CN107176525A - Double track building hoist - Google Patents

Double track building hoist Download PDF

Info

Publication number
CN107176525A
CN107176525A CN201710622948.4A CN201710622948A CN107176525A CN 107176525 A CN107176525 A CN 107176525A CN 201710622948 A CN201710622948 A CN 201710622948A CN 107176525 A CN107176525 A CN 107176525A
Authority
CN
China
Prior art keywords
door
building hoist
double track
car
track building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710622948.4A
Other languages
Chinese (zh)
Inventor
常彤
李彬
章振
徐伟
周忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Longbest Construction Equipment Co Ltd
Original Assignee
Shenzhen Longbest Construction Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Longbest Construction Equipment Co Ltd filed Critical Shenzhen Longbest Construction Equipment Co Ltd
Priority to CN201710622948.4A priority Critical patent/CN107176525A/en
Publication of CN107176525A publication Critical patent/CN107176525A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of double track building hoist, for tier building, described its structure of double track building hoist includes attached wall structural bearings, standard knot, drive device, car and electrical apparatus control system.Wherein, multiple attached wall structural bearingses are arranged up and down is fixed in building structure, and attached wall structural bearings is fixedly connected with two row standard knots;Double track building hoist body is set in the middle of two row standard knots.Double track building hoist is ratcheting by drive device and standard knot upper rack;Double track building hoist is unique body structure, can manned or loading, by double track dual drive, greatly improve the stability of double track building hoist operation, add the load and movement velocity of double track building hoist.

Description

Double track building hoist
Technical field
The present invention relates to a kind of building engineering field, more particularly to a kind of double track building hoist.
Background technology
Construction elevator is commonly referred to as building hoist.The species of building hoist is a lot, and counterweight is whether there is by a method of operation And have two kinds of counterweight, be divided into manual type and automatic control type by its control mode.Converter plant can also be added on demand With PLC control modules, it can in addition contain add floor call devices and leveling device.Major part currently used in the market is nothing Counterweight formula, drive system is placed in above cage top, reduces noise in cage, increases headroom in cage, while also making transmission more Steadily, mechanism vibrations are smaller, and counterweightless design simplifies installation process;The construction elevator for having counterweight, which is behaved, more puts down Surely, it is more energy efficient, but be due to that it has top sheave structure, will more it be bothered when supernumerary segment is installed, so there is counterweight present Gradually withdraw from the market.Intelligent for the ease of the control and its of construction elevator, construction elevator can also install frequency converter, both save It energy stepless speed regulation can behave more steadily, take also more comfortable again;Obtained very in secure context construction elevator Good guarantee, ensures, construction elevator is provided with sliding door travel switch, clamshell doors travel switch, roof door for electrical safety first Five travel switches such as travel switch, upper limit travel switch, lower limit travel switch, as long as having at any one travel switch In guard mode, motor would be at braking state, and in order to more ensure the security of construction elevator, electric part also increases Limit switch is added, when the casing of construction elevator is rushed to summit or fallen, high-low limit collision block will trigger limit switch, electricity Gas system shuts off power supply, and construction elevator is out of service to ensure safety.When the whole failures in above-mentioned part, construction electricity Ladder also has last one of safety curtain, is exactly anti-falling safety device, and the speed that the speed that elevator declines is more than catching device setting is anti-fall Device will brake to control the lapse rate of cage to ensure the safety of elevator.Catching device can also send control in the process of running Signal processed controls electrical system.Building hoist on-site be typically coordinate tower crane use, general loading capacity at 1-3 tons, The speed of service is 1-60M/min.But common construction elevator drives for single track list, with the development of society, common construction elevator is carried Lotus and the speed of service can not meet the demand of a part, so being badly in need of more top load and the construction elevator of more speed, energy Enough improve efficiency of construction.
The content of the invention
For above-mentioned situation, to overcome the defect of existing technology, the purpose of the present invention is just to provide a kind of double track construction Lift, can effectively solve construction elevator increasingly increased load and speed in work progress, so as to improve applying for workman Work efficiency rate.
Double track building hoist of the present invention, including attached wall structural bearings(1), standard knot(2)And car(9), driving structure (5).
Attached wall structural bearings(1)For a supporting member, multiple wall-attached supporting seats(1)Arrange up and down
It is fixed on bolt in building structure.Attached wall structural bearings(1)With standard knot(2)Fixed by fixture with V-type bolt. Attached wall structural bearings(1)Effect be constraint criteria(2)Lean forward, after turn over and turn on one's side.
Standard knot(2)It is a truss structure weldering body being welded into by bending plate, pipe, with attached wall structural bearings(1) Secure bond.To meet construction floor height, multiple standard knots are connected by fixture(2)Increase height, meets construction demand.
Car(9)Integral solder framework casing is used, construction elevator of the present invention is characterized in that front and rear sides are pacified respectively Equipped with preceding gate(8)With rear gate;Gate structure is by up door afterwards(7)With descending door(6)Composition, when up door(7)Transport upwards When dynamic, pass through steel wire rope and descending door(6)Deadweight, descending door(6)Rotated around axle, so that gate after opening;Preceding sedan-chair Door(8)Pass through car(9)Upper both sides balancing weight is moved up and down, so as to reach switch gate purpose.Install cage bottom both sides There is drive device(5)It is bolted to connection there is provided driving force, it is moved up and down.
Construction elevator of the present invention, by increasing a row standard knot and driving, so as to improve driving force, adds construction electricity The load of ladder, makes it not rocked in motion process as single track construction elevator is easily produced, can effectively carry by double track The stability of high construction elevator.
Structure novel and unique of the present invention, advantages of simple, easily production, saving of labor, time saving, safe efficient, using effect is good, is Innovation on construction elevator.
Brief description of the drawings
Fig. 1 is front view of the invention.
Fig. 2 is side view of the invention.
Fig. 3 is attached wall structural bearings front view of the present invention.
Fig. 4 is standard knot axis side view of the present invention.
Fig. 5 is drive device front view of the present invention.
Fig. 6 is descending door front view.
Part or position in figure represented by label are:1 --- attached wall structural bearings;2 --- standard knot;3 --- it is spacing Support;4 --- rack;5 --- drive device;6 --- descending door;7 --- up door;
8 --- preceding gate;9 --- car.
Embodiment
The embodiment of the present invention is described in further detail below in conjunction with accompanying drawing.
As Figure 1-5, double track building hoist of the present invention includes attached wall structural bearings(1), standard knot(2), car(9) And drive device(5)Composition.
Attached wall structural bearings(1)For a supporting member, multiple wall-attached supporting seats(1)Arrange to be fixed on bolt up and down and build On building structure.Wall-attached supporting seat(1)With standard knot(2)Fixed by fixture with V-type bolt.
Standard knot(2)It is a truss structure weldering body being welded into by bending plate, pipe, with attached wall
Structural bearings(1)Secure bond.To meet construction floor height, multiple standard knots are connected by fixture(2)Increase is high Degree, meets construction demand.
In two row standard knots(2)Between car is set(9), car(9)Integral solder framework casing, front and rear sides are respectively mounted There is preceding gate(8)With rear gate;Gate structure is by up door afterwards(7)With descending door(6)Composition, when up door(7)Motion upwards When, pass through steel wire rope and descending door(6)Deadweight, descending door(6)Rotated around axle, so that gate after opening;Preceding gate (8)Pass through car(9)Upper both sides balancing weight is moved up and down, so as to reach switch gate purpose.Cage bottom both sides are provided with Drive device(5)It is bolted to connection there is provided driving force, it is moved up and down.
As shown in figure 1, installing two row parallel standards sections in double track building hoist both sides(2), when being needed in work progress When construction elevator transports goods or be manned, pass through both sides drive device(5)Driving reaches construction requirement, when moving to limiting bracket (3)During place, pass through electric control system, car(9)Power-off, prevents double track building hoist from rolling standard knot away from(2);When moving to During up to place floor, by opening descending door completely(6)When, descending door serves as springboard, and people can pass through descending door(6)Reach building In layer.

Claims (4)

1. a kind of double track building hoist, for multi-story structure, it is characterised in that its structure bag of the double track building hoist Include attached wall structural bearings(1), standard knot(2), rack(4), drive device(5), car(9);Wherein, above and below multiple wall-attached supporting seats Left-right situs is fixed in building structure, and attached wall structural bearings is fixedly connected with standard knot;Sedan-chair is set between two row standard knots Railway carriage or compartment(9), car(9)Pass through drive device(5)With rack(4)Between it is ratcheting moved up and down, when moving to limiting bracket(3) During place, pass through electric control system, car(9)Power-off, prevents double track building hoist from rolling standard knot away from(2);Car(9)For case Body structure, front and rear sides are separately installed with preceding gate(8)With rear gate;Gate structure is by up door afterwards(7)With descending door(6)Group Into when up door(7)Upwards during motion, pass through steel wire rope and descending door(6)Deadweight, descending door(6)Rotated around axle, So as to gate after opening;Preceding gate(8)Pass through car(9)Upper both sides balancing weight is moved up and down, so as to reach switch gate mesh 's.
2. double track building hoist according to claim 1, it is characterised in that double track building hoist is in two row standards Section(2)Between, pass through car(9)The drive device that both sides are installed(5)With two row standard knots(2)Upper rack(4)Progress is ratcheting, from And moved up and down.
3. double track building hoist according to claim 1 or 2, it is characterised in that double track building hoist car(9)By Preceding gate(8), up door(7)With descending door(6)Composition, preceding gate(8)The counterweight installed by car both sides carries out switch gate; Descending door(6)Rope sheave is bypassed with up door by steel wire rope to connect, and descending door(6)Deadweight is than up door(7)From great, instantly After row door-lock opening, descending door(6)Meeting is rotated in the presence of deadweight around axle, so as to drive up door(7)To Upper motion, is easy to pass through, when up door so that door be opened(7)When moving downward, descending door is driven by steel wire rope(6)Rotation Motion, reaches the purpose closed the door.
4. the double track building hoist according to claim 1 or 2 or 3, it is characterised in that double track building hoist car (9)It is to be driven to be moved up and down by both sides driving, than common building hoist single track motion stabilization, and rated load increase, Load-carrying can be more born, the speed of service also can be faster than common building hoist.
CN201710622948.4A 2017-07-27 2017-07-27 Double track building hoist Pending CN107176525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710622948.4A CN107176525A (en) 2017-07-27 2017-07-27 Double track building hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710622948.4A CN107176525A (en) 2017-07-27 2017-07-27 Double track building hoist

Publications (1)

Publication Number Publication Date
CN107176525A true CN107176525A (en) 2017-09-19

Family

ID=59838501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710622948.4A Pending CN107176525A (en) 2017-07-27 2017-07-27 Double track building hoist

Country Status (1)

Country Link
CN (1) CN107176525A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108609457A (en) * 2018-03-22 2018-10-02 福建省力霸机械科技有限公司 a kind of construction elevator
CN109205416A (en) * 2018-11-07 2019-01-15 马秀辉 A kind of high stability elevator of construction
CN115341749A (en) * 2022-08-31 2022-11-15 中建三局科创产业发展有限公司 A double-layer multi-function combination guide frame climbing type working platform

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101407298A (en) * 2008-10-28 2009-04-15 四川锦城建筑机械有限责任公司 Overturn type cage door for construction elevator
CN101815667A (en) * 2007-09-10 2010-08-25 弗伦茨克萨韦尔梅勒汽车机械制造有限责任两合公司 Elevator cab door, it can selectively face upward or downward mobile on its whole vertical length in order to open car
CN201737553U (en) * 2010-05-18 2011-02-09 沈阳三洋电梯有限公司 Passenger elevator used for tower crane
CN203452362U (en) * 2013-09-02 2014-02-26 河南天立建筑工程技术有限公司 Lifting material platform
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN105113779A (en) * 2015-09-14 2015-12-02 深圳市龙柏建筑装备有限公司 Rail basket
CN204850497U (en) * 2015-08-13 2015-12-09 深圳市龙柏建筑装备有限公司 Promote no lower hem material platform
CN207258959U (en) * 2017-07-27 2018-04-20 深圳市龙柏建筑装备有限公司 Double track building hoist

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101815667A (en) * 2007-09-10 2010-08-25 弗伦茨克萨韦尔梅勒汽车机械制造有限责任两合公司 Elevator cab door, it can selectively face upward or downward mobile on its whole vertical length in order to open car
CN101407298A (en) * 2008-10-28 2009-04-15 四川锦城建筑机械有限责任公司 Overturn type cage door for construction elevator
CN201737553U (en) * 2010-05-18 2011-02-09 沈阳三洋电梯有限公司 Passenger elevator used for tower crane
CN203452362U (en) * 2013-09-02 2014-02-26 河南天立建筑工程技术有限公司 Lifting material platform
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN204850497U (en) * 2015-08-13 2015-12-09 深圳市龙柏建筑装备有限公司 Promote no lower hem material platform
CN105113779A (en) * 2015-09-14 2015-12-02 深圳市龙柏建筑装备有限公司 Rail basket
CN207258959U (en) * 2017-07-27 2018-04-20 深圳市龙柏建筑装备有限公司 Double track building hoist

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108609457A (en) * 2018-03-22 2018-10-02 福建省力霸机械科技有限公司 a kind of construction elevator
CN109205416A (en) * 2018-11-07 2019-01-15 马秀辉 A kind of high stability elevator of construction
CN115341749A (en) * 2022-08-31 2022-11-15 中建三局科创产业发展有限公司 A double-layer multi-function combination guide frame climbing type working platform

Similar Documents

Publication Publication Date Title
CN104140037B (en) Wallboard Lift-on/Lift-off System
WO2013143424A1 (en) Mining elevator carrying platform and carrying method
CN107176525A (en) Double track building hoist
CN104495585B (en) Intelligent vertical traction machine
CN111874780B (en) High-speed elevator decompression kuppe
JP5571130B2 (en) Elevator equipment
CN102344080A (en) Oblique hauling type elevator
CN111502293A (en) Method and system for hoisting single peripheral component of assembly type building
CN210795435U (en) Synchronous construction elevator
CN201132717Y (en) Single-column and single-cage elevator driven by drawing
CN207258959U (en) Double track building hoist
CN114829288B (en) Elevator device and method
CN110902526B (en) Single-drive parallel elevator, elevator running system and control method
CN210480526U (en) Lifting device using steel structure elevator shaft as vertical transportation channel
CN104591002B (en) A kind of low clearance double girder overhead crane
CN104444714A (en) Inclined elevator
CN102408052A (en) Counter-weight-free traction type passenger elevator
KR102402799B1 (en) Rope and twin mast type car self-driving lift having car for heavy duty without machine room and hoistway structure
CN215248971U (en) Hoisting construction device for large-scale overweight electromechanical equipment of high-rise and super high-rise building
CN211447834U (en) Curtain wall transportation and installation system
CN210594793U (en) Transmission device for lifting of elevator
CN210825249U (en) Novel self-lifting material platform
JP2003201074A (en) Elevator containment rescue method and apparatus
CN207538550U (en) Vertical elevating garage system
CN114873417A (en) Ultra-shallow pit low top layer steel belt traction home elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170919

WD01 Invention patent application deemed withdrawn after publication