CN107161796B - A wire-laying mechanism for electric power construction - Google Patents

A wire-laying mechanism for electric power construction Download PDF

Info

Publication number
CN107161796B
CN107161796B CN201710474041.8A CN201710474041A CN107161796B CN 107161796 B CN107161796 B CN 107161796B CN 201710474041 A CN201710474041 A CN 201710474041A CN 107161796 B CN107161796 B CN 107161796B
Authority
CN
China
Prior art keywords
oil cylinder
shaft
rotating shaft
sleeve
push block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710474041.8A
Other languages
Chinese (zh)
Other versions
CN107161796A (en
Inventor
叶军辉
沈波
顾泽民
谢朝平
王宇超
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengsi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China
Original Assignee
Shengsi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengsi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Zhoushan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, State Grid Corp of China filed Critical Shengsi Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201710474041.8A priority Critical patent/CN107161796B/en
Publication of CN107161796A publication Critical patent/CN107161796A/en
Application granted granted Critical
Publication of CN107161796B publication Critical patent/CN107161796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/02—Arrangements for removing spent cores or receptacles and replacing by supply packages at paying-out stations
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00—Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18—Methods or apparatus in which packages rotate
    • B65H49/20—Package-supporting devices
    • B65H49/32—Stands or frameworks
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00—Handled material; Storage means
    • B65H2701/30—Handled filamentary material
    • B65H2701/34—Handled filamentary material electric cords or electric power cables

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Earth Drilling (AREA)

Abstract

本发明涉及电力施工设备技术领域,特别涉及一种电力施工放线机构,U型臂的两端均设置有立柱;立柱的顶表面均设置有卷线抬起机构;轴套固定在推块上;转轴与轴套的内腔相匹配;转轴一端与圆盘的端面相固定连接;转轴另一端穿过轴套后与轴心一端相固定连接;轴心固定在转轴的偏心位置处;轴套与转轴转动连接;第二油缸一端与推块相铰接;第二油缸另一端与圆盘的偏心位置相铰接;滚珠套与轴心转动连接;线缆卷驱动机构固定在配重块的上表面。在使用本发明时,使用该结构后,线缆卷通过卷线抬起机构被抬起而且定位在放线机构上,线缆卷不需再用起吊设备吊入,极大限度地降低施工的难度。

The invention relates to the technical field of electric power construction equipment, in particular to a wire-releasing mechanism for electric power construction. Upright columns are arranged at both ends of the U-shaped arm; a wire winding lifting mechanism is arranged on the top surface of the upright columns; the shaft sleeve is fixed on the push block ; The rotating shaft matches the inner cavity of the shaft sleeve; one end of the rotating shaft is fixedly connected with the end surface of the disk; the other end of the rotating shaft passes through the shaft sleeve and is fixedly connected with one end of the shaft center; Rotationally connected with the rotating shaft; one end of the second oil cylinder is hinged with the push block; the other end of the second oil cylinder is hinged with the eccentric position of the disc; the ball sleeve is rotatably connected with the shaft; the cable coil drive mechanism is fixed on the upper surface of the counterweight . When using the present invention, after using this structure, the cable coil is lifted by the winding lifting mechanism and positioned on the wire releasing mechanism, and the cable coil does not need to be hoisted in by lifting equipment, which greatly reduces the construction cost. difficulty.

Description

一种电力施工放线机构A wire-laying mechanism for electric power construction

技术领域technical field

本发明涉及电力施工设备技术领域,特别涉及一种电力施工放线机构。The invention relates to the technical field of electric power construction equipment, in particular to a wire-releasing mechanism for electric power construction.

背景技术Background technique

在电力施工过程中,通常涉及到对电力线缆的铺设工作。电力线缆卷绕在线轴上,其卷取和拖放等操作一般由人工完成,由于电力线缆连同线轴的质量较大,在上述操作过程中要耗费大量的人力和物力,造成效率降低,直接影响施工的成本和进度,同时存在着较大的安全隐患而现有的电力施工放线机构缺少上料机构,需要把电力线缆卷通过吊车吊装到电力施工放线机上;在路面较窄的地方,吊车无法进入,给施工带来极大的不便。In the process of electric power construction, it usually involves the laying of power cables. The power cable is wound on the spool, and its coiling, dragging and dropping operations are generally done manually. Due to the high quality of the power cable and the spool, a lot of manpower and material resources are consumed in the above operation process, resulting in a decrease in efficiency. It directly affects the cost and progress of construction, and there is a big safety hazard at the same time. The existing power construction pay-off mechanism lacks a feeding mechanism, and the power cable coil needs to be hoisted to the power construction pay-off machine by a crane; on narrow roads The place where the crane cannot enter, which brings great inconvenience to the construction.

发明内容Contents of the invention

本发明的目的在于针对现有技术的缺陷和不足,提供一种使用方便的电力施工放线机构。The object of the present invention is to provide an easy-to-use power construction pay-off mechanism aiming at the defects and deficiencies of the prior art.

为实现上述目的,本发明采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:

本发明所述的一种电力施工放线机构,它包括有U型臂和线缆卷驱动机构;所述U型臂的底部设置有若干个滑轮;所述U型臂的两端均设置有立柱;所述立柱的顶表面均设置有卷线抬起机构;所述卷线抬起机构包括有导向板、第一油缸、推块、第二油缸、圆盘、轴套、转轴、滚珠套和轴心;所述导向板的上表面设置有导轨槽;所述推块的底部设置有与导轨槽相匹配的滑块;所述滑块插入到导轨槽的内部;所述第一油缸一端与导向板相固定连接;第一油缸另一端与推块相固定连接;所述轴套固定在推块上;所述转轴与轴套的内腔相匹配;所述转轴一端与圆盘的端面相固定连接;转轴另一端穿过轴套后与轴心一端相固定连接;所述轴心固定在转轴的偏心位置处;所述轴套与转轴转动连接;所述第二油缸一端与推块相铰接;第二油缸另一端与圆盘的偏心位置相铰接;所述滚珠套套在轴心外;所述滚珠套与轴心转动连接;所述U型臂的横梁上固定有配重块;所述线缆卷驱动机构固定在配重块的上表面。A kind of power construction pay-off mechanism of the present invention, it comprises U-shaped arm and cable reel driving mechanism; The bottom of described U-shaped arm is provided with several pulleys; Both ends of described U-shaped arm are provided with Column; the top surface of the column is provided with a winding lifting mechanism; the winding lifting mechanism includes a guide plate, a first oil cylinder, a push block, a second oil cylinder, a disc, a shaft sleeve, a rotating shaft, and a ball sleeve and axis; the upper surface of the guide plate is provided with a guide rail groove; the bottom of the push block is provided with a slider matching the guide rail groove; the slider is inserted into the inside of the guide rail groove; one end of the first oil cylinder It is fixedly connected with the guide plate; the other end of the first oil cylinder is fixedly connected with the push block; the shaft sleeve is fixed on the push block; the shaft is matched with the inner cavity of the shaft sleeve; one end of the shaft is connected with the end of the disc The surface phase is fixedly connected; the other end of the rotating shaft passes through the shaft sleeve and is fixedly connected to one end of the shaft center; the shaft center is fixed at the eccentric position of the rotating shaft; the shaft sleeve is connected to the rotating shaft in rotation; one end of the second oil cylinder is connected to the push block The other end of the second oil cylinder is hinged with the eccentric position of the disc; the ball sleeve is sleeved outside the axis; the ball sleeve is rotatably connected with the axis; a counterweight is fixed on the beam of the U-shaped arm; The cable coil driving mechanism is fixed on the upper surface of the counterweight.

进一步地,所述立柱的侧壁与导向板的底表面之间设置有加强筋。Further, a reinforcing rib is provided between the side wall of the column and the bottom surface of the guide plate.

进一步地,所述线缆卷驱动机构包括有两根摆杆、驱动辊、从动齿轮、电机和第三油缸;所述两根摆杆对称设置在配重块的左右两侧;所述摆杆一端均与配重块相铰接;所述述驱动辊设置在两根摆杆之间;所述驱动辊的两个轴头分别与两根摆杆转动连接;所述电机固定在摆杆的侧壁上;所述从动齿轮与驱动辊一端相固定连接;所述电机的输出端固定设置有与从动齿轮相啮合的主动齿轮。Further, the cable reel driving mechanism includes two swing rods, a driving roller, a driven gear, a motor and a third oil cylinder; the two swing rods are arranged symmetrically on the left and right sides of the counterweight; the swing rods One end of the rod is hinged with the counterweight; the drive roller is arranged between two swing rods; the two axle heads of the drive roller are respectively connected to the two swing rods in rotation; the motor is fixed on the swing rod On the side wall; the driven gear is fixedly connected to one end of the driving roller; the output end of the motor is fixedly provided with a driving gear meshing with the driven gear.

采用上述结构后,本发明有益效果为:本发明所述的一种电力施工放线机构,U型臂的两端均设置有立柱;立柱的顶表面均设置有卷线抬起机构;卷线抬起机构包括有导向板、第一油缸、推块、第二油缸、圆盘、轴套、转轴、滚珠套和轴心;导向板的上表面设置有导轨槽;推块的底部设置有与导轨槽相匹配的滑块;滑块插入到导轨槽的内部;第一油缸一端与导向板相固定连接;第一油缸另一端与推块相固定连接;轴套固定在推块上;转轴与轴套的内腔相匹配;转轴一端与圆盘的端面相固定连接;转轴另一端穿过轴套后与轴心一端相固定连接;轴心固定在转轴的偏心位置处;轴套与转轴转动连接;第二油缸一端与推块相铰接;第二油缸另一端与圆盘的偏心位置相铰接;滚珠套套在轴心外;滚珠套与轴心转动连接;U型臂的横梁上固定有配重块;线缆卷驱动机构固定在配重块的上表面。在使用本发明时,先通过第二油缸驱动,使转轴在轴套上运动,直至到轴心处于最低点;推动本放线机构,使线缆卷置于U型臂内,然后两端的第一油缸推动推块沿导轨槽滑动;使两侧的滚珠套插入到线缆卷两侧的内孔后,第二油缸驱动,使转轴在轴套上运动,直至到轴心处于最高点,把线缆卷抬离地面;然后线缆卷驱动机构控制线缆卷转动进行收卷;使用该结构后,线缆卷通过卷线抬起机构被抬起而且定位在放线机构上,线缆卷不需再用起吊设备吊入,极大限度地降低施工的难度。After adopting the above-mentioned structure, the beneficial effects of the present invention are as follows: a kind of electric power construction pay-off mechanism according to the present invention, both ends of the U-shaped arm are provided with columns; The lifting mechanism includes a guide plate, a first oil cylinder, a push block, a second oil cylinder, a disc, a shaft sleeve, a rotating shaft, a ball sleeve and an axis; the upper surface of the guide plate is provided with a guide rail groove; the bottom of the push block is provided with a The slide block that matches the guide rail groove; the slide block is inserted into the guide rail groove; one end of the first oil cylinder is fixedly connected with the guide plate; the other end of the first oil cylinder is fixedly connected with the push block; the shaft sleeve is fixed on the push block; The inner cavity of the shaft sleeve matches; one end of the rotating shaft is fixedly connected with the end surface of the disc; the other end of the rotating shaft passes through the shaft sleeve and is fixedly connected with one end of the shaft center; the shaft center is fixed at the eccentric position of the rotating shaft; the shaft sleeve and the rotating shaft rotate One end of the second oil cylinder is hinged with the push block; the other end of the second oil cylinder is hinged with the eccentric position of the disc; the ball sleeve is set outside the axis; the ball sleeve is connected with the axis in rotation; the beam of the U-shaped arm is fixed with a Weight; the cable coil driving mechanism is fixed on the upper surface of the counterweight. When using the present invention, it is firstly driven by the second oil cylinder to make the rotating shaft move on the shaft sleeve until the shaft center is at the lowest point; push the wire-releasing mechanism to make the cable coil be placed in the U-shaped arm, and then the first two ends at both ends One oil cylinder pushes the push block to slide along the guide rail groove; after the ball sleeves on both sides are inserted into the inner holes on both sides of the cable coil, the second oil cylinder is driven to make the rotating shaft move on the shaft sleeve until the shaft center is at the highest point. The cable reel is lifted off the ground; then the cable reel driving mechanism controls the rotation of the cable reel to rewind; after using this structure, the cable reel is lifted by the reel lifting mechanism and positioned on the pay-off mechanism, and the cable reel There is no need to use lifting equipment to hoist in, which greatly reduces the difficulty of construction.

附图说明Description of drawings

图1是本发明的结构主视图;Fig. 1 is a structural front view of the present invention;

图2是本发明的结构右视图;Fig. 2 is the structure right view of the present invention;

附图标记说明:Explanation of reference signs:

1、配重块;2、U型臂;3、滑轮;4、立柱;5、加强筋;6、导向板;1. Counterweight; 2. U-shaped arm; 3. Pulley; 4. Column; 5. Rib; 6. Guide plate;

601、导轨槽;7、第一油缸;8、推块;9、第二油缸;10、圆盘;601, guide rail groove; 7, the first oil cylinder; 8, push block; 9, the second oil cylinder; 10, disc;

11、轴套;12、摆杆;13、转轴;14、驱动辊;15、滚珠套;16、轴心;11. Shaft sleeve; 12. Swing rod; 13. Rotating shaft; 14. Driving roller; 15. Ball sleeve; 16. Shaft center;

17、从动齿轮;18、主动齿轮;19、电机;20、第三油缸。17, driven gear; 18, driving gear; 19, motor; 20, the third oil cylinder.

具体实施方式Detailed ways

下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.

如图1至2所示,本发明所述的一种电力施工放线机构,它包括有U型臂2和线缆卷驱动机构;所述U型臂2的底部设置有若干个滑轮3;所述U型臂2的两端均设置有立柱4;所述立柱4的顶表面均设置有卷线抬起机构;所述卷线抬起机构包括有导向板6、第一油缸7、推块8、第二油缸9、圆盘10、轴套11、转轴13、滚珠套15和轴心16;所述导向板6的上表面设置有导轨槽601;所述推块8的底部设置有与导轨槽601相匹配的滑块;所述滑块插入到导轨槽601的内部;所述第一油缸7一端与导向板6相固定连接;第一油缸7另一端与推块8相固定连接;所述轴套11固定在推块8上;所述转轴13与轴套11的内腔相匹配;所述转轴13一端与圆盘10的端面相固定连接;转轴13另一端穿过轴套11后与轴心16一端相固定连接;所述轴心16固定在转轴13的偏心位置处;所述轴套11与转轴13转动连接;所述第二油缸9一端与推块8相铰接;第二油缸9另一端与圆盘10的偏心位置相铰接;所述滚珠套15套在轴心16外;所述滚珠套15与轴心16转动连接;所述U型臂2的横梁上固定有配重块1;所述线缆卷驱动机构固定在配重块1的上表面;先通过第二油缸9驱动,使转轴13在轴套11上运动,直至到轴心16处于最低点;推动本放线机构,使线缆卷置于U型臂2内,然后两端的第一油缸7推动推块8沿导轨槽601滑动;使两侧的滚珠套15插入到线缆卷两侧的内孔后,第二油缸9驱动,使转轴13在轴套11上运动,直至到轴心16处于最高点,把线缆卷抬离地面;然后线缆卷驱动机构控制线缆卷转动进行收卷;使用该结构后,线缆卷通过卷线抬起机构被抬起而且定位在放线机构上,线缆卷不需再用起吊设备吊入,极大限度地降低施工的难度。As shown in Figures 1 to 2, a power construction pay-off mechanism according to the present invention includes a U-shaped arm 2 and a cable coil drive mechanism; the bottom of the U-shaped arm 2 is provided with several pulleys 3; The two ends of described U-shaped arm 2 are all provided with column 4; The top surface of described column 4 is all provided with reel lifting mechanism; Described reel lifting mechanism includes guide plate 6, first oil cylinder 7, push Block 8, second oil cylinder 9, disc 10, axle sleeve 11, rotating shaft 13, ball sleeve 15 and axle center 16; The upper surface of described guide plate 6 is provided with rail groove 601; The bottom of described push block 8 is provided with A slider matching the guide rail groove 601; the slider is inserted into the guide rail groove 601; one end of the first oil cylinder 7 is fixedly connected to the guide plate 6; the other end of the first oil cylinder 7 is fixedly connected to the push block 8 The shaft sleeve 11 is fixed on the push block 8; the rotating shaft 13 matches the inner cavity of the shaft sleeve 11; one end of the rotating shaft 13 is fixedly connected with the end face of the disc 10; the other end of the rotating shaft 13 passes through the shaft sleeve After 11, it is fixedly connected with one end of the shaft center 16; the shaft center 16 is fixed at the eccentric position of the rotating shaft 13; the shaft sleeve 11 is rotationally connected with the rotating shaft 13; one end of the second oil cylinder 9 is hinged with the push block 8; The other end of the second oil cylinder 9 is hinged with the eccentric position of the disk 10; the ball sleeve 15 is sleeved outside the shaft center 16; the ball sleeve 15 is rotationally connected with the shaft center 16; the beam of the U-shaped arm 2 is fixed There is a counterweight 1; the cable reel driving mechanism is fixed on the upper surface of the counterweight 1; it is first driven by the second oil cylinder 9 to make the rotating shaft 13 move on the shaft sleeve 11 until the shaft center 16 is at the lowest point; Push the pay-off mechanism so that the cable roll is placed in the U-shaped arm 2, and then the first oil cylinders 7 at both ends push the push block 8 to slide along the guide rail groove 601; the ball sleeves 15 on both sides are inserted into the two sides of the cable roll. Behind the inner hole, the second oil cylinder 9 is driven to make the rotating shaft 13 move on the shaft sleeve 11 until the shaft center 16 is at the highest point, and the cable coil is lifted off the ground; then the cable coil driving mechanism controls the rotation of the cable coil for retraction. After using this structure, the cable coil is lifted by the coil lifting mechanism and positioned on the pay-off mechanism, and the cable coil does not need to be hoisted in by lifting equipment, which greatly reduces the difficulty of construction.

作为本发明的一种优选方式,所述立柱4的侧壁与导向板6的底表面之间设置有加强筋5。As a preferred mode of the present invention, a reinforcing rib 5 is provided between the side wall of the column 4 and the bottom surface of the guide plate 6 .

作为本发明的一种优选方式,所述线缆卷驱动机构包括有两根摆杆12、驱动辊14、从动齿轮17、电机19和第三油缸20;所述两根摆杆12对称设置在配重块1的左右两侧;所述摆杆12一端均与配重块1相铰接;所述述驱动辊14设置在两根摆杆12之间;所述驱动辊14的两个轴头分别与两根摆杆12转动连接;所述电机19固定在摆杆12的侧壁上;所述从动齿轮17与驱动辊14一端相固定连接;所述电机19的输出端固定设置有与从动齿轮17相啮合的主动齿轮18;通过第三油缸20驱动摆杆12下压,使驱动辊14的辊表面抵压在线缆卷上,然后电机19带动主动齿轮18、从动齿轮17,使驱动辊14转动,通过驱动辊14对线缆卷的摩擦力驱动线缆卷。As a preferred mode of the present invention, the cable reel driving mechanism includes two swing rods 12, a driving roller 14, a driven gear 17, a motor 19 and a third oil cylinder 20; the two swing rods 12 are arranged symmetrically On the left and right sides of the counterweight 1; one end of the swing bar 12 is hinged with the counterweight 1; the drive roller 14 is arranged between the two swing bars 12; the two shafts of the drive roller 14 The head is respectively connected with two swing rods 12 in rotation; the motor 19 is fixed on the side wall of the swing rod 12; the driven gear 17 is fixedly connected with one end of the driving roller 14; the output end of the motor 19 is fixedly provided with The driving gear 18 meshed with the driven gear 17; the third oil cylinder 20 drives the pendulum 12 to press down, so that the roller surface of the driving roller 14 is pressed against the cable roll, and then the motor 19 drives the driving gear 18 and the driven gear 17. Make the driving roller 14 rotate, and drive the cable reel through the frictional force of the driving roller 14 on the cable reel.

在使用本发明时,先通过第二油缸驱动,使转轴在轴套上运动,直至到轴心处于最低点;推动本放线机构,使线缆卷置于U型臂内,然后两端的第一油缸推动推块沿导轨槽滑动;使两侧的滚珠套插入到线缆卷两侧的内孔后,第二油缸驱动,使转轴在轴套上运动,直至到轴心处于最高点,把线缆卷抬离地面;通过第三油缸驱动摆杆下压,使驱动辊的辊表面抵压在线缆卷上,然后电机带动主动齿轮、从动齿轮,使驱动辊转动,通过驱动辊对线缆卷的摩擦力驱动线缆卷;使用该结构后,线缆卷通过卷线抬起机构被抬起而且定位在放线机构上,线缆卷不需再用起吊设备吊入,极大限度地降低施工的难度。When using the present invention, it is firstly driven by the second oil cylinder to make the rotating shaft move on the shaft sleeve until the shaft center is at the lowest point; push the wire-releasing mechanism to make the cable coil be placed in the U-shaped arm, and then the first two ends at both ends One oil cylinder pushes the push block to slide along the guide rail groove; after the ball sleeves on both sides are inserted into the inner holes on both sides of the cable coil, the second oil cylinder is driven to make the rotating shaft move on the shaft sleeve until the shaft center is at the highest point. The cable roll is lifted off the ground; the pendulum rod is driven down by the third oil cylinder, so that the roller surface of the driving roller is pressed against the cable roll, and then the motor drives the driving gear and the driven gear to make the driving roller rotate. The friction force of the cable coil drives the cable coil; after using this structure, the cable coil is lifted by the coil lifting mechanism and positioned on the pay-off mechanism, and the cable coil does not need to be hoisted in by lifting equipment, which greatly Minimize the difficulty of construction.

以上所述仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。The above is only a preferred embodiment of the present invention, so all equivalent changes or modifications made according to the structure, features and principles described in the scope of the patent application of the present invention are included in the scope of the patent application of the present invention.

Claims (3)

1.一种电力施工放线机构,其特征在于:它包括有U型臂(2)和线缆卷驱动机构;所述U型臂(2)的底部设置有若干个滑轮(3);所述U型臂(2)的两端均设置有立柱(4);所述立柱(4)的顶表面均设置有卷线抬起机构;所述卷线抬起机构包括有导向板(6)、第一油缸(7)、推块(8)、第二油缸(9)、圆盘(10)、轴套(11)、转轴(13)、滚珠套(15)和轴心(16);所述导向板(6)的上表面设置有导轨槽(601);所述推块(8)的底部设置有与导轨槽(601)相匹配的滑块;所述滑块插入到导轨槽(601)的内部;所述第一油缸(7)一端与导向板(6)相固定连接;第一油缸(7)另一端与推块(8)相固定连接;所述轴套(11)固定在推块(8)上;所述转轴(13)与轴套(11)的内腔相匹配;所述转轴(13)一端与圆盘(10)的端面相固定连接;转轴(13)另一端穿过轴套(11)后与轴心(16)一端相固定连接;所述轴心(16)固定在转轴(13)的偏心位置处;所述轴套(11)与转轴(13)转动连接;所述第二油缸(9)一端与推块(8)相铰接;第二油缸(9)另一端与圆盘(10)的偏心位置相铰接;所述滚珠套(15)套在轴心(16)外;所述滚珠套(15)与轴心(16)转动连接;所述U型臂(2)的横梁上固定有配重块(1);所述线缆卷驱动机构固定在配重块(1)的上表面。1. A power construction pay-off mechanism, characterized in that: it includes a U-shaped arm (2) and a cable coil drive mechanism; the bottom of the U-shaped arm (2) is provided with several pulleys (3); Both ends of the U-shaped arm (2) are provided with a column (4); the top surface of the column (4) is provided with a winding lifting mechanism; the winding lifting mechanism includes a guide plate (6) , the first oil cylinder (7), the push block (8), the second oil cylinder (9), the disc (10), the shaft sleeve (11), the rotating shaft (13), the ball sleeve (15) and the shaft center (16); The upper surface of the guide plate (6) is provided with a guide rail groove (601); the bottom of the push block (8) is provided with a slider matching the guide rail groove (601); the slider is inserted into the guide rail groove ( 601); one end of the first oil cylinder (7) is fixedly connected with the guide plate (6); the other end of the first oil cylinder (7) is fixedly connected with the push block (8); the shaft sleeve (11) is fixed On the push block (8); the rotating shaft (13) matches the inner cavity of the sleeve (11); one end of the rotating shaft (13) is fixedly connected with the end face of the disc (10); the rotating shaft (13) is on the other hand One end passes through the shaft sleeve (11) and is fixedly connected to one end of the shaft center (16); the shaft center (16) is fixed at the eccentric position of the rotating shaft (13); the shaft sleeve (11) and the rotating shaft (13) Rotation connection; one end of the second oil cylinder (9) is hinged with the push block (8); the other end of the second oil cylinder (9) is hinged with the eccentric position of the disc (10); the ball sleeve (15) is set on Outside the axis (16); the ball sleeve (15) is rotatably connected to the axis (16); the counterweight (1) is fixed on the beam of the U-shaped arm (2); the cable coil driving mechanism fixed on the upper surface of the counterweight (1). 2.根据权利要求1所述的一种电力施工放线机构,其特征在于:所述立柱(4)的侧壁与导向板(6)的底表面之间设置有加强筋(5)。2. The wire-releasing mechanism for electric power construction according to claim 1, characterized in that: a reinforcing rib (5) is provided between the side wall of the column (4) and the bottom surface of the guide plate (6). 3.根据权利要求1所述的一种电力施工放线机构,其特征在于:所述线缆卷驱动机构包括有两根摆杆(12)、驱动辊(14)、从动齿轮(17)、电机(19)和第三油缸(20);所述两根摆杆(12)对称设置在配重块(1)的左右两侧;所述摆杆(12)一端均与配重块(1)相铰接;所述驱动辊(14)设置在两根摆杆(12)之间;所述驱动辊(14)的两个轴头分别与两根摆杆(12)转动连接;所述电机(19)固定在摆杆(12)的侧壁上;所述从动齿轮(17)与驱动辊(14)一端相固定连接;所述电机(19)的输出端固定设置有与从动齿轮(17)相啮合的主动齿轮(18)。3. A pay-off mechanism for electric power construction according to claim 1, characterized in that: the cable reel driving mechanism includes two swing rods (12), a driving roller (14), a driven gear (17) , the motor (19) and the third oil cylinder (20); the two swing rods (12) are symmetrically arranged on the left and right sides of the counterweight (1); one end of the swing rod (12) is connected to the counterweight ( 1) are hinged; the driving roller (14) is arranged between two swing rods (12); the two shaft heads of the driving roller (14) are respectively connected to the two swing rods (12) in rotation; the The motor (19) is fixed on the side wall of the pendulum (12); the driven gear (17) is fixedly connected to one end of the driving roller (14); the output end of the motor (19) is fixedly provided with the driven The driving gear (18) meshed with the gear (17).
CN201710474041.8A 2017-06-21 2017-06-21 A wire-laying mechanism for electric power construction Active CN107161796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710474041.8A CN107161796B (en) 2017-06-21 2017-06-21 A wire-laying mechanism for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710474041.8A CN107161796B (en) 2017-06-21 2017-06-21 A wire-laying mechanism for electric power construction

Publications (2)

Publication Number Publication Date
CN107161796A CN107161796A (en) 2017-09-15
CN107161796B true CN107161796B (en) 2019-11-12

Family

ID=59818885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710474041.8A Active CN107161796B (en) 2017-06-21 2017-06-21 A wire-laying mechanism for electric power construction

Country Status (1)

Country Link
CN (1) CN107161796B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107425467B (en) * 2017-10-09 2019-04-26 新昌县倍顺机械有限公司 A multifunctional electric construction machine
CN111037925A (en) * 2019-12-16 2020-04-21 安徽省春谷3D打印智能装备产业技术研究院有限公司 A tray structure of a 3D printer
CN114014080B (en) * 2021-11-15 2023-03-14 浙江宏策电缆有限公司 Cable manufacturing pay-off device with self-locking function

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5445661A (en) * 1977-09-19 1979-04-11 Hitachi Ltd Tip support device for coillers and un-coillers
JPS6469443A (en) * 1987-09-11 1989-03-15 Mitsubishi Heavy Ind Ltd Mill roll stand
CN2910861Y (en) * 2005-12-29 2007-06-13 涂明招 Height increasing type cloth-spreading and cloth-rolling integrated equipment
CN202967644U (en) * 2012-12-11 2013-06-05 佳源机电工业(昆山)有限公司 Shaftless emptying machine frame set
CN203889799U (en) * 2014-06-22 2014-10-22 芜湖市科特电线电缆有限公司 Electric wire machining conveying support
CN105347108A (en) * 2015-12-01 2016-02-24 重庆力缆电线有限责任公司 Electric type cable hoisting frame
CN205973270U (en) * 2016-08-22 2017-02-22 浙江伟联科技股份有限公司 Reinforcing bar drum lifting paying out machine constructs

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090045282A1 (en) * 2007-08-13 2009-02-19 Mike Cecil System for lifting, holding, and dispensing spooled cable

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5445661A (en) * 1977-09-19 1979-04-11 Hitachi Ltd Tip support device for coillers and un-coillers
JPS6469443A (en) * 1987-09-11 1989-03-15 Mitsubishi Heavy Ind Ltd Mill roll stand
CN2910861Y (en) * 2005-12-29 2007-06-13 涂明招 Height increasing type cloth-spreading and cloth-rolling integrated equipment
CN202967644U (en) * 2012-12-11 2013-06-05 佳源机电工业(昆山)有限公司 Shaftless emptying machine frame set
CN203889799U (en) * 2014-06-22 2014-10-22 芜湖市科特电线电缆有限公司 Electric wire machining conveying support
CN105347108A (en) * 2015-12-01 2016-02-24 重庆力缆电线有限责任公司 Electric type cable hoisting frame
CN205973270U (en) * 2016-08-22 2017-02-22 浙江伟联科技股份有限公司 Reinforcing bar drum lifting paying out machine constructs

Also Published As

Publication number Publication date
CN107161796A (en) 2017-09-15

Similar Documents

Publication Publication Date Title
CN201545555U (en) Wire coil turning device
CN107161796A (en) A kind of power construction payingoff mechanism
CN104085806B (en) A kind of elevator
CN108466865B (en) A cable device that is easy to roll and move
CN204424690U (en) A kind of movement being suitable for field work supplies electric car
CN106335818A (en) Copper rod winding device and copper rod winding method
CN207774448U (en) A kind of electromechanics construction cable paying-off implement
CN106516884A (en) Cable take-up mechanism
CN104291158A (en) Steel wire rope coiling machine and steel wire rope coiling and paying-off device
CN217602153U (en) Pay-off for building
CN118495268B (en) A cable retracting device for erecting a power system
CN108879477A (en) Replace transmission line of electricity linear insulator specific purpose tool
CN211848613U (en) A steel strand rope forming device
CN116853944B (en) Hoisting device for lifting materials used on construction site
CN209082962U (en) The roll device of Lifting basket equipment
CN204474021U (en) cable winder
CN219448814U (en) Cable processing winding machine
CN208429700U (en) A wire rope length measuring and cutting device
CN108975060A (en) A kind of swing device of 8 word wirerope
CN105173923A (en) Rotating disc type cable backwinding device
CN214737960U (en) Tamping device for electric power engineering construction
CN210286261U (en) Civil engineering measurement pay-off
CN111453545B (en) A method for distributing cables on-site in a warehouse
CN210973211U (en) Glass fiber felt rolling equipment
CN115417231A (en) Cable pay-off rack convenient to fast assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ye Junhui

Inventor after: Shen Bo

Inventor after: Gu Zemin

Inventor after: Xie Chaoping

Inventor after: Wang Yuchao

Inventor after: Other inventors request not to publish names

Inventor before: Request for anonymity

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191015

Address after: 202450, No. 301, Xing Hai Road, vegetable Town, Shengsi County, Zhoushan, Zhejiang

Applicant after: Shengsi County Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd.

Applicant after: State Grid Co., Ltd.

Applicant after: State Grid Zhejiang Electric Power Co., Ltd. Zhoushan power supply company

Address before: 528429 No. 63 Xinfeng North Road, Huangpu Town, Zhongshan City, Guangdong Province

Applicant before: Wu Shu Xia

GR01 Patent grant
GR01 Patent grant