steel.
3. A cable-stayed buckle mounting system according to claim 2, characterized in that: the web plate of the channel steel is welded with a plurality of stiffening plates, and the stiffening plates are perpendicular to the first anchor backing plate or the second anchor backing plate.
4. A cable-stayed buckle mounting system according to claim 1, characterized in that: the first anchor backing plate is welded with the first top plate and the first bottom plate.
5. A cable-stayed buckle mounting system according to claim 1, characterized in that: the second anchorage device is a pier head anchorage device.
6. A cable-stayed buckle-hang mounting system according to claim 5, characterized in that: the second anchor backing plate comprises an upper comb-shaped plate and a lower comb-shaped plate, and the upper comb-shaped plate is connected with the second carrying pole beam through the lower comb-shaped plate; the lower comb-shaped plate is provided with a plurality of first notches which are vertically upward, the upper comb-shaped plate is provided with a plurality of second notches which are vertically downward, and the first notches and the second notches are matched to form second through holes for the buckling ropes to pass through and to clamp the pier nose anchorage device.
7. A cable-stayed buckle mounting system according to claim 1, characterized in that: the steering cable saddle structures are arranged on the buckling towers in pairs, and the two steering cable saddle structures at the same height are provided with third buckling cable channels with the same orientation.
8. The cable-stayed buckle mounting system according to claim 1, characterized in that: the thickness of the first anchor backing plate and the second anchor backing plate is not less than 20mm.
9. A cable-stayed buckle mounting system according to claim 1, characterized in that: the distance between two adjacent first through holes and the distance between two adjacent second through holes are both 4-6 cm; the diameters of the first through hole and the second through hole are both 2-4 cm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710584174.0A CN107227692B (en) | 2017-07-18 | 2017-07-18 | Diagonal buckling and hanging installation system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710584174.0A CN107227692B (en) | 2017-07-18 | 2017-07-18 | Diagonal buckling and hanging installation system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107227692A CN107227692A (en) | 2017-10-03 |
| CN107227692B true CN107227692B (en) | 2023-01-24 |
Family
ID=59957123
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710584174.0A Active CN107227692B (en) | 2017-07-18 | 2017-07-18 | Diagonal buckling and hanging installation system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107227692B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109082996A (en) * | 2018-09-30 | 2018-12-25 | 广西路桥工程集团有限公司 | Inclined cable-stayed structure for bridge construction |
| CN109500993B (en) * | 2018-12-29 | 2023-10-27 | 新元果业(山东)集团有限公司 | Prestressed anchorage device, prestressed tensioning device and prestressed tensioning method |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5493746A (en) * | 1993-06-02 | 1996-02-27 | Minakami; Hiroyuki | Frame structured bridge |
| CN202012047U (en) * | 2011-03-03 | 2011-10-19 | 中铁十三局集团第一工程有限公司 | Steel strand inclined pulling and buckling system of tower |
| CN104715115A (en) * | 2015-03-19 | 2015-06-17 | 中铁二局第五工程有限公司 | Method and device for designing auxiliary construction facilities of steel truss arch bridge through BIM |
| CN205296019U (en) * | 2015-12-13 | 2016-06-08 | 张高峰 | Public road bridge for roof beam scour protection hit telescoping device |
| CN205711746U (en) * | 2016-06-02 | 2016-11-23 | 中铁第四勘察设计院集团有限公司 | A kind of mixing cable beam anchoring structure |
| CN106758837A (en) * | 2016-12-24 | 2017-05-31 | 中铁十八局集团有限公司 | A kind of Inclined cable-stayed construction system of combination spandrel column |
| CN207003269U (en) * | 2017-07-18 | 2018-02-13 | 广西路桥工程集团有限公司 | A kind of Inclined cable-stayed installation system |
-
2017
- 2017-07-18 CN CN201710584174.0A patent/CN107227692B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5493746A (en) * | 1993-06-02 | 1996-02-27 | Minakami; Hiroyuki | Frame structured bridge |
| CN202012047U (en) * | 2011-03-03 | 2011-10-19 | 中铁十三局集团第一工程有限公司 | Steel strand inclined pulling and buckling system of tower |
| CN104715115A (en) * | 2015-03-19 | 2015-06-17 | 中铁二局第五工程有限公司 | Method and device for designing auxiliary construction facilities of steel truss arch bridge through BIM |
| CN205296019U (en) * | 2015-12-13 | 2016-06-08 | 张高峰 | Public road bridge for roof beam scour protection hit telescoping device |
| CN205711746U (en) * | 2016-06-02 | 2016-11-23 | 中铁第四勘察设计院集团有限公司 | A kind of mixing cable beam anchoring structure |
| CN106758837A (en) * | 2016-12-24 | 2017-05-31 | 中铁十八局集团有限公司 | A kind of Inclined cable-stayed construction system of combination spandrel column |
| CN207003269U (en) * | 2017-07-18 | 2018-02-13 | 广西路桥工程集团有限公司 | A kind of Inclined cable-stayed installation system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107227692A (en) | 2017-10-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104594206B (en) | A steel truss girder longitudinally moving hanging type dragging anchor and method | |
| CN210918165U (en) | Multi-row overhanging support frame for high-rise building | |
| CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
| CN203514309U (en) | Steel strand anchorage device base | |
| CN214995799U (en) | Tool type wall hanging cantilever frame | |
| CN201297040Y (en) | Pre-stress stretching bracket | |
| CN202689340U (en) | Long-span arched truss structure | |
| CN205012238U (en) | A letter T roof beam anchor based on violently open prestressing force | |
| CN209339715U (en) | A kind of girdle ring attachment device for electric power pole | |
| CN107227692A (en) | A kind of Inclined cable-stayed installation system | |
| CN218147856U (en) | Bridge construction prestressed anchorage utensil | |
| CN207003269U (en) | A kind of Inclined cable-stayed installation system | |
| CN101457516B (en) | Hanging method of multilayer horizontal inhaul cable | |
| CN205558032U (en) | Modular honeycomb roof beam | |
| CN204919371U (en) | Hang water a festival section construction on arched bridge draw sectional shelf -unit device to one side | |
| CN202194073U (en) | Large-volume long-cantilever capping beam construction device | |
| CN204062152U (en) | High-pressure service pump pipe fixing device | |
| CN209368697U (en) | A kind of tensioning pylon | |
| CN209522474U (en) | A kind of hanging apparatus of tee girder template | |
| CN210713232U (en) | Steel wire end connection fixing structure | |
| CN202359826U (en) | Structure for fixing stiff steel columns temporarily | |
| CN203188109U (en) | Multi-span ground anchor type suspension bridge | |
| CN220643884U (en) | Initial tensioning construction platform for stay cables on large-segment cantilever cast-in-place bridge-building machine | |
| CN109113354B (en) | Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof | |
| CN206872268U (en) | T beams are revealed all the details suspender |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |