CN107098275A - A kind of slabstone for water conservancy construction lifts by crane transfer crane - Google Patents

A kind of slabstone for water conservancy construction lifts by crane transfer crane Download PDF

Info

Publication number
CN107098275A
CN107098275A CN201710349275.XA CN201710349275A CN107098275A CN 107098275 A CN107098275 A CN 107098275A CN 201710349275 A CN201710349275 A CN 201710349275A CN 107098275 A CN107098275 A CN 107098275A
Authority
CN
China
Prior art keywords
slabstone
crane
mobile
support beam
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710349275.XA
Other languages
Chinese (zh)
Other versions
CN107098275B (en
Inventor
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Tao
Original Assignee
李阳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李阳 filed Critical 李阳
Priority to CN201710349275.XA priority Critical patent/CN107098275B/en
Publication of CN107098275A publication Critical patent/CN107098275A/en
Application granted granted Critical
Publication of CN107098275B publication Critical patent/CN107098275B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods

Abstract

Transfer crane is lifted by crane the present invention relates to a kind of slabstone for water conservancy construction, including support beam, the lower end of the support beam is symmetrically installed with support arm, the center-side side of the support beam is installed with side support beam, the side support beam both sides are symmetrically installed with mobile support block, the side support beam lower slide is provided with mobile deploying and retracting axis, the mobile deploying and retracting axis lower end is rotatablely equipped with lifting rope, the lower end of the lifting rope is installed with suspension hook, the side support beam upper end is installed with the first motor, the mobile support block lower end is installed with lifting rope, the lifting rope middle-end is installed with balance connector, the lower end of the lifting rope is installed with slabstone barrow, the side roller is symmetrically rotatably installed in both sides inside carrying framework.The present invention is both easy to mobile and operated, and can be rapidly and efficiently construction with slabstone is subjected to lifting carrying, greatly save manpower and working time.

Description

A kind of slabstone for water conservancy construction lifts by crane transfer crane
Technical field
The present invention relates to hydraulic engineering suspender technical field, specifically a kind of slabstone for water conservancy construction is lifted by crane Transfer crane.
Background technology
Hydraulic engineering be in order to control, using and protection earth's surface and underground water resources and environment and every engineering for building The general name of construction, to eliminate water damage and developing the engineering that water resource is built, is divided into flood control works, agriculture by its service object Field hydraulic engineering, hydraulic power project, navigation channel and port engineering, water supply and drainage system, environmental bydraulic engineering engineering, polder work Journey etc., will be commonly used during some water conservancy constructions and arrive crane and suspender, some existing water conservancy construction liftings Machine is heavier, is not easy to movement, and compares limitation using function, wants frequent lifting to carry during water conservancy construction Scheelite plate, existing crane can not be quick and safe to slabstone progress lifting carrying, wastes time and energy, and removed in lifting Slabstone often can cause unnecessary damage because shaking and dropping during fortune, be directed to problem above, design here Go out a kind of slabstone for water conservancy construction and lift by crane transfer crane, it is possible to achieve slabstone is smoothly fast transported to the work specified Make place, and carry multiple functional, the cost that construction material is carried greatly reduces, favorable working performance greatlys save people Power and time.
The content of the invention
In order to solve the above problems, transfer crane is lifted by crane the invention provides a kind of slabstone for water conservancy construction, can It is heavier to solve some existing water conservancy construction cranes, movement is not easy to, and compare limitation using function, it is impossible to It is enough quick and it is safe lifting carrying is carried out to slabstone, waste time and energy, and lift by crane carry during carry thing and carrying During can be dropped often because of shaking and cause the problem of unnecessary damage, it is possible to achieve it is quick smoothly will construction The job site specified is transported to slabstone, and carries multiple functional, the cost that construction material is carried, work greatly reduces Make performance good.
To achieve these goals, the present invention is realized using following technical scheme:A kind of slabstone for water conservancy construction Transfer crane, including support beam are lifted by crane, the lower end of the support beam is symmetrically installed with support arm, the center-side of the support beam Side is installed with side support beam, and the side support beam both sides are symmetrically installed with mobile support block, the side support beam lower end Mobile deploying and retracting axis are slidably fitted with, the mobile deploying and retracting axis lower end is rotatablely equipped with lifting rope, and the lower end of the lifting rope is fixed Suspension hook is installed, the side support beam upper end is installed with the first motor, and the mobile support block lower end is installed with Lifting rope, the lifting rope middle-end is installed with balance connector, and the lower end of the lifting rope is installed with slabstone barrow, described Slabstone barrow includes side roller, rotating wheel and carries framework, and the rotating wheel is rotatably installed in the bottom for carrying framework, described Side roller is symmetrically rotatably installed in both sides inside carrying framework, and the carrying framework upper end is symmetrically installed with six connection locks Hook, the carrying framework two ends are symmetrically installed with handle, and the slabstone barrow upper end is installed with the second motor.
As a preferred technical solution of the present invention, chute is provided with inside the support beam.
As a preferred technical solution of the present invention, the mobile support block lower slide is provided with mobile pulley, and Mobile pulley is stuck in inside chute.
As a preferred technical solution of the present invention, the balance connector is arranged with two, and balance connector Upper and lower ends be connected to three lifting ropes respectively.
As a preferred technical solution of the present invention, the connection latch hook side by side parallel is set, and each row is three.
It is mutually solid by connecting support frame between described two support arm bottoms as a preferred technical solution of the present invention Fixed connection, and support arm and connection support frame lower end are provided with roller.
As a preferred technical solution of the present invention, the suspension hook is connected by lifting rope with mobile deploying and retracting axis.
During present invention work, the elongation of suspension hook is controlled by mobile deploying and retracting axis first, using suspension hook by one end of slabstone Sling, then take up the entrance point that the one end lifted is put into slabstone barrow using external force, now slabstone barrow slabstone Rotating wheel at the entrance point of barrow is rotated under the drive of the second motor, so that scheelite plate can be with light entrance Inside to slabstone barrow is carried, can be using mobile support block in support beam during being loaded to slabstone Movement inside chute adjusts the movement of slabstone barrow, is easy to the filling of scheelite plate, can pass through roller after the completion of filling Carry out the carrying of counterweight slabstone, by slabstone barrow upper end symmetrically sling by lifting rope and lifting rope middle-end install Balance connector so that slabstone barrow is constantly in stable state during carrying, prevents that scheelite plate from dropping damage Bad, the handle of slabstone barrow both sides also allows for loading and the angle of slabstone barrow is adjusted when unloading scheelite plate, and the present invention exists It can be realized during use and fast smoothly slabstone is transported to the job site specified, and carry multiple functional, significantly Reduce the cost that construction material is carried, favorable working performance greatlys save manpower and time.
The beneficial effects of the invention are as follows:
1st, the present invention is mounted with slabstone barrow, side support beam and suspension hook, carries out hanging the process for taking carrying in counterweight slabstone In, suspension hook can lift one end of scheelite plate the slow inside for being put into slabstone barrow, the porch of slabstone barrow Internal and both sides are mounted with rotating wheel and side roller, and rotating wheel can during the lifting of counterweight slabstone is loaded into slabstone barrow Rotated under the drive of the second motor so that slabstone becomes convenient power-saving in the process of state, also shortens the time, has loaded After can counterweight slabstone carry out transportation processing, because slabstone barrow upper end is symmetrically sling by lifting rope, and lifting rope in the middle part of It is mounted with to balance connector, so slabstone can have been at the state of a steady safety during carrying, to slabstone The position of slabstone barrow can also be adjusted by mobile support block during filling, so as to solve some existing water Not safe and efficient enough the shortcoming carried to slabstone of sharp lifting appliance.
2nd, the present invention has been symmetrically installed support arm, and support arm bottom is mutually fixedly connected by connecting support frame, constitutes three Angular, the lower end with good stability, and support arm and connection support frame is fitted with pulley, so this crane can Efficiently to be carried construction with slabstone, the time is saved.
3rd, side support beam lower end of the invention is mounted with to move deploying and retracting axis and suspension hook, and mobile deploying and retracting axis are in the first motor Drive it is lower can control to move transverse shifting of the deploying and retracting axis in the support beam of side and the folding and unfolding to suspension hook, greatly facilitate pair The lifting of scheelite plate, greatly saves manpower.
4、
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of main body of the present invention;
Fig. 2 is main body side view of the present invention;
Fig. 3 is slabstone barrow front view of the present invention;
Fig. 4 is slabstone barrow side view of the present invention.
In figure:1- support beams, 2- lifting ropes, 3- suspension hooks, 4- support arms, 5- rollers, 6- slabstones barrow, 7- balance connections Part, 8- lifting ropes, 9- movement deploying and retracting axis, the motor of 10- first, 11- sides support beam, 12- movement support block, 13- connections support frame, 14- side rollers, 15- rotating wheels, 16- handles, 17- carry framework, 18- connections latch hook, the motor of 19- second.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below Conjunction is specifically illustrating, and the present invention is expanded on further.
As shown in Figures 1 to 4, a kind of slabstone for water conservancy construction lifts by crane transfer crane, including support beam 1, described The lower end of support beam 1 is symmetrically installed with support arm 4, and the center-side side of the support beam 1 is installed with side support beam 11, institute State the both sides of side support beam 11 and be symmetrically installed with mobile support block 12, the lower slide of side support beam 11 is provided with mobile deploying and retracting axis 9, the mobile lower end of deploying and retracting axis 9 is rotatablely equipped with lifting rope 2, and the lower end of the lifting rope 2 is installed with suspension hook 3, described The upper end of side support beam 11 is installed with the first motor 10, and the mobile lower end of support block 12 is installed with lifting rope 8, described The middle-end of lifting rope 8 is installed with balance connector 7, and the lower end of the lifting rope 8 is installed with slabstone barrow 6, the slabstone Barrow 6 includes side roller 14, rotating wheel 15 and carries framework 17, and the rotating wheel 15 is rotatably installed in the bottom for carrying framework 17 End, the side roller 14 is symmetrically rotatably installed in carrying framework 17 inside both sides, and the upper end of carrying framework 17 is symmetrically fixed to pacify Equipped with six connection latch hooks 18, carrying framework 17 two ends are symmetrically installed with handle 16, the upper end of slabstone barrow 6 It is installed with the second motor 19.
The inside of support beam 1 is provided with chute, and the mobile lower slide of support block 12 is provided with mobile pulley, and mobile Pulley is stuck in inside chute, and the balance connector 7 is arranged with two, and the upper and lower ends of balance connector 7 are connected respectively Three lifting ropes 8, connection latch hook 18 side by side parallel is set, and each row is between three, described two bottoms of support arm 4 Mutually it is fixedly connected by connecting support frame 13, and support arm 4 and connection support frame 13 lower end are provided with roller 5, the suspension hook 3 leads to Lifting rope 2 is crossed with mobile deploying and retracting axis 9 to be connected.
During present invention work, the elongation of suspension hook 3 is controlled by mobile deploying and retracting axis 9 first, using suspension hook 3 by the one of slabstone End is sling, and then the one end lifted is put into the entrance point of slabstone barrow 6 using external force, and now slabstone barrow slabstone is removed Transport the rotating wheel 15 at the entrance point of frame 6 to rotate under the drive of the second motor 19, so that scheelite plate can be with light The inside for entering slabstone barrow 6 is carried, can be using mobile support block 12 in branch during being loaded to slabstone Support the movement inside the chute in beam 1 to adjust the movement of slabstone barrow 6, be easy to the filling of scheelite plate, after the completion of filling i.e. Can by roller 5 come the carrying of counterweight slabstone, by slabstone barrow 6 upper end symmetrically sling by lifting rope 8 and The middle-end of lifting rope 8 is mounted with to balance connector 7 so that slabstone barrow 6 is constantly in stable state during carrying, Prevent that scheelite plate from dropping damage, slabstone is adjusted when the handle 16 of the both sides of slabstone barrow 6 also allows for loading and unloads scheelite plate and is removed The angle of frame 6 is transported, the present invention can be realized in use is fast smoothly transported to slabstone the job site specified, and And carry multiple functional, the cost that construction material is carried greatly reduces, favorable working performance greatlys save manpower and time.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, the simply explanation present invention of the description in above-described embodiment and specification Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, and these change and changed Enter all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent Define.

Claims (7)

1. a kind of slabstone for water conservancy construction lifts by crane transfer crane, it is characterised in that:Including support beam (1), the support The lower end of beam (1) is symmetrically installed with support arm (4), and the center-side side of the support beam (1) is installed with side support beam (11), side support beam (11) both sides are symmetrically installed with mobile support block (12), side support beam (11) the lower slide peace Equipped with mobile deploying and retracting axis (9), mobile deploying and retracting axis (9) lower end is rotatablely equipped with lifting rope (2), the lifting rope (2) End is installed with suspension hook (3), and side support beam (11) upper end is installed with the first motor (10), the mobile support Block (12) lower end is installed with lifting rope (8), and lifting rope (8) middle-end is installed with balance connector (7), the lifting rope (8) lower end is installed with slabstone barrow (6), the slabstone barrow (6) include side roller (14), rotating wheel (15) and Framework (17) is carried, the rotating wheel (15) is rotatably installed in the bottom for carrying framework (17), and the side roller (14) symmetrically turns Dynamic be arranged on carries the internal both sides of framework (17), and carrying framework (17) upper end is symmetrically installed with six connection latch hooks (18), described carrying framework (17) two ends are symmetrically installed with handle (16), and slabstone barrow (6) upper end is fixedly mounted There is the second motor (19).
2. a kind of slabstone for water conservancy construction according to claim 1 lifts by crane transfer crane, it is characterised in that:It is described Chute is provided with inside support beam (1).
3. a kind of slabstone for water conservancy construction according to claim 2 lifts by crane transfer crane, it is characterised in that:It is described Mobile support block (12) lower slide is provided with mobile pulley, and mobile pulley is stuck in inside chute.
4. a kind of slabstone for water conservancy construction according to claim 1 lifts by crane transfer crane, it is characterised in that:It is described Balance connector (7) is arranged with two, and the upper and lower ends of balance connector (7) are connected to three lifting ropes (8) respectively.
5. a kind of slabstone for water conservancy construction according to claim 1 lifts by crane transfer crane, it is characterised in that:It is described Latch hook (18) side by side parallel is connected to set, and each row is three.
6. a kind of slabstone for water conservancy construction according to claim 1 lifts by crane transfer crane, it is characterised in that:It is described Mutually it is fixedly connected between two support arm (4) bottoms by connecting support frame (13), and support arm (4) and connection support frame (13) Lower end is provided with roller (5).
7. a kind of slabstone for water conservancy construction according to claim 1 lifts by crane transfer crane, it is characterised in that:It is described Suspension hook (3) is connected by lifting rope (2) with mobile deploying and retracting axis (9).
CN201710349275.XA 2017-05-17 2017-05-17 A kind of slabstone lifting handling crane for water conservancy construction Expired - Fee Related CN107098275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710349275.XA CN107098275B (en) 2017-05-17 2017-05-17 A kind of slabstone lifting handling crane for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710349275.XA CN107098275B (en) 2017-05-17 2017-05-17 A kind of slabstone lifting handling crane for water conservancy construction

Publications (2)

Publication Number Publication Date
CN107098275A true CN107098275A (en) 2017-08-29
CN107098275B CN107098275B (en) 2018-08-24

Family

ID=59669894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710349275.XA Expired - Fee Related CN107098275B (en) 2017-05-17 2017-05-17 A kind of slabstone lifting handling crane for water conservancy construction

Country Status (1)

Country Link
CN (1) CN107098275B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000153988A (en) * 1998-11-18 2000-06-06 Mitsubishi Heavy Ind Ltd Trackless road surface traveling body and container terminal
CN102689841A (en) * 2011-03-22 2012-09-26 大连大起产业开发有限公司 Electric hoist portal crane
CN202988598U (en) * 2012-11-09 2013-06-12 辽宁铭鹏防爆起重机有限公司 Gate-type container overturn crane
CN205312915U (en) * 2016-01-12 2016-06-15 云南力神重工机械有限公司 Double -beam portal crane
CN205709550U (en) * 2016-03-22 2016-11-23 卢统华 A kind of semi portal bridge-type cantilever crane of band exposed drive
CN205709559U (en) * 2016-03-22 2016-11-23 卢统华 A kind of can random angle rotate bridge-type cantilever crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000153988A (en) * 1998-11-18 2000-06-06 Mitsubishi Heavy Ind Ltd Trackless road surface traveling body and container terminal
CN102689841A (en) * 2011-03-22 2012-09-26 大连大起产业开发有限公司 Electric hoist portal crane
CN202988598U (en) * 2012-11-09 2013-06-12 辽宁铭鹏防爆起重机有限公司 Gate-type container overturn crane
CN205312915U (en) * 2016-01-12 2016-06-15 云南力神重工机械有限公司 Double -beam portal crane
CN205709550U (en) * 2016-03-22 2016-11-23 卢统华 A kind of semi portal bridge-type cantilever crane of band exposed drive
CN205709559U (en) * 2016-03-22 2016-11-23 卢统华 A kind of can random angle rotate bridge-type cantilever crane

Also Published As

Publication number Publication date
CN107098275B (en) 2018-08-24

Similar Documents

Publication Publication Date Title
CN201228206Y (en) Self-made small-sized hoisting machine
CN201474315U (en) Moveable hoisting brick clamp
CN201809036U (en) Hanging hopper with detachable chassis
CN204454402U (en) Detachable winch hanging apparatus
CN102635225A (en) Equipment hoisting platform and method for super high-rise buildings
CN204281112U (en) Special lifting lifting system processed by a kind of wheel
CN109110652A (en) A kind of movable type gantry crane
CN106829781A (en) Mobile shipment crane and its operating method of one kind
CN103159141A (en) Mini-type and crawler-type tray crane
CN202321480U (en) Tower crane lifter
CN207890900U (en) It is a kind of large size steel beam lifting, turn fixture
CN107098275A (en) A kind of slabstone for water conservancy construction lifts by crane transfer crane
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN207404737U (en) Build assembling light crane
KR100723643B1 (en) Turning device for hoist
US3861546A (en) Apparatus for lifting wallboard into multi-story buildings
CN216915839U (en) Simple cableway system for mine
CN215100780U (en) Discharge hopper and discharge system
CN204876765U (en) Pneumatic lift tower of self -discharging cabin formula
CN205527498U (en) Utilize pulley system's hoist and mount and conveyer
CN114538274A (en) Pole hoist and mount fixture
CN210236983U (en) Lifting machine for building engineering
CN102674134A (en) Rotatable lifting beam for gantry crane
CN202609760U (en) Rotatable hanging beam for gantry crane
CN102873756B (en) Concrete mixer with lifting discharge hopper lifted by guide rope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180622

Address after: 250000 No. 704 1 unit 95, Ji Luo Road, Tianqiao District, Ji'nan, Shandong

Applicant after: Li Xinzhen

Applicant after: Guo Tao

Address before: 233000 Li 18, Guangde village, Qin Ji Town, Yuhui District, Bengbu, Anhui

Applicant before: Li Yang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824

Termination date: 20190517

CF01 Termination of patent right due to non-payment of annual fee