CN107144015A - Water heater control method, water heater control system and Teat pump boiler - Google Patents

Water heater control method, water heater control system and Teat pump boiler Download PDF

Info

Publication number
CN107144015A
CN107144015A CN201710313857.2A CN201710313857A CN107144015A CN 107144015 A CN107144015 A CN 107144015A CN 201710313857 A CN201710313857 A CN 201710313857A CN 107144015 A CN107144015 A CN 107144015A
Authority
CN
China
Prior art keywords
pump boiler
teat pump
water
hot blast
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710313857.2A
Other languages
Chinese (zh)
Inventor
古宗敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710313857.2A priority Critical patent/CN107144015A/en
Publication of CN107144015A publication Critical patent/CN107144015A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0096Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater combined with domestic apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H4/00Fluid heaters characterised by the use of heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/18Details or features not otherwise provided for combined with domestic apparatus
    • F24F2221/183Details or features not otherwise provided for combined with domestic apparatus combined with a hot-water boiler

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention provides a kind of water heater control method, water heater control system and Teat pump boiler, wherein, water heater control method includes:Receive hot blast and prepare instruction;Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;The heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the Air blowing after heating to the first room.The water heater control method that the present invention is provided, by the way that Teat pump boiler is switched into hot blast preparation mode, now the temperature of the heat exchanger of Teat pump boiler raises and heats air, the air after heating is blown into by the first room by fan assembly again, the technique effect that hot-air is provided by Teat pump boiler is realized with this.

Description

Water heater control method, water heater control system and Teat pump boiler
Technical field
The present invention relates to household electrical appliance technical field, controlled in particular to a kind of water heater control method, water heater System and Teat pump boiler.
Background technology
Application using the air conditioner and water heater of refrigerating/heating technology is more and more universal, in technology precipitation, enterprise of Japan Industry is on the forefront.Domestic air energy water heater is increasingly received by market user.In conventional products design, there is split The differentiation product design such as formula, monoblock type direction.
By taking a kind of square air-source water heater product of monoblock type as an example (as depicted in figs. 1 and 2), product top is equipped with compression Machine, the evaporator for absorbing heat, in use, fan can blow out cold wind, the low product in evaporator absorption air Position heat energy.But client's complaint, when especially air energy product is arranged in toilet room, blowout are often had in practical application Cold wind can directly influence client's comfort level.As during bathing, the cold wind of blowout can produce cooling to environment of toilet temperature Effect, sense of discomfort is produced to client.
The content of the invention
At least one in order to solve the above-mentioned technical problem, the embodiment of the first aspect of the present invention proposes a kind of water heater Control method.
A kind of the second aspect of the present invention embodiment, it is also proposed that water heater control system.
A kind of the third aspect of the present invention embodiment, it is also proposed that Teat pump boiler.
In view of this, embodiment according to the first aspect of the invention, the present invention proposes a kind of water heater control method, For Teat pump boiler, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching mechanism, and switching mechanism is used for The switching of hot water preparation mode and hot blast preparation mode, water heater control method includes:Receive hot blast and prepare instruction;Control switching Teat pump boiler is switched to hot blast preparation mode by mechanism;The heat exchanger heating air of Teat pump boiler, the wind of Teat pump boiler Thermomechanical components are by the Air blowing after heating to the first room.
The water heater control method that the present invention is provided, it is now hot by the way that Teat pump boiler is switched into hot blast preparation mode The temperature of the heat exchanger of pump water heater is raised and heats air, then the air after heating is blown into the first room by fan assembly Between, the technique effect that hot-air is provided by Teat pump boiler is realized with this.
Wherein, usually, the refrigerant in Teat pump boiler can be controlled to flow to select heat by four-way valve or other modes Water preparation mode and hot blast preparation mode, water when in hot water preparation mode in water tank are heated, and when the hot blast system of being in Heat exchanger heats up and heats air during standby pattern, while absorbing the heat of Water in Water Tanks, afterwards can blow the air after heating Enter in the first room (such as toilet or shower cabinet), it is possible thereby to only provide hot blast into shower cabinet by Teat pump boiler, carry Environment temperature in high shower cabinet, lifts the usage experience of user, and has thus further expanded the function of Teat pump boiler Property.
In addition, the water heater control method in above-described embodiment that the present invention is provided can also have following supplementary technology special Levy:
In the above-mentioned technical solutions, it is preferable that also include:When the water temperature for the water tank for detecting Teat pump boiler is less than or waits Stopping prepares hot blast when the first preset temperature.
In the technical scheme, equivalent to absorbing the heat of water tank while hot blast is prepared, therefore also need to pass through Monitoring for water tank water temperature ensures that water temperature is in normal range (NR), it is to avoid cause the water in water tank because preparing hot blast overlong time Temperature is too low, influence Consumer's Experience, it is ensured that just commonly use water.
In any of the above-described technical scheme, it is preferable that stopping also including after preparing hot blast:Switching mechanism is controlled by heat pump Water heater switches to hot water preparation mode and starts to prepare hot water;Stop when detecting water temperature greater than or equal to the second preset temperature Only prepare hot water and Teat pump boiler is switched to hot blast preparation mode by control switching mechanism again;Wherein, the second preset temperature Higher than the first preset temperature.
In the technical scheme, prepared by stopping switches to hot water preparation mode by Teat pump boiler after hot blast and starts preparation Hot water, and the preparation of hot blast is carried out again when water temperature is greater than or equal to the second preset temperature, it can either so ensure hot blast It is normal to prepare, the temperature in shower cabinet is improved, the usage experience of user is lifted, while also ensure that the water temperature in water tank is in In suitable scope, it is to avoid cause water temperature too low because preparing hot blast, user's water is influenceed.
In any of the above-described technical scheme, it is preferable that also include:Detect the environment temperature in the first room;When detecting Stopping prepares hot blast when environment temperature is greater than or equal to three preset temperatures.
In the technical scheme, in addition to the environment temperature in the first room of detection, when environment temperature is greater than or equal to the It can consider that the environment temperature in the first room is sufficiently high during three preset temperatures, can stop preparing hot blast, it is so both real The environment temperature in the first room of lifting is showed, while also can effectively save energy consumption.
In any of the above-described technical scheme, it is preferable that stopping also including after preparing hot blast:It is low when detecting environment temperature Restart to prepare hot blast when four preset temperatures;Wherein, the 4th preset temperature is less than the 3rd preset temperature.
In the technical scheme, it be can consider when environment temperature is less than or equal to four preset temperatures in the first room Environment temperature is relatively low, it is necessary to prepare hot blast to lift environment temperature, thus equivalent to setting the bound temperature for preparing hot blast, Ensure that environment temperature is in suitable scope, the comfort level of user is lifted, while can also control energy consumption, it is to avoid the wave of the energy Take.
Wherein, the 3rd preset temperature and the 4th preset temperature can be by user's sets itselfs, for example, the 3rd preset temperature is 18 DEG C, the 4th preset temperature is 22 DEG C, or the 3rd preset temperature is 20 DEG C, and the 4th preset temperature is 23 DEG C etc., here no longer Repeat.
In any of the above-described technical scheme, it is preferable that also include:Receive hot water and prepare instruction;Switching mechanism is controlled by heat Pump water heater switches to hot water preparation mode and starts to prepare hot water;The heat of the heat exchanger absorption air of Teat pump boiler, heat The fan assembly of pump water heater is by the Air blowing after cooling to the second room;Detect the water temperature of the water tank of Teat pump boiler;When Stopping prepares hot water when detecting water temperature greater than or equal to five preset temperatures.
In the technical scheme, Teat pump boiler can be switched to by switching mechanism when receiving hot water and preparing instruction Hot water preparation mode simultaneously starts to prepare hot water, realizes that normal hot water prepares function, while can also be by changing fan assembly Rotation direction or set air channel structure mode the air after heat exchanger cools is blowed into the second room (such as kitchen), this Sample, which can either be realized, normally prepares hot water function, while it also avoid causing because preparing hot water temperature in the first room again Secondary reduction, and if cold air is blowed into kitchen, the temperature in kitchen can also be reduced, user so can be also lifted at kitchen Comfortableness.Pass through above-mentioned technical scheme so that the hot-air or cold air that Teat pump boiler is produced under different operating modes are all There is suitable flow direction, more fully make use of the feature of water heater, improve energy utilization rate.
In any of the above-described technical scheme, it is preferable that also include:Record Teat pump boiler is worked with hot blast preparation mode Time duration;Stopping prepares hot blast after time duration reaches the first preset duration.
In the technical scheme, by carrying out timing to the time duration for preparing hot blast, one single of setting heats wind Duration.Hot blast as prepared leads to shower cabinet, realizes the pre- heating of the environment temperature before user takes a shower to shower cabinet, then can By the restriction to heating wind time duration, can both realize the temperature rise in shower cabinet, can ensure in water tank again Water temperature will not significantly decline.
In any of the above-described technical scheme, it is preferable that also include:Detect the shell temperature of user;At Teat pump boiler When hot blast preparation mode, fan assembly is controlled to be transported with the first rotating speed if shell temperature is greater than or equal to the 5th preset temperature OK;When Teat pump boiler be in hot blast preparation mode when, if shell temperature be less than the 5th preset temperature if control fan assembly with Second rotating speed is run;Wherein, the second rotating speed is more than the first rotating speed.
In the technical scheme, by detecting the shell temperature of user and the rotating speed of fan assembly being adjusted with this, if than Shell temperature then can consider that the impression of user is more warm when being greater than or equal to five preset temperatures, then now control blower fan Component is run with the first rotating speed;It can consider that the impression of user is colder if when shell temperature is less than five preset temperatures, So now control fan assembly is with the second higher rotation speed operation of rotating speed, and to provide more hot blasts, lifting user's is comfortable Degree.
The embodiment of second aspect of the present invention additionally provides a kind of water heater control system, for Teat pump boiler, heat pump Water heater includes hot water preparation mode, hot blast preparation mode and switching mechanism, and switching mechanism is used for hot water preparation mode and hot blast The switching of preparation mode, water heater control system includes:Receiving unit, instruction is prepared for receiving hot blast;Control unit, is used for Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;Control unit is additionally operable to control the heat exchange of Teat pump boiler Device heats the fan assembly of air and Teat pump boiler by the Air blowing after heating to the first room.
The water heater control system that the present invention is provided is now warm by the way that Teat pump boiler is switched into hot blast preparation mode The temperature of the heat exchanger of pump water heater is raised and heats air, then the air after heating is blown into the first room by fan assembly Between, the technique effect that hot-air is provided by Teat pump boiler is realized with this.
Wherein, usually, the refrigerant in Teat pump boiler can be controlled to flow to select heat by four-way valve or other modes Water preparation mode and hot blast preparation mode, water when in hot water preparation mode in water tank are heated, and when the hot blast system of being in Heat exchanger heats up and heats air during standby pattern, while absorbing the heat of Water in Water Tanks, afterwards can blow the air after heating Enter in the first room (such as toilet or shower cabinet), it is possible thereby to only provide hot blast into shower cabinet by Teat pump boiler, carry Environment temperature in high shower cabinet, lifts the usage experience of user, and has thus further expanded the function of Teat pump boiler Property.
In addition, the water heater control system in above-described embodiment that the present invention is provided can also have following supplementary technology special Levy:
In the above-mentioned technical solutions, it is preferable that also include:First detection unit, the water tank for detecting Teat pump boiler Water temperature;Control unit is additionally operable to heat pump less than or equal to the first preset temperature time control when the first detection unit detects water temperature Water heater stopping prepares hot blast.
In the technical scheme, equivalent to absorbing the heat of water tank while hot blast is prepared, therefore also need to pass through Monitoring for water tank water temperature ensures that water temperature is in normal range (NR), it is to avoid cause the water in water tank because preparing hot blast overlong time Temperature is too low, influence Consumer's Experience, it is ensured that just commonly use water.
In any of the above-described technical scheme, it is preferable that control unit is additionally operable to after stopping prepares hot blast control switching Teat pump boiler is switched to hot water preparation mode and starts to prepare hot water by mechanism;Control unit is additionally operable to prepare hot blast in stopping Afterwards when the first detection unit detect water temperature greater than or equal to the second preset temperature time control heat pump water heater stop prepare heat Water simultaneously controls switching mechanism that Teat pump boiler is switched into hot blast preparation mode again;Wherein, the second preset temperature is higher than first Preset temperature.
In the technical scheme, prepared by stopping switches to hot water preparation mode by Teat pump boiler after hot blast and starts preparation Hot water, and the preparation of hot blast is carried out again when water temperature is greater than or equal to the second preset temperature, it can either so ensure hot blast It is normal to prepare, the temperature in shower cabinet is improved, the usage experience of user is lifted, while also ensure that the water temperature in water tank is in In suitable scope, it is to avoid cause water temperature too low because preparing hot blast, user's water is influenceed.
In any of the above-described technical scheme, it is preferable that also include:Second detection unit, for detecting in the first room Environment temperature;Control unit is additionally operable to when the second detection unit detects environment temperature greater than or equal to the 3rd preset temperature time control Heat pump water heater stopping and prepare hot blast.
In the technical scheme, in addition to the environment temperature in the first room of detection, when environment temperature is greater than or equal to the It can consider that the environment temperature in the first room is sufficiently high during three preset temperatures, can stop preparing hot blast, it is so both real The environment temperature in the first room of lifting is showed, while also can effectively save energy consumption.
In any of the above-described technical scheme, it is preferable that control unit is additionally operable to after stopping prepares hot blast when the second inspection Survey unit and detect environment temperature and heat pump water heater less than or equal to the 4th preset temperature time control and restart to prepare hot blast;Its In, the 4th preset temperature is less than the 3rd preset temperature.
In the technical scheme, it be can consider when environment temperature is less than or equal to four preset temperatures in the first room Environment temperature is relatively low, it is necessary to prepare hot blast to lift environment temperature, thus equivalent to setting the bound temperature for preparing hot blast, Ensure that environment temperature is in suitable scope, the comfort level of user is lifted, while can also control energy consumption, it is to avoid the wave of the energy Take.
Wherein, the 3rd preset temperature and the 4th preset temperature can be by user's sets itselfs, for example, the 3rd preset temperature is 18 DEG C, the 4th preset temperature is 22 DEG C, or the 3rd preset temperature is 20 DEG C, and the 4th preset temperature is 23 DEG C etc., here no longer Repeat.
In any of the above-described technical scheme, it is preferable that also include:3rd detection unit, for detecting Teat pump boiler The water temperature of water tank;Receiving unit is additionally operable to receive hot water preparation instruction;Control unit is additionally operable to control switching mechanism by Heat Pump Hydrophone switches to hot water preparation mode and controls Teat pump boiler to start to prepare hot water;Control unit is additionally operable to control heat-pump hot-water The heat of heat exchanger absorption air and the fan assembly of Teat pump boiler of device are by the Air blowing after cooling to the second room; Control unit is additionally operable to heat pump water heater greater than or equal to the 5th preset temperature time control when the 3rd detection unit detects water temperature Stopping prepares hot water.
In the technical scheme, Teat pump boiler can be switched to by switching mechanism when receiving hot water and preparing instruction Hot water preparation mode simultaneously starts to prepare hot water, realizes that normal hot water prepares function, while can also be by changing fan assembly Rotation direction or set air channel structure mode the air after heat exchanger cools is blowed into the second room (such as kitchen), this Sample, which can either be realized, normally prepares hot water function, while it also avoid causing because preparing hot water temperature in the first room again Secondary reduction, and if cold air is blowed into kitchen, the temperature in kitchen can also be reduced, user so can be also lifted at kitchen Comfortableness.Pass through above-mentioned technical scheme so that the hot-air or cold air that Teat pump boiler is produced under different operating modes are all There is suitable flow direction, more fully make use of the feature of water heater, improve energy utilization rate.
In any of the above-described technical scheme, it is preferable that also include:Timing unit, for recording Teat pump boiler with hot blast The time duration of preparation mode work;Control unit is additionally operable to control heat-pump hot-water after time duration reaches the first preset duration Device stopping prepares hot blast.
In the technical scheme, by carrying out timing to the time duration for preparing hot blast, one single of setting heats wind Duration.Hot blast as prepared leads to shower cabinet, realizes the pre- heating of the environment temperature before user takes a shower to shower cabinet, then can By the restriction to heating wind time duration, can both realize the temperature rise in shower cabinet, can ensure in water tank again Water temperature will not significantly decline.
In any of the above-described technical scheme, it is preferable that also include:4th detection unit, the body surface temperature for detecting user Degree;Control unit is additionally operable to when Teat pump boiler is in hot blast preparation mode, if shell temperature is preset greater than or equal to the 5th Temperature then controls fan assembly to be run with the first rotating speed;Control unit is additionally operable to when Teat pump boiler is in hot blast preparation mode When, control fan assembly to be run with the second rotating speed if shell temperature is less than the 5th preset temperature;Wherein, the second rotating speed is more than the One rotating speed.
In the technical scheme, by detecting the shell temperature of user and the rotating speed of fan assembly being adjusted with this, if than Shell temperature then can consider that the impression of user is more warm when being greater than or equal to five preset temperatures, then now control blower fan Component is run with the first rotating speed;It can consider that the impression of user is colder if when shell temperature is less than five preset temperatures, So now control fan assembly is with the second higher rotation speed operation of rotating speed, and to provide more hot blasts, lifting user's is comfortable Degree.
The embodiment of third aspect present invention additionally provides a kind of Teat pump boiler, including:Second aspect of the present invention is implemented The water heater control system of example.
The Teat pump boiler that the present invention is provided, by using the water heater control system of second aspect of the present invention embodiment, Cold wind or hot blast that Teat pump boiler is produced under different operating modes are efficiently utilized, the utilization rate of the energy is effectively improved, The comfort level of user under different scenes is also improved simultaneously.
In addition, the Teat pump boiler in above-described embodiment that the present invention is provided can also have following additional technical feature:
In the above-mentioned technical solutions, it is preferable that also include:Pipeline;Compressor, is arranged on pipeline;Water tank, water tank and pipe Road is connected;Heat exchanger, is arranged on pipeline;Fan assembly, fan assembly is connected with heat exchanger;Switching mechanism, is arranged on On pipeline and positioned between compressor and water tank, switching mechanism is used for switching working mode, and mode of operation prepares mould including hot water Formula, hot blast preparation mode;Throttling arrangement, is arranged on pipeline and positioned between water tank and heat exchanger.
In the technical scheme, switch the mode of operation of Teat pump boiler by switching construction, wherein switching construction can be with It is four-way valve, so can flows to adjusting working mode by control refrigerant (refrigerant).
In any of the above-described technical scheme, it is preferable that also include:Diversion air duct, diversion air duct is connected with fan assembly, The first air outlet, the second air outlet and deflector are provided with diversion air duct;Wherein, the air flowed out through fan assembly is flowed into Diversion air duct, the air that deflector is used to control in diversion air duct flows out through the first air outlet and/or the second air outlet.
In the technical scheme, the air-out direction of diversion air duct is controlled by deflector, is such as gone out by the first air outlet Wind, or by the second air outlet, or by the first air outlet and the common air-out of the second air outlet, be achieved in that for The more flexible air-out mode of cold wind or hot blast.
Wherein, the first air outlet can lead to toilet or shower cabinet, and the second air outlet can lead to kitchen or outdoor.
The present invention provides Teat pump boiler and produces hot-air by the switching of mode of operation, and hot-air can be used for preheating small sky Between environment temperature, optimize system control scheme on the premise of, it is ensured that premised on hot water, equivalent to the heat with original hot water The temperature come in regenerator section bath space, it is ensured that the comfortableness of bathing process.And the program does not increase in design cost In the case of blown a cold wind over the scheme of problem there is provided a kind of air energy product that solves to a certain extent, realize more preferable client's body Test., can be using top air-out scheme and axle outflow wind scheme, naturally it is also possible to using other air-out sides on air-out conceptual design Case.
The additional aspect and advantage of the present invention will become obvious in following description section, or pass through the practice of the present invention Recognize.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from description of the accompanying drawings below to embodiment is combined Substantially and be readily appreciated that, wherein:
Fig. 1 is a kind of structural representation of Teat pump boiler in correlation technique;
Fig. 2 is a kind of structural representation of Teat pump boiler in correlation technique;
Fig. 3 is the structural representation of the Teat pump boiler of one embodiment of the present of invention;
Fig. 4 is the control principle drawing of the Teat pump boiler of one embodiment of the present of invention;
Fig. 5 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Fig. 6 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Fig. 7 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Fig. 8 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Fig. 9 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Figure 10 is the schematic flow sheet of the water heater control method of one embodiment of the present of invention;
Figure 11 is the schematic block diagram of the Teat pump boiler of one embodiment of the present of invention.
Wherein, the corresponding relation in Fig. 3 between reference and component names is:
302 compressors, 304 switching mechanisms, 306 exhaust temperature-sensitive bags, 308 first temperature sensors, 310 second temperatures sensing Device, 312 throttling arrangements, 314 fan assemblies, 316 heat exchangers, 318 three-temperature sensors, 320 the 4th temperature sensors, 322 Water tank, 324 pipelines.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting, the implementation of the application Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also Implemented with being different from other modes described here using other, therefore, protection scope of the present invention is not by described below Specific embodiment limitation.
Water heater control method described according to some embodiments of the invention, water heater are described referring to Fig. 3 to Figure 11 Control system and Teat pump boiler.
As shown in figure 5, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method can For controlling Teat pump boiler as shown in Figure 3, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching machine Structure, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 502, receive hot blast and prepare instruction;
Step 504, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 506, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the air after heating Blow out to the first room.
The water heater control method that the present invention is provided, it is now hot by the way that Teat pump boiler is switched into hot blast preparation mode The temperature of the heat exchanger of pump water heater is raised and heats air, then the air after heating is blown into the first room by fan assembly Between, the technique effect that hot-air is provided by Teat pump boiler is realized with this.
Wherein, usually, the refrigerant in Teat pump boiler can be controlled to flow to select heat by four-way valve or other modes Water preparation mode and hot blast preparation mode, water when in hot water preparation mode in water tank are heated, and when the hot blast system of being in Heat exchanger heats up and heats air during standby pattern, while absorbing the heat of Water in Water Tanks, afterwards can blow the air after heating Enter in the first room (such as toilet or shower cabinet), it is possible thereby to only provide hot blast into shower cabinet by Teat pump boiler, carry Environment temperature in high shower cabinet, lifts the usage experience of user, and has thus further expanded the function of Teat pump boiler Property.
As shown in fig. 6, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method can For controlling Teat pump boiler as shown in Figure 3, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching machine Structure, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 602, receive hot blast and prepare instruction;
Step 604, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 606, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the air after heating Blow out to the first room;
Step 608, the water temperature of the water tank of detection Teat pump boiler;
Step 610, judge whether water temperature is less than or equal to the first preset temperature;
Step 612, if the judged result of step 610 is yes, stopping prepares hot blast;
Step 614, Teat pump boiler is switched to hot water preparation mode and starts to prepare hot water by control switching mechanism;
Step 616, the water temperature of the water tank of detection Teat pump boiler;
Step 618, judge whether water temperature is greater than or equal to the second preset temperature;
Step 620, if the judged result of step 618 is yes, stopping prepares hot water and controls switching mechanism again by heat Pump water heater switches to hot blast preparation mode.
In this embodiment, while hot blast is prepared equivalent to absorbing the heat of water tank, therefore also need to by right Ensure that water temperature is in normal range (NR) in the monitoring of water tank water temperature, it is to avoid cause the water temperature in water tank because preparing hot blast overlong time Too low, influence Consumer's Experience, it is ensured that just commonly use water.And Teat pump boiler is switched into hot water system after stopping prepares hot blast Standby pattern starts to prepare hot water, and carries out the preparation of hot blast again when water temperature is greater than or equal to the second preset temperature, so both The normal preparation of hot blast is ensure that, the temperature in shower cabinet is improved, the usage experience of user is lifted, while also ensure that water Water temperature in case is in suitable scope, it is to avoid cause water temperature too low because preparing hot blast, influences user's water.
As shown in fig. 7, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method can For controlling Teat pump boiler as shown in Figure 3, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching machine Structure, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 702, receive hot blast and prepare instruction;
Step 704, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 706, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the air after heating Blow out to the first room;
Step 708, the environment temperature in the first room of detection;
Step 710, judge whether environment temperature is greater than or equal to the 3rd preset temperature;
Step 712, if the judged result of step 710 is yes, stopping prepares hot blast;
Step 714, judge whether environment temperature is less than or equal to the 4th preset temperature;
Step 716, if the judged result of step 714 is yes, restart to prepare hot blast.
In this embodiment, the environment temperature in the first room of detection, when environment temperature is greater than or equal to the 3rd default temperature It is considered that the environment temperature in the first room is sufficiently high when spending, it can stop preparing hot blast, so both realize lifting Environment temperature in first room, while also can effectively save energy consumption.When environment temperature is less than or equal to the 4th default temperature It is considered that the environment temperature in the first room is relatively low, it is necessary to prepare hot blast to lift environment temperature when spending, thus equivalent to setting Determine to prepare the bound temperature of hot blast, it is ensured that environment temperature is in suitable scope, lift the comfort level of user, while Energy consumption can be controlled, it is to avoid the waste of the energy.
Wherein, the 3rd preset temperature and the 4th preset temperature can be by user's sets itselfs, for example, the 3rd preset temperature is 18 DEG C, the 4th preset temperature is 22 DEG C, or the 3rd preset temperature is 20 DEG C, and the 4th preset temperature is 23 DEG C etc., here no longer Repeat.
As shown in figure 8, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method can For controlling Teat pump boiler as shown in Figure 3, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching machine Structure, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 802, receive hot blast and prepare instruction;
Step 804, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 806, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the air after heating Blow out to the first room;
Step 808, receive hot water and prepare instruction;
Step 810, Teat pump boiler is switched to hot water preparation mode and starts to prepare hot water by control switching mechanism;
Step 812, the heat of the heat exchanger absorption air of Teat pump boiler, after the fan assembly of Teat pump boiler will cool Air blowing to the second room;
Step 814, the water temperature of the water tank of detection Teat pump boiler;
Step 816, when detecting water temperature greater than or equal to five preset temperatures, stopping prepares hot water.
In this embodiment, Teat pump boiler can also be switched to by switching mechanism when receiving hot water and preparing instruction Hot water preparation mode simultaneously starts to prepare hot water, realizes that normal hot water prepares function, while can also be by changing fan assembly Rotation direction or set air channel structure mode the air after heat exchanger cools is blowed into the second room (such as kitchen), this Sample, which can either be realized, normally prepares hot water function, while it also avoid causing because preparing hot water temperature in the first room again Secondary reduction, and if cold air is blowed into kitchen, the temperature in kitchen can also be reduced, user so can be also lifted at kitchen Comfortableness.Pass through above-mentioned technical scheme so that the hot-air or cold air that Teat pump boiler is produced under different operating modes are all There is suitable flow direction, more fully make use of the feature of water heater, improve energy utilization rate.In addition, in the method Corresponding follow-up action can be carried out according to the instruction type being an actually-received.
As shown in figure 9, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method can For controlling Teat pump boiler as shown in Figure 3, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching machine Structure, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 902, receive hot blast and prepare instruction;
Step 904, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 906, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the air after heating Blow out to the first room;
Step 908, the time duration that record Teat pump boiler is worked with hot blast preparation mode;
Step 910, stopping prepares hot blast after time duration reaches the first preset duration.
In this embodiment, by prepare hot blast time duration carry out timing, setting one single heat wind when It is long.Hot blast as prepared leads to shower cabinet, realizes the pre- heating to the environment temperature of shower cabinet before user takes a shower, then can be with By the restriction to heating wind time duration, the temperature rise in shower cabinet can be both realized, the water in water tank can be ensured again Temperature will not significantly decline.
As shown in Figure 10, the schematic flow sheet of the water heater control method of one embodiment of the present of invention, the control method Available for Teat pump boiler as shown in Figure 3 is controlled, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching Mechanism, switching mechanism is used for the switching of hot water preparation mode and hot blast preparation mode, and the water heater control method includes:
Step 1002, receive hot blast and prepare instruction;
Step 1004, Teat pump boiler is switched to hot blast preparation mode by control switching mechanism;
Step 1006, the heat exchanger heating air of Teat pump boiler, the fan assembly of Teat pump boiler is by the sky after heating Air-blowing goes out to the first room;
Step 1008, the shell temperature of user is detected;
Step 1010, judge whether shell temperature is greater than or equal to the 5th preset temperature;
Step 1012, if the judged result of step 1010 is yes, control fan assembly is run with the first rotating speed;
Step 1014, if the judged result of step 1010 is no, control fan assembly is run with the second rotating speed;
Wherein, the second rotating speed is more than the first rotating speed.
In this embodiment, by detecting the shell temperature of user and the rotating speed of fan assembly being adjusted with this, if than body Table temperature then can consider that the impression of user is more warm when being greater than or equal to five preset temperatures, then now control blower fan group Part is run with the first rotating speed;It can consider that the impression of user is colder if when shell temperature is less than five preset temperatures, that Now control fan assembly, to provide more hot blasts, lifts the comfort level of user with the second higher rotation speed operation of rotating speed.
Present invention also offers a kind of refrigerator control system, as shown in figure 11, available for controlling Heat Pump as shown in Figure 3 Hydrophone, Teat pump boiler includes hot water preparation mode, hot blast preparation mode and switching mechanism, and switching mechanism prepares mould for hot water The switching of formula and hot blast preparation mode, water heater control system 11 includes:Receiving unit 1102, refers to for receiving hot blast and preparing Order;Control unit 1104, hot blast preparation mode is switched to for controlling switching mechanism by Teat pump boiler;Control unit 1104 is also For controlling the heat exchanger heating air of Teat pump boiler and the fan assembly of Teat pump boiler by the Air blowing after heating To the first room.
The water heater control system 11 that the present invention is provided, by the way that Teat pump boiler is switched into hot blast preparation mode, now The temperature of the heat exchanger of Teat pump boiler is raised and heats air, then the air after heating is blown into the first room by fan assembly Between, the technique effect that hot-air is provided by Teat pump boiler is realized with this.
Wherein, usually, the refrigerant in Teat pump boiler can be controlled to flow to select heat by four-way valve or other modes Water preparation mode and hot blast preparation mode, water when in hot water preparation mode in water tank are heated, and when the hot blast system of being in Heat exchanger heats up and heats air during standby pattern, while absorbing the heat of Water in Water Tanks, afterwards can blow the air after heating Enter in the first room (such as toilet or shower cabinet), it is possible thereby to only provide hot blast into shower cabinet by Teat pump boiler, carry Environment temperature in high shower cabinet, lifts the usage experience of user, and has thus further expanded the function of Teat pump boiler Property.
In one embodiment of the invention, it is preferable that also include:First detection unit 1106, for detecting Heat Pump The water temperature of the water tank of hydrophone;Control unit 1104 is additionally operable to when the first detection unit 1106 detects water temperature less than or equal to first Preset temperature time control heats pump water heater stopping and prepares hot blast.
In this embodiment, while hot blast is prepared equivalent to absorbing the heat of water tank, therefore also need to by right Ensure that water temperature is in normal range (NR) in the monitoring of water tank water temperature, it is to avoid cause the water temperature in water tank because preparing hot blast overlong time Too low, influence Consumer's Experience, it is ensured that just commonly use water.
In one embodiment of the invention, it is preferable that control unit 1104 is additionally operable to control after stopping prepares hot blast Teat pump boiler is switched to hot water preparation mode and starts to prepare hot water by switching mechanism processed;Control unit 1104 is additionally operable to stopping Only prepare after hot blast when the first detection unit 1106 detects water temperature greater than or equal to the second preset temperature time control Heat Pump Hydrophone stopping prepares hot water and Teat pump boiler is switched to hot blast preparation mode by control switching mechanism again;Wherein, second is pre- If temperature is higher than the first preset temperature.
In this embodiment, prepared by stopping switches to hot water preparation mode by Teat pump boiler after hot blast and starts to prepare heat Water, and the preparation of hot blast is carried out again when water temperature is greater than or equal to the second preset temperature, so it can either ensure hot blast just It is normal to prepare, the temperature in shower cabinet is improved, the usage experience of user is lifted, while also ensure that the water temperature in water tank is in conjunction In suitable scope, it is to avoid cause water temperature too low because preparing hot blast, user's water is influenceed.
In one embodiment of the invention, it is preferable that also include:Second detection unit 1108, for detecting the first room Interior environment temperature;Control unit 1104 is additionally operable to when the second detection unit 1108 detects environment temperature greater than or equal to the Three preset temperature time controls heat pump water heater stopping and prepare hot blast.
In this embodiment, in addition to detection the first room in environment temperature, when environment temperature be greater than or equal to the 3rd It can consider that the environment temperature in the first room is sufficiently high during preset temperature, can stop preparing hot blast, so both realize Environment temperature in the first room of lifting, while also can effectively save energy consumption.
In one embodiment of the invention, it is preferable that control unit 1104 is additionally operable to work as after stopping prepares hot blast Second detection unit 1108, which detects environment temperature and heats pump water heater less than or equal to the 4th preset temperature time control, to restart Prepare hot blast;Wherein, the 4th preset temperature is less than the 3rd preset temperature.
In this embodiment, the ring in the first room is can consider when environment temperature is less than or equal to four preset temperatures Border temperature is relatively low, it is necessary to prepare hot blast to lift environment temperature, thus equivalent to the bound temperature for preparing hot blast is set, protects Demonstrate,prove environment temperature to be in suitable scope, the comfort level of user is lifted, while can also control energy consumption, it is to avoid the wave of the energy Take.
Wherein, the 3rd preset temperature and the 4th preset temperature can be by user's sets itselfs, for example, the 3rd preset temperature is 18 DEG C, the 4th preset temperature is 22 DEG C, or the 3rd preset temperature is 20 DEG C, and the 4th preset temperature is 23 DEG C etc., here no longer Repeat.
In one embodiment of the invention, it is preferable that also include:3rd detection unit 1110, for detecting Heat Pump The water temperature of the water tank of hydrophone;Receiving unit 1102 is additionally operable to receive hot water preparation instruction;Control unit 1104 is additionally operable to control and cut Teat pump boiler is switched to hot water preparation mode and controls Teat pump boiler to start to prepare hot water by converting mechanism;Control unit 1104 It is additionally operable to control the heat of heat exchanger absorption air and the fan assembly of Teat pump boiler of Teat pump boiler by after cooling Air blowing is to the second room;Control unit 1104 is additionally operable to when the 3rd detection unit 1110 detects water temperature greater than or equal to the Five preset temperature time controls heat pump water heater stopping and prepare hot water.
In this embodiment, Teat pump boiler can be switched to by heat by switching mechanism when receiving hot water and preparing instruction Water preparation mode simultaneously starts to prepare hot water, realizes that normal hot water prepares function, while can also be by changing fan assembly Rotation direction sets the mode of air channel structure that the air after heat exchanger cools is blowed into the second room (such as kitchen), so It can either realize and normally prepare hot water function, while it also avoid causing because preparing hot water temperature in the first room again Reduction, and if cold air is blowed into kitchen, it can also reduce the temperature in kitchen, so can also lift user at kitchen Comfortableness.Pass through above-mentioned technical scheme so that the hot-air or cold air that Teat pump boiler is produced under different operating modes have Suitable flow direction, more fully make use of the feature of water heater, improves energy utilization rate.
In one embodiment of the invention, it is preferable that also include:Timing unit 1112, for recording Teat pump boiler The time duration worked with hot blast preparation mode;Control unit 1104 is additionally operable to control after time duration reaches the first preset duration Heat pump water heater stopping and prepare hot blast.
In this embodiment, by prepare hot blast time duration carry out timing, setting one single heat wind when It is long.Hot blast as prepared leads to shower cabinet, realizes the pre- heating to the environment temperature of shower cabinet before user takes a shower, then can be with By the restriction to heating wind time duration, the temperature rise in shower cabinet can be both realized, the water in water tank can be ensured again Temperature will not significantly decline.
In one embodiment of the invention, it is preferable that also include:4th detection unit 1114, for detecting user's Shell temperature;Control unit 1104 is additionally operable to when Teat pump boiler is in hot blast preparation mode, if shell temperature is higher than or waited Fan assembly is then controlled to be run with the first rotating speed in the 5th preset temperature;Control unit 1104 is additionally operable to when Teat pump boiler is in During hot blast preparation mode, fan assembly is controlled to be run with the second rotating speed if shell temperature is less than the 5th preset temperature;Wherein, Two rotating speeds are more than the first rotating speed.
In this embodiment, by detecting the shell temperature of user and the rotating speed of fan assembly being adjusted with this, if than body Table temperature then can consider that the impression of user is more warm when being greater than or equal to five preset temperatures, then now control blower fan group Part is run with the first rotating speed;It can consider that the impression of user is colder if when shell temperature is less than five preset temperatures, that Now control fan assembly, to provide more hot blasts, lifts the comfort level of user with the second higher rotation speed operation of rotating speed.
Present invention also offers a kind of Teat pump boiler, as shown in figure 3, including:The heat of second aspect of the present invention embodiment Hydrophone control system.
The Teat pump boiler that the present invention is provided, by using the water heater control system of second aspect of the present invention embodiment, Cold wind or hot blast that Teat pump boiler is produced under different operating modes are efficiently utilized, the utilization rate of the energy is effectively improved, The comfort level of user under different scenes is also improved simultaneously.In addition, hot blast preparation mode therein also is used as the change of water heater White pattern, realizes that the defrost for water heater is handled.
In one embodiment of the present of invention, it is preferable that as shown in figure 3, also including:Pipeline 324;Compressor 302, is arranged on On pipeline 324;Water tank 322, water tank 322 is connected with pipeline 324;Heat exchanger 316, is arranged on pipeline 324;Fan assembly 314, fan assembly 314 is connected with heat exchanger 316;Switching mechanism 304, be arranged on pipeline 324 and positioned at compressor 302 with Between water tank 322, switching mechanism 304 is used for switching working mode, and mode of operation includes hot water preparation mode, hot blast and prepares mould Formula;Throttling arrangement 312, is arranged on pipeline 324 and positioned between water tank 322 and heat exchanger 316.Additionally include:Exhaust sense Thermometer bulb 306, the first temperature sensor 308, second temperature sensor 310, three-temperature sensor 318, the 4th temperature sensor 320。
In this embodiment, the mode of operation of Teat pump boiler, wherein switching construction 304 are switched by switching construction 304 Can be four-way reversing valve, throttling arrangement 312 can be electronic throttle part, so can be by controlling refrigerant (refrigerant) Flow to adjusting working mode.Such as, the hollow direction of arrow refers to that refrigerant during water heating is flowed in Fig. 3, filled arrows direction Refrigerant flow direction when referring to heating wind.
In addition, master control borad as shown in Figure 4 can also realize heat according to the different part of a variety of state modulators The various functions of pump hot water.
In one embodiment of the invention, it is preferable that also include:Diversion air duct, diversion air duct is connected with fan assembly Connect, the first air outlet, the second air outlet and deflector are provided with diversion air duct;Wherein, the air flowed out through fan assembly Diversion air duct is flowed into, the air that deflector is used to control in diversion air duct flows out through the first air outlet and/or the second air outlet.
In this embodiment, the air-out direction of diversion air duct is controlled by deflector, such as by the first air outlet, Or by the second air outlet, or by the first air outlet and the common air-out of the second air outlet, be achieved in that for cold The more flexible air-out mode of wind or hot blast.
Wherein, the first air outlet can lead to toilet or shower cabinet, and the second air outlet can lead to kitchen or outdoor.
In the present invention, term " multiple " then refers to two or more, unless otherwise clear and definite restriction.Term " peace The term such as dress ", " connected ", " connection ", " fixation " all should be interpreted broadly, for example, " connection " can be fixedly connected, can also It is to be detachably connected, or is integrally connected;" connected " can be joined directly together, and can also be indirectly connected to by intermediary.It is right For one of ordinary skill in the art, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that combining the embodiment or specific features, structure, material or the feature of example description is contained at least one reality of the invention Apply in example or example.In this manual, identical embodiment or reality are not necessarily referring to the schematic representation of above-mentioned term Example.Moreover, description specific features, structure, material or feature can in any one or more embodiments or example with Suitable mode is combined.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (19)

1. a kind of water heater control method, for Teat pump boiler, the Teat pump boiler includes hot water preparation mode, hot blast system Standby pattern and switching mechanism, the switching mechanism are used for the switching of the hot water preparation mode and the hot blast preparation mode, its It is characterised by, the water heater control method includes:
Receive hot blast and prepare instruction;
Control the switching mechanism that the Teat pump boiler is switched into the hot blast preparation mode;
The heat exchanger heating air of the Teat pump boiler, the fan assembly of the Teat pump boiler is by the Air blowing after heating To the first room.
2. water heater control method according to claim 1, it is characterised in that also include:
Detect the water temperature of the water tank of the Teat pump boiler;
When detecting the water temperature of water tank of the Teat pump boiler less than or equal to the first preset temperature, stopping prepares hot blast.
3. water heater control method according to claim 2, it is characterised in that the stopping also being wrapped after preparing hot blast Include:
Control the switching mechanism that the Teat pump boiler is switched into the hot water preparation mode and starts to prepare hot water;
When detecting the water temperature greater than or equal to the second preset temperature, stopping prepares hot water and controls the switching machine again The Teat pump boiler is switched to the hot blast preparation mode by structure;
Wherein, second preset temperature is higher than the first preset temperature.
4. water heater control method according to claim 1, it is characterised in that also include:
Detect the environment temperature in first room;
When detecting the environment temperature greater than or equal to three preset temperatures, stopping prepares hot blast.
5. water heater control method according to claim 4, it is characterised in that the stopping also being wrapped after preparing hot blast Include:
Restart to prepare hot blast when detecting the environment temperature less than or equal to four preset temperatures;
Wherein, the 4th preset temperature is less than the 3rd preset temperature.
6. water heater control method according to any one of claim 1 to 5, it is characterised in that also include:
Receive hot water and prepare instruction;
Control the switching mechanism that the Teat pump boiler is switched into the hot water preparation mode and starts to prepare hot water;
The heat of the heat exchanger absorption air of the Teat pump boiler, the fan assembly of the Teat pump boiler is by the sky after cooling Air-blowing goes out to the second room;
Detect the water temperature of the water tank of the Teat pump boiler;
When detecting the water temperature greater than or equal to five preset temperatures, stopping prepares hot water.
7. water heater control method according to any one of claim 1 to 5, it is characterised in that also include:
Record the time duration that the Teat pump boiler is worked with the hot blast preparation mode;
Stopping prepares hot blast after the time duration reaches the first preset duration.
8. water heater control method according to any one of claim 1 to 5, it is characterised in that also include:
Detect the shell temperature of user;
When the Teat pump boiler is in the hot blast preparation mode, if the shell temperature is greater than or equal to the 5th default temperature Degree then controls the fan assembly to be run with the first rotating speed;
When the Teat pump boiler is in the hot blast preparation mode, if the shell temperature is less than the 5th preset temperature The fan assembly is then controlled to be run with the second rotating speed;
Wherein, second rotating speed is more than first rotating speed.
9. a kind of water heater control system, for Teat pump boiler, the Teat pump boiler includes hot water preparation mode, hot blast system Standby pattern and switching mechanism, the switching mechanism are used for the switching of the hot water preparation mode and the hot blast preparation mode, its It is characterised by, the water heater control system includes:
Receiving unit, instruction is prepared for receiving hot blast;
Control unit, the hot blast preparation mode is switched to for controlling the switching mechanism by the Teat pump boiler;
Described control unit is additionally operable to control the heat exchanger of the Teat pump boiler to heat air and the Teat pump boiler Fan assembly is by the Air blowing after heating to the first room.
10. water heater control system according to claim 9, it is characterised in that also include:
First detection unit, the water temperature of the water tank for detecting the Teat pump boiler;
Described control unit is additionally operable to when first detection unit detects the water temperature less than or equal to the first preset temperature When control the Teat pump boiler stopping to prepare hot blast.
11. water heater control system according to claim 10, it is characterised in that
Described control unit is additionally operable to control the switching mechanism by the Teat pump boiler after the stopping prepares hot blast Switch to the hot water preparation mode and start to prepare hot water;
Described control unit is additionally operable to after the stopping prepares hot blast when first detection unit detects the water temperature Control the Teat pump boiler stopping to prepare hot water during greater than or equal to the second preset temperature and control the switching mechanism again The Teat pump boiler is switched into the hot blast preparation mode;
Wherein, second preset temperature is higher than the first preset temperature.
12. water heater control system according to claim 9, it is characterised in that also include:
Second detection unit, for detecting the environment temperature in first room;
Described control unit is additionally operable to preset greater than or equal to the 3rd when second detection unit detects the environment temperature The Teat pump boiler stopping is controlled to prepare hot blast during temperature.
13. water heater control system according to claim 12, it is characterised in that
Described control unit is additionally operable to after the stopping prepares hot blast when second detection unit detects the environment Temperature controls the Teat pump boiler to restart to prepare hot blast when being less than or equal to four preset temperatures;
Wherein, the 4th preset temperature is less than the 3rd preset temperature.
14. the water heater control system according to any one of claim 9 to 13, it is characterised in that also include:
3rd detection unit, the water temperature of the water tank for detecting the Teat pump boiler;
The receiving unit is additionally operable to receive hot water preparation instruction;
Described control unit is additionally operable to control the switching mechanism that the Teat pump boiler is switched into the hot water preparation mode And control the Teat pump boiler to start to prepare hot water;
Described control unit is additionally operable to control the heat and the Heat Pump of the heat exchanger absorption air of the Teat pump boiler The fan assembly of hydrophone is by the Air blowing after cooling to the second room;
Described control unit is additionally operable to when the 3rd detection unit detects the water temperature greater than or equal to the 5th preset temperature When control the Teat pump boiler stopping to prepare hot water.
15. the water heater control system according to any one of claim 9 to 13, it is characterised in that also include:
Timing unit, for recording the time duration that the Teat pump boiler is worked with the hot blast preparation mode;
Described control unit is additionally operable to control the Teat pump boiler to stop after the first preset duration when the time duration reaches Prepare hot blast.
16. the water heater control system according to any one of claim 9 to 13, it is characterised in that also include:
4th detection unit, the shell temperature for detecting user;
Described control unit is additionally operable to when the Teat pump boiler is in the hot blast preparation mode, if the shell temperature is high The fan assembly is then controlled to be run with the first rotating speed in or equal to the 5th preset temperature;
Described control unit is additionally operable to when the Teat pump boiler is in the hot blast preparation mode, if the shell temperature is low The fan assembly is then controlled to be run with the second rotating speed in the 5th preset temperature;
Wherein, second rotating speed is more than first rotating speed.
17. a kind of Teat pump boiler, it is characterised in that including:
Water heater control system as any one of claim 9 to 16.
18. Teat pump boiler according to claim 17, it is characterised in that also include:
Pipeline;
Compressor, is arranged on the pipeline;
Water tank, the water tank is connected with the pipeline;
Heat exchanger, is arranged on the pipeline;
Fan assembly, the fan assembly is connected with the heat exchanger;
Switching mechanism, is arranged on the pipeline and positioned between the compressor and the water tank, the switching mechanism is used for Switching working mode, the mode of operation includes hot water preparation mode, hot blast preparation mode;
Throttling arrangement, is arranged on the pipeline and positioned between the water tank and the heat exchanger.
19. Teat pump boiler according to claim 18, it is characterised in that also include:
Diversion air duct, the diversion air duct is connected with the fan assembly, be provided with the diversion air duct the first air outlet, Second air outlet and deflector;
Wherein, the air flowed out through the fan assembly flows into the diversion air duct, and the deflector is used to control described lead The air flowed in air channel flows out through first air outlet and/or second air outlet.
CN201710313857.2A 2017-05-05 2017-05-05 Water heater control method, water heater control system and Teat pump boiler Pending CN107144015A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710313857.2A CN107144015A (en) 2017-05-05 2017-05-05 Water heater control method, water heater control system and Teat pump boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710313857.2A CN107144015A (en) 2017-05-05 2017-05-05 Water heater control method, water heater control system and Teat pump boiler

Publications (1)

Publication Number Publication Date
CN107144015A true CN107144015A (en) 2017-09-08

Family

ID=59777915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710313857.2A Pending CN107144015A (en) 2017-05-05 2017-05-05 Water heater control method, water heater control system and Teat pump boiler

Country Status (1)

Country Link
CN (1) CN107144015A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489106A (en) * 2018-02-09 2018-09-04 合肥美的暖通设备有限公司 Heat method and apparatus, water heater and the machine readable storage medium of wind
CN108507113A (en) * 2018-03-28 2018-09-07 北京小米移动软件有限公司 Temperature control method, device, electronic equipment and storage medium
CN113531693A (en) * 2020-03-31 2021-10-22 松下电器研究开发(苏州)有限公司 Method for optimizing temperature control by linkage of bathroom air conditioner and water heater
WO2024165838A1 (en) * 2023-02-06 2024-08-15 Kers Innovation UK Limited Method for providing cooled air

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2502213Y (en) * 2001-10-16 2002-07-24 陈志强 Heat pump type water heater for air conditioner
CN2779308Y (en) * 2005-01-25 2006-05-10 李永光 Heat-pump type water-heater
CN2823907Y (en) * 2005-09-29 2006-10-04 舒增鳌 Domestic air source or land source electric heat pump air conditioning water heater
CN103175302A (en) * 2011-12-22 2013-06-26 珠海格力电器股份有限公司 Water heater water tank and heat pump water heater
CN104048403A (en) * 2013-03-11 2014-09-17 青岛经济技术开发区海尔热水器有限公司 Split type warm braw heat pump water heater
US20140326004A1 (en) * 2013-05-02 2014-11-06 Carrier Corporation Method for managing a refrigerant charge in a multi-purpose hvac system
WO2015104815A1 (en) * 2014-01-09 2015-07-16 三菱電機株式会社 Combined air-conditioning and hot-water-supply system
CN105020848A (en) * 2015-05-29 2015-11-04 广东美的制冷设备有限公司 Air conditioner and air speed control method thereof
CN106016440A (en) * 2016-06-08 2016-10-12 合肥美的暖通设备有限公司 Bathroom water heater system and bathroom temperature adjusting method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2502213Y (en) * 2001-10-16 2002-07-24 陈志强 Heat pump type water heater for air conditioner
CN2779308Y (en) * 2005-01-25 2006-05-10 李永光 Heat-pump type water-heater
CN2823907Y (en) * 2005-09-29 2006-10-04 舒增鳌 Domestic air source or land source electric heat pump air conditioning water heater
CN103175302A (en) * 2011-12-22 2013-06-26 珠海格力电器股份有限公司 Water heater water tank and heat pump water heater
CN104048403A (en) * 2013-03-11 2014-09-17 青岛经济技术开发区海尔热水器有限公司 Split type warm braw heat pump water heater
US20140326004A1 (en) * 2013-05-02 2014-11-06 Carrier Corporation Method for managing a refrigerant charge in a multi-purpose hvac system
WO2015104815A1 (en) * 2014-01-09 2015-07-16 三菱電機株式会社 Combined air-conditioning and hot-water-supply system
CN105020848A (en) * 2015-05-29 2015-11-04 广东美的制冷设备有限公司 Air conditioner and air speed control method thereof
CN106016440A (en) * 2016-06-08 2016-10-12 合肥美的暖通设备有限公司 Bathroom water heater system and bathroom temperature adjusting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108489106A (en) * 2018-02-09 2018-09-04 合肥美的暖通设备有限公司 Heat method and apparatus, water heater and the machine readable storage medium of wind
CN108507113A (en) * 2018-03-28 2018-09-07 北京小米移动软件有限公司 Temperature control method, device, electronic equipment and storage medium
CN113531693A (en) * 2020-03-31 2021-10-22 松下电器研究开发(苏州)有限公司 Method for optimizing temperature control by linkage of bathroom air conditioner and water heater
CN113531693B (en) * 2020-03-31 2023-09-01 松下电器研究开发(苏州)有限公司 Method for controlling optimal temperature by linkage of bathroom air conditioner and water heater
WO2024165838A1 (en) * 2023-02-06 2024-08-15 Kers Innovation UK Limited Method for providing cooled air

Similar Documents

Publication Publication Date Title
CN107444065B (en) Electric automobile air conditioner control system and method
CN106247552A (en) A kind of control method for air-conditioning, device and air-conditioning
CN107144015A (en) Water heater control method, water heater control system and Teat pump boiler
CN207688449U (en) Air-conditioning device
CN104110776B (en) Air conditioning system and control method thereof
CN105972774A (en) Control method and device for air conditioner and air conditioner
CN108072214A (en) Air-conditioning device and its control method
CN107366999A (en) A kind of multiple air-conditioned clothes dryer and its control method
CN105987429A (en) Multi-split air-conditioning system and heating standby quick starting control method thereof
WO2018133430A1 (en) Multi-split system, and anti-cold air control method and apparatus for indoor unit thereof
CN203534006U (en) Air-conditioning system
CN110410857A (en) A kind of air conditioner and its defrosting control method
CN104101143A (en) Air conditioner and control method thereof
JP2012211709A (en) Air conditioner
CN204665584U (en) A kind of heat pump air conditioner defrosting device
JP3518350B2 (en) Heat pump heating system
JPS5915733A (en) Temperature control device of heat pump type floor heating apparatus
JP4486205B2 (en) Air conditioning and hot water supply system
JP3518353B2 (en) Heat pump heating system
CN107192130B (en) Water heater and control method thereof
JP4151464B2 (en) Air conditioner control device
CN207797287U (en) A kind of low temperature Central air-conditioning unit heat pump to melt frost system
WO2017050072A1 (en) Water chiller-heater unit of air cooled heat pump and defrosting control method therefor
JP3380384B2 (en) Control device for air conditioner
JPH11294834A (en) Multi-room air conditioner provided with air cleaner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908

RJ01 Rejection of invention patent application after publication