CN107119727A CN201710512650.8A CN201710512650A CN107119727A CN 107119727 A CN107119727 A CN 107119727A CN 201710512650 A CN201710512650 A CN 201710512650A CN 107119727 A CN107119727 A CN 107119727A
Authority
CN
China
Prior art keywords
reinforcement
additional reinforcement
additional
waterstop
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710512650.8A
Other languages
Chinese (zh)
Inventor
夏国恩
田优美
张俊
张洁
刘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zunhua Water Affairs Bureau
Nanchang Institute of Technology
Original Assignee
Zunhua Water Affairs Bureau
Nanchang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zunhua Water Affairs Bureau, Nanchang Institute of Technology filed Critical Zunhua Water Affairs Bureau
Priority to CN201710512650.8A priority Critical patent/CN107119727A/en
Publication of CN107119727A publication Critical patent/CN107119727A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及混凝土连续浇筑的施工技术,尤其涉及附加钢筋固定止水带实现混凝土连续浇筑施工的技术。提供了一种附加钢筋固定止水带的混凝土结构及其连续浇筑施工方法,它包括附加钢筋固定止水带的混凝土结构包括附加两对钢筋框、两对砂浆垫块和一个止水带,所述两对附加钢筋框分别与止水带方向平行的顶层、底层钢筋焊接,两对砂浆垫块分别与附加钢筋框绑扎,上下方向固定止水带,附加钢筋框左右方向固定填缝沥青木板。本发明可缩短混凝土浇筑工期,减少模板用量,加快施工进度,同时节省成本,提高经济效益。

The invention relates to the construction technology of continuous concrete pouring, in particular to the technology of adding steel bars to fix the water stop to realize the continuous concrete pouring construction. Provided is a concrete structure with additional reinforcing bars to fix the waterstop and its continuous pouring construction method, which includes the concrete structure with additional reinforcing bars to fix the waterstop including adding two pairs of steel bar frames, two pairs of mortar pads and a waterstop. The two pairs of additional reinforcement frames are respectively welded to the top and bottom reinforcement bars parallel to the direction of the waterstop, and the two pairs of mortar pads are bound to the additional reinforcement frame respectively, the waterstop is fixed in the upper and lower directions, and the joint filling asphalt planks are fixed in the left and right directions of the additional reinforcement frame. The invention can shorten the construction period of concrete pouring, reduce the amount of formwork, speed up the construction progress, save costs and improve economic benefits.

Description

附加钢筋固定止水带的混凝土结构及其连续浇筑施工方法Concrete Structure with Additional Reinforcement Fixing Waterstop and Its Continuous Pour Construction Method

技术领域technical field

本发明涉及混凝土连续浇筑的施工技术,尤其涉及附加钢筋固定止水带实现混凝土连续浇筑施工的技术。The invention relates to the construction technology of continuous concrete pouring, in particular to the technology of adding steel bars to fix the water stop to realize the continuous concrete pouring construction.

背景技术Background technique

在一般较大工程的建筑设计中,由于所需要浇筑的混凝土量过大,不能进行连续浇注,且由于地基变形,或由于温度变化引起的混凝土构件热胀冷缩等原因,需留有施工缝、沉降缝、变形缝,在这些缝处必须安装止水带来防止水的渗漏问题。In the architectural design of general large projects, due to the large amount of concrete that needs to be poured, continuous pouring cannot be performed, and due to the deformation of the foundation, or the thermal expansion and contraction of concrete components caused by temperature changes, it is necessary to leave construction joints. , settlement joints, and deformation joints, water stop belts must be installed at these joints to prevent water leakage.

在现有的混凝土施工工艺中,通常采用跳仓浇筑的方式进行施工。该施工工艺虽然解决了施工缝、沉降缝、变形缝等施工过程中所遗留下的问题,但也存在以下问题:In the existing concrete construction technology, the construction is usually carried out by means of jumping warehouse pouring. Although this construction technology solves the problems left over in the construction process such as construction joints, settlement joints, deformation joints, etc., it also has the following problems:

1、施工进度较慢。采用跳仓法进行施工时,需分别进行仓位钢筋的绑扎、安装止水带和支护模板,当某一仓位浇筑完成后,还需经过养护期后才能进行模板的拆除,进行钢筋绑扎和安装填缝沥青木板进行下一仓位的浇筑,这就导致了施工进度的延长。1. The construction progress is slow. When the warehouse jumping method is used for construction, it is necessary to bind the steel bars of the warehouse, install the water stop belt and the support formwork separately. After the pouring of a certain warehouse is completed, the formwork needs to be removed after the curing period, and the steel bars are bound and installed. The caulked asphalt planks were poured for the next warehouse, which resulted in an extension of the construction schedule.

2、施工材料耗费较大。采用跳仓法进行施工时,由于不能同时进行施工,需对不同仓位进行模板支护,这就导致模板耗费巨大。2. The consumption of construction materials is relatively large. When using the warehouse-hopping method for construction, since the construction cannot be carried out at the same time, it is necessary to carry out formwork support for different positions, which leads to a huge cost of formwork.

发明内容Contents of the invention

为了缩短施工工期、减少模板使用,本发明提供一种附加钢筋固定止水带的混凝土结构及其连续浇筑施工方法。In order to shorten the construction period and reduce the use of templates, the invention provides a concrete structure with additional steel bars to fix the water stop and its continuous pouring construction method.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

一种附加钢筋固定止水带的混凝土结构,包括顶层钢筋、底层钢筋、止水带和砼,其特征在于:还包括附加钢筋框、砂浆垫块和填缝沥青木板,附加钢筋框分为一对上附加钢筋框和一对下附加钢筋框,一对上附加钢筋框与顶层钢筋连接,一对下附加钢筋框与底层钢筋连接;上附加钢筋框和下附加钢筋框之间设置两对砂浆垫块,一对砂浆垫块与上附加钢筋框固定绑扎,另一对砂浆垫块与下附加钢筋框固定绑扎,上下两对砂浆垫块之间放置止水带;填缝沥青木板分为上填缝沥青木板和下填缝沥青木板,上填缝沥青木板设置在一对上附加钢筋框之间,下填缝沥青木板设置在一对下附加钢筋框之间。A concrete structure for fixing the waterstop with additional steel bars, including top layer steel bars, bottom layer steel bars, water stop belts and concrete, characterized in that it also includes additional steel bar frames, mortar pads and caulking asphalt boards, and the additional steel bar frames are divided into one A pair of upper additional reinforcement frames and a pair of lower additional reinforcement frames, a pair of upper additional reinforcement frames are connected to the top layer of reinforcement, a pair of lower additional reinforcement frames are connected to the bottom layer of reinforcement; two pairs of mortar are arranged between the upper additional reinforcement frame and the lower additional reinforcement frame Pads, a pair of mortar pads are fixedly bound to the upper additional steel bar frame, another pair of mortar pads are fixedly bound to the lower additional steel bar frame, and a waterstop is placed between the upper and lower pairs of mortar pads; The caulking asphalt plank and the lower caulking asphalt plank, the upper caulking asphalt plank is set between a pair of upper additional reinforcement frames, and the lower caulking asphalt plank is arranged between a pair of lower additional reinforcement frames.

进一步地,上附加钢筋框与顶层钢筋焊接,下附加钢筋框与底层钢筋焊接。Further, the upper additional reinforcement frame is welded to the top layer of reinforcement, and the lower additional reinforcement frame is welded to the bottom layer of reinforcement.

进一步地,顶层钢筋是由横向钢筋和纵向钢筋组成的钢筋网,底层钢筋是由横向钢筋和纵向钢筋组成的钢筋网。Further, the top layer of reinforcement is a reinforcement mesh composed of transverse reinforcement and longitudinal reinforcement, and the bottom reinforcement is a reinforcement mesh composed of transverse reinforcement and longitudinal reinforcement.

止水带根据需要选择,优选的,止水带为654型中孔型,宽度为350mm,厚度为10mm。附加钢筋框的大小根据实际情况设置,优选的,附加钢筋框的加工宽度为160mm,加工高度为76mm,其中钢筋的直径为8mm。砂浆垫块的大小根据实际情况设置,优选的,砂浆垫块的高度控制为25mm。The waterstop is selected according to the needs. Preferably, the waterstop is a 654-type medium hole, with a width of 350mm and a thickness of 10mm. The size of the additional reinforcement frame is set according to the actual situation. Preferably, the processing width of the additional reinforcement frame is 160mm, the processing height is 76mm, and the diameter of the reinforcement is 8mm. The size of the mortar pad is set according to the actual situation, preferably, the height of the mortar pad is controlled to be 25mm.

上述的附加钢筋固定止水带的混凝土结构用于施工缝、沉降缝、变形缝等混凝土结构中,可实现混凝土连续浇筑。The above-mentioned concrete structure with additional steel bars fixed to the waterstop is used in concrete structures such as construction joints, settlement joints, deformation joints, etc., and can realize continuous pouring of concrete.

一种附加钢筋固定止水带实现混凝土连续浇筑施工的方法,包括以下步骤:A method for implementing continuous pouring of concrete by adding reinforcement to fix the waterstop, comprising the following steps:

1)加工制作附加钢筋框,附加钢筋框分为一对上附加钢筋框和一对下附加钢筋框;1) Processing and making additional reinforcement frames, the additional reinforcement frames are divided into a pair of upper additional reinforcement frames and a pair of lower additional reinforcement frames;

2)依设计变形缝在垫层上布混凝土分块线;2) According to the designed deformation joints, lay concrete block lines on the cushion;

3)绑扎底层钢筋;3) Binding the underlying steel bars;

4)在底层钢筋上焊接一对下附加钢筋框,下附加钢筋框与混凝土竖向钢筋错位布置,并在一对下附加钢筋框之间固定下填缝沥青木板;4) Weld a pair of lower additional reinforcement frames on the bottom reinforcement, displace the lower additional reinforcement frames and concrete vertical reinforcement, and fix the lower joint asphalt planks between the pair of lower additional reinforcement frames;

5)在一对下附加钢筋框上分别绑扎固定下砂浆垫块;5) Bind and fix the lower mortar pads respectively on a pair of lower additional reinforcement frames;

6)在下砂浆垫块和下填缝沥青木板上放置止水带;6) Place a water stop on the lower mortar block and the lower caulking asphalt plank;

7)绑扎顶层钢筋;7) Binding the top layer of steel bars;

8)将顶层钢筋和上附加钢筋框焊接,上附加钢筋框与下附加钢筋框位置对应,并在一对上附加钢筋框之间固定上填缝沥青木板;8) Weld the top layer of reinforcement and the upper additional reinforcement frame, the upper additional reinforcement frame corresponds to the lower additional reinforcement frame, and fix the upper caulking asphalt plank between the pair of upper additional reinforcement frames;

9)将一对上附加钢筋框和一对上砂浆垫块绑扎固定;9) Bind and fix a pair of upper additional reinforcement frames and a pair of upper mortar pads;

10) 浇筑混凝土。10) Pour the concrete.

上述方法中,顶层钢筋是由横向钢筋和纵向钢筋组成的钢筋网,底层钢筋是由横向钢筋和纵向钢筋组成的钢筋网。In the above method, the top layer of reinforcement is a reinforcement mesh composed of transverse reinforcement and longitudinal reinforcement, and the bottom reinforcement is a reinforcement mesh composed of transverse reinforcement and longitudinal reinforcement.

上述方法中,浇筑混凝土时,附加钢筋框两侧的混凝土对称入仓及振捣,防止发生位移。In the above method, when pouring concrete, the concrete on both sides of the additional reinforcement frame is put into the warehouse and vibrated symmetrically to prevent displacement.

本发明的有益效果:本发明的混凝土结构不仅不影响砼的性能,而且有利于加快施工进度,可以连续浇筑混凝土,克服了跳仓法间隔施工的缺陷,能够大大缩短施工工期,还能减少模板的使用。Beneficial effects of the present invention: the concrete structure of the present invention not only does not affect the performance of the concrete, but also helps to speed up the construction progress, can pour concrete continuously, overcomes the defect of interval construction by jumping bin method, can greatly shorten the construction period, and can also reduce the formwork usage of.

附图说明Description of drawings

图1为本发明的左视结构示意图。Fig. 1 is a left view structural schematic diagram of the present invention.

图2为图1中A部分的放大示意图。FIG. 2 is an enlarged schematic view of part A in FIG. 1 .

图3为实施例的左视结构示意图。Fig. 3 is a left view structural schematic diagram of the embodiment.

图4为图3中A部分的放大示意图。FIG. 4 is an enlarged schematic view of part A in FIG. 3 .

在图中,101、顶层横向钢筋;102、顶层纵向钢筋;201、底层横向钢筋;202、底层纵向钢筋;3、上附加钢筋框;4、下附加钢筋框;5、砂浆垫块;6、止水带;7、上填缝沥青木板;8、下填缝沥青木板;9、砼。In the figure, 101, the top horizontal reinforcement; 102, the top longitudinal reinforcement; 201, the bottom horizontal reinforcement; 202, the bottom longitudinal reinforcement; 3, the upper additional reinforcement frame; 4, the lower additional reinforcement frame; 5, the mortar block; 6, Waterstop; 7. Top caulking asphalt planks; 8. Bottom caulking asphalt planks; 9. Concrete.

具体实施方式detailed description

实施例1Example 1

为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明的附图,对技术方案进行清楚、完整地描述。In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution will be clearly and completely described below in conjunction with the accompanying drawings of the present invention.

如图3、4所示,一种附加钢筋固定止水带的混凝土结构,包括顶层钢筋、底层钢筋、附加钢筋框、两对砂浆垫块5、止水带6、填缝沥青木板和砼9。顶层钢筋由顶层横向钢筋101和顶层纵向钢筋102组成,顶层横向钢筋101和顶层纵向钢筋102构成网状;底层钢筋由底层横向钢筋201和底层纵向钢筋202组成,底层横向钢筋201和底层纵向钢筋202构成网状。附加钢筋框分为一对上附加钢筋框3和一对下附加钢筋框4。填缝沥青木板分为上填缝沥青木板7和下填缝沥青木板8。砼9填充结构空间。As shown in Figures 3 and 4, a concrete structure with additional reinforcement to fix the waterstop, including top reinforcement, bottom reinforcement, additional reinforcement frame, two pairs of mortar pads 5, waterstop 6, caulking asphalt planks and concrete 9 . The top layer of reinforcement is composed of the top layer of transverse reinforcement 101 and the top layer of longitudinal reinforcement 102, and the top layer of transverse reinforcement 101 and the top layer of longitudinal reinforcement 102 form a mesh; form a mesh. The additional reinforcement frames are divided into a pair of upper additional reinforcement frames 3 and a pair of lower additional reinforcement frames 4 . The caulking asphalt planks are divided into upper caulking asphalt planks 7 and lower caulking asphalt planks 8 . Concrete 9 fills the structural space.

所述一对上附加钢筋框3和一对下附加钢筋框4分别与顶层钢筋、底层钢筋焊接。一对上附加钢筋框3和一对下附加钢筋框4之间分别放置填缝沥青木板7、8,附加钢筋框3、4起到固定填缝沥青木板7、8的作用。The pair of upper additional reinforcing bar frames 3 and the pair of lower additional reinforcing bar frames 4 are respectively welded to the top layer of reinforcing bars and the bottom layer of reinforcing bars. A pair of upper additional reinforcing bar frames 3 and a pair of lower additional reinforcing bar frames 4 place joint-filling asphalt planks 7,8 respectively, and the additional reinforcing bar frames 3,4 play the role of fixing the joint-filling asphalt planks 7,8.

所述止水带6放置在上附加钢筋框3和下附加钢筋框4之间,并绑扎固定止水带6与上、下两对砂浆垫块5。止水带6为654型中孔型,宽度为350mm,厚度为10mm。所述的两对砂浆垫块5的高度控制为25mm,将附加钢筋3、4与止水带6保持25mm的间距,防止形成渗水通道、影响止水效果。The waterstop 6 is placed between the upper additional reinforcement frame 3 and the lower additional reinforcement frame 4, and the waterstop 6 and the upper and lower pairs of mortar pads 5 are bound and fixed. The waterstop 6 is a 654-type mesopore, with a width of 350mm and a thickness of 10mm. The height of the two pairs of mortar blocks 5 is controlled to be 25 mm, and the distance between the additional steel bars 3 and 4 and the water stop belt 6 is kept at 25 mm to prevent the formation of seepage channels and affect the water stop effect.

所述固定绑扎在附加钢筋框4上、位于止水带6下侧的两个砂浆垫块5和下填缝沥青木板8共同作用,三个位置顶托固定止水带6,防止止水带6因重力向下弯曲变形,附加钢筋框4布置间距500mm。The fixed binding is fixed on the additional steel frame 4, and the two mortar pads 5 located on the lower side of the waterstop 6 and the lower caulking asphalt board 8 work together to support and fix the waterstop 6 at three positions to prevent the waterstop from 6 Due to the downward bending and deformation due to gravity, the additional reinforcement frame 4 is arranged at a distance of 500mm.

所述固定绑扎在附加钢筋框3下、位于止水带上侧的两个砂浆垫块5摁压固定止水带6,防止浇筑混凝土时将止水带6浮起,附加钢筋框3布置间距500mm与附加钢筋框4位置对应布置。The fixed binding is under the additional steel frame 3, and the two mortar pads 5 located on the upper side of the water stop press the fixed water stop 6 to prevent the water stop 6 from floating when pouring concrete, and the additional steel frame 3 is arranged at a distance 500mm is arranged corresponding to the position of the additional reinforcement frame 4.

所述的上附加钢筋框3所用钢筋的直径为8mm,加工宽度为160mm,加工高度依据止水带设计预埋深度确定为76mm;加工高度(76mm)=止水带设计埋深(150mm)-钢筋保护层厚度(25mm)-两层钢筋101、102直径和(24mm)-砂浆垫块5高度(25mm)三者之和。下附加钢筋框4所用钢筋的直径也为8mm,加工宽度为175mm;加工宽度(175mm)=止水带6半幅宽度(175mm)+止水带6外缘超宽(10mm)-填缝沥青木板8设计宽度左右均分值(10mm)。下附加钢筋框4的加工高度根据钢筋混凝土实际情况据实制作:顶、底层纵向钢筋102、202的净高-附加钢筋框3的高度(76mm)-上下砂浆垫块5高度(50mm)-止水带6厚度(10mm)。The diameter of the reinforcement used in the upper additional reinforcement frame 3 is 8mm, the processing width is 160mm, and the processing height is determined to be 76mm according to the design pre-embedded depth of the waterstop; processing height (76mm) = design depth of the waterstop (150mm) - Thickness of steel bar protection layer (25mm) - the sum of the diameters of two layers of steel bars 101 and 102 (24mm) - the height of mortar block 5 (25mm). The diameter of the steel bars used in the lower additional reinforcement frame 4 is also 8 mm, and the processing width is 175 mm; processing width (175 mm) = half width (175 mm) of water stop 6 + super wide outer edge of water stop 6 (10 mm) - caulking asphalt board 8 The design width is divided equally between the left and right (10mm). The processing height of the lower additional reinforcement frame 4 is made according to the actual situation of the reinforced concrete: the net height of the top and bottom longitudinal reinforcement 102, 202 - the height of the additional reinforcement frame 3 (76mm) - the height of the upper and lower mortar pads 5 (50mm) - stop Hose 6 thickness (10mm).

所述两对附加钢筋框3、4对填缝沥青木板7、8左右方向固定,确保混凝土结构尺寸及钢筋保护层厚度与设计相符。The two pairs of additional reinforcement frames 3 and 4 are fixed in the left and right directions of the joint-filling asphalt boards 7 and 8 to ensure that the size of the concrete structure and the thickness of the protective layer of reinforcement conform to the design.

上述的附加钢筋固定止水带的混凝土结构可用于施工缝、沉降缝、变形缝等混凝土结构中,可实现混凝土连续浇筑。The above-mentioned concrete structure with additional steel bars fixed to the waterstop can be used in concrete structures such as construction joints, settlement joints, deformation joints, etc., and can realize continuous pouring of concrete.

实施例2Example 2

一种附加钢筋固定止水带实现混凝土连续浇筑施工的方法,包括以下步骤:A method for implementing continuous pouring of concrete by adding reinforcement to fix the waterstop, comprising the following steps:

1)加工制作附加钢筋框,附加钢筋框分为一对上附加钢筋框3和一对下附加钢筋框4;1) processing and manufacturing additional reinforcement frames, the additional reinforcement frames are divided into a pair of upper additional reinforcement frames 3 and a pair of lower additional reinforcement frames 4;

2)依设计变形缝在垫层上布混凝土分块线;2) According to the designed deformation joints, lay concrete block lines on the cushion;

3)绑扎底层钢筋;3) Binding the underlying steel bars;

4)在底层钢筋上焊接一对下附加钢筋框4,下附加钢筋框4与混凝土竖向钢筋错位布置,并在一对下附加钢筋框4之间固定下填缝沥青木板8;4) Welding a pair of lower additional reinforcement frames 4 on the bottom reinforcement, the lower additional reinforcement frames 4 and the concrete vertical reinforcement are misplaced, and fixing the lower joint asphalt planks 8 between the pair of lower additional reinforcement frames 4;

5)在一对下附加钢筋框4上分别绑扎固定下砂浆垫块5;5) Binding and fixing the lower mortar pads 5 on a pair of lower additional reinforcement frames 4;

6)在下砂浆垫块5和下填缝沥青木板8上放置止水带6;6) Place a waterstop 6 on the lower mortar block 5 and the lower caulking asphalt plank 8;

7)绑扎顶层钢筋;7) Binding the top layer of steel bars;

8)将顶层钢筋和上附加钢筋框3焊接,上附加钢筋框3与下附加钢筋框4位置对应,并在一对上附加钢筋框3之间固定上填缝沥青木板7;8) Weld the top layer of reinforcement and the upper additional reinforcement frame 3, the upper additional reinforcement frame 3 corresponds to the lower additional reinforcement frame 4, and fix the upper caulking asphalt plank 7 between a pair of upper additional reinforcement frames 3;

9)将一对上附加钢筋框3和一对上砂浆垫块5绑扎固定;9) Binding and fixing a pair of upper additional reinforcement frames 3 and a pair of upper mortar pads 5;

10) 浇筑混凝土;连续浇筑混凝土时,附加钢筋框3、4两侧混凝土需对称入仓及振捣,防止发生位移。10) Concrete pouring; when pouring concrete continuously, the concrete on both sides of the additional reinforcement frames 3 and 4 must be placed in the warehouse and vibrated symmetrically to prevent displacement.

以上所述,仅为本发明在河北省遵化市黎河八级水电站引水渠进口钢筋混凝土底板中的应用实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变换,均属于本发明技术方案的保护范围内。The above is only an application example of the present invention in the reinforced concrete floor of the inlet channel of the Lihe eight-stage hydropower station in Zunhua City, Hebei Province, and does not limit the present invention. Any simple modification, change and equivalent structural transformation all belong to the protection scope of the technical solution of the present invention.

Claims (9)

1.一种附加钢筋固定止水带的混凝土结构,包括顶层钢筋、底层钢筋、止水带和砼,其特征在于:还包括附加钢筋框、砂浆垫块和填缝沥青木板,附加钢筋框分为一对上附加钢筋框和一对下附加钢筋框,一对上附加钢筋框与顶层钢筋连接,一对下附加钢筋框与底层钢筋连接;上附加钢筋框和下附加钢筋框之间设置两对砂浆垫块,一对砂浆垫块与上附加钢筋框固定绑扎,另一对砂浆垫块与下附加钢筋框固定绑扎,上下两对砂浆垫块之间放置止水带;填缝沥青木板分为上填缝沥青木板和下填缝沥青木板,上填缝沥青木板设置在一对上附加钢筋框之间,下填缝沥青木板设置在一对下附加钢筋框之间。1. A concrete structure for fixing the waterstop with additional reinforcement, comprising top layer reinforcement, bottom reinforcement, waterstop and concrete, is characterized in that: it also includes an additional reinforcement frame, mortar pads and caulking asphalt planks, and the additional reinforcement frame is divided into A pair of upper additional reinforcement frames and a pair of lower additional reinforcement frames, a pair of upper additional reinforcement frames are connected to the top layer of reinforcement, a pair of lower additional reinforcement frames are connected to the bottom layer of reinforcement; For mortar pads, one pair of mortar pads is fixedly bound to the upper additional steel bar frame, the other pair of mortar pads is fixedly bound to the lower additional steel bar frame, and a waterstop is placed between the upper and lower pairs of mortar pads; The upper caulking asphalt plank and the lower caulking asphalt plank are arranged between a pair of upper additional reinforcement frames, and the lower caulking asphalt plank is arranged between a pair of lower additional reinforcement frames. 2.如权利要求1所述的附加钢筋固定止水带的混凝土结构,其特征在于:上附加钢筋框与顶层钢筋焊接,下附加钢筋框与底层钢筋焊接。2. The concrete structure for fixing the waterstop with additional reinforcement as claimed in claim 1, characterized in that: the upper additional reinforcement frame is welded with the top layer of reinforcement, and the lower additional reinforcement frame is welded with the bottom layer of reinforcement. 3.如权利要求1所述的附加钢筋固定止水带的混凝土结构,其特征在于:顶层钢筋是由横向钢筋和纵向钢筋组成的钢筋网,底层钢筋是由横向钢筋和纵向钢筋组成的钢筋网。3. the concrete structure that additional reinforcing bar fixes waterstop as claimed in claim 1 is characterized in that: top layer reinforcing bar is the reinforcing mesh that is made up of transverse reinforcing bar and longitudinal reinforcing bar, and bottom reinforcing bar is the reinforcing mesh that is made up of transverse reinforcing bar and longitudinal reinforcing bar . 4.如权利要求1所述的附加钢筋固定止水带的混凝土结构,其特征在于:止水带为654型中孔型,宽度为350mm,厚度为10mm。4. The concrete structure for fixing the waterstop with additional reinforcement as claimed in claim 1, characterized in that: the waterstop is a 654-type medium hole, with a width of 350mm and a thickness of 10mm. 5.如权利要求1所述的附加钢筋固定止水带的混凝土结构,其特征在于:附加钢筋框的加工宽度为160mm,加工高度为76mm,其中钢筋的直径为8mm。5. The concrete structure for fixing the waterstop with additional reinforcement as claimed in claim 1, characterized in that: the processing width of the additional reinforcement frame is 160mm, the processing height is 76mm, and the diameter of the reinforcement is 8mm. 6.如权利要求1所述的附加钢筋固定止水带的混凝土结构,其特征在于:砂浆垫块的高度控制为25mm。6. The concrete structure for fixing the waterstop with additional reinforcement as claimed in claim 1, characterized in that: the height of the mortar block is controlled to be 25mm. 7.一种附加钢筋固定止水带实现混凝土连续浇筑施工的方法,包括如下步骤:7. A method for implementing continuous pouring of concrete by adding a steel bar to fix the waterstop, comprising the steps of: 1)加工制作附加钢筋框,附加钢筋框分为一对上附加钢筋框和一对下附加钢筋框;1) Processing and making additional reinforcement frames, the additional reinforcement frames are divided into a pair of upper additional reinforcement frames and a pair of lower additional reinforcement frames; 2)依设计变形缝在垫层上布混凝土分块线;2) According to the designed deformation joints, lay concrete block lines on the cushion; 3)绑扎底层钢筋;3) Binding the underlying steel bars; 4)在底层钢筋上焊接一对下附加钢筋框,下附加钢筋框与混凝土竖向钢筋错位布置,并在一对下附加钢筋框之间固定下填缝沥青木板;4) Weld a pair of lower additional reinforcement frames on the bottom reinforcement, displace the lower additional reinforcement frames and concrete vertical reinforcement, and fix the lower joint asphalt planks between the pair of lower additional reinforcement frames; 5)在一对下附加钢筋框上分别绑扎固定下砂浆垫块;5) Bind and fix the lower mortar pads respectively on a pair of lower additional reinforcement frames; 6)在下砂浆垫块和下填缝沥青木板上放置止水带;6) Place a water stop on the lower mortar block and the lower caulking asphalt plank; 7)绑扎顶层钢筋;7) Binding the top layer of steel bars; 8)将顶层钢筋和上附加钢筋框焊接,上附加钢筋框与下附加钢筋框位置对应,并在一对上附加钢筋框之间固定上填缝沥青木板;8) Weld the top layer of reinforcement and the upper additional reinforcement frame, the upper additional reinforcement frame corresponds to the lower additional reinforcement frame, and fix the upper caulking asphalt plank between the pair of upper additional reinforcement frames; 9)将一对上附加钢筋框和一对上砂浆垫块绑扎固定;9) Bind and fix a pair of upper additional reinforcement frames and a pair of upper mortar pads; 10)浇筑混凝土。10) Pouring concrete. 8.如权利要求7所述的附加钢筋固定止水带实现混凝土连续浇筑施工的方法,其特征在于:顶层钢筋是由横向钢筋和纵向钢筋组成的钢筋网,底层钢筋是由横向钢筋和纵向钢筋组成的钢筋网。8. the method for the continuous pouring of concrete is realized by adding reinforcement as claimed in claim 7, characterized in that: the top layer of reinforcement is a reinforcement mesh made up of transverse reinforcement and longitudinal reinforcement, and the bottom reinforcement is composed of transverse reinforcement and longitudinal reinforcement Composed of steel mesh. 9.如权利要求7所述的附加钢筋固定止水带实现混凝土连续浇筑施工的方法,其特征在于:浇筑混凝土时,附加钢筋框两侧的混凝土对称入仓及振捣,防止发生位移。9. The method for implementing continuous pouring of concrete by fixing the waterstop with additional reinforcement as claimed in claim 7, characterized in that: when pouring concrete, the concrete on both sides of the additional reinforcement frame is symmetrically put into the warehouse and vibrated to prevent displacement.
CN201710512650.8A 2017-06-29 2017-06-29 Additional bar fixes the concrete structure and its continuous placing construction method of waterstop Pending CN107119727A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710512650.8A CN107119727A (en) 2017-06-29 2017-06-29 Additional bar fixes the concrete structure and its continuous placing construction method of waterstop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710512650.8A CN107119727A (en) 2017-06-29 2017-06-29 Additional bar fixes the concrete structure and its continuous placing construction method of waterstop

Publications (1)

Publication Number Publication Date
CN107119727A true CN107119727A (en) 2017-09-01

Family

ID=59720011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710512650.8A Pending CN107119727A (en) 2017-06-29 2017-06-29 Additional bar fixes the concrete structure and its continuous placing construction method of waterstop

Country Status (1)

Country Link
CN (1) CN107119727A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975074A (en) * 2017-12-28 2018-05-01 中国电建集团成都勘测设计研究院有限公司 A kind of concrete structure seam
CN109372133A (en) * 2018-12-04 2019-02-22 中国核工业华兴建设有限公司 In buried rubber fastening band positioning construction method is installed
CN110359486A (en) * 2019-07-05 2019-10-22 中国十七冶集团有限公司 The fixed device of circumferential direction waterstop and its construction method at a kind of piping lane construction joint
CN110820791A (en) * 2019-11-29 2020-02-21 广东省水利水电第三工程局有限公司 Water-stopping system and construction method for concrete foundation construction
CN114960768A (en) * 2022-05-20 2022-08-30 上海二十冶建设有限公司 Installation method of steel-edge water stop belt of pipe gallery expansion joint structure
CN115198804A (en) * 2022-07-06 2022-10-18 中国核工业华兴建设有限公司 Water stop belt installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064999A (en) * 2001-08-22 2003-03-05 Sumitomo Rubber Ind Ltd Flexible rubber joint
CN102373715A (en) * 2011-07-29 2012-03-14 中国二十二冶集团有限公司 Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part
CN102900102A (en) * 2012-04-27 2013-01-30 常州第一建筑集团有限公司 Basement bottom plate having advanced-waterstop post-cast strip structure
CN206279636U (en) * 2016-05-31 2017-06-27 上海市政工程设计研究总院(集团)有限公司 A kind of template for installing fixed rubber fastening band
CN206844167U (en) * 2017-06-29 2018-01-05 遵化市水务局 Additional bar fixes the concrete structure of waterstop

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064999A (en) * 2001-08-22 2003-03-05 Sumitomo Rubber Ind Ltd Flexible rubber joint
CN102373715A (en) * 2011-07-29 2012-03-14 中国二十二冶集团有限公司 Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part
CN102900102A (en) * 2012-04-27 2013-01-30 常州第一建筑集团有限公司 Basement bottom plate having advanced-waterstop post-cast strip structure
CN206279636U (en) * 2016-05-31 2017-06-27 上海市政工程设计研究总院(集团)有限公司 A kind of template for installing fixed rubber fastening band
CN206844167U (en) * 2017-06-29 2018-01-05 遵化市水务局 Additional bar fixes the concrete structure of waterstop

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975074A (en) * 2017-12-28 2018-05-01 中国电建集团成都勘测设计研究院有限公司 A kind of concrete structure seam
CN109372133A (en) * 2018-12-04 2019-02-22 中国核工业华兴建设有限公司 In buried rubber fastening band positioning construction method is installed
CN110359486A (en) * 2019-07-05 2019-10-22 中国十七冶集团有限公司 The fixed device of circumferential direction waterstop and its construction method at a kind of piping lane construction joint
CN110820791A (en) * 2019-11-29 2020-02-21 广东省水利水电第三工程局有限公司 Water-stopping system and construction method for concrete foundation construction
CN114960768A (en) * 2022-05-20 2022-08-30 上海二十冶建设有限公司 Installation method of steel-edge water stop belt of pipe gallery expansion joint structure
CN115198804A (en) * 2022-07-06 2022-10-18 中国核工业华兴建设有限公司 Water stop belt installation method
CN115198804B (en) * 2022-07-06 2023-08-11 中国核工业华兴建设有限公司 Water stop belt installation method

Similar Documents

Publication Publication Date Title
CN107119727A (en) Additional bar fixes the concrete structure and its continuous placing construction method of waterstop
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN206245209U (en) A kind of bridge floor attachment means for continuous deck simply supported girder bridge
CN104404985B (en) The construction method of basement bottom plate rear pouring tape waterproof construction
CN108797638A (en) Integrated assembled piping lane based on composite bottom board and its construction method
CN104594511A (en) Laminated slab subjected to abutted seam assembling by corrugated steel plate with seam steel bars
CN107090908B (en) A joint connection method of vertical prefabricated components
CN207267954U (en) A Prefabricated Prestressed Construction Waste Recycled Aggregate Road
CN105442629B (en) A kind of large scale equipment T stage vibration isolation mounts construction
CN106480821B (en) A kind of end is constructed using the seamless bridge of arc attachment strap and its construction method
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN204112712U (en) A kind of side root haunch cast-in-place wall model sheetinstallat device
CN103696439A (en) Immersed tube pouring method
CN202247961U (en) Basement post-cast strip assembled side form device
CN206844167U (en) Additional bar fixes the concrete structure of waterstop
CN205224266U (en) Overlength super large area bottom plate post -cast strip structure
CN105648899A (en) Hinge joint reinforcement bar structure for concrete hollow slab bridge
CN111379277A (en) Fixing device for box culvert connected bin pouring rubber waterstop and foam board and using method of fixing device
CN106499187A (en) A kind of arm support and concrete spraying machine
CN108824810B (en) Laying construction process for steel skeleton composite building top plate
CN203807954U (en) Box girder strengthening structure based on steel plate-concrete and unbonded pre-stressing tendons
CN207538314U (en) A kind of superimposed sheet for making piece splicing by C-shaped steel plate
CN205296521U (en) Superimposed sheet of piece concatenation is made by C shape steel sheet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination