CN107192111A - A kind of condensate water recovery device of air conditioner - Google Patents

A kind of condensate water recovery device of air conditioner Download PDF

Info

Publication number
CN107192111A
CN107192111A CN201710378757.8A CN201710378757A CN107192111A CN 107192111 A CN107192111 A CN 107192111A CN 201710378757 A CN201710378757 A CN 201710378757A CN 107192111 A CN107192111 A CN 107192111A
Authority
CN
China
Prior art keywords
water
storage tank
water storage
air
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710378757.8A
Other languages
Chinese (zh)
Inventor
张涛
高媛
宫英杰
陈淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jin Zhicheng Construction Co Ltd
Original Assignee
Shandong Jin Zhicheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jin Zhicheng Construction Co Ltd filed Critical Shandong Jin Zhicheng Construction Co Ltd
Priority to CN201710378757.8A priority Critical patent/CN107192111A/en
Publication of CN107192111A publication Critical patent/CN107192111A/en
Pending legal-status Critical Current

Links

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/22—Means for preventing condensation or evacuating condensate
    • F24F13/222—Means for preventing condensation or evacuating condensate for evacuating condensate
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06—Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/42—Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger characterised by the use of the condensate, e.g. for enhanced cooling
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F6/00—Air-humidification, e.g. cooling by humidification
    • F24F6/12—Air-humidification, e.g. cooling by humidification by forming water dispersions in the air
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Dispersion Chemistry (AREA)
  • Devices For Blowing Cold Air, Devices For Blowing Warm Air, And Means For Preventing Water Condensation In Air Conditioning Units (AREA)

Abstract

The invention discloses a kind of condensate water recovery device of air conditioner, including air-conditioner outdoor unit and indoor apparatus of air conditioner, condenser and refrigerating plant are provided with air-conditioner outdoor unit, the refrigerating plant includes the first storage tank, main sewer and branch's refrigeration water pipe, cooling piece is provided with branch's refrigeration water pipe;Blower fan is provided with the rear portion of refrigerating plant;Overflow pipe and the first magnetic valve are provided with the bottom of main sewer;Atomising device is provided with the side of the indoor apparatus of air conditioner, atomising device includes the second storage tank, atomization box and water pump;It is sequentially provided with filtering meshes, active carbon layer, PP cottons layer and filtering water storage cavity from top to bottom in the inside of the second storage tank;Ultrasonic ultrasonic delay line memory and Venturi tube are provided with atomization box;Plastic screwed pipe is provided with the top of atomization box.The present invention can be collected to condensed water, make full use of the refrigerating capacity contained by condensed water, and the outdoor unit of air-conditioning is cooled, and room air is humidified by the condensed water of collection.

Description

一种空调冷凝水回收装置An air conditioner condensate recovery device

技术领域technical field

本发明涉及空调制冷技术领域,尤其涉及一种空调冷凝水回收装置。The invention relates to the technical field of air-conditioning and refrigeration, in particular to an air-conditioning condensed water recovery device.

背景技术Background technique

目前市场上的分体式空调器,在夏季的制冷过程中,空调的室内机会产生大量的冷凝水,通常一匹的空调在制冷或除湿工作时,每2小时可排出1升左右的冷凝水。现有设计的空调往往通过排水管将冷凝水排出到室外,由此会产生产生一定的弊端:(1)排放到室外的冷凝水会附着在建筑物的表面,长期的浸湿会对建筑物的外墙造成一定的破坏,同时,从高层建筑滴落的冷凝水会对行人和居民的生活造成不便;(2)未对冷凝水进行收集,浪费了大量的水资源;(3)冷凝水温度低,排到室外后会损失一部分有效的制冷量,不利于环保。At present, split air conditioners on the market produce a lot of condensed water during the cooling process in summer. Usually, a single air conditioner can discharge about 1 liter of condensed water every 2 hours when it is cooling or dehumidifying. Existing air conditioners often discharge the condensed water to the outside through the drain pipe, which will cause certain disadvantages: (1) The condensed water discharged to the outdoor will adhere to the surface of the building, and long-term soaking will damage the building. At the same time, the condensed water dripping from high-rise buildings will cause inconvenience to the lives of pedestrians and residents; (2) The condensed water is not collected, wasting a lot of water resources; (3) The condensed water The temperature is low, and part of the effective cooling capacity will be lost after being discharged outdoors, which is not conducive to environmental protection.

发明内容Contents of the invention

为了弥补现有技术的不足,本发明提供了一种空调冷凝水回收装置,能够对冷凝水进行收集,充分利于冷凝水所含的制冷量,对空调的室外机进行降温,并通过收集的冷凝水对室内空气进行加湿,以解决现有技术中存在的问题。In order to make up for the deficiencies in the prior art, the present invention provides an air conditioner condensed water recovery device, which can collect the condensed water, fully benefit the cooling capacity contained in the condensed water, cool down the outdoor unit of the air conditioner, and use the collected condensed water The water humidifies the indoor air to solve the problems in the prior art.

本发明是通过如下技术方案实现的:The present invention is achieved through the following technical solutions:

一种空调冷凝水回收装置,包括空调室外机和空调室内机,在所述空调室外机的内部设有冷凝器,在所述冷凝器的后部设有制冷装置,所述制冷装置包括第一储水箱,所述第一储水箱通过冷凝水进水管与空调室内机进行连接;在所述第一储水箱的下部设有总排水管,所述第一储水箱和总排水管通过若干分支制冷水管进行连接;在所述分支制冷水管上均设有制冷片,所述制冷片的截面形状为平行四边形,所述分支制冷水管和制冷片均为铝材质;在所述制冷装置的后部设有风机,在所述空调室外机的前部设有出风口;在所述第一储水箱的内部设有第一水位计;在所述总排水管的下部设有溢流管,在所述溢流管上设有第一电磁阀;An air conditioner condensate recovery device, comprising an air conditioner outdoor unit and an air conditioner indoor unit, a condenser is provided inside the air conditioner outdoor unit, and a refrigerating device is provided at the rear of the condenser, and the refrigerating device includes a first A water storage tank, the first water storage tank is connected to the indoor unit of the air conditioner through a condensed water inlet pipe; a main drainage pipe is provided at the lower part of the first water storage tank, and the first water storage tank and the main drainage pipe are refrigerated through several branches Water pipes are connected; on the branch cooling water pipes, cooling sheets are provided, and the cross-sectional shape of the cooling sheets is a parallelogram, and the branch cooling water pipes and cooling sheets are made of aluminum; There is a fan, and an air outlet is provided at the front of the outdoor unit of the air conditioner; a first water level gauge is provided inside the first water storage tank; an overflow pipe is provided at the bottom of the main drain pipe, and an overflow pipe is provided at the bottom of the The overflow pipe is provided with a first electromagnetic valve;

在所述空调室内机的侧面设有雾化装置,在所述雾化装置的内部设有第二储水箱和雾化箱;在所述第二储水箱的上部设有水泵,所述水泵的进水端通过雾化装置进水管与总排水管相连接,所述水泵的出水端与第二储水箱相连接;所述第一水位计与水泵通过导线电性连接;An atomizing device is provided on the side of the indoor unit of the air conditioner, and a second water storage tank and an atomizing tank are arranged inside the atomizing device; a water pump is provided on the upper part of the second water storage tank, and the water pump The water inlet end is connected to the main drainage pipe through the water inlet pipe of the atomization device, and the water outlet end of the water pump is connected to the second water storage tank; the first water level gauge is electrically connected to the water pump through a wire;

在所述第二储水箱的内部从上到下依次设有过滤网层、活性炭层、PP棉层和过滤储水腔,在所述过滤储水腔的内壁上设有第二水位计;所述第二水位计与第一电磁阀通过导线电性连接;Inside the second water storage tank, a filter screen layer, an activated carbon layer, a PP cotton layer, and a filter water storage chamber are sequentially provided from top to bottom, and a second water level gauge is provided on the inner wall of the filter water storage chamber; The second water level gauge is electrically connected to the first electromagnetic valve through a wire;

在所述雾化装置的底壁上设有雾化进水管,在所述雾化进水管上设有第二电磁阀,所述第二储水箱和雾化箱通过雾化进水管相连接;在所述雾化箱的底壁上设有超声波雾化器,在所述超声波雾化器的上部设有文丘里管;在所述雾化箱的上部设有塑料螺纹管;在所述雾化装置的外壁上设有湿度传感器,所述湿度传感器分别与超声波雾化器、第二电磁阀通过导线电性连接。An atomization water inlet pipe is provided on the bottom wall of the atomization device, a second solenoid valve is arranged on the atomization water inlet pipe, and the second water storage tank and the atomization tank are connected through the atomization water inlet pipe; The bottom wall of the atomization box is provided with an ultrasonic atomizer, and a Venturi tube is arranged on the top of the ultrasonic atomizer; a plastic threaded pipe is arranged on the top of the atomization box; A humidity sensor is provided on the outer wall of the atomization device, and the humidity sensor is electrically connected to the ultrasonic nebulizer and the second electromagnetic valve through wires.

进一步优化地,所述第一储水箱的表面设有聚氨酯保温层。Further preferably, the surface of the first water storage tank is provided with a polyurethane insulation layer.

进一步优化地,在所述空调室内机的前部设有PLC控制器和触摸屏,所述PLC控制器和触摸屏通过导线电性连接;在所述第一储水箱和过滤储水腔内均设有温度传感器,所述温度传感器均通过导线与PLC控制器电性连接。Further optimally, a PLC controller and a touch screen are provided at the front of the air-conditioning indoor unit, and the PLC controller and the touch screen are electrically connected through wires; A temperature sensor, the temperature sensors are electrically connected to the PLC controller through wires.

进一步优化地,在所述PLC控制器上设有WiFi通信模块。Further optimally, a WiFi communication module is provided on the PLC controller.

进一步优化地,在所述第二储水箱的下部设有水龙头。Further preferably, a faucet is provided at the lower part of the second water storage tank.

进一步优化地,在所述雾化装置的下部设有若干万向轮。Further optimally, several universal wheels are arranged at the lower part of the atomization device.

进一步优化地,在所述塑料螺纹管的上部活动安装有L形喷雾嘴。Further optimally, an L-shaped spray nozzle is movably installed on the upper part of the plastic threaded pipe.

本发明的有益效果是:The beneficial effects of the present invention are:

能够对冷凝水进行收集,充分利用冷凝水所含的制冷量,对空调的室外机进行降温,并通过收集的冷凝水对室内空气进行加湿,减少了空调冷凝水的排放,有效保护了环境,适于广泛推广应用。It can collect condensed water, make full use of the cooling capacity contained in condensed water, cool down the outdoor unit of the air conditioner, and humidify the indoor air through the collected condensed water, which reduces the discharge of condensed water from the air conditioner and effectively protects the environment. It is suitable for wide popularization and application.

附图说明Description of drawings

图1为本发明的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.

图2为本发明中制冷装置的结构示意图。Fig. 2 is a structural schematic diagram of a refrigeration device in the present invention.

图3为本发明中制冷装置的透视结构示意图。Fig. 3 is a schematic perspective view of the refrigeration device in the present invention.

图4为本发明中空调室外机的侧面透视结构示意图。Fig. 4 is a schematic diagram of the side perspective structure of the outdoor unit of the air conditioner in the present invention.

图5为本发明中雾化装置的透视结构示意图。Fig. 5 is a schematic perspective view of the atomization device in the present invention.

图中,1、空调室外机;11、冷凝器;12、冷凝水进水管;13、风机;14、出风口;2、空调室内机;21、雾化装置进水管;22、PLC控制器;23、触摸屏;24、温度传感器;25、WiFi通信模块;3、制冷装置;31、第一储水箱;32、总排水管;33、分支制冷水管;34、制冷片;35、第一水位计;36、溢流管;37、第一电磁阀;4、雾化装置;41、第二储水箱;411、过滤网层;412、活性炭层;413、PP棉层;414、过滤储水腔;415、第二水位计;42、雾化箱;421、超声波雾化器;422、文丘里管;423、塑料螺纹管;43、水泵;44、雾化进水管;45、第二电磁阀;46、湿度传感器;47、水龙头;48、万向轮;49、L形喷雾嘴。In the figure, 1. Air conditioner outdoor unit; 11. Condenser; 12. Condensed water inlet pipe; 13. Fan; 14. Air outlet; 2. Air conditioner indoor unit; 21. Atomization device inlet pipe; 22. PLC controller; 23. Touch screen; 24. Temperature sensor; 25. WiFi communication module; 3. Refrigeration device; 31. First water storage tank; 32. Main drainage pipe; 33. Branch cooling water pipe; ; 36, overflow pipe; 37, the first solenoid valve; 4, atomization device; 41, the second water storage tank; 411, filter screen layer; 412, activated carbon layer; 413, PP cotton layer; 414, filter water storage chamber ; 415, the second water level gauge; 42, atomization box; 421, ultrasonic atomizer; 422, Venturi tube; 423, plastic threaded pipe; 43, water pump; 44, atomization water inlet pipe; 45, the second solenoid valve ; 46, humidity sensor; 47, faucet; 48, universal wheel; 49, L-shaped spray nozzle.

具体实施方式detailed description

为能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本发明进行详细阐述。In order to clearly illustrate the technical features of this solution, the present invention will be described in detail below through specific implementation modes and in conjunction with the accompanying drawings.

如图1—图5所示,本实施例公开了一种空调冷凝水回收装置,包括空调室外机1和空调室内机2,在所述空调室外机1的内部设有冷凝器11,在所述冷凝器11的后部设有制冷装置3,所述制冷装置3包括第一储水箱31,所述第一储水箱31通过冷凝水进水管12与空调室内机2进行连接,空调室内机2产生的冷凝水从冷凝水进水管12流入第一储水箱31进行存储。As shown in Figures 1-5, this embodiment discloses an air conditioner condensate recovery device, which includes an air conditioner outdoor unit 1 and an air conditioner indoor unit 2, a condenser 11 is provided inside the air conditioner outdoor unit 1, and the The rear part of the condenser 11 is provided with a refrigeration device 3, and the refrigeration device 3 includes a first water storage tank 31, and the first water storage tank 31 is connected to the air-conditioning indoor unit 2 through the condensed water inlet pipe 12, and the air-conditioning indoor unit 2 The generated condensed water flows into the first water storage tank 31 from the condensed water inlet pipe 12 for storage.

在所述第一储水箱31的下部设有总排水管32,所述第一储水箱31和总排水管32通过若干分支制冷水管33进行连接;在所述分支制冷水管33上均设有制冷片34,所述第一储水箱31内的冷凝水流入分支制冷水管33内,并将冷凝水所含的制冷量传导给制冷片34;所述制冷片34的截面形状为平行四边形,能够增加制冷片34与空气接触的面积,提高制冷片34散发制冷量的效率。所述分支制冷水管33和制冷片34均为铝材质,能够将制冷片34所含的制冷量快速与空气进行交换。在所述制冷装置3的后部设有风机13,在所述空调室外机1的前部设有出风口14,所述风机13运转后,将制冷片34所含的制冷量通过空气吹向冷凝器11,带走冷凝器11运行所散发的热量,并通过出风口14排出,达到降温冷却空调室外机1的效果。在所述第一储水箱31的内部设有第一水位计35,能够检测第一储水箱31内冷凝水的储存量;在所述总排水管32的下部设有溢流管36,能够将第一储水箱31、分支制冷水管33和总排水管32内多余的冷凝水排出;在所述溢流管36上设有第一电磁阀37,能够控制溢流管36的开启和关闭。A main drainage pipe 32 is provided at the bottom of the first water storage tank 31, and the first water storage tank 31 and the main drainage pipe 32 are connected through several branch cooling water pipes 33; sheet 34, the condensed water in the first water storage tank 31 flows into the branch cooling water pipe 33, and conducts the cooling capacity contained in the condensed water to the cooling sheet 34; the cross-sectional shape of the cooling sheet 34 is a parallelogram, which can increase The contact area of the refrigerating sheet 34 with the air improves the efficiency of the refrigerating sheet 34 dissipating the cooling capacity. Both the branch cooling water pipe 33 and the cooling sheet 34 are made of aluminum, which can quickly exchange the cooling capacity contained in the cooling sheet 34 with air. A fan 13 is provided at the rear of the refrigerating device 3, and an air outlet 14 is provided at the front of the air conditioner outdoor unit 1. After the fan 13 is in operation, the cooling capacity contained in the refrigerating sheet 34 is blown to the air through the air. The condenser 11 takes away the heat dissipated by the operation of the condenser 11 and discharges it through the air outlet 14 to achieve the effect of cooling the outdoor unit 1 of the air conditioner. The inside of the first water storage tank 31 is provided with a first water level gauge 35, which can detect the storage capacity of condensed water in the first water storage tank 31; an overflow pipe 36 is provided at the bottom of the main drain pipe 32, which can The excess condensed water in the first water storage tank 31 , the branch cooling water pipe 33 and the main drain pipe 32 is discharged; the overflow pipe 36 is provided with a first electromagnetic valve 37 which can control the opening and closing of the overflow pipe 36 .

在所述空调室内机2的侧面设有雾化装置4,在所述雾化装置4的内部设有第二储水箱41和雾化箱42;在所述第二储水箱41的上部设有水泵43,所述水泵43的进水端通过雾化装置进水管21与总排水管32相连接,能够将第一储水箱31、分支制冷水管33和总排水管32内的冷凝水抽出;所述水泵43的出水端与第二储水箱41相连接,能够将抽出的冷凝水输送到第二储水箱41内;所述第一水位计35与水泵43通过导线电性连接,当第一水位计35检测到第一储水箱31内储存的冷凝水接近储存量的临界值时,能够控制水泵43开启,将第一储水箱31内过多的冷凝水抽出。An atomizing device 4 is arranged on the side of the air-conditioning indoor unit 2, and a second water storage tank 41 and an atomizing tank 42 are arranged inside the atomizing device 4; Water pump 43, the water inlet end of described water pump 43 is connected with main drainage pipe 32 through atomization device water inlet pipe 21, can extract the condensed water in the first water storage tank 31, branch cooling water pipe 33 and main drainage pipe 32; The water outlet of the water pump 43 is connected to the second water storage tank 41, and the extracted condensed water can be delivered to the second water storage tank 41; the first water level gauge 35 is electrically connected to the water pump 43 through a wire, when the first water level When the meter 35 detects that the condensed water stored in the first water storage tank 31 is close to the critical value of the storage capacity, it can control the water pump 43 to be turned on, and the excess condensed water in the first water storage tank 31 is drawn out.

在所述第二储水箱41的内部从上到下依次设有过滤网层411、活性炭层412、PP棉层413和过滤储水腔414。水泵43将抽出的冷凝水输送到第二储水箱41内部后,冷凝水将依次通过过滤网层411、活性炭层412和PP棉层413,对冷凝水进行过滤和净化,通过过滤网层411对冷凝水进行初步过滤,通过PP棉层413能够吸附冷凝水中的杂质,通过活性炭层412能够减少冷凝水中的重金属含量。过滤后的冷凝水被收集到过滤储水腔414内,进行存储,以便作为雾化加湿所用的水源。在所述过滤储水腔414的内壁上设有第二水位计415,用于检测过滤储水腔414内冷凝水的储存量;所述第二水位计415与第一电磁阀37通过导线电性连接,当第二水位计415检测到过滤储水腔414内冷凝水的储存量接近临界值时,为了防止溢出,所述第二水位计415能够控制第一电磁阀37开启,将第一储水箱31、分支制冷水管33和总排水管32内多余的冷凝水排出,防止冷凝水继续被水泵43抽入第二储水箱41内。A filter layer 411 , an activated carbon layer 412 , a PP cotton layer 413 and a filter water storage chamber 414 are sequentially arranged inside the second water storage tank 41 from top to bottom. After the water pump 43 transports the extracted condensed water to the inside of the second water storage tank 41, the condensed water will pass through the filter screen layer 411, the activated carbon layer 412 and the PP cotton layer 413 in sequence to filter and purify the condensed water, and pass through the filter screen layer 411 to The condensed water is preliminarily filtered, the PP cotton layer 413 can absorb impurities in the condensed water, and the activated carbon layer 412 can reduce the heavy metal content in the condensed water. The filtered condensed water is collected into the filtered water storage chamber 414 for storage, so as to be used as a water source for atomization humidification. A second water level gauge 415 is provided on the inner wall of the filtered water storage chamber 414 to detect the storage amount of condensed water in the filtered water storage chamber 414; the second water level gauge 415 is electrically connected to the first electromagnetic valve 37 through a wire When the second water level gauge 415 detects that the storage amount of condensed water in the filtered water storage chamber 414 is close to the critical value, in order to prevent overflow, the second water level gauge 415 can control the opening of the first electromagnetic valve 37, and the first The excess condensed water in the water storage tank 31 , the branch cooling water pipe 33 and the main drain pipe 32 is discharged to prevent the condensed water from being continuously drawn into the second water storage tank 41 by the water pump 43 .

在所述雾化装置4的底壁上设有雾化进水管44,在所述雾化进水管44上设有第二电磁阀45,能够控制雾化进水管44的开启和关闭,所述第二储水箱41和雾化箱42通过雾化进水管44相连接。在所述雾化箱42的底壁上设有超声波雾化器421,第二储水箱41内的冷凝水经过雾化进水管44流入雾化箱42后,通过超声波雾化器421产生雾化效果,进而起到对室内空气加湿的作用。在所述超声波雾化器421的上部设有文丘里管422,能够起到加速雾化水分流动的作用,使雾化后的水分能够以较高的流速从文丘里管422内向上流出。An atomizing water inlet pipe 44 is arranged on the bottom wall of the atomizing device 4, and a second electromagnetic valve 45 is arranged on the atomizing water inlet pipe 44, which can control the opening and closing of the atomizing water inlet pipe 44. The second water storage tank 41 and the atomization tank 42 are connected through an atomization water inlet pipe 44 . An ultrasonic atomizer 421 is arranged on the bottom wall of the atomization box 42. After the condensed water in the second water storage tank 41 flows into the atomization box 42 through the atomization water inlet pipe 44, it is atomized by the ultrasonic atomizer 421. effect, and then play a role in indoor air humidification. A Venturi tube 422 is arranged on the upper part of the ultrasonic atomizer 421 , which can accelerate the flow of atomized water, so that the atomized water can flow upward from the Venturi tube 422 at a higher flow rate.

在所述雾化箱42的上部设有塑料螺纹管423,雾化后的水分从塑料螺纹管423内向外喷出,通过调节塑料螺纹管423的长度,进而起到调节雾化水分喷出的高度。在所述雾化装置4的外壁上设有湿度传感器46,能够感知室内空气的湿度。所述湿度传感器46分别与超声波雾化器421、第二电磁阀45通过导线电性连接,当湿度传感器46检测到室内空气较为干燥时,能够控制第二电磁阀45和超声波雾化器421开启,使冷凝水从雾化进水管44流入雾化箱42,并使超声波雾化器421工作,对冷凝水进行雾化,起到对室内的空气进行加湿的作用。A plastic threaded pipe 423 is provided on the top of the atomization box 42, and the atomized water is sprayed out from the plastic threaded pipe 423. By adjusting the length of the plastic threaded pipe 423, the spraying of atomized water can be adjusted. high. A humidity sensor 46 is provided on the outer wall of the atomizing device 4 to sense the humidity of the indoor air. The humidity sensor 46 is electrically connected to the ultrasonic atomizer 421 and the second electromagnetic valve 45 respectively through wires, and when the humidity sensor 46 detects that the indoor air is relatively dry, it can control the opening of the second electromagnetic valve 45 and the ultrasonic atomizer 421 , the condensed water flows into the atomizing box 42 from the atomizing water inlet pipe 44, and the ultrasonic atomizer 421 is operated to atomize the condensed water to humidify the indoor air.

作为一种优选的实施方式,所述第一储水箱31的表面设有聚氨酯保温层,具有较好的保温作用,使第一储水箱31内的冷凝水能够保持较低的温度,进而对冷凝器11产生较好的降温效果。As a preferred embodiment, the surface of the first water storage tank 31 is provided with a polyurethane insulation layer, which has a good heat preservation effect, so that the condensed water in the first water storage tank 31 can maintain a lower temperature, and then the condensation water Device 11 produces better cooling effect.

作为一种优选的实施方式,在所述空调室内机2的前部设有PLC控制器22和触摸屏23,所述PLC控制器22和触摸屏23通过导线电性连接,通过触摸屏23能够查看PLC控制器22的运行状态,并对PLC控制器22进行相关参数的控制。在所述第一储水箱31和过滤储水腔414内均设有温度传感器24,所述温度传感器24均通过导线与PLC控制器22电性连接,能够将温度数据传递至PLC控制器22,进而能够通过触摸屏23查看第一储水箱31和过滤储水腔414内冷凝水的温度。优选地,在所述PLC控制器22上设有WiFi通信模块25,通过WiFi通信模块25,能够将第一储水箱31和过滤储水腔414内冷凝水的温度数据,通过网络发送至空调用户的移动设备,方便用户进行查看。As a preferred embodiment, a PLC controller 22 and a touch screen 23 are provided at the front of the air-conditioning indoor unit 2, and the PLC controller 22 and the touch screen 23 are electrically connected through wires, and the PLC control panel can be viewed through the touch screen 23. The operating state of the controller 22, and control the relevant parameters of the PLC controller 22. Both the first water storage tank 31 and the filtered water storage chamber 414 are provided with temperature sensors 24, and the temperature sensors 24 are electrically connected to the PLC controller 22 through wires, and can transmit temperature data to the PLC controller 22, Furthermore, the temperature of the condensed water in the first water storage tank 31 and the filtered water storage chamber 414 can be viewed through the touch screen 23 . Preferably, the PLC controller 22 is provided with a WiFi communication module 25, through the WiFi communication module 25, the temperature data of the condensed water in the first water storage tank 31 and the filtered water storage chamber 414 can be sent to the air conditioner user through the network mobile devices for easy viewing.

作为一种优选的实施方式,在所述第二储水箱41的下部设有水龙头47,通过打开水龙头47,能够将第二储水箱41内经过过滤的冷凝水排出,作为生活用水使用,进而对冷凝水进行充分的利用。As a preferred embodiment, a faucet 47 is provided at the bottom of the second water storage tank 41, and by opening the faucet 47, the filtered condensed water in the second water storage tank 41 can be discharged and used as domestic water, and then used for Condensed water is fully utilized.

作为一种优选的实施方式,在所述雾化装置4的下部设有若干万向轮48,能够在室内方便对雾化装置4进行移动。As a preferred embodiment, several universal wheels 48 are provided on the lower part of the atomization device 4, so that the atomization device 4 can be moved indoors conveniently.

作为一种优选的实施方式,在所述塑料螺纹管423的上部活动安装有L形喷雾嘴49,能够使雾化后的水分沿着水平反向喷出;当不需要使用时,能够将L形喷雾嘴49从塑料螺纹管423上取下,使用方式较为灵活。As a preferred embodiment, an L-shaped spray nozzle 49 is movably installed on the top of the plastic threaded pipe 423, so that the atomized moisture can be sprayed out along the horizontal direction; The shape spray nozzle 49 is taken off from the plastic threaded pipe 423, and the mode of use is comparatively flexible.

综上,本发明能够对冷凝水进行收集,充分利用冷凝水所含的制冷量,对空调的室外机进行降温,并通过收集的冷凝水对室内空气进行加湿,减少了空调冷凝水的排放,有效保护了环境,In summary, the present invention can collect condensed water, make full use of the cooling capacity contained in the condensed water, cool down the outdoor unit of the air conditioner, and humidify the indoor air through the collected condensed water, reducing the discharge of condensed water from the air conditioner. effectively protect the environment,

本发明未详述之处,均为本技术领域技术人员的公知技术。最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。The parts of the present invention that are not described in detail are known technologies of those skilled in the art. Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present invention without limitation. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be carried out Modifications or equivalent replacements without departing from the spirit and scope of the technical solution of the present invention shall be covered by the claims of the present invention.

Claims (7)

1.一种空调冷凝水回收装置,包括空调室外机(1)和空调室内机(2),其特征在于:在所述空调室外机(1)的内部设有冷凝器(11),在所述冷凝器(11)的后部设有制冷装置(3),所述制冷装置(3)包括第一储水箱(31),所述第一储水箱(31)通过冷凝水进水管(12)与空调室内机(2)进行连接;在所述第一储水箱(31)的下部设有总排水管(32),所述第一储水箱(31)和总排水管(32)通过若干分支制冷水管(33)进行连接;在所述分支制冷水管(33)上均设有制冷片(34),所述制冷片(34)的截面形状为平行四边形,所述分支制冷水管(33)和制冷片(34)均为铝材质;在所述制冷装置(3)的后部设有风机(13),在所述空调室外机(1)的前部设有出风口(14);在所述第一储水箱(31)的内部设有第一水位计(35);在所述总排水管(32)的下部设有溢流管(36),在所述溢流管(36)上设有第一电磁阀(37);1. An air-conditioning condensed water recovery device, comprising an air-conditioning outdoor unit (1) and an air-conditioning indoor unit (2), is characterized in that: a condenser (11) is provided inside the air-conditioning outdoor unit (1). The rear portion of the condenser (11) is provided with a refrigerating device (3), and the refrigerating device (3) includes a first water storage tank (31), and the first water storage tank (31) passes through the condensed water inlet pipe (12) Connect with the air-conditioning indoor unit (2); a main drainage pipe (32) is provided at the bottom of the first water storage tank (31), and the first water storage tank (31) and the main drainage pipe (32) pass through several branches Refrigeration water pipe (33) is connected; On described branch refrigeration water pipe (33), be provided with refrigeration plate (34), the cross-sectional shape of described refrigeration plate (34) is parallelogram, described branch refrigeration water pipe (33) and The refrigerating sheets (34) are all made of aluminum; a fan (13) is provided at the rear of the refrigerating device (3), and an air outlet (14) is provided at the front of the air conditioner outdoor unit (1); The inside of the first water storage tank (31) is provided with a first water level gauge (35); an overflow pipe (36) is provided at the bottom of the main drainage pipe (32), and on the overflow pipe (36) A first solenoid valve (37) is provided; 在所述空调室内机(2)的侧面设有雾化装置(4),在所述雾化装置(4)的内部设有第二储水箱(41)和雾化箱(42);在所述第二储水箱(41)的上部设有水泵(43),所述水泵(43)的进水端通过雾化装置进水管(21)与总排水管(32)相连接,所述水泵(43)的出水端与第二储水箱(41)相连接;所述第一水位计(35)与水泵(43)通过导线电性连接;An atomizing device (4) is provided on the side of the air-conditioning indoor unit (2), and a second water storage tank (41) and an atomizing box (42) are arranged inside the atomizing device (4); The top of the second water storage tank (41) is provided with a water pump (43), the water inlet end of the water pump (43) is connected with the main drainage pipe (32) through the atomization device water inlet pipe (21), and the water pump ( The water outlet of 43) is connected to the second water storage tank (41); the first water level gauge (35) is electrically connected to the water pump (43) through a wire; 在所述第二储水箱(41)的内部从上到下依次设有过滤网层(411)、活性炭层(412)、PP棉层(413)和过滤储水腔(414),在所述过滤储水腔(414)的内壁上设有第二水位计(415);所述第二水位计(415)与第一电磁阀(37)通过导线电性连接;Inside the second water storage tank (41), a filter layer (411), an activated carbon layer (412), a PP cotton layer (413) and a filter water storage chamber (414) are sequentially provided from top to bottom, in the A second water level gauge (415) is provided on the inner wall of the filter water storage cavity (414); the second water level gauge (415) is electrically connected to the first electromagnetic valve (37) through a wire; 在所述雾化装置(4)的底壁上设有雾化进水管(44),在所述雾化进水管(44)上设有第二电磁阀(45),所述第二储水箱(41)和雾化箱(42)通过雾化进水管(44)相连接;在所述雾化箱(42)的底壁上设有超声波雾化器(421),在所述超声波雾化器(421)的上部设有文丘里管(422);在所述雾化箱(42)的上部设有塑料螺纹管(423);在所述雾化装置(4)的外壁上设有湿度传感器(46),所述湿度传感器(46)分别与超声波雾化器(421)、第二电磁阀(45)通过导线电性连接。An atomization water inlet pipe (44) is provided on the bottom wall of the atomization device (4), a second solenoid valve (45) is arranged on the atomization water inlet pipe (44), and the second water storage tank (41) is connected with atomizing box (42) by atomizing water inlet pipe (44); On the bottom wall of described atomizing box (42), be provided with ultrasonic nebulizer (421), in described ultrasonic atomizing The top of the device (421) is provided with a Venturi tube (422); the top of the atomization box (42) is provided with a plastic threaded pipe (423); the outer wall of the atomization device (4) is provided with a humidity A sensor (46), the humidity sensor (46) is electrically connected to the ultrasonic nebulizer (421) and the second electromagnetic valve (45) respectively through wires. 2.根据权利要求1所述的空调冷凝水回收装置,其特征在于:所述第一储水箱(31)的表面设有聚氨酯保温层。2. The air conditioner condensate recovery device according to claim 1, characterized in that: the surface of the first water storage tank (31) is provided with a polyurethane insulation layer. 3.根据权利要求1所述的空调冷凝水回收装置,其特征在于:在所述空调室内机(2)的前部设有PLC控制器(22)和触摸屏(23),所述PLC控制器(22)和触摸屏(23)通过导线电性连接;在所述第一储水箱(31)和过滤储水腔(414)内均设有温度传感器(24),所述温度传感器(24)均通过导线与PLC控制器(22)电性连接。3. The air-conditioning condensate recovery device according to claim 1, characterized in that: a PLC controller (22) and a touch screen (23) are provided at the front of the air-conditioning indoor unit (2), and the PLC controller (22) and the touch screen (23) are electrically connected by wires; temperature sensors (24) are all arranged in the first water storage tank (31) and the filtered water storage cavity (414), and the temperature sensors (24) are all It is electrically connected with the PLC controller (22) through wires. 4.根据权利要求3所述的空调冷凝水回收装置,其特征在于:在所述PLC控制器(22)上设有WiFi通信模块(25)。4. The air conditioner condensate recovery device according to claim 3, characterized in that: a WiFi communication module (25) is provided on the PLC controller (22). 5.根据权利要求1所述的空调冷凝水回收装置,其特征在于:在所述第二储水箱(41)的下部设有水龙头(47)。5. The air conditioner condensate recovery device according to claim 1, characterized in that: a faucet (47) is provided at the lower part of the second water storage tank (41). 6.根据权利要求1所述的空调冷凝水回收装置,其特征在于:在所述雾化装置(4)的下部设有若干万向轮(48)。6. The air conditioner condensed water recovery device according to claim 1, characterized in that: several universal wheels (48) are provided at the lower part of the atomization device (4). 7.根据权利要求1所述的空调冷凝水回收装置,其特征在于:在所述塑料螺纹管(423)的上部活动安装有L形喷雾嘴(49)。7. The air conditioner condensate recovery device according to claim 1, characterized in that: an L-shaped spray nozzle (49) is movably installed on the upper part of the plastic threaded pipe (423).
CN201710378757.8A 2017-05-25 2017-05-25 A kind of condensate water recovery device of air conditioner Pending CN107192111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710378757.8A CN107192111A (en) 2017-05-25 2017-05-25 A kind of condensate water recovery device of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710378757.8A CN107192111A (en) 2017-05-25 2017-05-25 A kind of condensate water recovery device of air conditioner

Publications (1)

Publication Number Publication Date
CN107192111A true CN107192111A (en) 2017-09-22

Family

ID=59874988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710378757.8A Pending CN107192111A (en) 2017-05-25 2017-05-25 A kind of condensate water recovery device of air conditioner

Country Status (1)

Country Link
CN (1) CN107192111A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107917486A (en) * 2017-10-30 2018-04-17 新奥泛能网络科技股份有限公司 Air conditioner
CN108592176A (en) * 2018-03-06 2018-09-28 广西玉柴机器股份有限公司 Humidifying energy saving air conditioner
CN108800352A (en) * 2018-04-09 2018-11-13 浙江欧伦电气有限公司 Double space constant humidity system and control method
CN108826520A (en) * 2018-07-09 2018-11-16 广东志高暖通设备股份有限公司 A kind of air-conditioning and its refrigeration unit
CN109520035A (en) * 2018-12-11 2019-03-26 杭州虹华环保科技有限公司 A kind of central air-conditioning atomization energy-saving equipment
CN109910552A (en) * 2019-04-16 2019-06-21 南华大学 Bus air conditioning condensate reuse system and condensate reuse method
WO2019137084A1 (en) * 2018-01-09 2019-07-18 青岛海尔空调器有限总公司 Atomizing drainage air conditioner
CN110056977A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 Condensated water treatment device of air conditioner and air conditioner
CN110056978A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 Utilize the humidifying controlling method of air conditioner condensate water
CN110056979A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 The discharge control method of air conditioner condensate water
CN110486856A (en) * 2019-08-02 2019-11-22 青岛海尔空调器有限总公司 Air conditioner and its control method
CN110617586A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall
CN110617574A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall and building
CN110617587A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall
CN110657500A (en) * 2019-10-17 2020-01-07 珠海格力电器股份有限公司 Air conditioner with automatic humidifying function and control method
CN110726185A (en) * 2019-09-04 2020-01-24 徐忠华 Cooling atomizer
CN111912090A (en) * 2020-08-21 2020-11-10 南京贝特空调设备有限公司 Condensate recovery device and system thereof
CN114353192A (en) * 2022-01-10 2022-04-15 张沣栎 Air conditioner condensate water recycling system based on household air conditioner
CN115560466A (en) * 2022-03-30 2023-01-03 李珂珂 A kind of solar water heater with solar photovoltaic power generation system
CN115751491A (en) * 2022-11-19 2023-03-07 安徽弘金祥机电设备有限公司 Central air-conditioning condensate secondary recovery atomization cooling device
WO2025228061A1 (en) * 2024-04-30 2025-11-06 曾琦 Integrated split-type air conditioning and atmospheric water generating device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201096396Y (en) * 2007-08-22 2008-08-06 黄军团 Energy-saving air conditioner possessing condensate water utilization device
CN101676642A (en) * 2008-09-18 2010-03-24 乐金电子(天津)电器有限公司 Water-cooled dehumidifier
JP2010181050A (en) * 2009-02-03 2010-08-19 Nippon Spindle Mfg Co Ltd Temperature control device
CN204388258U (en) * 2014-12-25 2015-06-10 重庆大学 Split-type air conditioner condensing hot air furnace re-use device
CN204830363U (en) * 2015-07-18 2015-12-02 河南西科电子有限公司 Air conditioner drainage cyclic utilization device
CN205783412U (en) * 2016-05-20 2016-12-07 罗国权 A kind of air-conditioner outdoor unit cold and heat recovery device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201096396Y (en) * 2007-08-22 2008-08-06 黄军团 Energy-saving air conditioner possessing condensate water utilization device
CN101676642A (en) * 2008-09-18 2010-03-24 乐金电子(天津)电器有限公司 Water-cooled dehumidifier
JP2010181050A (en) * 2009-02-03 2010-08-19 Nippon Spindle Mfg Co Ltd Temperature control device
CN204388258U (en) * 2014-12-25 2015-06-10 重庆大学 Split-type air conditioner condensing hot air furnace re-use device
CN204830363U (en) * 2015-07-18 2015-12-02 河南西科电子有限公司 Air conditioner drainage cyclic utilization device
CN205783412U (en) * 2016-05-20 2016-12-07 罗国权 A kind of air-conditioner outdoor unit cold and heat recovery device

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107917486A (en) * 2017-10-30 2018-04-17 新奥泛能网络科技股份有限公司 Air conditioner
WO2019137084A1 (en) * 2018-01-09 2019-07-18 青岛海尔空调器有限总公司 Atomizing drainage air conditioner
CN108592176A (en) * 2018-03-06 2018-09-28 广西玉柴机器股份有限公司 Humidifying energy saving air conditioner
CN108800352A (en) * 2018-04-09 2018-11-13 浙江欧伦电气有限公司 Double space constant humidity system and control method
CN108826520A (en) * 2018-07-09 2018-11-16 广东志高暖通设备股份有限公司 A kind of air-conditioning and its refrigeration unit
CN109520035A (en) * 2018-12-11 2019-03-26 杭州虹华环保科技有限公司 A kind of central air-conditioning atomization energy-saving equipment
CN110056977B (en) * 2019-03-21 2021-08-31 重庆海尔空调器有限公司 Air conditioner condensate treatment device and air conditioner
CN110056977A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 Condensated water treatment device of air conditioner and air conditioner
CN110056978A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 Utilize the humidifying controlling method of air conditioner condensate water
CN110056979A (en) * 2019-03-21 2019-07-26 青岛海尔空调器有限总公司 The discharge control method of air conditioner condensate water
CN109910552A (en) * 2019-04-16 2019-06-21 南华大学 Bus air conditioning condensate reuse system and condensate reuse method
CN110486856A (en) * 2019-08-02 2019-11-22 青岛海尔空调器有限总公司 Air conditioner and its control method
WO2021023057A1 (en) * 2019-08-02 2021-02-11 青岛海尔空调器有限总公司 Air conditioner and control method therefor
CN110726185A (en) * 2019-09-04 2020-01-24 徐忠华 Cooling atomizer
CN110617574A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall and building
CN110617587A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall
CN110617586A (en) * 2019-09-09 2019-12-27 青岛新航农高科产业发展有限公司 Integrated wall
CN110657500A (en) * 2019-10-17 2020-01-07 珠海格力电器股份有限公司 Air conditioner with automatic humidifying function and control method
CN111912090A (en) * 2020-08-21 2020-11-10 南京贝特空调设备有限公司 Condensate recovery device and system thereof
CN114353192A (en) * 2022-01-10 2022-04-15 张沣栎 Air conditioner condensate water recycling system based on household air conditioner
CN115560466A (en) * 2022-03-30 2023-01-03 李珂珂 A kind of solar water heater with solar photovoltaic power generation system
CN115751491A (en) * 2022-11-19 2023-03-07 安徽弘金祥机电设备有限公司 Central air-conditioning condensate secondary recovery atomization cooling device
WO2025228061A1 (en) * 2024-04-30 2025-11-06 曾琦 Integrated split-type air conditioning and atmospheric water generating device

Similar Documents

Publication Publication Date Title
CN206073415U (en) A kind of air-conditioning environmental protection and energy saving humidifier
CN102679470B (en) Self-cleaning efficient constant-temperature constant-humidity energy-saving central air conditioning equipment
CN203443010U (en) Spray humidifier, air conditioner indoor unit and air conditioner
CN204665473U (en) Air conditioner indoor unit and air conditioning unit
CN210951539U (en) Indoor unit base and air conditioner
CN207279933U (en) A kind of air conditioner condensation water collecting device, condensation water collection processing equipment and air-conditioning
CN108518761B (en) Air conditioner
CN203642416U (en) Phase-change cooling energy-saving system
CN108194995A (en) A kind of air-conditioning
CN106891692A (en) For the condensation water recovery system of caravan air-conditioning
CN103277848A (en) Energy-saving type household air conditioner without drainage
CN210399460U (en) Air conditioner condensate water phase change cold accumulation recovery unit
CN208124531U (en) A kind of electric water one air-conditioning heating hot wind unit of fully-automatic intelligent manipulation
CN207702635U (en) A kind of atomizing air-conditioning with wind energy self-generating device
CN207990806U (en) A kind of car overhead elevator air conditioning system
CN207081187U (en) Air conditioner without draining
CN210801420U (en) Energy-conserving air condensing units comdenstion water recovery unit
CN203258772U (en) Energy-saving type household air conditioner without discharging water
CN104154594B (en) Air purification and regulation device without indoor set
CN101871681B (en) Wind-powered ultrasonic-wave water-atomization cooling wall
CN208253835U (en) A kind of evaporation cooling channel air-conditioning system of combination laminar air-supply
CN201740149U (en) Wind ultrasonic water-atomization cooling wall
CN201387116Y (en) Automatic continuous drainage for through-the-wall air conditioners
CN201637015U (en) Heat pump air conditioner integrating humidifying indoor air and waste heat recovery
CN215112901U (en) Constant temperature and humidity new trend air purification all-in-one

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication