CN107165161A - The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch - Google Patents
The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch Download PDFInfo
- Publication number
- CN107165161A CN107165161A CN201710161617.5A CN201710161617A CN107165161A CN 107165161 A CN107165161 A CN 107165161A CN 201710161617 A CN201710161617 A CN 201710161617A CN 107165161 A CN107165161 A CN 107165161A
- Authority
- CN
- China
- Prior art keywords
- pile
- construction
- axes agitating
- support
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
Abstract
The present invention relates to the technical field of pattern foundation pit supporting structure, the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including following construction procedure are disclosed:1), jump and mutually overlapped between the multiple three axes agitating piles of play construction, adjacent three axes agitating pile in groove, form stirring row of piles;2), constructed multiple support piles in stirring row of piles;3), in the top construction stake apical cap beam of support pile, adjacent support pile is connected;4), in the plain concrete surface layer of excavation face injection of foundation ditch.First construct three axes agitating pile, formed and is mutually overlapped between stirring row of piles, three axes agitating pile, contrasted in the mixing pile of identical stake footpath and spacing, identical water-stop curtain length, reduce at least 2/3 overlap joint number of times, globality, the compactness of water-stop curtain is effectively ensured;Constructed in the stirring row of piles of formation the support pile separately arranged, can not only effectively prevent underground water seepage, water-stagnating effect is good, and need not additionally take construction land, support pattern more optimizes, rationally.
Description
Technical field
The present invention relates to the technical field of pattern foundation pit supporting structure, more particularly to the continuous three axes agitating pile water-stop curtain interplantation of foundation ditch
The construction method of support pile.
Background technology
In foundation pit supporting construction, the utilization of " retaining piles+water-stop curtain " is very universal, and conventional at present has following
Two kinds of forms, shown in reference picture 1, one kind is using the formation water-stop curtain of high-pressure rotary jet grouting pile 102 between retaining piles 101;Ginseng
According to shown in Fig. 2, another is using the deep-mixed pile or high-pressure rotary jet grouting pile 102 mutually overlapped in the outside of retaining piles 101
Form waterproof of man.
During practice of construction, because the water-stop curtain diameter of high-pressure rotary jet grouting pile 102, deep-mixed pile formation is small
(550mm-800mm), between stake in mutually overlap joint often, is influenceed easily to produce perpendicularity deviation greatly by formation, is caused
Not close, bifurcated is combined between water-stop curtain, causes occur underground water seepage in Excavation Process, water-stagnating effect is difficult to ensure that.
The content of the invention
It is an object of the invention to provide the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch,
Aim to solve the problem that water-stop curtain of the prior art is not close in the presence of combining, cause occur underground water seepage in Excavation Process
And the problem of water-stagnating effect difference.
The present invention is achieved in that the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, bag
Include following construction procedure:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on the ground, is jumped in the groove
Mutually overlapped between the multiple three axes agitating piles of play construction, the adjacent three axes agitating pile, and multiple three axes agitating piles
It is in a row-shaped arrangement, form stirring row of piles;
2), constructed multiple support piles in the stirring row of piles, construction of multiple support piles along the stirring row of piles
Direction arranged for interval,;
3), in the top construction stake apical cap beam of the support pile, construction direction of the stake top Guan Liang along the support pile
It is disposed to extend;
4) bottom of foundation ditch, is excavated on ground, in the plain concrete surface layer of excavation face injection of the foundation ditch.
Further, the water barrier that the bottom of the three axes agitating pile enters below bottom of foundation ditch.
Further, in the construction procedure 1) before, first ground grading.
Further, after the mixing pile applies work completion about 5~7 days, by the three axes agitating pile for stirring row of piles
The stake of sequence of construction construction supporting.
Further, in the construction procedure 4) in, the supporting pile driving construction is completed after being no less than 15 days, carries out foundation ditch
Excavate, staged and layered is excavated to bottom of foundation ditch.
Further, in the construction procedure 4) in, in the middle of the plain concrete surface layer, add two-way concrete slab net.
Further, the Single Pile footpath of the three axes agitating pile is between 650mm-850mm.
Further, it is engaged between the stake of the adjacent three axes agitating pile between spacing 200mm-250mm.
Further, the stake footpath of the support pile is between 1000mm-1200mm.
Further, the spacing of the adjacent support pile is between 1500mm-1800mm.
The construction method for the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch that the present invention is provided, first constructs three
Axle mixing pile, forms and is mutually overlapped between stirring row of piles, three axes agitating pile, contrasts the mixing pile of identical stake footpath and spacing, identical
In water-stop curtain length, at least 2/3 overlap joint number of times is reduced, globality, the compactness of water-stop curtain is effectively ensured;In shape
Into stirring row of piles in construct the support pile separately arranged, can not only effectively prevent underground water seepage, water-stagnating effect is good,
And construction land need not be additionally taken, support pattern more optimizes, rationally.
Brief description of the drawings
Fig. 1 is the cut-away illustration using high-pressure rotary jet grouting pile formation water-stop curtain between retaining piles of the prior art;
Fig. 2 is the outside of retaining piles of the prior art using the deep-mixed pile or high-pressure rotary jet grouting pile mutually overlapped
Form the cut-away illustration of waterproof of man;
Fig. 3 is the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch provided in an embodiment of the present invention
Method cut-away illustration;
Fig. 4 is the cut-away illustration of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with drawings and Examples,
The present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only to explain this hair
It is bright, it is not intended to limit the present invention.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Shown in reference picture 3, the preferred embodiment provided for the present invention.
The construction method that the present embodiment is provided, for forming water-stop curtain in foundation ditch.
The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including following construction procedure:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on ground 100, jumps and beats in groove
Mutually overlapped between the multiple three axes agitating piles 104 of method construction, adjacent three axes agitating pile 104, multiple three axes agitating piles 104 are in
Row pattern is arranged, forms stirring row of piles;
2), constructed multiple support piles 103 in stirring row of piles, construction direction of the plurality of support pile 103 along stirring row of piles
Separately arrange,;
3), in the top construction stake apical cap beam 105 of support pile 103, the construction of the stake top Guan Liang 105 along support pile 103
Direction is disposed to extend;
4) bottom of foundation ditch 106, is excavated on ground, plain concrete surface layer 107 is sprayed in excavation of foundation pit face.
The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch of above-mentioned offer, three axles of first constructing
Mixing pile 104, forms and is mutually overlapped between stirring row of piles, three axes agitating pile 104, contrast the mixing pile of identical stake footpath and spacing,
In identical water-stop curtain length, at least 2/3 overlap joint number of times is reduced, globality, the compactness of water-stop curtain is effectively ensured;
Constructed in the stirring row of piles of formation the support pile 103 separately arranged, can not only effectively prevent underground water seepage, sealing
Effect is good, and need not additionally take construction land, and support pattern more optimizes, rationally.
In the present embodiment, the bottom of three axes agitating pile 104 enters water barrier of the bottom of foundation ditch below 106.In addition, supporting
The top of stake 103 and the top flush arrangement of three axes agitating pile 104.
In above-mentioned construction procedure 1) before, first ground grading 100.In above-mentioned construction procedure 1) in, using special
Mixing pile machine construction three axes agitating pile 104, stirs technique pile using four sprays four, is overlapped between stake by design requirement.
After mixing pile applies work completion about 5~7 days, accordingly constructed by the sequence of construction of three axes agitating pile 104 of stirring row of piles
Support pile 103, the length and arrangement of reinforcement of support pile 103 are calculated by base pit stability to be determined.
In above-mentioned construction procedure 4) in, the construction of support pile 103 is completed after being no less than 15 days, can carry out pit earthwork
Excavate, staged and layered is excavated to designed elevation i.e. foundation ditch bottom surface.
In above-mentioned construction procedure 4) in, in the middle of plain concrete surface layer 107, add two-way concrete slab net.
In the present embodiment, the Single Pile footpath of three axes agitating pile 104 is between 650mm-850mm, and adjacent three axles stirring
Between the stake of stake 104 between occlusion spacing 200mm-250mm.
The stake footpath of support pile 103 is between 1000mm-1200mm, and the spacing of adjacent support pile 103 is 1500mm-
Between 1800mm.
The present embodiment additionally provides the constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, including
Multiple three axes agitating piles 104, multiple support piles 103 and stake top Guan Liang 105, multiple three axes agitating piles 104 are in a row-shaped arrangement,
Stirring row of piles is formed, and adjacent three axes agitating pile 104 is mutually overlapped, multiple support piles 103 are formed in stirring row of piles, and
Separately arrange, stake top Guan Liang 105 forms the top in support pile 103, the construction of the stake top Guan Liang 105 along support pile 103
Direction is disposed to extend.
The constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch of above-mentioned offer, multiple three axles are stirred
Stake 104 is mixed, is formed and is mutually overlapped between stirring row of piles, three axes agitating pile 104, contrast the mixing pile of identical stake footpath and spacing, phase
With at least 2/3 overlap joint number of times in water-stop curtain length, is reduced, globality, the compactness of water-stop curtain is effectively ensured;
The support pile 103 separately arranged is formed with the stirring row of piles of formation, underground water seepage, sealing can not only be effectively prevented
Effect is good, and need not additionally take construction land, and support pattern more optimizes, rationally.
The bottom of three axes agitating pile 104 enters water barrier of the bottom of foundation ditch below 106.In addition, the top of support pile 103
With the top flush arrangement of three axes agitating pile 104.
The constructing structure of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch also includes being formed in excavation of foundation pit face
On plain concrete surface layer 107, also, in the middle of plain concrete surface layer 107, add two-way concrete slab net.
In the present embodiment, the Single Pile footpath of three axes agitating pile 104 is between 650mm-850mm, and adjacent three axles stirring
Between the stake of stake 104 between occlusion spacing 200mm-250mm.
The stake footpath of support pile 103 be 1000mm-1200mm between, and support pile 103 spacing be 1500mm-1800mm
Between.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.
Claims (10)
1. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch, it is characterised in that including following construction
Step:
1), according to Foundation Pit Support Design, the groove of certain depth and width is excavated on the ground, and play is jumped in the groove and is applied
Mutually overlapped between the multiple three axes agitating piles of work, the adjacent three axes agitating pile, and multiple three axes agitating piles are in a row-shaped
Arrangement, forms stirring row of piles;
2), constructed multiple support piles in the stirring row of piles, construction direction of multiple support piles along the stirring row of piles
Arranged for interval,;
3), in the top construction stake apical cap beam of the support pile, construction direction extension of the stake top Guan Liang along the support pile
Arrangement;
4) bottom of foundation ditch, is excavated on ground, in the plain concrete surface layer of excavation face injection of the foundation ditch.
2. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as claimed in claim 1, its feature
It is, the water barrier that the bottom of the three axes agitating pile enters below bottom of foundation ditch.
3. the construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as claimed in claim 1, its feature
It is, in the construction procedure 1) before, first ground grading.
4. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that after the mixing pile applies work completion about 5~7 days, by the construction of the three axes agitating pile of the stirring row of piles
Sequence construction support pile.
5. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that in the construction procedure 4) in, the supporting pile driving construction is completed after being no less than 15 days, carries out excavation of foundation pit,
Staged and layered is excavated to bottom of foundation ditch.
6. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that in the construction procedure 4) in, in the middle of the plain concrete surface layer, add two-way concrete slab net.
7. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that the Single Pile footpath of the three axes agitating pile is between 650mm-850mm.
8. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that be engaged between the stake of the adjacent three axes agitating pile between spacing 200mm-250mm.
9. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that the stake footpath of the support pile is between 1000mm-1200mm.
10. the construction party of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch as described in any one of claims 1 to 3
Method, it is characterised in that the spacing of the adjacent support pile is between 1500mm-1800mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710161617.5A CN107165161A (en) | 2017-03-17 | 2017-03-17 | The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710161617.5A CN107165161A (en) | 2017-03-17 | 2017-03-17 | The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107165161A true CN107165161A (en) | 2017-09-15 |
Family
ID=59848887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710161617.5A Pending CN107165161A (en) | 2017-03-17 | 2017-03-17 | The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107165161A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524150A (en) * | 2017-08-28 | 2017-12-29 | 深圳市勘察测绘院有限公司 | A kind of supporting pile protection bores three axes agitating pile foundation pit enclosure water sealing structure |
CN109403334A (en) * | 2018-12-18 | 2019-03-01 | 山西建筑工程集团有限公司 | A kind of foundation pit structure and foundation ditch construction method |
CN110468828A (en) * | 2019-07-21 | 2019-11-19 | 辽宁省有色地质一〇五队有限责任公司 | A kind of construction method of pattern foundation pit supporting structure water-stop continuous wall |
CN114622574A (en) * | 2022-04-08 | 2022-06-14 | 中国铁路设计集团有限公司 | Water-rich cast-fill deep foundation pit water-intercepting excavation supporting method and supporting device |
CN115142436A (en) * | 2022-08-17 | 2022-10-04 | 中国建筑第八工程局有限公司 | Construction method for double-row supporting piles and waterproof curtain in narrow space |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101798810A (en) * | 2009-02-20 | 2010-08-11 | 上海强劲基础工程有限公司 | Cement-soil composite pile inserted into reinforced concrete core materials |
CN202073101U (en) * | 2011-05-10 | 2011-12-14 | 中天建设集团有限公司天津分公司 | Building envelope with functions of blocking soil and stopping water |
CN202559361U (en) * | 2012-04-09 | 2012-11-28 | 东南大学 | Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure |
CN104032763A (en) * | 2014-06-25 | 2014-09-10 | 上海市建工设计研究院有限公司 | Combined-type anti-seepage waterstop curtain structure and construction method thereof |
CN205975626U (en) * | 2016-06-28 | 2017-02-22 | 昆明理工大学 | Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch |
-
2017
- 2017-03-17 CN CN201710161617.5A patent/CN107165161A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101798810A (en) * | 2009-02-20 | 2010-08-11 | 上海强劲基础工程有限公司 | Cement-soil composite pile inserted into reinforced concrete core materials |
CN202073101U (en) * | 2011-05-10 | 2011-12-14 | 中天建设集团有限公司天津分公司 | Building envelope with functions of blocking soil and stopping water |
CN202559361U (en) * | 2012-04-09 | 2012-11-28 | 东南大学 | Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure |
CN104032763A (en) * | 2014-06-25 | 2014-09-10 | 上海市建工设计研究院有限公司 | Combined-type anti-seepage waterstop curtain structure and construction method thereof |
CN205975626U (en) * | 2016-06-28 | 2017-02-22 | 昆明理工大学 | Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch |
Non-Patent Citations (3)
Title |
---|
优路教育全国二级建造师执业资格考试命题研究组: "《市政工程管理与实务1纲2点3题速通宝典 速通版》", 31 January 2014, 中国经济出版社 * |
杨光煦: "《岩土工程关键技术研究与实践》", 31 August 2016, 中国水利水电出版社 * |
陈书申等: "《土力学与地基基础 第5版》", 31 January 2015, 武汉理工大学出版社 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524150A (en) * | 2017-08-28 | 2017-12-29 | 深圳市勘察测绘院有限公司 | A kind of supporting pile protection bores three axes agitating pile foundation pit enclosure water sealing structure |
CN109403334A (en) * | 2018-12-18 | 2019-03-01 | 山西建筑工程集团有限公司 | A kind of foundation pit structure and foundation ditch construction method |
CN110468828A (en) * | 2019-07-21 | 2019-11-19 | 辽宁省有色地质一〇五队有限责任公司 | A kind of construction method of pattern foundation pit supporting structure water-stop continuous wall |
CN114622574A (en) * | 2022-04-08 | 2022-06-14 | 中国铁路设计集团有限公司 | Water-rich cast-fill deep foundation pit water-intercepting excavation supporting method and supporting device |
CN114622574B (en) * | 2022-04-08 | 2023-10-13 | 中国铁路设计集团有限公司 | Water-rich throwing filling deep foundation pit water interception excavation supporting method and supporting device |
CN115142436A (en) * | 2022-08-17 | 2022-10-04 | 中国建筑第八工程局有限公司 | Construction method for double-row supporting piles and waterproof curtain in narrow space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107165161A (en) | The construction method of the continuous three axes agitating pile water-stop curtain interplantation support pile of foundation ditch | |
CN102605792B (en) | Multi-row mini-pile enclosing structure for blocking soil and construction process | |
CN107288135A (en) | A kind of inter-pile soil reinforcement means of foundation ditch Double-row Piles Support | |
CN103967504B (en) | A kind of supporting construction and construction method of electric power plant circulating water system tunnel mouth | |
CN103603358B (en) | A kind of multi-platform building enclosure and constructional method | |
CN105178327A (en) | Composite retaining structure of foundation pit project and construction method thereof | |
CN208379610U (en) | A kind of broken line alternating expression double-row pile foundation pit support structure | |
CN110424434A (en) | For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea | |
CN107366282A (en) | A kind of tunnel arch foot partial high pressure rotary churning pile reinforcement technique | |
CN106120805B (en) | The construction method of ultra-deep foundation pit supporting under dilapidated house environment | |
CN106758890B (en) | Campshed box culvert structure and its construction method | |
CN109322313B (en) | Foundation pit enclosure structure system and its construction method | |
CN103603357B (en) | A kind of multi-platform without inner support self waterproofing foundation pit enclosure structure and constructional method thereof | |
CN105350575B (en) | A kind of reversed construction method of diaphram wall | |
CN108999218A (en) | Antiseepage panel wall construction method is passed through in the construction of shield section | |
CN210087321U (en) | Pile foundation pre-reinforcing and supporting structure for controlling tunnel settlement | |
KR20090080230A (en) | The grouting structure of tunnel and tunnel construction method using the same | |
CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
JP2007170008A (en) | Liquefaction countermeasuring method | |
CN207228123U (en) | The supporting construction of the continuous three axes agitating pile water-stop curtain interplantation campshed of foundation pit | |
CN104153347A (en) | Repair structure of underground diaphragm wall panel notch and construction method of repair structure | |
CN107503357A (en) | Annular pile supporting construction | |
CN208763446U (en) | Increase the supporting construction for building the underground space under a kind of existing building group | |
CN207846429U (en) | A kind of phreatic high, high basement rock go out the foundation pit supporting system shown up | |
CN106567382B (en) | A kind of pit curtain construction method in metalling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |
|
RJ01 | Rejection of invention patent application after publication |