CN107089573A - A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot - Google Patents

A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot Download PDF

Info

Publication number
CN107089573A
CN107089573A CN201710392115.3A CN201710392115A CN107089573A CN 107089573 A CN107089573 A CN 107089573A CN 201710392115 A CN201710392115 A CN 201710392115A CN 107089573 A CN107089573 A CN 107089573A
Authority
CN
China
Prior art keywords
piece
main limb
main
limb
cross bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710392115.3A
Other languages
Chinese (zh)
Inventor
刘立新
张青
侯涛
王玉磊
张瑞军
何芹
刘杰
田野
王琛
仉硕华
丛东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Shandong Jianzhu University
Original Assignee
SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG FUJI ZHIYU ELEVATOR CO Ltd, Shandong Jianzhu University filed Critical SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Priority to CN201710392115.3A priority Critical patent/CN107089573A/en
Publication of CN107089573A publication Critical patent/CN107089573A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot, is connected in sequence by four standard nodal plates:It is a piece of including a main limb, two cross bars, the two doorway columns in left and right up and down, two cross bar horizontal positioneds and one end is connected with main limb, doorway column is in the middle of two cross bars;It is a piece of including a main limb, two cross bar horizontal positioneds and one end is connected with main limb, car T-rail is provided with two cross bars up and down;It is a piece of including a main limb, two cross bar horizontal positioneds up and down, one end is connected with main limb;It is a piece of including a main limb, two cross bar horizontal positioneds and one end is connected with main limb up and down, one car-counterweight common guide rails frame is respectively installed on two cross bars, two are provided with inside the circle that guide rail bracket is constituted with cross bar with hollow guide rail is reused, external parallel is provided with a T-shaped guide rail of car in main limb.The present invention installs and uses that rapid convenient, structural strength is big, convenient transportation, can reduce cost of transportation.

Description

一种老楼快装式钢结构电梯片式井道标准节A piece-type shaft standard section of quick-installed steel structure elevator for old buildings

技术领域technical field

本发明涉及一种老楼快装式钢结构电梯片式井道标准节,属于电梯技术领域。The invention relates to a piece-type shaft standard section of a quick-installed steel structure elevator for an old building, and belongs to the technical field of elevators.

背景技术Background technique

随着人口老龄化的加剧及楼价的居高不下,旧楼加装电梯势在必行,同时这也是政府倡导和鼓励的民生工程,市场潜力巨大。老楼加装电梯因事先没有设置井道,通常的解决办法是采用钢结构做为井道安装在室外,老楼快装式钢结构电梯井道采用标准节式设计,一节节的标准节连接形成井道,因此标准节是钢结构井道关键受力构件。With the intensification of population aging and high property prices, it is imperative to install elevators in old buildings. At the same time, this is also a livelihood project advocated and encouraged by the government, and the market potential is huge. Because there is no shaft installed in the old building, the usual solution is to use a steel structure as the shaft and install it outdoors. The shaft of the quick-installed steel structure elevator in the old building adopts a standard section design, and the standard sections are connected to form a shaft. , so the standard section is the key stress member of the steel structure well.

现有钢结构井道组装都是通过大型车辆将标准节在内的各种部件运送到现场安装而成,由于标准节是按照标准制作,每个标准节占据有很大的体积,这大大增加了运输成本。The assembly of the existing steel structure hoistway is carried out by large vehicles to transport various components including the standard section to the site for installation. Since the standard section is made according to the standard, each standard section occupies a large volume, which greatly increases the transportation cost.

发明内容Contents of the invention

本发明目的在于克服现有技术存在的不足而提供一种结构相对简单,安装使用方便快捷,结构刚度好,能降低运输成本的组装式井道标准节。The purpose of the present invention is to overcome the disadvantages of the prior art and provide an assembled shaft standard section with relatively simple structure, convenient and fast installation and use, good structural rigidity and reduced transportation cost.

本发明是通过以下技术实现的:The present invention is achieved through the following technologies:

本发明提供一种老楼快装式钢结构电梯片式井道标准节,它主要由四个标准节片依次连接而成,四片标准节结构各不相同:一片包括一根主肢、两根横杆、两根门口立柱,两根横杆水平放置且一端与主肢连接,门口立柱安装在两根横杆中间;一片包括一根主肢,两根横杆水平放置且一端与主肢连接,两根横杆上安装有轿厢用T形导轨;一片包括一根主肢,两根横杆水平放置,一端与主肢连接;一片包括一根主肢,两根横杆水平放置,一端与主肢连接,两根横杆上各安装有一个轿厢—配重共用导轨架,导轨架与横杆组成的圈内部安装有两根配重用空心导轨,外部平行于横杆安装有一根轿厢用T型导轨;在主肢上安装有与另一片式标准节横杆相配的连接件。The invention provides a piece-type shaft standard section of a quick-installed steel structure elevator in an old building. It is mainly composed of four standard sections connected in sequence. The four standard sections have different structures: one piece includes a main limb, two Cross bar, two door posts, two cross bars are placed horizontally and one end is connected to the main leg, and the door post is installed between the two cross bars; one piece includes a main leg, two cross bars are placed horizontally and one end is connected to the main leg , T-shaped guide rails for the car are installed on two cross bars; one piece includes a main leg, two cross bars are placed horizontally, and one end is connected to the main leg; one piece includes a main leg, two cross bars are placed horizontally, and one end Connected with the main limb, a car-counterweight shared guide rail frame is installed on each of the two cross bars. Two hollow guide rails for counterweight are installed inside the circle formed by the guide rail frame and the cross bar, and a car is installed parallel to the bar on the outside. T-shaped guide rail for carriage; a connecting piece matching another piece of standard section crossbar is installed on the main limb.

本发明所述的主肢为一根方管,其一端设置有两片弯板组成的套筒,另一端设置有可供两片弯板组成的套筒连接的连接孔;每片弯板角度为90°且刚好与主肢配合,弯板垂直的两片板上各开有三个孔,不同板上的孔不在同一竖直平面内且连接时彼此不受影响;该构件的设置大大提高了电梯钢结构井道的组装速度。The main limb of the present invention is a square tube, one end of which is provided with a sleeve composed of two bent plates, and the other end is provided with a connecting hole for connecting the sleeve composed of two bent plates; the angle of each bent plate It is 90° and just fits with the main limb. There are three holes on each of the two vertical plates of the bent plate. The holes on different plates are not in the same vertical plane and are not affected by each other when connected; the setting of this component greatly improves The assembly speed of the steel structure shaft of the elevator.

本发明所述的连接件用来连接一片标准节的主肢与另一片与之相配的标准节的横杆,连接件的一端扣接在主肢上且通过螺栓与主肢相连接,连接件的另一端扣接在另一片标准节的横杆上且通过螺栓进行连接,进而实现主肢与横杆的连接;且每个连接点采用两个连个连接件,连接件在主肢与横杆连接的角上设置有肋板,肋板的设置大大增加了标准节的刚度与稳定性。The connecting piece of the present invention is used to connect the main limb of a standard section and the cross bar of another matching standard section. One end of the connecting piece is buckled on the main limb and connected with the main limb through bolts. The connecting piece The other end is fastened to the cross bar of another standard section and connected by bolts, so as to realize the connection between the main leg and the cross bar; and each connection point uses two connecting pieces, and the connecting piece is between the main There are ribs on the corners of the rod connection, which greatly increase the rigidity and stability of the standard joint.

附图说明Description of drawings

图1本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2连接件的结构示意图。Figure 2 Schematic diagram of the connector.

图3弯板的结构示意图。Figure 3 Schematic diagram of the structure of the bent plate.

具体实施方式detailed description

下面将结合附图对本发明做详细的介绍。The present invention will be described in detail below in conjunction with the accompanying drawings.

图1所示,本发明一种老楼快装式钢结构电梯片式井道标准节,它主要由四个标准节片依次连接而成,四片标准节结构各不相同:一片包括一根主肢1、上横杆9和下横杆20、左门口立柱11和右门口立柱3,上横杆9和下横杆20水平放置且一端与主肢1连接,门口右立柱11和左立柱3安装在上横杆9和下横杆20中间且垂直横杆;一片包括一根主肢23,上横杆12和下横杆13水平放置且一端与主肢23连接,上横杆12和下横杆13横杆上安装有轿厢用T形导轨4,导轨竖直安装;一片包括一根主肢21,上横杆7和下横杆14水平放置,一端与主肢连接;一片包括一根主肢22,上横杆15和下横杆16水平放置,一端与主肢连接,上横杆15和下横杆16各安装有一个轿厢—配重共用导轨架8,导轨架8与横杆组成的圈内部安装有两根配重用空心导轨10,外部平行于横杆15和16安装有一根轿厢用T型导轨17;在每根主肢上都安装有与另一片式标准节横杆相配的连接件5和19。As shown in Fig. 1 , the present invention is a kind of old building fast-installation steel structure elevator piece-type shaft standard section, which is mainly composed of four standard sections connected in sequence, and the four standard sections have different structures: one section includes a Limb 1, upper crossbar 9 and lower crossbar 20, left doorway column 11 and right doorway column 3, upper crossbar 9 and lower crossbar 20 are placed horizontally and one end is connected with main limb 1, doorway right column 11 and left column 3 Installed in the middle of the upper cross bar 9 and the lower cross bar 20 and the vertical cross bar; one piece includes a main limb 23, the upper cross bar 12 and the lower cross bar 13 are placed horizontally and one end is connected with the main limb 23, the upper cross bar 12 and the lower cross bar The T-shaped guide rail 4 for the car is installed on the cross bar 13 cross bars, and the guide rail is installed vertically; One piece includes a main limb 21, and the upper cross bar 7 and the lower cross bar 14 are placed horizontally, and one end is connected with the main limb; The root main limb 22, the upper cross bar 15 and the lower cross bar 16 are horizontally placed, and one end is connected with the main limb. The upper cross bar 15 and the lower cross bar 16 are respectively equipped with a car-counterweight sharing guide rail frame 8, and the guide rail frame 8 and Two hollow guide rails 10 for counterweight are installed inside the circle formed by the cross bars, and a T-shaped guide rail 17 for the car is installed on the outside parallel to the cross bars 15 and 16; Connectors 5 and 19 that the crossbar matches.

参见图2和图3,所述吊装固定座包括固定座底板21和固定座筋板22和固定座侧板23,所述固定座底板21设有四个螺栓孔,所述固定座底板21通过螺栓与标准节各主弦梁座板11相连接,所述固定座筋板22设有两个吊装用孔221,所述吊装用孔221与吊具相连接,所述固定座侧板23与固定座底板21、固定座筋板22相固接。Referring to Fig. 2 and Fig. 3, the hoisting fixing seat includes a fixing seat bottom plate 21, a fixing seat rib plate 22 and a fixing seat side plate 23, and the fixing seat bottom plate 21 is provided with four bolt holes, and the fixing seat bottom plate 21 passes through Bolts are connected with each main chord beam seat plate 11 of the standard section, and the fixed seat reinforcement plate 22 is provided with two hoisting holes 221, and the hoisting holes 221 are connected with the lifting gear, and the fixed seat side plate 23 is connected with The base plate 21 of the fixed seat and the rib plate 22 of the fixed seat are fixedly connected.

图1、3所示,主肢为一根方管,其一端设置有两片弯板6和18组成的套筒,另一端设置有可供两片弯板组成的套筒连接的连接孔2;每片弯板角度为90°且刚好与主肢配合,弯板垂直的两片板C和板D上各开有三个孔,板C和板D上的孔不在同一竖直平面内且连接时彼此不受影响;该构件的设置大大提高了电梯钢结构井道的组装速度。As shown in Figures 1 and 3, the main limb is a square tube, one end of which is provided with a sleeve composed of two bent plates 6 and 18, and the other end is provided with a connecting hole 2 for connecting the sleeve composed of two bent plates ; The angle of each bent plate is 90° and it just matches the main limb. There are three holes on the two vertical plates C and D respectively. The holes on the plates C and D are not in the same vertical plane and connected They are not affected by each other; the setting of this component greatly improves the assembly speed of the steel structure shaft of the elevator.

图1、2所示,连接件用来连接一片标准节的主肢与另一片与之相配的标准节的横杆,连接件的槽A扣接在主肢上且通过螺栓与主肢相连接,连接件的槽B扣接在另一片标准节的横杆上且通过螺栓进行连接,进而实现主肢与横杆的连接;且每个连接点采用两个连接件,连接件在主肢与横杆连接的角上设置有肋板P,肋板P的设置大大增加了标准节的刚度与稳定性。As shown in Figures 1 and 2, the connecting piece is used to connect the main limb of one standard section and the cross bar of another matching standard section. The slot A of the connecting piece is fastened to the main limb and connected to the main limb through bolts. , the slot B of the connecting piece is fastened to the crossbar of another standard section and connected by bolts, so as to realize the connection between the main limb and the crossbar; and each connection point uses two connecting pieces, and the connecting pieces are connected between the main limb and the crossbar. A rib plate P is arranged on the corner connected by the cross bar, and the setting of the rib plate P greatly increases the rigidity and stability of the standard joint.

Claims (4)

1.一种老楼快装式钢结构电梯片式井道标准节,由四个标准节片依次连接而成,四片标准节结构各不相同:一片包括一根主肢、上下两根横杆、左右两根门口立柱,上下两根横杆水平放置且一端与主肢连接,门口左右立柱安装在两根横杆中间;一片包括一根主肢,上下两根横杆水平放置且一端与主肢连接,上下两根横杆上安装有轿厢用T形导轨;一片包括一根主肢,上下两根横杆水平放置,一端与主肢连接;一片包括一根主肢,上下两根横杆水平放置,一端与主肢连接,两根横杆上各安装有一个轿厢—配重共用导轨架,导轨架与横杆组成的圈内部安装有两根配重用空心导轨,外部平行于横杆安装有一根轿厢用T型导轨;在主肢上安装有与另一片式标准节横杆相配的连接件用来连接两个钢结构电梯井道标准节;钢结构电梯井道标准节片与片之间的连接通过一种快速连接装置。1. A piece-type shaft standard section of a fast-installed steel structure elevator in an old building, which is formed by connecting four standard sections in sequence. The four standard sections have different structures: one piece includes a main limb and two upper and lower cross bars 1. There are two left and right door columns, the upper and lower horizontal bars are placed horizontally and one end is connected to the main limb, and the left and right columns of the door are installed between the two horizontal bars; one piece includes a main leg, and the upper and lower horizontal bars are placed horizontally and one end is connected to the main body. T-shaped guide rails for the car are installed on the upper and lower cross bars; one piece includes a main leg, the upper and lower cross bars are placed horizontally, and one end is connected to the main leg; one end includes a main leg, and the upper and lower two horizontal The rod is placed horizontally, one end is connected with the main limb, and a car-counterweight shared guide rail frame is installed on each of the two cross rods. Two hollow guide rails for counterweight are installed inside the circle formed by the guide rail frame and the cross rod, and the outside is parallel to the horizontal rail. A T-shaped guide rail for the car is installed on the pole; a connecting piece matching another piece of standard section crossbar is installed on the main limb to connect two steel structure elevator shaft standard sections; the steel structure elevator shaft standard section and piece The connection between them is through a quick connection device. 2.根据权利要求1所述的一种老楼快装式钢结构电梯片式井道标准节,其特征在于所述的钢结构电梯标准节有四节标准节片互相连接而成,标准节片中:一片包括一根主肢、上下两根横杆、两根门口立柱,上下两根横杆水平放置且一端与主肢连接,门口左右立柱安装在两根横杆中间;一片包括一根主肢,上下两根横杆水平放置且一端与主肢连接,上下两根横杆上安装有轿厢用T形导轨;一片包括一根主肢,上下两根横杆水平放置,一端与主肢连接;一片包括一根主肢,上下两根横杆水平放置,一端与主肢连接,两根横杆上各安装有一个轿厢—配重共用导轨架,导轨架与横杆组成的圈内部安装有两根配重用空心导轨,外部平行于主肢安装有一根轿厢用T型导轨。2. A kind of old building quick-installation steel structure elevator piece-type shaft standard section according to claim 1, characterized in that the steel structure elevator standard section has four standard sections connected to each other, and the standard section Middle: one piece consists of a main leg, two upper and lower cross bars, and two door posts, the upper and lower cross bars are placed horizontally and one end is connected to the main leg, and the left and right posts of the door are installed between the two cross bars; one piece includes a main The upper and lower crossbars are placed horizontally and one end is connected to the main limb. T-shaped guide rails for the car are installed on the upper and lower two crossbars; one piece includes a main limb, the upper and lower crossbars are placed horizontally, and one end is connected to the main limb Connection; one piece includes a main leg, two upper and lower cross bars are placed horizontally, one end is connected to the main leg, and a car-counterweight shared guide rail frame is installed on each of the two cross bars, inside the circle formed by the guide rail frame and the cross bar Two hollow guide rails for counterweight are installed, and a T-shaped guide rail for car is installed on the outside parallel to the main limb. 3.根据权利要求1所述的一种老楼快装式钢结构电梯片式井道标准节,其特征在于所述的主肢为一根方管,其一端设置有两片弯板组成的套筒,另一端设置有可供两片弯板组成的套筒连接的连接孔;每片弯板角度为90°且刚好与主肢配合,弯板垂直的两片板上各开有三个孔,不同板上的孔不在同一竖直平面内且连接时彼此不受影响;该构件的设置大大提高了电梯钢结构井道的组装速度。3. A piece-type shaft standard section of an old building quick-installed steel structure elevator according to claim 1, wherein the main limb is a square tube, and one end is provided with a sleeve composed of two bent plates. The other end is provided with a connection hole that can be connected by a sleeve composed of two bent plates; each bent plate has an angle of 90° and just fits with the main limb, and each of the two vertical bent plates has three holes. The holes on different plates are not in the same vertical plane and are not affected by each other when connected; the setting of this component greatly improves the assembly speed of the steel structure shaft of the elevator. 4.根据权利要求1所述的一种老楼快装式钢结构电梯片式井道标准节,其特征在于设计一连接件用来连接两个相邻的标准接片,连接件的一端扣接在主肢上且通过螺栓与主肢相连接,连接件的另一端扣接在另一片标准节的横杆上且通过螺栓进行连接,进而实现主肢与横杆的连接;且每个连接点采用两个连接件,连接件在主肢与横杆连接的角上设置有肋板,肋板的设置大大增加了标准节的刚度与稳定性。4. The piece-type hoistway standard section of a quick-installed steel structure elevator in an old building according to claim 1, wherein a connecting piece is designed to connect two adjacent standard pieces, and one end of the connecting piece is buckled On the main limb and connected with the main limb through bolts, the other end of the connecting piece is buckled on the crossbar of another standard section and connected through bolts, so as to realize the connection between the main limb and the crossbar; and each connection point Two connecting pieces are used, and the connecting piece is provided with a rib plate at the corner where the main limb is connected to the cross bar. The setting of the rib plate greatly increases the rigidity and stability of the standard joint.
CN201710392115.3A 2017-05-27 2017-05-27 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot Pending CN107089573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710392115.3A CN107089573A (en) 2017-05-27 2017-05-27 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710392115.3A CN107089573A (en) 2017-05-27 2017-05-27 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot

Publications (1)

Publication Number Publication Date
CN107089573A true CN107089573A (en) 2017-08-25

Family

ID=59638892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710392115.3A Pending CN107089573A (en) 2017-05-27 2017-05-27 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot

Country Status (1)

Country Link
CN (1) CN107089573A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107954296A (en) * 2017-10-20 2018-04-24 东南电梯股份有限公司 A kind of fabricated construction elevator shaft and elevator
CN108442949A (en) * 2018-05-03 2018-08-24 山东建筑大学 A kind of assembled pump house water-absorbing well support system and construction method
CN108726316A (en) * 2018-08-15 2018-11-02 项达林 Building-block-type lift hoistway and its installation method
CN108975131A (en) * 2018-09-28 2018-12-11 山东富士制御电梯有限公司 A kind of hoistway with steel structure standard knot connection structure
CN109138364A (en) * 2018-09-20 2019-01-04 上海三菱电梯有限公司 A kind of installation elevator shaft structure and its building method
CN109279480A (en) * 2018-11-02 2019-01-29 广州广日电梯工业有限公司 A kind of steel structure lift shaft splicing apparatus and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1114382A (en) * 1964-08-24 1968-05-22 Int Standard Electric Corp Goods elevator system
CN101423164A (en) * 2008-11-26 2009-05-06 卢元明 Construction elevator without cable for external-use
CN201786835U (en) * 2010-09-22 2011-04-06 浙江三禾纺织机械有限公司 Clip of pipelines
CN102060222A (en) * 2011-01-04 2011-05-18 张向阳 Elevator assembled by utilizing combination type derrick
CN202012542U (en) * 2011-05-11 2011-10-19 捷立机械有限公司 Combined fixed joint
CN102583130A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frame
CN105271018A (en) * 2015-09-30 2016-01-27 徐州建机工程机械有限公司 A detachable tower crane frame
CN205151449U (en) * 2015-11-17 2016-04-13 四川科成机电设备有限公司 No computer lab circular arc bbservation elevator
CN206798914U (en) * 2017-05-27 2017-12-26 山东富士制御电梯有限公司 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1114382A (en) * 1964-08-24 1968-05-22 Int Standard Electric Corp Goods elevator system
CN101423164A (en) * 2008-11-26 2009-05-06 卢元明 Construction elevator without cable for external-use
CN201786835U (en) * 2010-09-22 2011-04-06 浙江三禾纺织机械有限公司 Clip of pipelines
CN102060222A (en) * 2011-01-04 2011-05-18 张向阳 Elevator assembled by utilizing combination type derrick
CN102583130A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frame
CN202012542U (en) * 2011-05-11 2011-10-19 捷立机械有限公司 Combined fixed joint
CN105271018A (en) * 2015-09-30 2016-01-27 徐州建机工程机械有限公司 A detachable tower crane frame
CN205151449U (en) * 2015-11-17 2016-04-13 四川科成机电设备有限公司 No computer lab circular arc bbservation elevator
CN206798914U (en) * 2017-05-27 2017-12-26 山东富士制御电梯有限公司 A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107954296A (en) * 2017-10-20 2018-04-24 东南电梯股份有限公司 A kind of fabricated construction elevator shaft and elevator
CN108442949A (en) * 2018-05-03 2018-08-24 山东建筑大学 A kind of assembled pump house water-absorbing well support system and construction method
CN108442949B (en) * 2018-05-03 2023-09-26 山东建筑大学 A kind of prefabricated pump room suction well support system and construction method
CN108726316A (en) * 2018-08-15 2018-11-02 项达林 Building-block-type lift hoistway and its installation method
CN108726316B (en) * 2018-08-15 2023-09-12 项达林 Building block type elevator shaft installation method
CN109138364A (en) * 2018-09-20 2019-01-04 上海三菱电梯有限公司 A kind of installation elevator shaft structure and its building method
CN108975131A (en) * 2018-09-28 2018-12-11 山东富士制御电梯有限公司 A kind of hoistway with steel structure standard knot connection structure
CN109279480A (en) * 2018-11-02 2019-01-29 广州广日电梯工业有限公司 A kind of steel structure lift shaft splicing apparatus and method
CN109279480B (en) * 2018-11-02 2024-03-19 广州广日电梯工业有限公司 Steel structure elevator hoistway splicing device and method

Similar Documents

Publication Publication Date Title
CN107089573A (en) A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot
CN204715722U (en) A kind of all steel attachment type raise scaffold
CN103758024B (en) Quickly disassembled steel structure pedestrian bridge
CN104213707B (en) All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
CN206798914U (en) A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot
CN204940861U (en) Adjustable case beam side steel bracket
CN203347205U (en) Overhung scaffold
CN103352570B (en) Assembled construction gateway
CN204040437U (en) Cantilever tripod and single-row cantilever protection frame system
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN205186218U (en) All -purpose transport vechicle of fan blade girder
CN207177246U (en) A kind of elevated truss Mobile operating platform
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN206376514U (en) Tool climbing scaffold
CN205688778U (en) A kind of elevating scaffold special over sling structure
CN215107213U (en) Improved structure of vertical main frame of attached lifting scaffold
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN205012628U (en) It climbs a support body to add stationary
CN204531342U (en) Light-duty assembled elevator well support frame
CN205224568U (en) Safety protection lift platform
CN103899078B (en) Attachment automatic lifting protecting screen mounting method
CN202299365U (en) Vertical main framework structure of attached elevating scaffold
CN206126696U (en) A detachable indoor hoist for buckling restrained brace
CN104195954A (en) Overhead stand column construction platform without support and erecting method thereof
CN207905333U (en) Saddle combines Construction of Supporting hoistable platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825