- Prior art keywords
- steel
- pile
- pile casting
- soft soil
- deep basal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
Abstract
The present invention relates to deep basal pit soft soil foundation construction, more particularly to deep basal pit soft soil foundation manual digging pile construction.A kind of deep basal pit soft soil foundation steel pile casting manual digging pile construction method, it includes:Step one, the steel reinforcement cage of outside Large-diameter Steel casing and the inside steel bushing with bellend is made;Step 2, vibration hammer or steel sheet pile manipulator vibration dip set outside steel pile casting;Step 3, sets steel pile casting inner bottom part blotter;Step 4, installs the steel reinforcement cage with bellend with internal steel bushing;Step 5, one-time-concreting bottom concrete;Step 6, it is secondary to pour top concrete;Step 7, backfill between outer steel pile casting and interior firm sleeve;Step 8, pulls out interior steel bushing and outer steel pile casting;Step 9, pile top reinforcing bar cleaning is normally carried out structure construction after being connected with basic bottom reinforced slab.The method of the present invention can form the pile foundation that pile foundation bottom carries bellend, be effectively improved its weight capacity, it is ensured that safety and the surrounding enviroment adverse effect of construction period.
Description
Technical field
The present invention relates to deep basal pit soft soil foundation construction, more particularly to deep basal pit soft soil foundation manual digging pile construction.
Background technology
In deep foundation pit of soft soil foundation engineering, the application of pile foundation is relatively broad, but when carrying out pile foundation construction in such region, using common pile tube or cast-in-situ bored pile because its diameter is smaller, because load-bearing requirements need the quantity and length of the pile foundation set than larger, and soft soil foundation engineering property is poor, common pile foundation equipment construction is limited, and difficulty of construction is higher.If piling is more difficult in the soft base deep basal pit after excavation.
The content of the invention
It is contemplated that overcoming the defect of prior art, there is provided a kind of deep basal pit soft soil foundation steel pile casting manual digging pile construction method.The method of the present invention can form the pile foundation that pile foundation bottom carries bellend, be effectively improved its weight capacity, it is ensured that the safety and surrounding enviroment of construction period is unaffected.
A kind of deep basal pit soft soil foundation steel pile casting manual digging pile construction method of the present invention, it includes:
Step one, the steel reinforcement cage of outside Large-diameter Steel casing and the inside steel bushing with bellend is made;
Step 2, vibration hammer or steel sheet pile manipulator vibration dip set outside steel pile casting;
Step 3, sets steel pile casting inner bottom part blotter;
Step 4, installs the steel reinforcement cage with bellend with internal steel bushing;
Step 5, one-time-concreting bottom concrete;
Step 6, it is secondary to pour top concrete;
Step 7, backfill between outer steel pile casting and interior firm sleeve;
Step 8, pulls out interior steel bushing and outer steel pile casting;
Step 9, pile top reinforcing bar cleaning is normally carried out structure construction after being connected with basic bottom reinforced slab.
The present invention can form the pile foundation that pile foundation bottom carries bellend, be effectively improved its weight capacity, reduce soft soil foundation pile foundation consumption.Present invention process principle is simple, safe and reliable, influences small to surrounding enviroment, is easy to operation.The steel bushing of the present invention is repeatable to be used in turn, and advantageously reduces cost.
Embodiment
A kind of deep basal pit soft soil foundation steel pile casting manual digging pile construction method of the present invention, first by the steel pile casting of major diameter(Outer casing)Set using vibration hammer or steel sheet pile manipulator vibration dip to precalculated position, then manually, small-sized machine coordinate etc. measure the earthwork in steel pile casting is excavated, the earthwork of steel pile casting bottom should reserve certain thickness when excavating, it is ensured that the soil stabilization of steel pile casting inner bottom part, then lay blotter;Again bellend is carried by what is made(Steel reinforcement cage lower end)With steel bushing(Inner sleeve)Steel reinforcement cage be attached in Large-diameter Steel casing, then pour a steel reinforcement cage lower end(Bellend)Concrete;It is secondary when one-time-concreting concrete is pre-hardening to pour steel bushing(Inner sleeve)Interior concrete;Pour after the completion of concrete the backfill between outer steel pile casting and interior steel bushing;Pull out internal steel bushing;Pull out outside steel pile casting.The pile foundation that pile foundation bottom carries bellend can be thus formed, is effectively improved its weight capacity, it is ensured that the safety and surrounding enviroment of construction period is unaffected.
Claims (1)
1. a kind of deep basal pit soft soil foundation steel pile casting manual digging pile construction method, it is characterised in that it includes:
Step one, the steel reinforcement cage of outside Large-diameter Steel casing and the inside steel bushing with bellend is made;
Step 2, vibration hammer or steel sheet pile manipulator vibration dip set outside steel pile casting;
Step 3, sets steel pile casting inner bottom part blotter;
Step 4, installs the steel reinforcement cage with bellend with internal steel bushing;
Step 5, one-time-concreting bottom concrete;
Step 6, it is secondary to pour top concrete;
Step 7, backfill between outer steel pile casting and interior firm sleeve;
Step 8, pulls out interior steel bushing and outer steel pile casting;
Step 9, pile top reinforcing bar cleaning is normally carried out structure construction after being connected with basic bottom reinforced slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610104929.8A CN107130591B (en) | 2016-02-26 | 2016-02-26 | Deep basal pit soft soil foundation steel pile casting manual digging pile construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610104929.8A CN107130591B (en) | 2016-02-26 | 2016-02-26 | Deep basal pit soft soil foundation steel pile casting manual digging pile construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107130591A true CN107130591A (en) | 2017-09-05 |
CN107130591B CN107130591B (en) | 2019-07-30 |
Family
ID=59721250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610104929.8A Active CN107130591B (en) | 2016-02-26 | 2016-02-26 | Deep basal pit soft soil foundation steel pile casting manual digging pile construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107130591B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100869815B1 (en) * | 2007-04-03 | 2008-11-21 | 임수용 | Apparatus to upgrade end bearing capacity of pile and pile construction method |
CN101761072A (en) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | Construction process for bored pile close to flood wall through riprap layer |
CN104480934A (en) * | 2014-12-12 | 2015-04-01 | 中铁十九局集团有限公司 | Water drilling pile foundation construction system capable of recycling outer steel protecting tube, and construction method of water drilling pile foundation construction system |
CN104895057A (en) * | 2015-05-15 | 2015-09-09 | 上海长凯岩土工程有限公司 | Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method |
CN204703156U (en) * | 2015-02-09 | 2015-10-14 | 中交第二航务工程局有限公司 | The interior casing structure of mortar leakage prevention |
-
2016
- 2016-02-26 CN CN201610104929.8A patent/CN107130591B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100869815B1 (en) * | 2007-04-03 | 2008-11-21 | 임수용 | Apparatus to upgrade end bearing capacity of pile and pile construction method |
CN101761072A (en) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | Construction process for bored pile close to flood wall through riprap layer |
CN104480934A (en) * | 2014-12-12 | 2015-04-01 | 中铁十九局集团有限公司 | Water drilling pile foundation construction system capable of recycling outer steel protecting tube, and construction method of water drilling pile foundation construction system |
CN204703156U (en) * | 2015-02-09 | 2015-10-14 | 中交第二航务工程局有限公司 | The interior casing structure of mortar leakage prevention |
CN104895057A (en) * | 2015-05-15 | 2015-09-09 | 上海长凯岩土工程有限公司 | Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method |
Also Published As
Publication number | Publication date |
---|---|
CN107130591B (en) | 2019-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179174B (en) | A kind of multiple holes grouting pipe shaped pile and pile making method thereof | |
CN103205964B (en) | Cast-in-place pile construction method using steel pipe column splicing piles | |
CN101761237B (en) | Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance | |
CN102628269B (en) | Technical device for reducing negative frictional resistance on driven cast-in-place pile, and application method thereof | |
CN108166483A (en) | Bored pile construction method | |
CN104563118B (en) | The pre-poured built pile construction method of full-sleeve vibration soil taking | |
CN103485347A (en) | Batter pile used for building foundation pit support and construction method thereof | |
KR100970440B1 (en) | Beam penetrating after lower part casting type cast-in-place pile method | |
JP2013164103A (en) | Embedded pipe structure and method for constructing embedded pipe structure | |
CN102134861B (en) | Method for testing precast pile in soil body | |
JP6413469B2 (en) | Pile foundation and pile foundation construction method | |
WO2022021469A1 (en) | Method for constructing pipeline sinking rammed and expanded cast-in-situ pile in sand or gravel layer | |
CN205444192U (en) | Bridge stake is towards pile driving construction system | |
KR100628511B1 (en) | External reinforcement reverse circulation drill method | |
CN107130591A (en) | Deep basal pit soft soil foundation steel pile casting manual digging pile construction method | |
CN104196021A (en) | Uplift pile structure and construction method thereof | |
CN111485549A (en) | Rotary drilling and buried drilling treatment method | |
CN103911986B (en) | A kind of construction method combining strike-on steel pipe pile | |
CN207160088U (en) | One kind occlusion pile driving construction deviation correcting device | |
JP6326294B2 (en) | Construction method of earth retaining structure | |
CN207109804U (en) | A kind of quick spreading structure configuration of soft soil foundation bored concrete pile | |
CN105274984A (en) | Double-casing-pipe full-circle-swinging erect column pile construction method | |
KR101375155B1 (en) | Construction Method of Reinforced Bar Insert Type in-situ Concrete Pile | |
JP5176788B2 (en) | Construction method of underground structure | |
CN105544551B (en) | A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |