CN107165161A CN201710161617.5A CN201710161617A CN107165161A CN 107165161 A CN107165161 A CN 107165161A CN 201710161617 A CN201710161617 A CN 201710161617A CN 107165161 A CN107165161 A CN 107165161A
Authority
CN
China
Prior art keywords
pile
construction
axes agitating
support
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710161617.5A
Other languages
Chinese (zh)
Inventor
熊亚萍
雷斌
尹佳
付维民
邵晓慧
李波
杨静
凌利婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Construction Group Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Jiangsu Provincial Construction Group Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Construction Group Co Ltd, Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Jiangsu Provincial Construction Group Co Ltd
Priority to CN201710161617.5A priority Critical patent/CN107165161A/en
Publication of CN107165161A publication Critical patent/CN107165161A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Abstract

The present invention relates to the technical field of pattern foundation pit supporting structure, the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including following construction procedure are disclosed:1), jump and mutually overlapped between the multiple three axes agitating piles of play construction, adjacent three axes agitating pile in groove, form stirring row of piles;2), constructed multiple support piles in stirring row of piles;3), in the top construction stake apical cap beam of support pile, adjacent support pile is connected;4), in the plain concrete surface layer of excavation face injection of foundation ditch.First construct three axes agitating pile, formed and is mutually overlapped between stirring row of piles, three axes agitating pile, contrasted in the mixing pile of identical stake footpath and spacing, identical water-stop curtain length, reduce at least 2/3 overlap joint number of times, globality, the compactness of water-stop curtain is effectively ensured;Constructed in the stirring row of piles of formation the support pile separately arranged, can not only effectively prevent underground water seepage, water-stagnating effect is good, and need not additionally take construction land, support pattern more optimizes, rationally.

Description

The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch
Technical field
The present invention relates to the technical field of pattern foundation pit supporting structure, more particularly to the continuous three axes agitating pile water-stop curtain interplantation of foundation ditch The construction method of support pile.
Background technology
In foundation pit supporting construction, the utilization of " retaining piles+water-stop curtain " is very universal, and conventional at present has following Two kinds of forms, shown in reference picture 1, one kind is using the formation water-stop curtain of high-pressure rotary jet grouting pile 102 between retaining piles 101;Ginseng According to shown in Fig. 2, another is using the deep-mixed pile or high-pressure rotary jet grouting pile 102 mutually overlapped in the outside of retaining piles 101 Form waterproof of man.
During practice of construction, because the water-stop curtain diameter of high-pressure rotary jet grouting pile 102, deep-mixed pile formation is small (550mm-800mm), between stake in mutually overlap joint often, is influenceed easily to produce perpendicularity deviation greatly by formation, is caused Not close, bifurcated is combined between water-stop curtain, causes occur underground water seepage in Excavation Process, water-stagnating effect is difficult to ensure that.
The content of the invention
It is an object of the invention to provide the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, Aim to solve the problem that water-stop curtain of the prior art is not close in the presence of combining, cause occur underground water seepage in Excavation Process And the problem of water-stagnating effect difference.
The present invention is achieved in that the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, bag Include following construction procedure:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on the ground, is jumped in the groove Mutually overlapped between the multiple three axes agitating piles of play construction, the adjacent three axes agitating pile, and multiple three axes agitating piles It is in a row-shaped arrangement, form stirring row of piles;
2), constructed multiple support piles in the stirring row of piles, construction of multiple support piles along the stirring row of piles Direction arranged for interval,;
3), in the top construction stake apical cap beam of the support pile, construction direction of the stake top Guan Liang along the support pile It is disposed to extend;
4) bottom of foundation ditch, is excavated on ground, in the plain concrete surface layer of excavation face injection of the foundation ditch.
Further, the water barrier that the bottom of the three axes agitating pile enters below bottom of foundation ditch.
Further, in the construction procedure 1) before, first ground grading.
Further, after the mixing pile applies work completion about 5~7 days, by the three axes agitating pile for stirring row of piles The stake of sequence of construction construction supporting.
Further, in the construction procedure 4) in, the supporting pile driving construction is completed after being no less than 15 days, carries out foundation ditch Excavate, staged and layered is excavated to bottom of foundation ditch.
Further, in the construction procedure 4) in, in the middle of the plain concrete surface layer, add two-way concrete slab net.
Further, the Single Pile footpath of the three axes agitating pile is between 650mm-850mm.
Further, it is engaged between the stake of the adjacent three axes agitating pile between spacing 200mm-250mm.
Further, the stake footpath of the support pile is between 1000mm-1200mm.
Further, the spacing of the adjacent support pile is between 1500mm-1800mm.
The construction method for the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch that the present invention is provided, first constructs three Axle mixing pile, forms and is mutually overlapped between stirring row of piles, three axes agitating pile, contrasts the mixing pile of identical stake footpath and spacing, identical In water-stop curtain length, at least 2/3 overlap joint number of times is reduced, globality, the compactness of water-stop curtain is effectively ensured;In shape Into stirring row of piles in construct the support pile separately arranged, can not only effectively prevent underground water seepage, water-stagnating effect is good, And construction land need not be additionally taken, support pattern more optimizes, rationally.
Brief description of the drawings
Fig. 1 is the cut-away illustration using high-pressure rotary jet grouting pile formation water-stop curtain between retaining piles of the prior art;
Fig. 2 is the outside of retaining piles of the prior art using the deep-mixed pile or high-pressure rotary jet grouting pile mutually overlapped Form the cut-away illustration of waterproof of man;
Fig. 3 is the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch provided in an embodiment of the present invention Method cut-away illustration;
Fig. 4 is the cut-away illustration of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with drawings and Examples, The present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only to explain this hair It is bright, it is not intended to limit the present invention.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Shown in reference picture 3, the preferred embodiment provided for the present invention.
The construction method that the present embodiment is provided, for forming water-stop curtain in foundation ditch.
The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including following construction procedure:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on ground 100, jumps and beats in groove Mutually overlapped between the multiple three axes agitating piles 104 of method construction, adjacent three axes agitating pile 104, multiple three axes agitating piles 104 are in Row pattern is arranged, forms stirring row of piles;
2), constructed multiple support piles 103 in stirring row of piles, construction direction of the plurality of support pile 103 along stirring row of piles Separately arrange,;
3), in the top construction stake apical cap beam 105 of support pile 103, the construction of the stake top Guan Liang 105 along support pile 103 Direction is disposed to extend;
4) bottom of foundation ditch 106, is excavated on ground, plain concrete surface layer 107 is sprayed in excavation of foundation pit face.
The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch of above-mentioned offer, three axles of first constructing Mixing pile 104, forms and is mutually overlapped between stirring row of piles, three axes agitating pile 104, contrast the mixing pile of identical stake footpath and spacing, In identical water-stop curtain length, at least 2/3 overlap joint number of times is reduced, globality, the compactness of water-stop curtain is effectively ensured; Constructed in the stirring row of piles of formation the support pile 103 separately arranged, can not only effectively prevent underground water seepage, sealing Effect is good, and need not additionally take construction land, and support pattern more optimizes, rationally.
In the present embodiment, the bottom of three axes agitating pile 104 enters water barrier of the bottom of foundation ditch below 106.In addition, supporting The top of stake 103 and the top flush arrangement of three axes agitating pile 104.
In above-mentioned construction procedure 1) before, first ground grading 100.In above-mentioned construction procedure 1) in, using special Mixing pile machine construction three axes agitating pile 104, stirs technique pile using four sprays four, is overlapped between stake by design requirement.
After mixing pile applies work completion about 5~7 days, accordingly constructed by the sequence of construction of three axes agitating pile 104 of stirring row of piles Support pile 103, the length and arrangement of reinforcement of support pile 103 are calculated by base pit stability to be determined.
In above-mentioned construction procedure 4) in, the construction of support pile 103 is completed after being no less than 15 days, can carry out pit earthwork Excavate, staged and layered is excavated to designed elevation i.e. foundation ditch bottom surface.
In above-mentioned construction procedure 4) in, in the middle of plain concrete surface layer 107, add two-way concrete slab net.
In the present embodiment, the Single Pile footpath of three axes agitating pile 104 is between 650mm-850mm, and adjacent three axles stirring Between the stake of stake 104 between occlusion spacing 200mm-250mm.
The stake footpath of support pile 103 is between 1000mm-1200mm, and the spacing of adjacent support pile 103 is 1500mm- Between 1800mm.
The present embodiment additionally provides the constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including Multiple three axes agitating piles 104, multiple support piles 103 and stake top Guan Liang 105, multiple three axes agitating piles 104 are in a row-shaped arrangement, Stirring row of piles is formed, and adjacent three axes agitating pile 104 is mutually overlapped, multiple support piles 103 are formed in stirring row of piles, and Separately arrange, stake top Guan Liang 105 forms the top in support pile 103, the construction of the stake top Guan Liang 105 along support pile 103 Direction is disposed to extend.
The constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch of above-mentioned offer, multiple three axles are stirred Stake 104 is mixed, is formed and is mutually overlapped between stirring row of piles, three axes agitating pile 104, contrast the mixing pile of identical stake footpath and spacing, phase With at least 2/3 overlap joint number of times in water-stop curtain length, is reduced, globality, the compactness of water-stop curtain is effectively ensured; The support pile 103 separately arranged is formed with the stirring row of piles of formation, underground water seepage, sealing can not only be effectively prevented Effect is good, and need not additionally take construction land, and support pattern more optimizes, rationally.
The bottom of three axes agitating pile 104 enters water barrier of the bottom of foundation ditch below 106.In addition, the top of support pile 103 With the top flush arrangement of three axes agitating pile 104.
The constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch also includes being formed in excavation of foundation pit face On plain concrete surface layer 107, also, in the middle of plain concrete surface layer 107, add two-way concrete slab net.
In the present embodiment, the Single Pile footpath of three axes agitating pile 104 is between 650mm-850mm, and adjacent three axles stirring Between the stake of stake 104 between occlusion spacing 200mm-250mm.
The stake footpath of support pile 103 be 1000mm-1200mm between, and support pile 103 spacing be 1500mm-1800mm Between.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, it is characterised in that including following construction Step:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on the ground, and play is jumped in the groove and is applied Mutually overlapped between the multiple three axes agitating piles of work, the adjacent three axes agitating pile, and multiple three axes agitating piles are in a row-shaped Arrangement, forms stirring row of piles;
2), constructed multiple support piles in the stirring row of piles, construction direction of multiple support piles along the stirring row of piles Arranged for interval,;
3), in the top construction stake apical cap beam of the support pile, construction direction extension of the stake top Guan Liang along the support pile Arrangement;
4) bottom of foundation ditch, is excavated on ground, in the plain concrete surface layer of excavation face injection of the foundation ditch.
2. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as claimed in claim 1, its feature It is, the water barrier that the bottom of the three axes agitating pile enters below bottom of foundation ditch.
3. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as claimed in claim 1, its feature It is, in the construction procedure 1) before, first ground grading.
4. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that after the mixing pile applies work completion about 5~7 days, by the construction of the three axes agitating pile of the stirring row of piles Sequence construction support pile.
5. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that in the construction procedure 4) in, the supporting pile driving construction is completed after being no less than 15 days, carries out excavation of foundation pit, Staged and layered is excavated to bottom of foundation ditch.
6. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that in the construction procedure 4) in, in the middle of the plain concrete surface layer, add two-way concrete slab net.
7. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that the Single Pile footpath of the three axes agitating pile is between 650mm-850mm.
8. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that be engaged between the stake of the adjacent three axes agitating pile between spacing 200mm-250mm.
9. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that the stake footpath of the support pile is between 1000mm-1200mm.
10. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3 Method, it is characterised in that the spacing of the adjacent support pile is between 1500mm-1800mm.
CN201710161617.5A 2017-03-17 2017-03-17 The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch Pending CN107165161A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710161617.5A CN107165161A (en) 2017-03-17 2017-03-17 The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710161617.5A CN107165161A (en) 2017-03-17 2017-03-17 The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch

Publications (1)

Publication Number Publication Date
CN107165161A true CN107165161A (en) 2017-09-15

Family

ID=59848887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710161617.5A Pending CN107165161A (en) 2017-03-17 2017-03-17 The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch

Country Status (1)

Country Link
CN (1) CN107165161A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524150A (en) * 2017-08-28 2017-12-29 深圳市勘察测绘院有限公司 A kind of supporting pile protection bores three axes agitating pile foundation pit enclosure water sealing structure
CN109403334A (en) * 2018-12-18 2019-03-01 山西建筑工程集团有限公司 A kind of foundation pit structure and foundation ditch construction method
CN110468828A (en) * 2019-07-21 2019-11-19 辽宁省有色地质一〇五队有限责任公司 A kind of construction method of pattern foundation pit supporting structure water-stop continuous wall
CN114622574A (en) * 2022-04-08 2022-06-14 中国铁路设计集团有限公司 Water-rich cast-fill deep foundation pit water-intercepting excavation supporting method and supporting device
CN115142436A (en) * 2022-08-17 2022-10-04 中国建筑第八工程局有限公司 Construction method for double-row supporting piles and waterproof curtain in narrow space

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN202073101U (en) * 2011-05-10 2011-12-14 中天建设集团有限公司天津分公司 Building envelope with functions of blocking soil and stopping water
CN202559361U (en) * 2012-04-09 2012-11-28 东南大学 Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN104032763A (en) * 2014-06-25 2014-09-10 上海市建工设计研究院有限公司 Combined-type anti-seepage waterstop curtain structure and construction method thereof
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN202073101U (en) * 2011-05-10 2011-12-14 中天建设集团有限公司天津分公司 Building envelope with functions of blocking soil and stopping water
CN202559361U (en) * 2012-04-09 2012-11-28 东南大学 Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN104032763A (en) * 2014-06-25 2014-09-10 上海市建工设计研究院有限公司 Combined-type anti-seepage waterstop curtain structure and construction method thereof
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
优路教育全国二级建造师执业资格考试命题研究组: "《市政工程管理与实务1纲2点3题速通宝典 速通版》", 31 January 2014, 中国经济出版社 *
杨光煦: "《岩土工程关键技术研究与实践》", 31 August 2016, 中国水利水电出版社 *
陈书申等: "《土力学与地基基础 第5版》", 31 January 2015, 武汉理工大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524150A (en) * 2017-08-28 2017-12-29 深圳市勘察测绘院有限公司 A kind of supporting pile protection bores three axes agitating pile foundation pit enclosure water sealing structure
CN109403334A (en) * 2018-12-18 2019-03-01 山西建筑工程集团有限公司 A kind of foundation pit structure and foundation ditch construction method
CN110468828A (en) * 2019-07-21 2019-11-19 辽宁省有色地质一〇五队有限责任公司 A kind of construction method of pattern foundation pit supporting structure water-stop continuous wall
CN114622574A (en) * 2022-04-08 2022-06-14 中国铁路设计集团有限公司 Water-rich cast-fill deep foundation pit water-intercepting excavation supporting method and supporting device
CN114622574B (en) * 2022-04-08 2023-10-13 中国铁路设计集团有限公司 Water-rich throwing filling deep foundation pit water interception excavation supporting method and supporting device
CN115142436A (en) * 2022-08-17 2022-10-04 中国建筑第八工程局有限公司 Construction method for double-row supporting piles and waterproof curtain in narrow space

Similar Documents

Publication Publication Date Title
CN107165161A (en) The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch
CN102605792B (en) Multi-row mini-pile enclosing structure for blocking soil and construction process
CN107288135A (en) A kind of inter-pile soil reinforcement means of foundation ditch Double-row Piles Support
CN103967504B (en) A kind of supporting construction and construction method of electric power plant circulating water system tunnel mouth
CN103603358B (en) A kind of multi-platform building enclosure and constructional method
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN208379610U (en) A kind of broken line alternating expression double-row pile foundation pit support structure
CN110424434A (en) For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea
CN107366282A (en) A kind of tunnel arch foot partial high pressure rotary churning pile reinforcement technique
CN106120805B (en) The construction method of ultra-deep foundation pit supporting under dilapidated house environment
CN106758890B (en) Campshed box culvert structure and its construction method
CN109322313B (en) Foundation pit enclosure structure system and its construction method
CN103603357B (en) A kind of multi-platform without inner support self waterproofing foundation pit enclosure structure and constructional method thereof
CN105350575B (en) A kind of reversed construction method of diaphram wall
CN108999218A (en) Antiseepage panel wall construction method is passed through in the construction of shield section
CN210087321U (en) Pile foundation pre-reinforcing and supporting structure for controlling tunnel settlement
KR20090080230A (en) The grouting structure of tunnel and tunnel construction method using the same
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
JP2007170008A (en) Liquefaction countermeasuring method
CN207228123U (en) The supporting construction of the continuous three axes agitating pile water-stop curtain interplantation campshed of foundation pit
CN104153347A (en) Repair structure of underground diaphragm wall panel notch and construction method of repair structure
CN107503357A (en) Annular pile supporting construction
CN208763446U (en) Increase the supporting construction for building the underground space under a kind of existing building group
CN207846429U (en) A kind of phreatic high, high basement rock go out the foundation pit supporting system shown up
CN106567382B (en) A kind of pit curtain construction method in metalling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication