CN107131505A - Rubbish press dry incinerator - Google Patents
Rubbish press dry incinerator Download PDFInfo
- Publication number
- CN107131505A CN107131505A CN201710342969.0A CN201710342969A CN107131505A CN 107131505 A CN107131505 A CN 107131505A CN 201710342969 A CN201710342969 A CN 201710342969A CN 107131505 A CN107131505 A CN 107131505A
- Authority
- CN
- China
- Prior art keywords
- rubbish
- heating tube
- electric heating
- square type
- incinerator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/08—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating
- F23G5/10—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating electric
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/02—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
- F23G5/033—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment comminuting or crushing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/44—Details; Accessories
- F23G5/442—Waste feed arrangements
- F23G5/444—Waste feed arrangements for solid waste
Abstract
Incinerator is pressed dry the invention discloses a kind of rubbish, include the placement rack of square type, riser and the U-shaped mounting bracket installed in both sides at the top of placement rack are installed installed in placement rack top side, the installation riser is provided with rubbish extrusion equipment close to the U-shaped side roof part of mounting bracket one, cutting equipment is installed on the inside of the U-shaped mounting bracket, and the lower section of cutting equipment is provided with the incinerator being arranged at the top of placement rack, it is described that the frame for being provided with and being arranged at the top of placement rack between riser and U-shaped mounting bracket is installed, and three drying arrayed from left to right casings are welded with the top of frame, the bottom of the drying casing sets opening, and the side of drying casing offers the first square type groove, the first square type groove offers the second square type groove on the side inwall of drying box house.The present invention is economical and practical, and the electric heating tube of drying box house is easy to staff to be changed so that the exchonge step of electric heating tube is simple, it is easy to which staff is operated.
Description
Technical field
Incinerator is pressed dry the present invention relates to technical field of garbage disposal equipment, more particularly to rubbish.
Background technology
With the continuous improvement continued to develop with Process of Urbanization Construction of society, increasing crowd pours in city so that
The density of population in city becomes increasing, and then house refuse gradually increases also with being continuously increased for population, these lifes
Rubbish living have impact on the production and living of people, these house refuses how be handled into the task of top priority of present people, wherein right
The burning of rubbish is a kind of effective processing mode, and the burning of rubbish is completed by incinerator, and the principle of incinerator is to utilize
The burning of the fuel such as coal, fuel oil, combustion gas, destroys object to be processed progress high temperature by fire carbonization, to reach the purpose of sterilization, but
It is that house refuse has more moisture before burning so that incinerator is difficult that the rubbish containing moisture is burnt, and is
Moisture in removing house refuse before incinerator burning, in the market occurs in that rubbish press dry incinerator, existing rubbish
Rubbish press dry incinerator and the house refuse after extruding is also dried using drying unit, because drying unit is all direct
It is welded in the frame that rubbish is pressed dry in incinerator, and then is not easy to change the electric heating tube inside drying unit.
The content of the invention
The technical problem existed based on background technology, the present invention is proposed rubbish and press dry incinerator.
Rubbish proposed by the present invention press dry incinerator, including square type placement rack, installed in placement rack top side
Riser and the U-shaped mounting bracket installed in both sides at the top of placement rack are installed, the installation riser is pacified close to the U-shaped side roof part of mounting bracket one
Equipped with rubbish extrusion equipment, cutting equipment is installed on the inside of the U-shaped mounting bracket, and cutting equipment lower section provided with being arranged on
Incinerator at the top of placement rack, is provided with the frame being arranged at the top of placement rack, and machine between the installation riser and U-shaped mounting bracket
Three drying arrayed from left to right casings are welded with the top of frame, the bottom of the drying casing sets opening, and dries
The side of dry casing offers the first square type groove, and the first square type groove is offered on the side inwall of drying box house
Second square type groove, and the first square type groove by the second square type groove with drying casing inside be connected, the second square type groove
Side both sides are provided with the screwed hole being opened in the first square type groove sidewall, side inwall of the first square type groove away from screwed hole
On be connected through the hinge and have glass cabinet door, the glass cabinet door is fixed on by the first screw rod on the side wall of the first square type groove, and
First screw rod and screwed hole are screwed, and the glass cabinet door is provided with and the second square type groove close to the side of drying box house
The square type sealing ring that side wall is in contact, the inner horizontal of the drying casing is placed with installing plate, the top weldering of the installing plate
The output shaft of push-rod electric machine is connected to, and push-rod electric machine is arranged on the top center position of drying casing, the both sides of the installing plate
The slide rail being welded on drying wall box is slidably connected, the bottom side of the installing plate is equidistantly welded with electric heating tube
Mounting seat, and electric heating tube mounting seat offers installation circular hole, the inside peace of the installation circular hole close to the side of glass cabinet door
Equipped with electric heating tube, and electric heating tube is provided with external screw thread close to the lateral ends of glass cabinet door, and the electric heating tube mounting seat is leaned on
The side of nearly glass cabinet door is welded with round slide rail, and round slide rail side slidably connect positioned at electric heating tube mounting seat and
Bowl-type mounting cup between glass cabinet door, the side wall of the bowl-type mounting cup is provided with the internal thread being meshed with external screw thread, institute
The transmission belt for being provided with frame and sequentially passing through three drying casings is stated, and conveyer belt and cutting equipment are adapted.
It is preferably located at the top of the rubbish extrusion equipment for installing the side roof part of riser one and is provided with garbage feeding bucket, and rubbish
Rubbish extrusion equipment is provided with discharge bucket away from the side bottom for installing riser, and the discharge bucket is located at the surface of conveyer belt, institute
State and water outlet mouthpiece is also equipped with rubbish extrusion equipment, and by water outlet mouthpiece to be threaded with water outlet soft for rubbish extrusion equipment
Pipe.
Preferably, the rubbish that the rubbish extrusion equipment is used to convey feed hopper carries out extrusion process, and rubbish is squeezed
Pressure equipment is transferred out the water in rubbish by the delivery hose of water outlet mouthpiece.
Preferably, the one end of the electric heating tube away from glass cabinet door sequentially passes through bowl-type mounting cup, round slide rail and electricity
Heat pipe mounting seat.
Preferably, the side of the bowl-type mounting cup away from opening offers position and electric heating tube matches first and consolidated
Determine to be slidably connected on the outside of hole, and the first fixing hole and electric heating tube.
Preferably, position and push-rod electric machine output shaft matches second is offered at the top of the drying casing to fix
Hole, and the side wall of the second fixing hole and the output shaft of push-rod electric machine be slidably connected.
Preferably, the feed end of the incinerator is connected with the discharge end of cutting equipment, and the discharge end peace of incinerator
Equipped with L-type discharge nozzle, one end of the L-type discharge nozzle is provided with the solid material collecting box placed at the top of placement rack.
Preferably, the height of the installing plate of three drying box houses is reduced successively from left to right.
In the present invention, it is engaged by the electric heating tube in push-rod electric machine, slide rail, installing plate and electric heating tube mounting seat,
Electric heating tube in electric heating tube mounting seat can be moved to the height and position of glass cabinet door by push-rod electric machine;
It is meshed by the screwed hole on the first screw rod on glass cabinet door and the first standing groove inwall, and the square on glass cabinet door
The side wall of type sealing ring and the second standing groove is engaged so that glass cabinet door is easy to open;
It is engaged by the installation circular hole in electric heating tube mounting seat, round slide rail, bowl-type mounting cup and electric heating tube, and electricity adds
The internal thread that external screw thread and bowl-type on the outside of heat pipe are installed on cup sidewall is meshed, and is easy to electric heating tube in corresponding electric heating tube
Dismantled in mounting seat so that the replacing of electric heating tube is convenient.
The present invention is economical and practical, and the electric heating tube of drying box house is easy to staff to be changed so that electrical heating
The exchonge step of pipe is simple, it is easy to which staff is operated.
Brief description of the drawings
Fig. 1 is the structural representation that rubbish proposed by the present invention press dry incinerator.
Fig. 2 is structural representation of the glass cabinet door in open mode that rubbish proposed by the present invention press dry incinerator.
Fig. 3 is the cross section structure diagram for the drying casing that rubbish proposed by the present invention press dry incinerator.
Fig. 4 is the mounting structure schematic diagram for the electric heating tube that rubbish proposed by the present invention press dry incinerator.
In figure:Riser, 3 rubbish extrusion equipments, 4 U-shaped mounting brackets, 5 cutting equipments, 6 incinerators, 7 are installed in 1 placement rack, 2
Collecting box, 9 frames, 10 conveyer belts, 11 drying casings, 12 first square type grooves, 13 second square type grooves, 14 are expected in L-type discharge nozzle, 8 admittedly
Screwed hole, 15 glass cabinet doors, 16 first screw rods, 17 square type sealing rings, 18 installing plates, 19 push-rod electric machines, 20 slide rails, 21 electrical heating
Pipe mounting seat, 22 round slide rails, 23 bowl-type mounting cups, 24 electric heating tubes.
Embodiment
The present invention is made with reference to specific embodiment further to explain.
Embodiment
With reference to Fig. 1-4, rubbish is proposed in the present embodiment and press dry incinerator, including square type placement rack 1, installed in putting
That puts the top side of seat 1 installs riser 2 and the U-shaped mounting bracket 4 installed in the top both sides of placement rack 1, installs riser 2 close to U-shaped
The side roof part of mounting bracket 4 one is provided with rubbish extrusion equipment 3, and the inner side of U-shaped mounting bracket 4 is provided with cutting equipment 5, and cutting equipment
5 lower section is provided with the incinerator 6 for being arranged on the top of placement rack 1, installs to be provided with to be arranged between riser 2 and U-shaped mounting bracket 4 and places
The frame 9 at the top of seat 1, and the top of frame 9 is welded with three drying arrayed from left to right casings 11, dries casing 11
Bottom opening is set, and the side of drying casing 11 offers the first square type groove 12, and the first square type groove 12 is close to drying casing
The second square type groove 13 is offered on side inwall inside 11, and the first square type groove 12 passes through the second square type groove 13 and drying casing
11 inside is connected, and the side both sides of the second square type groove 13 are provided with the screwed hole 14 being opened on the side wall of the first square type groove 12,
First square type groove 12 is connected through the hinge on the side inwall away from screwed hole 14 glass cabinet door 15, and glass cabinet door 15 passes through
One screw rod 16 is fixed on the side wall of the first square type groove 12, and the first screw rod 16 and screwed hole 14 are screwed, glass cabinet door 15
Side inside drying casing 11 is provided with the square type sealing ring 17 being in contact with the side wall of the second square type groove 13, works as drying baker
When electric heating tube 24 inside body 11 is damaged, due to the first screw rod 16 and the inwall of the first standing groove 12 on glass cabinet door 15
On screwed hole 14 be meshed, staff can be torn the first screw rod 16 open out of corresponding screwed hole 14 by screwdriver
Under, then movable glass cabinet door 15, because the side inwall of the standing groove 12 of glass cabinet door 15 and first is connected through the hinge, glass
Cabinet door 15 is rotated on the side inwall of the first standing groove 12 so that the second standing groove 13 is completely exposed, now glass cabinet
Door 15 is in open mode, and the inner horizontal of drying casing 11 is placed with installing plate 18, and the top of installing plate 18 is welded with push rod
The output shaft of motor 19, and push-rod electric machine 19 is arranged on the top center position of drying casing 11, two Slideslips of installing plate 18
The slide rail 20 being welded on the drying side wall of casing 11 is connected with, the bottom side of installing plate 18 is equidistantly welded with electric heating tube peace
Seat 21 is filled, and electric heating tube mounting seat 21 offers installation circular hole close to the side of glass cabinet door 15, installs the inside peace of circular hole
Equipped with electric heating tube 24, and electric heating tube 24 is provided with external screw thread 25 close to the lateral ends of glass cabinet door 15, push-rod electric machine 19,
Under the cooperation of electric heating tube 24 in slide rail 20, installing plate 18 and electric heating tube mounting seat 21, the output shaft band of push-rod electric machine 19
Dynamic installing plate 18 is in the enterprising line slip of slide rail 20, and installing plate 18 can move the electric heating tube 24 in electric heating tube mounting seat 21
To the height and position of glass cabinet door 15, electric heating tube mounting seat 21 is welded with round slide rail 22 close to the side of glass cabinet door 15,
And the side of round slide rail 22 slidably connects the bowl-type mounting cup between electric heating tube mounting seat 21 and glass cabinet door 15
23, the side wall of bowl-type mounting cup 23 is provided with the internal thread being meshed with external screw thread 25, the peace in electric heating tube mounting seat 21
Under the cooperation for filling circular hole, round slide rail 22, bowl-type mounting cup 23 and electric heating tube 24, one first hand presses the tight heating tube 24 of electricity,
Another rotates bowl-type mounting cup 23 on round slide rail 22, due to the external screw thread on the outside of electric heating tube and bowl-type installation cup sidewall
On internal thread be meshed, the inside of external screw thread 25 from bowl-type mounting cup 23 on electric heating tube is back-outed, and then electric heating tube 24
Dismantled in corresponding electric heating tube mounting seat 21 so that the electric heating tube 21 in drying casing 11 changes convenient, frame 9
On the transmission belt 10 for sequentially passing through three drying casings 11 is installed, and conveyer belt 10 and cutting equipment 5 are adapted, conveyer belt 10
The rubbish that rubbish extrusion equipment 3 can be conveyed sequentially passes through three drying casings 11, and three drying casings 11 are successively to transmission
Drying and processing is carried out with the rubbish on 10, the rubbish being ultimately delivered on band 10 is transported to cutting equipment 5 and cut, by cutting
The rubbish after equipment 5 is handled is cut to be passed into incinerator 6.
In the present embodiment, the top positioned at the rubbish extrusion equipment 3 for installing the side roof part of riser 2 one is provided with garbage feeding
Bucket, and rubbish extrusion equipment 3 is provided with discharge bucket away from the side bottom for installing riser 2, discharge bucket is being located at conveyer belt 10 just
Water outlet mouthpiece is also equipped with top, rubbish extrusion equipment 3, and rubbish extrusion equipment 3 is threaded with out by water outlet mouthpiece
Water tube hose, the rubbish that rubbish extrusion equipment 3 is used to convey feed hopper carries out extrusion process, and rubbish extrusion equipment 3 passes through
The delivery hose of water outlet mouthpiece transfers out the water in rubbish, and the one end of electric heating tube 24 away from glass cabinet door 15 is sequentially passed through
Bowl-type mounting cup 23, round slide rail 22 and electric heating tube mounting seat 21, side of the bowl-type mounting cup 23 away from opening offer position
The first fixing hole matched with electric heating tube 24 is put, and the outside of the first fixing hole and electric heating tube 24 is slidably connected, drying
The top of casing 11 offers the second fixing hole that position matches with the output shaft of push-rod electric machine 19, and the side wall of the second fixing hole
It is slidably connected, the feed end of incinerator 6 is connected with the discharge end of cutting equipment 5, and burns with the output shaft of push-rod electric machine 19
The discharge end of stove 6 is provided with L-type discharge nozzle 7, and one end of L-type discharge nozzle 7 is provided with the solid material collecting box 8 for placing the top of placement rack 1,
The height of installing plate 18 inside three drying casings 11 is reduced successively from left to right, and the present invention is economical and practical, dries casing 11
Internal electric heating tube 24 is easy to staff to be changed so that the exchonge step of electric heating tube 24 is simple, it is easy to which work people
Member is operated.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its
Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.
Claims (8)
1. rubbish press dry incinerator, include the placement rack of square type(1), installed in placement rack(1)The installation riser of top side
(2)With installed in placement rack(1)The U-shaped mounting bracket of top both sides(4), the installation riser(2)Close to U-shaped mounting bracket(4)One
Side roof part is provided with rubbish extrusion equipment(3), the U-shaped mounting bracket(4)Inner side cutting equipment is installed(5), and cutting set
It is standby(5)Lower section be provided be arranged on placement rack(1)The incinerator at top(6), it is characterised in that the installation riser(2)With it is U-shaped
Mounting bracket(4)Between be provided be arranged on placement rack(1)The frame at top(9), and frame(9)Top be welded with three from a left side to
The drying casing that the right side is arranged in order(11), the drying casing(11)Bottom set opening, and drying casing(11)Side
Offer the first square type groove(12), the first square type groove(12)Close to drying casing(11)Offered on internal side inwall
Second square type groove(13), and the first square type groove(12)Pass through the second square type groove(13)With drying casing(11)Inside be connected,
The second square type groove(13)Side both sides provided with being opened in the first square type groove(12)Screwed hole on the wall of side(14), described
One square type groove(12)Away from screwed hole(14)Side inwall on be connected through the hinge and have glass cabinet door(15), the glass cabinet door
(15)Pass through the first screw rod(16)It is fixed on the first square type groove(12)Side wall on, and the first screw rod(16)And screwed hole(14)Spiral shell
Line is fixed, the glass cabinet door(15)Close to drying casing(11)Internal side is provided with and the second square type groove(13)Side wall phase
The square type sealing ring of contact(17), the drying casing(11)Inner horizontal be placed with installing plate(18), the installing plate
(18)Top be welded with push-rod electric machine(19)Output shaft, and push-rod electric machine(19)Installed in drying casing(11)Top in
Entreat position, the installing plate(18)Both sides slidably connect and be welded on drying casing(11)Slide rail on the wall of side(20), it is described
Installing plate(18)Bottom side be equidistantly welded with electric heating tube mounting seat(21), and electric heating tube mounting seat(21)Close to glass
Glass cabinet door(15)Side offer installation circular hole, the inside of the installation circular hole is provided with electric heating tube(24), and electrical heating
Pipe(24)Close to glass cabinet door(15)Lateral ends be provided with external screw thread(25), the electric heating tube mounting seat(21)Close to glass
Cabinet door(15)Side be welded with round slide rail(22), and round slide rail(22)Side slidably connect positioned at electric heating tube peace
Fill seat(21)And glass cabinet door(15)Between bowl-type mounting cup(23), the bowl-type mounting cup(23)Side wall be provided with it is outer
Screw thread(25)The internal thread being meshed, the frame(9)On be provided with and sequentially pass through three drying casings(11)Transmission belt
(10), and conveyer belt(10)And cutting equipment(5)It is adapted.
2. rubbish according to claim 1 press dry incinerator, it is characterised in that positioned at installation riser(2)One side roof part
Rubbish extrusion equipment(3)Top be provided with garbage feeding bucket, and rubbish extrusion equipment(3)Away from installation riser(2)One
Side bottom is provided with discharge bucket, and the discharge bucket is located at conveyer belt(10)Surface, the rubbish extrusion equipment(3)On also pacify
Equipped with water outlet mouthpiece, and rubbish extrusion equipment(3)Delivery hose is threaded with by water outlet mouthpiece.
3. rubbish according to claim 1 press dry incinerator, it is characterised in that the rubbish extrusion equipment(3)For
The rubbish conveyed to feed hopper carries out extrusion process, and rubbish extrusion equipment(3)By the delivery hose of water outlet mouthpiece by rubbish
Water in rubbish is transferred out.
4. rubbish according to claim 1 press dry incinerator, it is characterised in that the electric heating tube(24)Away from glass
Cabinet door(15)One end sequentially pass through bowl-type mounting cup(23), round slide rail(22)With electric heating tube mounting seat(21).
5. rubbish according to claim 1 press dry incinerator, it is characterised in that the bowl-type mounting cup(23)Keep away
The side of mouth offers position and electric heating tube(24)The first fixing hole matched, and the first fixing hole and electric heating tube(24)
Outside be slidably connected.
6. rubbish according to claim 1 press dry incinerator, it is characterised in that the drying casing(11)Top open
Provided with position and push-rod electric machine(19)The second fixing hole that output shaft matches, and the side wall and push-rod electric machine of the second fixing hole
(19)Output shaft be slidably connected.
7. rubbish according to claim 1 press dry incinerator, it is characterised in that the incinerator(6)Feed end and
Cutting equipment(5)Discharge end be connected, and incinerator(6)Discharge end L-type discharge nozzle is installed(7), the L-type discharge nozzle
(7)One end provided with place placement rack(1)The solid material collecting box at top(8).
8. rubbish according to claim 1 press dry incinerator, it is characterised in that three drying casings(11)Internal peace
Fill plate(18)Height reduce successively from left to right.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710342969.0A CN107131505B (en) | 2017-05-16 | 2017-05-16 | Rubbish press dry incinerator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710342969.0A CN107131505B (en) | 2017-05-16 | 2017-05-16 | Rubbish press dry incinerator |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107131505A true CN107131505A (en) | 2017-09-05 |
CN107131505B CN107131505B (en) | 2019-06-25 |
Family
ID=59732792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710342969.0A Active CN107131505B (en) | 2017-05-16 | 2017-05-16 | Rubbish press dry incinerator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107131505B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108759312A (en) * | 2018-04-17 | 2018-11-06 | 深圳市玖品空气净化科技有限公司 | A kind of efficient organic waste drying equipment with deodorization functions |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2711546Y (en) * | 2004-06-21 | 2005-07-20 | 张维田 | Continuous type box type rubbish incineration furnace |
KR100935446B1 (en) * | 2009-08-13 | 2010-01-06 | 주식회사 아이디알시스템 | Method of device for high water content of drying and carbonizing |
KR100935447B1 (en) * | 2009-08-13 | 2010-01-06 | 주식회사 아이디알시스템 | High water content of drying device |
CN205261577U (en) * | 2015-12-12 | 2016-05-25 | 张极 | A drying equipment for refuse treatment |
DE202016005060U1 (en) * | 2016-05-27 | 2016-10-13 | Balcke-Dürr GmbH | Air preheating device, in particular for a waste incineration plant, and waste incineration plant |
CN206073594U (en) * | 2016-10-11 | 2017-04-05 | 浙江春绿生态环保科技有限公司 | A kind of garbage disposer heating, drying box body device |
-
2017
- 2017-05-16 CN CN201710342969.0A patent/CN107131505B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2711546Y (en) * | 2004-06-21 | 2005-07-20 | 张维田 | Continuous type box type rubbish incineration furnace |
KR100935446B1 (en) * | 2009-08-13 | 2010-01-06 | 주식회사 아이디알시스템 | Method of device for high water content of drying and carbonizing |
KR100935447B1 (en) * | 2009-08-13 | 2010-01-06 | 주식회사 아이디알시스템 | High water content of drying device |
CN205261577U (en) * | 2015-12-12 | 2016-05-25 | 张极 | A drying equipment for refuse treatment |
DE202016005060U1 (en) * | 2016-05-27 | 2016-10-13 | Balcke-Dürr GmbH | Air preheating device, in particular for a waste incineration plant, and waste incineration plant |
CN206073594U (en) * | 2016-10-11 | 2017-04-05 | 浙江春绿生态环保科技有限公司 | A kind of garbage disposer heating, drying box body device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108759312A (en) * | 2018-04-17 | 2018-11-06 | 深圳市玖品空气净化科技有限公司 | A kind of efficient organic waste drying equipment with deodorization functions |
Also Published As
Publication number | Publication date |
---|---|
CN107131505B (en) | 2019-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110153153B (en) | High-efficiency garbage treatment method | |
CN110697158B (en) | Automatic household garbage compression and packaging device and using method thereof | |
CN206522779U (en) | A kind of waste incinerator with waste gas Solid state fermentation device | |
CN107569888A (en) | A kind of portable type sludge dehydration device | |
CN214133291U (en) | Kitchen garbage crushing device | |
CN108758637B (en) | A kind of rubbish solid-liquid separation pyrolyzing device of easy to clean | |
CN107702103A (en) | A kind of garbage incinerating system | |
CN107131505A (en) | Rubbish press dry incinerator | |
CN206229431U (en) | A kind of refuse disposal installation | |
CN207394853U (en) | A kind of life refuse high temperature pyrolysis installation | |
CN112377919A (en) | Waste incineration equipment | |
ES2183588T3 (en) | INSTALLATION FOR THE RESIDUAL SUBSTANCE TREATMENT. | |
CN105444188B (en) | A kind of medical waste microwave handling method and processing equipment | |
CN211292229U (en) | Garbage extraction and detection device for earthworm garbage disposal | |
CN107900067A (en) | A kind of industry old material cleaning, drying crushes retracting device | |
CN207123412U (en) | A kind of grain sampler | |
CN204342724U (en) | A kind of distillation apparatus being provided with material seal apparatus | |
CN207407346U (en) | A kind of solid waste treatment device | |
CN206593306U (en) | A kind of hot-water boiler with emission-control equipment | |
CN211551608U (en) | Garbage pyrolysis device | |
CN211475949U (en) | Rotary kiln feeding device | |
CN214172245U (en) | Automatic garbage incinerator who fills | |
CN209778762U (en) | Horizontal partition movable type fire grate pyrolysis device | |
CN105444178A (en) | Sundry-harmless pyrolyzing furnace | |
CN108626725A (en) | A kind of energy saving and environmental protection garbage processing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |