CN107188025A - A kind of Steel bar hanger for crane and its application method - Google Patents

A kind of Steel bar hanger for crane and its application method Download PDF

Info

Publication number
CN107188025A
CN107188025A CN201710624820.1A CN201710624820A CN107188025A CN 107188025 A CN107188025 A CN 107188025A CN 201710624820 A CN201710624820 A CN 201710624820A CN 107188025 A CN107188025 A CN 107188025A
Authority
CN
China
Prior art keywords
rod
push rod
hole
slot
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710624820.1A
Other languages
Chinese (zh)
Other versions
CN107188025B (en
Inventor
唐志赏
关宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huabiao Special Equipment Testing Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710624820.1A priority Critical patent/CN107188025B/en
Publication of CN107188025A publication Critical patent/CN107188025A/en
Application granted granted Critical
Publication of CN107188025B publication Critical patent/CN107188025B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明涉及到起重机械领域,具体涉及到一种起重机用钢筋吊具及其使用方法。包括吊梁,吊梁下端面均布设置有多个立杆,立杆右侧均设置有旋转杆,旋转杆与立杆通过销轴连接,立杆后方的旋转杆通过连接杆连接,连接杆上设置有配重块,旋转杆上设置有与立杆配合的限位装置,立杆内部设置解除限位装置的卸载装置。本发明结构简单,操作方便,本发明的起重机用钢筋吊具在吊装钢筋时准确迅速,吊装效率高,而且不再需要人工装夹而且使用安全。

The invention relates to the field of hoisting machinery, in particular to a steel bar spreader for a crane and a using method thereof. Including the hanging beam, the lower end of the hanging beam is evenly arranged with a plurality of vertical rods, and the right side of the vertical rods is equipped with a rotating rod. A counterweight is arranged on the top, a limit device matched with the vertical rod is arranged on the rotating rod, and an unloading device for releasing the limit device is arranged inside the vertical rod. The invention has the advantages of simple structure and convenient operation. The steel bar spreader for cranes of the invention is accurate and fast in hoisting steel bars, has high hoisting efficiency, does not need manual clamping, and is safe to use.

Description

一种起重机用钢筋吊具及其使用方法A kind of steel bar spreader for crane and using method thereof

技术领域technical field

本发明涉及到起重机械领域,具体涉及到一种起重机用钢筋吊具及其使用方法。The invention relates to the field of hoisting machinery, in particular to a steel bar spreader for a crane and a using method thereof.

背景技术Background technique

目前,管桩在制作过程中需要用起重机吊装钢筋。而钢筋在吊装时,一般由操作工用钢丝绳等索具扎紧后置于起重机吊梁下进行起吊、就位。这样,不仅工人劳动强度大,也不安全,而且钢筋卸下就位也较慢,效率大大降低。因此,为解决上述技术问题,确有必要提供一种结构新颖的起重机用钢筋吊具,以克服现有技术中的所述缺陷。Currently, the steel bars need to be hoisted by a crane during the fabrication of the pipe piles. When the steel bar is hoisted, it is generally placed under the crane beam for hoisting and positioning by the operator after being tightened with slings such as steel wire ropes. Like this, not only worker's labor intensity is big, also unsafe, and steel bar is unloaded and puts in place also slower, and efficiency is greatly reduced. Therefore, in order to solve the above-mentioned technical problems, it is indeed necessary to provide a steel bar spreader for cranes with a novel structure, so as to overcome the above-mentioned defects in the prior art.

发明内容Contents of the invention

为解决上述问题,本发明的目的在于提供一种就位快速准确、使用安全且效率高的起重机用钢筋吊具及其使用方法。In order to solve the above problems, the object of the present invention is to provide a fast and accurate positioning, safe and efficient steel bar spreader for cranes and a method of use thereof.

为了实现上述目的,本发明提供的技术方案是:In order to achieve the above object, the technical solution provided by the invention is:

一种起重机用钢筋吊具,包括吊梁,吊梁下端面均布设置有多个立杆,立杆右侧均设置有旋转杆,旋转杆与立杆通过销轴连接,立杆后方的旋转杆通过连接杆连接,连接杆上设置有配重块,旋转杆上设置有与立杆配合的限位装置,立杆内部设置解除限位装置的卸载装置。A steel bar spreader for a crane, comprising a hanging beam, a plurality of vertical rods are evenly distributed on the lower end surface of the hanging beam, and a rotating rod is arranged on the right side of the vertical rods, the rotating rods and the vertical rods are connected by pin shafts, and the rotation at the rear of the vertical rods The rods are connected by connecting rods, the connecting rods are provided with counterweights, the rotating rods are provided with a limit device that cooperates with the vertical rod, and the inside of the vertical rod is provided with an unloading device that releases the limit device.

具体的,所述限位装置包括设置在旋转杆上轴向中心线与吊梁平行的第三槽孔,第三槽孔内设置有第二推杆,第二推杆的右端面与第三槽孔的孔底之间设置有第二弹簧,第二弹簧一端与第三槽孔的孔底固定连接,第二弹簧的另一端与第二推杆的右端面固定连接。Specifically, the limiting device includes a third slot on the rotating rod whose axial center line is parallel to the suspension beam, a second push rod is arranged in the third slot, and the right end surface of the second push rod is aligned with the third A second spring is arranged between the bottoms of the slots, one end of the second spring is fixedly connected with the bottom of the third slot, and the other end of the second spring is fixedly connected with the right end surface of the second push rod.

具体的,所述卸载装置包括设置在立杆内部且轴向中心线与立杆平行的第一槽孔,第一槽孔内设置有顶杆,顶杆上部设置有第一档环,第一槽孔的底部设置有第一孔档,第一孔档的内缘上设置有与顶杆上的档条配合的方槽,第一孔档和第一档环之间的顶杆上设置有第一弹簧,第一弹簧的上端与第一档环个固定连接,第一弹簧的下端与第一孔档固定连接,立杆的右部设置有与第一槽孔连通且轴向中心线与第一槽孔的轴向中心线垂直的第二槽孔,第二槽孔的孔壁左侧设置有第二孔档,第二槽孔内设置有第一推杆,第一推杆右端设置有第三档环,第一推杆的左部外缘设置有第二档环,第三档环和第二档环的外经相等,且第三档环的外径大于第二孔档的内径,第二槽孔的轴向中心线在第二推杆的轴向中心线绕销轴旋转的轨迹上,且第二槽孔的孔径到大于第二推杆的外经。Specifically, the unloading device includes a first slot arranged inside the vertical rod and the axial center line is parallel to the vertical rod. A push rod is arranged in the first slot, and a first gear ring is arranged on the upper part of the push rod. The bottom of the slot hole is provided with a first hole shelf, and the inner edge of the first hole shelf is provided with a square groove that matches the bar on the push rod, and the push rod between the first hole shelf and the first stop ring is provided with a The first spring, the upper end of the first spring is fixedly connected with the first gear ring, the lower end of the first spring is fixedly connected with the first hole gear, and the right part of the vertical rod is provided with a device that communicates with the first slot and the axial centerline is in line with the first hole. The axial center line of the first slot is vertical to the second slot, the left side of the hole wall of the second slot is provided with a second hole stopper, the second slot is provided with a first push rod, and the right end of the first push rod is provided There is a third gear ring, the left outer edge of the first push rod is provided with a second gear ring, the outer diameters of the third gear ring and the second gear ring are equal, and the outer diameter of the third gear ring is larger than that of the second hole gear Inner diameter, the axial centerline of the second slot hole is on the track where the axial centerline of the second push rod rotates around the pin shaft, and the diameter of the second slot hole is larger than the outer diameter of the second push rod.

具体的,所述顶杆下端设置有底座。Specifically, a base is provided at the lower end of the push rod.

具体的,所述立杆后方的旋转杆上设置有档杆。Specifically, the rotating rod behind the vertical rod is provided with a gear rod.

具体的,所述顶杆上端设置有朝向第二槽孔的斜面。Specifically, the upper end of the push rod is provided with a slope facing the second slot.

具体的,所述第一推杆左端面为圆弧面。Specifically, the left end surface of the first push rod is an arc surface.

与现有技术相比,本发明的有益效果为:Compared with prior art, the beneficial effect of the present invention is:

本发明结构简单,操作方便,本发明的起重机用钢筋吊具在吊装钢筋时准确迅速,吊装效率高,而且不再需要人工装夹而且使用安全。The invention has the advantages of simple structure and convenient operation. The steel bar spreader for cranes of the invention is accurate and fast in hoisting steel bars, has high hoisting efficiency, does not need manual clamping, and is safe to use.

附图说明Description of drawings

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2为图1中A区域的放大图。FIG. 2 is an enlarged view of area A in FIG. 1 .

图3为图2中B区域的放大图。FIG. 3 is an enlarged view of area B in FIG. 2 .

图4本发明的侧视图。Figure 4 is a side view of the present invention.

图5为图4中C区域的放大图。FIG. 5 is an enlarged view of area C in FIG. 4 .

图6为第一孔档的俯视图。Fig. 6 is a top view of the first hole stop.

附图中的零部件名称为:The names of the parts in the accompanying drawings are:

1、立杆,2、旋转杆,3、销轴,4、档杆,5、第一槽孔,6、第二槽孔,7、第一推杆,8、顶杆,9、第一档环,10、连接杆,11、配重块,12、第一孔档,13、第一弹簧,14、底座,15、第二档环,16、第二推杆,17、第二槽孔,18、第二弹簧,19、吊梁,20、第三档环,21、档条,22、方槽,23、第二孔档。1. Vertical rod, 2. Rotating rod, 3. Pin shaft, 4. Gear lever, 5. First slot hole, 6. Second slot hole, 7. First push rod, 8. Ejector rod, 9. First Gear ring, 10, connecting rod, 11, counterweight, 12, first hole gear, 13, first spring, 14, base, 15, second gear ring, 16, second push rod, 17, second groove Hole, 18, the second spring, 19, hanging beam, 20, the third gear ring, 21, gear bar, 22, square groove, 23, the second hole gear.

具体实施方式detailed description

如图1-6所示,一种起重机用钢筋吊具,包括吊梁19,吊梁19下端面均布设置有多个立杆1,立杆1右侧均设置有旋转杆2,旋转杆2与立杆1通过销轴3连接,立杆1后方的旋转杆2通过连接杆10连接,连接杆10上设置有配重块11,旋转杆2上设置有与立杆1配合的限位装置,立杆1内部设置解除限位装置的卸载装置。As shown in Figures 1-6, a steel bar spreader for a crane includes a suspension beam 19, a plurality of vertical rods 1 are evenly distributed on the lower end surface of the suspension beam 19, and a rotating rod 2 is arranged on the right side of the vertical rod 1. 2 is connected with the vertical pole 1 through the pin shaft 3, and the rotating rod 2 behind the vertical rod 1 is connected through the connecting rod 10. device, the inside of the pole 1 is provided with an unloading device for releasing the limit device.

所述限位装置包括设置在旋转杆2上且轴向中心线与吊梁19平行的第三槽孔17,第三槽孔17内设置有第二推杆16,第二推杆16的右端面与第三槽孔17的孔底之间设置有第二弹簧18,第二弹簧18一端与第三槽孔17的孔底固定连接,第二弹簧18的另一端与第二推杆16的右端面固定连接。The limiting device includes a third slot 17 that is arranged on the rotating rod 2 and whose axial center line is parallel to the suspension beam 19. A second push rod 16 is arranged in the third slot 17, and the right end of the second push rod 16 A second spring 18 is arranged between the surface and the bottom of the third slot 17, one end of the second spring 18 is fixedly connected with the bottom of the third slot 17, and the other end of the second spring 18 is connected to the bottom of the second push rod 16. The right end face is fixedly connected.

所述卸载装置包括设置在立杆1内部且轴向中心线与立杆1平行的第一槽孔5,第一槽孔5内设置有顶杆8,顶杆8上部设置有第一档环9,第一槽孔5的底部设置有第一孔档12,第一孔档12的内缘上设置有与顶杆8上的档条21配合的方槽22,第一孔档12和第一档环9之间的顶杆8上设置有第一弹簧13,第一弹簧13的上端与第一档环9个固定连接,第一弹簧13的下端与第一孔档12固定连接,立杆1的右部设置有与第一槽孔5连通且轴向中心线与第一槽孔5的轴向中心线垂直的第二槽孔6,第二槽孔6的孔壁左侧设置有第二孔档23,第二槽孔6内设置有第一推杆7,第一推杆7右端设置有第三档环20,第一推杆7的左部外缘设置有第二档环15,第三档环20和第二档环15的外经相等,且第三档环20的外径大于第二孔档23的内径,第二槽孔6的轴向中心线在第二推杆16的轴向中心线绕销轴3旋转的轨迹上,且第二槽孔6的孔径到大于第二推杆16的外经。The unloading device includes a first slot 5 arranged inside the vertical rod 1 and the axial center line is parallel to the vertical rod 1, a push rod 8 is arranged in the first slot 5, and a first stop ring is arranged on the upper part of the push rod 8 9. The bottom of the first slot 5 is provided with a first hole stopper 12, and the inner edge of the first hole stopper 12 is provided with a square groove 22 that cooperates with the bar 21 on the ejector rod 8. The first hole stopper 12 and the second The push rod 8 between the first gear rings 9 is provided with a first spring 13, the upper end of the first spring 13 is fixedly connected with 9 first gear rings, the lower end of the first spring 13 is fixedly connected with the first hole gear 12, and the vertical The right part of the rod 1 is provided with a second slot 6 which communicates with the first slot 5 and whose axial centerline is perpendicular to the axial centerline of the first slot 5. The left side of the second slot 6 is provided with a The second hole gear 23, the second slotted hole 6 is provided with a first push rod 7, the right end of the first push rod 7 is provided with a third gear ring 20, and the left outer edge of the first push rod 7 is provided with a second gear ring 15. The outer diameters of the third gear ring 20 and the second gear ring 15 are equal, and the outer diameter of the third gear ring 20 is larger than the inner diameter of the second hole gear 23, and the axial centerline of the second slot hole 6 is in the second push The axial centerline of the rod 16 is on the track of rotation around the pin shaft 3 , and the diameter of the second slot 6 is larger than the outer diameter of the second push rod 16 .

所述顶杆8下端设置有底座14。The lower end of the push rod 8 is provided with a base 14 .

所述立杆1后方的旋转杆2上设置有档杆4。A gear rod 4 is arranged on the rotating rod 2 at the rear of the vertical rod 1 .

所述顶杆8上端设置有朝向第二槽孔6的斜面。The upper end of the push rod 8 is provided with a slope facing the second slot 6 .

所述第一推杆7左端面为圆弧面。The left end surface of the first push rod 7 is an arc surface.

使用时,第三槽孔17内的第二推杆16受到第二弹簧18的弹力伸进第二槽孔6中,此时立杆1前方的旋转杆2一端向吊梁19方向倾斜,吊装时,下放吊梁19,使得顶杆8的底座14与地面保持一定距离,将需要移动的钢筋放在倾斜的旋转杆2上,然后吊起,设置有多个立杆1和旋转杆2能够防止钢筋在吊动时由于自身重力的原因而弯折变形。During use, the second push rod 16 in the third slot 17 is stretched into the second slot 6 by the elastic force of the second spring 18. At this moment, one end of the rotating rod 2 in the front of the vertical rod 1 is inclined to the direction of the suspension beam 19, and the hoisting , lower the suspension beam 19 so that the base 14 of the push rod 8 keeps a certain distance from the ground, place the steel bar that needs to be moved on the inclined rotating rod 2, and then lift it up. A plurality of vertical rods 1 and rotating rods 2 can be Prevent the steel bar from bending and deforming due to its own gravity when it is hoisted.

当钢筋被吊到指定位置是,下放吊梁19,当顶杆8下端的底座14与地面接触时有吊具及钢筋自身的重力就会挤压顶杆8,顶杆8在第一槽孔5内上升,此时第一弹簧13呈拉伸状态,顶杆8上端的斜面与第一推杆7接触后并推动第一推杆7向第三槽孔17方向运动,第一推杆7推动第二推杆16向第三槽孔17的槽底方向运动,且第二推杆16挤压第二弹簧18,当第二推杆16与第二槽孔6分离后由于钢筋的重力,立杆1前方的旋转杆2就会向下旋转,直到旋转杆2上的档杆4与立杆1接触,此时旋转杆2上的钢筋就会滑落到地面上。When the steel bar is hoisted to the designated position, the hanging beam 19 is lowered, and when the base 14 at the lower end of the push rod 8 contacts the ground, the gravity of the hanger and the steel bar itself will squeeze the push rod 8, and the push rod 8 is in the first slot. 5 rises, and now the first spring 13 is in a stretched state. After the inclined surface on the upper end of the push rod 8 contacts the first push rod 7 and pushes the first push rod 7 to move toward the third slot 17, the first push rod 7 Promote the second push rod 16 to move toward the bottom of the third slot 17, and the second push rod 16 squeezes the second spring 18. After the second push rod 16 is separated from the second slot 6, due to the gravity of the steel bar, The rotating rod 2 in front of the vertical rod 1 will rotate downwards, until the gear lever 4 on the rotating rod 2 contacts with the vertical rod 1, at this moment the steel bar on the rotating rod 2 will slide down on the ground.

钢筋卸下后起升吊梁19,底座14与地面分离后,第一弹簧13使得顶杆8向下移动,由于立杆1后方连接旋转杆2的连接杆10以及其上的配重块11的重力,立杆1前方的旋转杆2部分就会绕销轴3向上方旋转,直到第二弹簧18将第二推杆16推进第二槽孔6中,第二推杆16进入到第二槽孔6后就会推动第二槽孔6中的第一推杆7向第一槽孔5方向运动,此时旋转杆2恢复到起吊前的状态,为下次起吊做准备,旋转杆2在旋转的过程中始终与立杆1的右端面接触。After the steel bar is unloaded, the lifting beam 19 is lifted, and after the base 14 is separated from the ground, the first spring 13 makes the push rod 8 move downward. gravity, the part of the rotating rod 2 in front of the vertical rod 1 will rotate upwards around the pin shaft 3 until the second spring 18 pushes the second push rod 16 into the second slot 6, and the second push rod 16 enters the second After the slot 6, the first push rod 7 in the second slot 6 will be pushed to move towards the first slot 5. At this time, the rotating rod 2 returns to the state before the lifting, to prepare for the next lifting, and the rotating rod 2 In the process of rotation, it is always in contact with the right end face of the pole 1.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.

Claims (8)

1.一种起重机用钢筋吊具,包括吊梁(19),吊梁(19)下端面均布设置有多个立杆(1),其特征在于,立杆(1)右侧均设置有旋转杆(2),旋转杆(2)与立杆(1)通过销轴(3)连接,立杆(1)后方的旋转杆(2)通过连接杆(10)连接,连接杆(10)上设置有配重块(11),旋转杆(2)上设置有与立杆(1)配合的限位装置,立杆(1)内部设置解除限位装置的卸载装置。1. A steel bar spreader for a crane, comprising a suspension beam (19), a plurality of vertical rods (1) are evenly distributed on the lower end surface of the suspension beam (19), it is characterized in that the right side of the vertical rod (1) is equipped with The rotating rod (2), the rotating rod (2) is connected with the vertical rod (1) through a pin shaft (3), the rotating rod (2) at the rear of the vertical rod (1) is connected through a connecting rod (10), and the connecting rod (10) A counterweight (11) is arranged on the top, a limit device cooperating with the vertical rod (1) is arranged on the rotating rod (2), and an unloading device for releasing the limit device is arranged inside the vertical rod (1). 2.根据权利要求1所述一种起重机用钢筋吊具,其特征在于,所述限位装置包括设置在旋转杆(2)上且轴向中心线与吊梁(19)平行的第三槽孔(17),第三槽孔(17)内设置有第二推杆(16),第二推杆(16)的右端面与第三槽孔(17)的孔底之间设置有第二弹簧(18),第二弹簧(18)一端与第三槽孔(17)的孔底固定连接,第二弹簧(18)的另一端与第二推杆(16)的右端面固定连接。2. A steel bar spreader for a crane according to claim 1, characterized in that, the limiting device comprises a third groove arranged on the rotating rod (2) and whose axial centerline is parallel to the suspension beam (19) hole (17), a second push rod (16) is arranged in the third slot hole (17), and a second Spring (18), second spring (18) one end is fixedly connected with the hole bottom of the 3rd slotted hole (17), and the other end of second spring (18) is fixedly connected with the right end face of the second push rod (16). 3.根据权利要求1所述一种起重机用钢筋吊具,其特征在于,所述卸载装置包括设置在立杆(1)内部且轴向中心线与立杆(1)平行的第一槽孔(5),第一槽孔(5)内设置有顶杆(8),顶杆(8)上部设置有第一档环(9),第一槽孔(5)的底部设置有第一孔档(12),第一孔档(12)的内缘上设置有与顶杆(8)上的档条(21)配合的方槽(22),第一孔档(12)和第一档环(9)之间的顶杆(8)上设置有第一弹簧(13),第一弹簧(13)的上端与第一档环(9)个固定连接,第一弹簧(13)的下端与第一孔档(12)固定连接,立杆(1)的右部设置有与第一槽孔(5)连通且轴向中心线与第一槽孔(5)的轴向中心线垂直的第二槽孔(6),第二槽孔(6)的孔壁左侧设置有第二孔档(23),第二槽孔(6)内设置有第一推杆(7),第一推杆(7)右端设置有第三档环(20),第一推杆(7)的左部外缘设置有第二档环(15),第三档环(20)和第二档环(15)的外经相等,且第三档环(20)的外径大于第二孔档(23)的内径,第二槽孔(6)的轴向中心线在第二推杆(16)的轴向中心线绕销轴(3)旋转的轨迹上,且第二槽孔(6)的孔径到大于第二推杆(16)的外经。3. A steel bar spreader for a crane according to claim 1, wherein the unloading device comprises a first slot arranged inside the vertical rod (1) and the axial center line is parallel to the vertical rod (1) (5), the first slot (5) is provided with a push rod (8), the upper part of the push rod (8) is provided with a first gear ring (9), and the bottom of the first slot (5) is provided with a first hole Gear (12), the inner edge of the first hole gear (12) is provided with a square groove (22) that matches the gear (21) on the push rod (8), the first hole gear (12) and the first gear The push rod (8) between the rings (9) is provided with a first spring (13), the upper end of the first spring (13) is fixedly connected with the first gear ring (9), and the lower end of the first spring (13) It is fixedly connected with the first hole stopper (12), and the right part of the upright rod (1) is provided with a hole that communicates with the first slot hole (5) and whose axial centerline is perpendicular to the axial centerline of the first slot hole (5). The second slotted hole (6), the second hole stopper (23) is arranged on the left side of the hole wall of the second slotted hole (6), and the first push rod (7) is arranged in the second slotted hole (6). The right end of the push rod (7) is provided with a third gear ring (20), and the left outer edge of the first push rod (7) is provided with a second gear ring (15), a third gear ring (20) and a second gear ring The outer diameters of (15) are equal, and the outer diameter of the third gear ring (20) is greater than the inner diameter of the second hole gear (23), and the axial centerline of the second slotted hole (6) is at the second push rod (16) The axial centerline of the shaft rotates around the pin shaft (3), and the diameter of the second slot hole (6) is greater than the outer diameter of the second push rod (16). 4.根据权利要求3所述一种起重机用钢筋吊具,其特征在于,所述顶杆(8)下端设置有底座(14)。4. A steel bar spreader for a crane according to claim 3, characterized in that a base (14) is provided at the lower end of the push rod (8). 5.根据权利要求1所述一种起重机用钢筋吊具,其特征在于,所述立杆(1)后方的旋转杆(2)上设置有档杆(4)。5 . A steel bar spreader for a crane according to claim 1 , characterized in that, a gear lever ( 4 ) is arranged on the rotating rod ( 2 ) behind the vertical rod ( 1 ). 6.根据权利要求3所述一种起重机用钢筋吊具,其特征在于,所述顶杆(8)上端设置有朝向第二槽孔(6)的斜面。6. A steel bar spreader for a crane according to claim 3, characterized in that, the upper end of the push rod (8) is provided with a slope facing the second slot hole (6). 7.根据权利要求3所述一种起重机用钢筋吊具,其特征在于,所述第一推杆(7)左端面为圆弧面。7. A steel bar spreader for a crane according to claim 3, characterized in that, the left end surface of the first push rod (7) is an arc surface. 8.一种起重机用钢筋吊具的使用方法,其特征在于,使用时,第三槽孔(17)内的第二推杆(16)受到第二弹簧(18)的弹力伸进第二槽孔(6)中,此时立杆(1)前方的旋转杆(2)一端向吊梁(19)方向倾斜,吊装时,下放吊梁(19),使得顶杆(8)的底座(14)与地面保持一定距离,将需要移动的钢筋放在倾斜的旋转杆(2)上,然后吊起,设置有多个立杆(1)和旋转杆(2)能够防止钢筋在吊动时由于自身重力的原因而弯折变形,8. A method of using a steel bar spreader for a crane, characterized in that, when in use, the second push rod (16) in the third slot (17) is stretched into the second slot by the elastic force of the second spring (18) In the hole (6), at this time, one end of the rotating rod (2) in front of the vertical rod (1) is inclined to the direction of the hanging beam (19). When hoisting, lower the hanging beam (19) so that the base (14 ) keep a certain distance from the ground, place the steel bar to be moved on the inclined rotating rod (2), and then lift it up. Multiple vertical rods (1) and rotating rods (2) are provided to prevent the steel bar from being Bending and deforming due to its own gravity, 当钢筋被吊到指定位置是,下放吊梁(19),当顶杆(8)下端的底座(14)与地面接触时有吊具及钢筋自身的重力就会挤压顶杆(8),顶杆(8)在第一槽孔(5)内上升,此时第一弹簧(13)呈拉伸状态,顶杆(8)上端的斜面与第一推杆(7)接触后并推动第一推杆(7)向第三槽孔(17)方向运动,第一推杆(7)推动第二推杆(16)向第三槽孔(17)的槽底方向运动,且第二推杆(16)挤压第二弹簧(18),当第二推杆(16)与第二槽孔(6)分离后由于钢筋的重力,立杆(1)前方的旋转杆(2)就会向下旋转,直到旋转杆(2)上的档杆(4)与立杆(1)接触,此时旋转杆(2)上的钢筋就会滑落到地面上,When the reinforcing bar is hoisted to the designated position, lower the suspension beam (19), when the base (14) at the lower end of the push rod (8) is in contact with the ground, the gravity of the hanger and the reinforcing bar itself will extrude the push rod (8), The ejector rod (8) rises in the first slot hole (5), and the first spring (13) is stretched at this time, and the inclined surface at the upper end of the ejector rod (8) contacts the first push rod (7) and pushes the first push rod (7). A push rod (7) moves toward the third slot hole (17), the first push rod (7) pushes the second push rod (16) to move toward the bottom of the third slot hole (17), and the second push rod The rod (16) extrudes the second spring (18), and when the second push rod (16) is separated from the second slot (6) due to the gravity of the steel bar, the rotating rod (2) in front of the vertical rod (1) will Rotate downward until the gear lever (4) on the rotating rod (2) contacts the vertical rod (1), at this moment the steel bar on the rotating rod (2) will slide down to the ground, 钢筋卸下后起升吊梁(19),底座(14)与地面分离后,第一弹簧(13)使得顶杆(8)向下移动,由于立杆(1)后方连接旋转杆(2)的连接杆(10)以及其上的配重块(11)的重力,立杆(1)前方的旋转杆(2)部分就会绕销轴(3)向上方旋转,直到第二弹簧(18)将第二推杆(16)推进第二槽孔(6)中,第二推杆(16)进入到第二槽孔(6)后就会推动第二槽孔(6)中的第一推杆(7)向第一槽孔(5)方向运动,此时旋转杆(2)恢复到起吊前的状态,为下次起吊做准备,旋转杆(2)在旋转的过程中始终与立杆(1)的右端面接触。After the steel bar is unloaded, the lifting beam (19) is lifted, and after the base (14) is separated from the ground, the first spring (13) makes the push rod (8) move downward, because the rear of the vertical rod (1) is connected with the rotating rod (2) The gravity of the connecting rod (10) and the counterweight (11) on it, the rotating rod (2) part in front of the vertical rod (1) will rotate upward around the pin shaft (3) until the second spring (18 ) to push the second push rod (16) into the second slot (6), and after the second push rod (16) enters the second slot (6), it will push the first The push rod (7) moves towards the direction of the first slot hole (5). At this time, the rotating rod (2) returns to the state before lifting to prepare for the next lifting. The rotating rod (2) is always in contact with the vertical The right end face of the rod (1) is in contact.
CN201710624820.1A 2017-07-27 2017-07-27 A kind of Steel bar hanger for crane and its application method Active CN107188025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710624820.1A CN107188025B (en) 2017-07-27 2017-07-27 A kind of Steel bar hanger for crane and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710624820.1A CN107188025B (en) 2017-07-27 2017-07-27 A kind of Steel bar hanger for crane and its application method

Publications (2)

Publication Number Publication Date
CN107188025A true CN107188025A (en) 2017-09-22
CN107188025B CN107188025B (en) 2019-03-12

Family

ID=59884822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710624820.1A Active CN107188025B (en) 2017-07-27 2017-07-27 A kind of Steel bar hanger for crane and its application method

Country Status (1)

Country Link
CN (1) CN107188025B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394805A (en) * 2018-03-14 2018-08-14 重庆明君建筑劳务有限公司 Rebar fixing device
CN109109716A (en) * 2018-10-24 2019-01-01 广东电网有限责任公司 A kind of electric pole transport device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE416938B (en) * 1979-05-04 1981-02-16 Kjellstroms Mek Verkstad Ab Unhooking mechanism for a lift arrangement
US5114200A (en) * 1990-10-30 1992-05-19 Gould Inc. Gravity operated automatic hook
CN2841605Y (en) * 2005-05-20 2006-11-29 太原重型机械集团有限公司 Rake crane slings
CN102897646A (en) * 2012-09-26 2013-01-30 河南卫华重型机械股份有限公司 Crane sling device
CN203295045U (en) * 2013-05-31 2013-11-20 焦作市飞鹏机械设备有限责任公司 Full-automatic balance crane capable of allowing electrical control to expansion and rotation
CN204342268U (en) * 2014-12-08 2015-05-20 中国能源建设集团沈阳电力机械总厂有限公司 A kind of steel-slag sand lifting Anti-hook releasing device
CN106946145A (en) * 2017-04-21 2017-07-14 扬州市大洋水务设备有限公司 A kind of gate Automatic-falling locking device
CN206927466U (en) * 2017-07-27 2018-01-26 唐志赏 A kind of Steel bar hanger for crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE416938B (en) * 1979-05-04 1981-02-16 Kjellstroms Mek Verkstad Ab Unhooking mechanism for a lift arrangement
US5114200A (en) * 1990-10-30 1992-05-19 Gould Inc. Gravity operated automatic hook
CN2841605Y (en) * 2005-05-20 2006-11-29 太原重型机械集团有限公司 Rake crane slings
CN102897646A (en) * 2012-09-26 2013-01-30 河南卫华重型机械股份有限公司 Crane sling device
CN203295045U (en) * 2013-05-31 2013-11-20 焦作市飞鹏机械设备有限责任公司 Full-automatic balance crane capable of allowing electrical control to expansion and rotation
CN204342268U (en) * 2014-12-08 2015-05-20 中国能源建设集团沈阳电力机械总厂有限公司 A kind of steel-slag sand lifting Anti-hook releasing device
CN106946145A (en) * 2017-04-21 2017-07-14 扬州市大洋水务设备有限公司 A kind of gate Automatic-falling locking device
CN206927466U (en) * 2017-07-27 2018-01-26 唐志赏 A kind of Steel bar hanger for crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394805A (en) * 2018-03-14 2018-08-14 重庆明君建筑劳务有限公司 Rebar fixing device
CN109109716A (en) * 2018-10-24 2019-01-01 广东电网有限责任公司 A kind of electric pole transport device
CN109109716B (en) * 2018-10-24 2023-08-29 广东电网有限责任公司 Telegraph pole conveying device

Also Published As

Publication number Publication date
CN107188025B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN103183282B (en) Hoisting tool used for large ring pieces
CN103318762B (en) Radioactive waste transitory warehouse crane in nuclear power plant antiswing device
CN212769426U (en) Steel reinforcement cage hoisting accessory for hoist
CN203474253U (en) Umbrella-open type automatic positioning spreader
CN107188025A (en) A kind of Steel bar hanger for crane and its application method
CN103863972A (en) Forklift hoisting tool and hoisting method thereof
CN204173759U (en) Convenient heavy panel device of transportation
CN207497906U (en) A kind of flip horizontal pylon
CN106629139B (en) The holding clamp of the brick-holding machine and the automatic driving-type brick-holding machine using it
CN210029757U (en) Lifting appliance for circular ring parts
CN206927466U (en) A kind of Steel bar hanger for crane
CN204778295U (en) Novel multi -functional lifting by crane device
CN205397867U (en) A hoist for differential mechanism shell hole
CN217296905U (en) Reinforced concrete pipe lifting device
CN104528519A (en) Clamping tool for assisting in hoisting cement electric poles
CN205151660U (en) Automatic jacking device of quick -witted maintenance of conical rollers down of ring of passing through many hands or places
CN104265056B (en) One lands pole
CN210439991U (en) Hanging ring
CN211056518U (en) Wheel hub hoist
CN204435359U (en) Reinforcing cage suspension bracket
CN204162284U (en) A kind of lifting device of rectangular top pipe tube coupling
CN208980168U (en) A kind of suspender claw hook device
CN107697791B (en) A kind of limited large-scale component of lifting condition hangs sliding method for carrying from pushing away without anchor point
CN112875490A (en) Large-scale ring hoisting accessory
CN204324713U (en) Cement electric pole lifting auxiliary clamp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250731

Address after: 276800 Shandong Province Rizhao City Economic Development Zone Kuishan Street North of Changzhou Road West of Nanchang Road South of Shenjialou Village

Patentee after: Shandong Huabiao Special Equipment Testing Co.,Ltd.

Country or region after: China

Address before: 451162 the 2 building of Zhenghong Central Park at the intersection of Zhenggang three road and Zhenggang four road, Zhengzhou, Henan.

Patentee before: Tang Zhishang

Country or region before: China

TR01 Transfer of patent right