CN107086002B - A kind of indoor ore drawing System and method for of multiple spot ore removal - Google Patents

A kind of indoor ore drawing System and method for of multiple spot ore removal Download PDF

Info

Publication number
CN107086002B
CN107086002B CN201710494301.8A CN201710494301A CN107086002B CN 107086002 B CN107086002 B CN 107086002B CN 201710494301 A CN201710494301 A CN 201710494301A CN 107086002 B CN107086002 B CN 107086002B
Authority
CN
China
Prior art keywords
ore
ore removal
machine
gear
worm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710494301.8A
Other languages
Chinese (zh)
Other versions
CN107086002A (en
Inventor
路增祥
张国建
张治强
常贯峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Liaoning USTL
Original Assignee
University of Science and Technology Liaoning USTL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Liaoning USTL filed Critical University of Science and Technology Liaoning USTL
Priority to CN201710494301.8A priority Critical patent/CN107086002B/en
Publication of CN107086002A publication Critical patent/CN107086002A/en
Application granted granted Critical
Publication of CN107086002B publication Critical patent/CN107086002B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery

Abstract

It is an object of the invention to solve the problems, such as that existing indoor ore drawing experiment scuppit shovels out ore to exist, it is proposed that a kind of indoor ore drawing System and method for of multiple spot ore removal belongs to simulation mine ore drawing technical field.The indoor ore drawing system of multiple spot ore removal includes ore removal device, ore removal machine hoistable platform, reciprocating mechanism, moves forward and backward mechanism and side-to-side movement mechanism;The left/right movement device moves forward and backward mechanism and is located on ore removal machine hoistable platform, and the ore removal device is connect with mechanism is moved forward and backward, the left/right movement device with move forward and backward mechanism and connect, the reciprocating mechanism is connect with ore removal machine hoistable platform.The system is by building ore removal machine hoistable platform, ore removal machine is installed on platform, hoistable platform is controlled by different power sources and carries out three-dimensional motion, realizes the multiple spot ore removal to the different location of multiple segmentations of indoor ore drawing device, multiple discharging tunnels or single discharging tunnel.

Description

A kind of indoor ore drawing System and method for of multiple spot ore removal
Technical field
The invention belongs to simulate mine ore drawing technical field, the more particularly to indoor ore drawing system of a kind of multiple spot ore removal and side Method.
Background technology
In sublevel caving room in ore drawing experiment, to overcome influence of the model casing boundary to ore drawing experiment effect, lead to It can often select and be at least made of there are three the above ore caving interval three ore removal routes, every route three segmentations, often segmentation Experimental model carries out ore drawing experiment.After ore removal, according to the ore total amount loaded in advance, shoveled out ore total amount and it is mixed into Barren rock amount therein, to analyze the loss late of ore and barren rock incorporation rate under different ro om -character parameters, research influences ore damage The factor of mistake rate and barren rock incorporation rate, it is final to provide foundation for stope structure parameter optimization.
In traditional indoor ore drawing experiment, ore removal mainly relies on manual type, using various forms of scuppits from simulation Discharging tunnel in, constantly shovel out and be filled in the ore in sublevel caving model casing to realize in advance, it is such go out There is following aspect in mine mode:
(1) shoveling depth can not be held well, this can have an impact the flow behavior of ore in model casing and barren rock, And then influence the loss late of ore and the incorporation rate of barren rock;
(2) ore in model casing is all shoveled out by what an artificial shovel, one shoveled, heavy workload, and experimental period is long;
(3) ore removal change in location is big, especially when ore removal position height smaller (ore removal segmentation reduces), testing crew frequency It is numerous to bend over, it is easy that it is made to generate fatigue.If model casing is placed in higher position, the ore removal of upper segment is because going out mine mouth position It sets higher, and causes inconvenience.
Invention content
It is an object of the invention to solve the problems, such as that existing indoor ore drawing experiment ore removal exists, it is proposed that a kind of multiple spot ore removal Indoor ore drawing System and method for.Ore removal machine is installed on platform, by building ore removal machine hoistable platform by not by the system With power source control hoistable platform carry out three-dimensional motion, realize multiple segmentations of indoor ore drawing device, multiple discharging tunnels or The multiple spot ore removal of the different location of single discharging tunnel.
A kind of indoor ore drawing system of multiple spot ore removal, including ore removal device, ore removal machine hoistable platform, reciprocating mechanism, Move forward and backward mechanism and side-to-side movement mechanism;
The left/right movement device moves forward and backward mechanism and is located on ore removal machine hoistable platform, the ore removal device with it is front and back Motion connects, and the left/right movement device is connect with mechanism is moved forward and backward, and the reciprocating mechanism is lifted with ore removal machine Platform connects;
Wherein, the reciprocating mechanism by four worm and gear (leading screw) elevator groups at the worm and gear (silk Thick stick) elevator is made of screw rod (leading screw), lifting nut and worm gear machine, and the worm gear machine is installed on ground, the screw rod (silk Thick stick) it is plugged in worm gear machine, the lifting nut is set on the screw rod (leading screw);The screw rod (leading screw) is in worm gear machine It is rotated by, drives the lifting nut on screw rod (leading screw) to realize and move up and down;Four elevators share a power source, lead to The forward or reverse of control power source is crossed, realizes rising or falling for ore removal machine hoistable platform;
Further, the power source is connect by shaft coupling with kinematic link, there are one the both ends of kinematic link respectively connect Steering gear, each steering gear are separately connected a Synchronous Transmission connecting rod again, and every Synchronous Transmission connecting rod is connect with two worm gear machines, To realize the up and down motion of four elevator synchronism stabilities;
Further, the reciprocating mechanism can also be replaced by hydraulic elevator, and four hydraulic elevators It is powered by a hydraulic power supply, to ensure the synchronization of four hydraulic elevator adjustable heights;
The ore removal machine hoistable platform is rectangular plane or frame, four angles of the platform respectively with it is described on move down The lifting nut of four worm and gear (leading screw) elevators of motivation structure or the top of hydraulic elevator are fixedly connected, by described The lifting of ore removal machine hoistable platform is realized in the lifting of reciprocating mechanism;Be additionally provided on the platform by mine funnel and positioned at by Hopper under mine funnel;
The side-to-side movement mechanism includes being set to the sliding rail on ore removal machine hoistable platform and on ore removal machine hoistable platform Worm and gear (leading screw) elevator being horizontally mounted, described worm and gear (leading screw) elevator being horizontally mounted includes worm gear Machine is plugged in parallel with sliding rail screw rod (leading screw) in worm gear machine, along the mobile movable part of screw rod (leading screw) and for worm gear machine The power source of power is provided, screw rod (leading screw) being rotated by worm gear machine drives the movable part on screw rod (leading screw) Part side-to-side movement;Preferably, the movable part is lifting nut;
The top for moving forward and backward mechanism and being located at side-to-side movement mechanism is the upward spur rack of the flank of tooth, the spur rack It is vertical with the sliding rail of side-to-side movement mechanism and screw rod, and one end of the spur rack and the worm and gear (leading screw) that is horizontally mounted The movable part of elevator is fixedly connected, and the other end is placed on sliding rail;In worm and gear (leading screw) up-and-down maneuver being horizontally mounted Under the drive in power source, the spur rack being fixedly connected with elevator movable component is along worm and gear (leading screw) elevator being horizontally mounted Screw rod and sliding rail move left and right;Preferably, the spur rack is equipped with size scale;
By mounting seat, the ore removal machine being located on mounting seat is fixedly connected the ore removal device with ore removal machine side Spade, be fixedly connected with spade for shoveling out the scraper bowl of ore, and under mounting seat, with closed block Gear forms;The spur rack for moving forward and backward mechanism is arranged in parallel with spade, and the gear is meshed with the rack of spur rack, Being rolled on spur rack by gear makes ore removal machine be moved forward and backward along spade direction, and can pass through the closed block on gear Ore removal machine is fixed on and is moved forward and backward in mechanism;
Further, described to realize that the indoor ore drawing system of multiple spot ore removal further includes ore case, the ore case is babinet, Include several segmentations from top to bottom, each segmentation is equipped with several ore removal step pitches, and several in the setting of the lower parallel of each segmentation Discharging tunnel, the access adit of the discharging tunnel by ore case same side opening;Elevator is arranged in the tunnel of ore case The side of mouth.
A kind of indoor ore drawing method of multiple spot ore removal, uses the indoor ore drawing device of above-mentioned multiple spot ore removal, including such as Lower step:
The first step carries out ore filling to ore case, and carries out ore drawing experiment;
Second step after the completion of ore drawing, first starts the power source of worm and gear (leading screw) elevator, and adjustment ore removal machine height makes Ore removal mechanical shovel bucket bottom and after needing the discharging tunnel bottom of ore removal to be located at sustained height, closing power source;Then start horizontal peace Worm and gear (leading screw) elevator power source of dress after moving ore removal mechanical shovel bucket to the access adit for needing ore removal, closes power source; Finally manually adjusting back-and-forth motion mechanism makes ore removal machine be moved forward and backward, and so that scraper bowl is entered tunnel and reaches target shoveling depth;
Third walks, and manually adjusts ore removal machine and scraper bowl is removed tunnel, start ore removal, until this ore locations ore removal terminates;
Ore removal machine is moved to next ore locations by the program of the second to three steps and carries out ore removal, until ore removal is real by the 4th step Test end.
Compared with prior art, the invention has the advantages that:
1, in sublevel caving method room in ore drawing experiment, ore removal machine, can be according to ore removal lane in the ore removal of single discharging tunnel The width match condition of the width and ore removal mechanical shovel bucket in road, in same discharging tunnel realization single-point, 2 points or 3 ore removals, and into When 2 points of row or 3 ore removals, orderly ore removal can be realized according to certain rules, achievees the purpose that uniform ore drawing, advantageously reduces The loss late and the rate of dilution of ore;
2, the single-point or multiple spot ore removal in the different discharging tunnels of same segmentation can be realized, while can also realize difference The single-point or multiple spot ore removal of the different discharging tunnels of segmentation;
3, in ore drawing experimentation, after the completion of the ore removal task of first ore removal step pitch, ore removal machine is manually adjusted backward It is mobile, so that scraper bowl is entered tunnel and reach the target shoveling depth of second ore removal step pitch, realizes the adjustment of ore removal step pitch;
4, shoveling depth existing for artificial ore removal in ore drawing experimentation can be overcome in sublevel caving method room not easy to control The shortcomings that, it is ensured that each ore removal can carry out ore removal according to the shoveling depth of design, meanwhile, alleviate the muscle power of experimenter Labour.
Description of the drawings
The right side structural representation of Fig. 1, the present apparatus:
The overlooking structure diagram of Fig. 2, the present apparatus;
Wherein, 1, ore removal machine, 2, ore removal machine hoistable platform, 3, segmentation, 4, spur rack, 5, ore removal step pitch, 6, ore case;
11, mounting seat, 12, spade, 13, scraper bowl, 14, gear, 21, by mine funnel, 22, hopper, 31, screw rod (silk Thick stick), 32, lifting nut, 33, worm gear machine, 34, motor, 35, shaft coupling, 36, kinematic link, 37, steering gear, 51, sliding rail, 52, Horizontal worm and gear (leading screw) elevator, 53, horizontal worm and gear (leading screw) elevator worm gear machine, 54, horizontal worm and gear (silk Thick stick) elevator nut, 55, horizontal worm and gear (leading screw) elevator screw rod (leading screw), 61, discharging tunnel.
Specific implementation mode
Embodiment 1
A kind of indoor ore drawing system of multiple spot ore removal, as shown in Fig. 1~2, including ore removal machine 1, ore removal machine hoistable platform 2, Reciprocating mechanism moves forward and backward mechanism and side-to-side movement mechanism;
Wherein, the reciprocating mechanism is connect with ore removal machine hoistable platform 2;The reciprocating mechanism is by four worm gears Worm screw (leading screw) elevator group is at worm and gear (leading screw) elevator is by screw rod (leading screw) 31, lifting nut 32 and worm gear Machine 33 forms, and the worm gear machine 33 is installed on ground, and the screw rod (leading screw) 31 is plugged in worm gear machine 33, the lifting spiral shell Mother 32 is set on the screw rod (leading screw) 31;31 being rotated by worm gear machine 33 of screw rod (leading screw) drives screw rod Lifting nut 32 on (leading screw) 31, which is realized, to move up and down;Four elevators share a power source, that is, motor 34, and motor 34 is logical It crosses shaft coupling 35 to connect with kinematic link 36, the both ends of kinematic link respectively connect there are one steering gear 37, and steering gear 37 connects respectively again A Synchronous Transmission connecting rod 36 is connect, every Synchronous Transmission connecting rod 36 is connect with two worm gear machines 33, to realize four elevators The up and down motion of synchronism stability;By controlling the forward and backward of motor 34, the ascending, descending of ore removal machine hoistable platform 2 is realized;
The ore removal machine hoistable platform 2 be rectangular plane or frame, four angles respectively with the reciprocating mechanism The lifting nut 32 of four worm and gear (leading screw) elevators is fixedly connected, and by the lifting of reciprocating mechanism, realizes ore removal The lifting of machine hoistable platform 2;It is additionally provided on the platform 2 by mine funnel 21 and positioned at by the hopper 22 under mine funnel 21;
The side-to-side movement mechanism include be set to ore removal machine hoistable platform 2 on sliding rail 51 and be set to ore removal machine hoistable platform Horizontal worm and gear (leading screw) elevator 52 being horizontally mounted on 2, horizontal worm and gear (leading screw) elevator 52 include Worm gear machine 53, the screw rod parallel with sliding rail (leading screw) 55, the nut 54 and power source for moving along screw rod i.e. side-to-side movement;
The top for moving forward and backward mechanism and being located at side-to-side movement mechanism is that the flank of tooth is put down upwards, with the ore removal mechanical shovel handle Capable spur rack 4, the spur rack 4 is vertical with sliding rail 51 and screw rod (leading screw) 55 of side-to-side movement mechanism, and the straight-tooth One end of item 4 is fixedly connected with the movable part (nut) 54 of horizontal worm and gear (leading screw) elevator 52, and the other end is placed in cunning On rail 51;Under the drive of 52 power source of horizontal worm and gear (leading screw) elevator, it is fixedly connected with 52 nut 54 of elevator Spur rack 4 is moved left and right along the screw rod (leading screw) 55 and sliding rail 51 of horizontal worm and gear (leading screw) elevator 52;The spur rack 4 It is equipped with size scale;
The ore removal device is by mounting seat 11, and the ore removal machine 1 being located on mounting seat 11 is solid with 1 side of ore removal machine Surely the spade 12 connected, the scraper bowl 13 for shoveling out ore being fixedly connected with spade 12, and under mounting seat 11, Gear 14 with closed block forms;The spur rack 4 for moving forward and backward mechanism is arranged in parallel with spade 12, the gear 14 It is meshed with the rack of spur rack 4, rolls on spur rack 4 that so that ore removal machine 1 is done along 12 direction of spade front and back by gear 14 Movement, and ore removal machine 1 can be fixed on by the closed block on gear 14 and be moved forward and backward in mechanism;
The indoor ore drawing system of the multiple spot ore removal further includes ore case 6, and the ore case 6 is babinet, is wrapped from top to bottom Several segmentations 3 are included, each segmentation is equipped with several ore removal step pitches 5, and several discharging tunnels are arranged in the lower parallel of each segmentation 61, the access adit of the discharging tunnel 61 is in the same side opening of ore case;Elevator is arranged in the discharging tunnel of ore case 1 The side of mouth.
Using the indoor ore drawing method of the multiple spot ore removal of above-mentioned apparatus, include the following steps:
The first step carries out ore filling to ore drawing ore case, and carries out ore drawing work;
Second step after the completion of ore drawing, first starts the power source of reciprocating mechanism, and adjustment ore removal machine height makes ore removal mechanical shovel Bucket bottom and after needing the discharging tunnel bottom plate of ore removal to be located at sustained height, closing power source;Then start horizontal worm and gear (silk Thick stick) elevator power source, after moving ore removal mechanical shovel bucket to the access adit for needing ore removal, close power source;Last manual control goes out Mine machine is moved forward and backward, and so that scraper bowl is entered tunnel and is reached target shoveling depth;
Third walks, and manually adjusts ore removal machine and scraper bowl is removed tunnel, start ore removal, until this ore locations ore removal terminates;
Ore removal machine is moved to next ore locations by the program of the second to three steps and carries out ore removal, until ore removal knot by the 4th step Beam.
Embodiment 2
A kind of indoor ore drawing system for realizing multiple spot ore removal, structure with embodiment 1, difference lies in:Reciprocating mechanism by Four hydraulic elevators replace, and four hydraulic elevators are powered by a hydraulic power supply, ore removal machine hoistable platform Four angles be fixedly connected respectively with the top of the hydraulic elevator, to ensure the same of four hydraulic elevator adjustable heights Step.

Claims (8)

1. a kind of indoor ore drawing system of multiple spot ore removal, which is characterized in that including ore removal device, ore removal machine hoistable platform, up and down Mobile mechanism moves forward and backward mechanism and side-to-side movement mechanism;
The reciprocating mechanism by four worm and gear elevator groups at;The worm and gear elevator is by screw rod, lifting spiral shell Female and worm gear machine composition, the worm gear machine are installed on ground, and the screw rod is plugged in worm gear machine, and the lifting nut is set in On the screw rod;The screw rod is rotated by worm gear machine, and the lifting nut on screw rod is driven to move up and down;Four liftings Machine shares a 1# power source for providing power for elevator;
The ore removal machine hoistable platform is rectangular plane or frame, and four angles of the platform move up and down machine with described respectively The lifting nut of four worm and gear elevators of structure is fixedly connected, and by the lifting of reciprocating mechanism, realizes ore removal machine liter The lifting of platform is dropped;It is additionally provided on the ore removal machine hoistable platform by mine funnel and positioned at by the hopper under mine funnel;
The side-to-side movement mechanism includes the sliding rail being set on ore removal machine hoistable platform and the water on ore removal machine hoistable platform The worm and gear elevator of safety dress, the worm and gear elevator being horizontally mounted include worm gear machine, are plugged in worm gear machine The screw rod parallel with the sliding rail is set in the movable part of screw rod and provides power for the worm and gear elevator being horizontally mounted 2# power sources;The screw rod is rotated by worm gear machine, drives the movable part side-to-side movement on screw rod;
The top for moving forward and backward mechanism and being located at side-to-side movement mechanism is the upward spur rack of the flank of tooth, the spur rack and a left side The sliding rail and screw rod of right motion are vertical, and the work of one end of the spur rack and the worm and gear elevator being horizontally mounted Dynamic component is fixedly connected, and the other end is placed on sliding rail;Under the drive of the 2# power sources, with the worm gear snail being horizontally mounted The screw rod and sliding rail for the worm and gear elevator that the spur rack that bar elevator movable component is fixedly connected is horizontally mounted described in are left It moves right;
The ore removal device is by mounting seat, the ore removal machine being located on mounting seat, the shovel being fixedly connected with ore removal machine side Handle, the scraper bowl for shoveling out ore being fixedly connected with spade, and the gear under mounting seat, with closed block Composition;The spade is arranged in parallel with the spur rack for moving forward and backward mechanism, and the gear is meshed with the rack of the spur rack, Being rolled on spur rack by gear makes ore removal machine be moved forward and backward along spade direction, and will by the closed block on gear Ore removal machine, which is fixed on, to move forward and backward in mechanism.
2. a kind of indoor ore drawing system of multiple spot ore removal according to claim 1, which is characterized in that the 1# power sources are logical It crosses shaft coupling to connect with kinematic link, the both ends of kinematic link respectively connect there are one steering gear, and each steering gear is separately connected one again Root Synchronous Transmission connecting rod, every Synchronous Transmission connecting rod are connect with two worm gear machines.
3. a kind of indoor ore drawing system of multiple spot ore removal according to claim 1, which is characterized in that described moves up and down Mechanism is four hydraulic elevators, and four angles of the ore removal machine hoistable platform are fixedly connected with hydraulic elevator top, and Four hydraulic elevators are powered by a hydraulic power supply.
4. a kind of indoor ore drawing system of multiple spot ore removal according to claim 1, which is characterized in that the side-to-side movement machine The movable part of structure is lifting nut.
5. a kind of indoor ore drawing system of multiple spot ore removal according to claim 1, which is characterized in that described to move forward and backward machine The spur rack of structure is equipped with size scale.
6. a kind of indoor ore drawing system of multiple spot ore removal as claimed in any of claims 1 to 5, which is characterized in that The system also includes ore casees.
7. a kind of indoor ore drawing system of multiple spot ore removal according to claim 6, which is characterized in that the ore case is case Body includes several segmentations from top to bottom, and each segmentation is equipped with several ore removal step pitches, and number is arranged in the lower parallel of each segmentation A discharging tunnel, the access adit of the discharging tunnel is in the same side opening of ore case;The worm gear of the reciprocating mechanism Worm screw elevator is located at the side equipped with access adit of ore case.
8. a kind of indoor ore drawing method of multiple spot ore removal, using the indoor ore drawing system of the multiple spot ore removal described in claim 6 or 7 System, which is characterized in that include the following steps:
The first step carries out ore filling to ore case, and carries out ore drawing experiment;
Second step after the completion of ore drawing, first starts the power source of reciprocating mechanism, and adjustment ore removal machine height makes scraper bowl bottom and needs After the discharging tunnel bottom of ore removal is located at sustained height, the power source is closed;Then start the worm and gear lifting being horizontally mounted The power source is closed in mechanomotive force source after moving scraper bowl to the access adit for needing ore removal;Last manual control, which is moved forward and backward mechanism, to be made Ore removal machine is moved forward and backward, and the scraper bowl of ore removal machine enters tunnel and reaches target shoveling depth;
Third walks, and manually adjusts ore removal machine back-and-forth motion mechanism and scraper bowl is removed tunnel, start ore removal, until this ore locations ore removal Terminate;
Ore removal machine is moved to next ore locations by the program of the second to three steps and carries out ore removal by the 4th step, until ore removal experiment knot Beam.
CN201710494301.8A 2017-06-26 2017-06-26 A kind of indoor ore drawing System and method for of multiple spot ore removal Active CN107086002B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710494301.8A CN107086002B (en) 2017-06-26 2017-06-26 A kind of indoor ore drawing System and method for of multiple spot ore removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710494301.8A CN107086002B (en) 2017-06-26 2017-06-26 A kind of indoor ore drawing System and method for of multiple spot ore removal

Publications (2)

Publication Number Publication Date
CN107086002A CN107086002A (en) 2017-08-22
CN107086002B true CN107086002B (en) 2018-11-02

Family

ID=59606493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710494301.8A Active CN107086002B (en) 2017-06-26 2017-06-26 A kind of indoor ore drawing System and method for of multiple spot ore removal

Country Status (1)

Country Link
CN (1) CN107086002B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201140938Y (en) * 2007-11-27 2008-10-29 灵宝市金源矿业有限责任公司 Lifting type drawing chute
CN201443403U (en) * 2009-06-24 2010-04-28 鞍钢集团矿业公司 Hydraulic control ore drawing device
CN201559978U (en) * 2009-09-30 2010-08-25 长沙有色冶金设计研究院 Toothed gate vibration ore drawing machine
CN203531902U (en) * 2013-10-16 2014-04-09 湖南宝山有色金属矿业有限责任公司 Two-piece type vibratory ore drawing hopper with adjustable height
US9378663B2 (en) * 2011-06-27 2016-06-28 Caterpillar Inc. Method and system for mapping terrain using machine parameters
CN205827772U (en) * 2016-03-30 2016-12-21 昆明理工大学 A kind of simulation ore drawing assay device
CN206148053U (en) * 2016-08-22 2017-05-03 昆明理工大学 Experimental ore device of putting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201140938Y (en) * 2007-11-27 2008-10-29 灵宝市金源矿业有限责任公司 Lifting type drawing chute
CN201443403U (en) * 2009-06-24 2010-04-28 鞍钢集团矿业公司 Hydraulic control ore drawing device
CN201559978U (en) * 2009-09-30 2010-08-25 长沙有色冶金设计研究院 Toothed gate vibration ore drawing machine
US9378663B2 (en) * 2011-06-27 2016-06-28 Caterpillar Inc. Method and system for mapping terrain using machine parameters
CN203531902U (en) * 2013-10-16 2014-04-09 湖南宝山有色金属矿业有限责任公司 Two-piece type vibratory ore drawing hopper with adjustable height
CN205827772U (en) * 2016-03-30 2016-12-21 昆明理工大学 A kind of simulation ore drawing assay device
CN206148053U (en) * 2016-08-22 2017-05-03 昆明理工大学 Experimental ore device of putting

Also Published As

Publication number Publication date
CN107086002A (en) 2017-08-22

Similar Documents

Publication Publication Date Title
CN104674856B (en) Base Pit Excavation Simulation device when hypergravity
CN205314994U (en) Coal -winning machine simulation cut experimental apparatus
CN107093364B (en) The more segmentation interiors ore drawing device and method of automatic height adjustment and bottom structure
CN107855272A (en) A kind of hydraulic engineering construction sand screening installation
CN107086002B (en) A kind of indoor ore drawing System and method for of multiple spot ore removal
CN207571960U (en) A kind of indoor ore drawing system of multiple spot ore removal
CN206707224U (en) A kind of intelligent metope scraping device
CN207327068U (en) A kind of Simple lifting vegetable drug cutter device
CN206756824U (en) It is a kind of to be easy to the soil testing assemblies that depth fetches earth
CN206319615U (en) Thin layer RPC intelligence paving system
CN206431130U (en) A kind of experimental rig for being used to test landslide stress state on sliding surface
CN104849432A (en) Strip mine rock step bedded slope landslide monitoring model
CN207216944U (en) More segmentation interiors ore drawing device of automatic height adjustment and polycrystalline substance
CN109372513B (en) Statistical device and method for top coal discharge rate and gangue content of gangue flow
CN206513043U (en) The scaffold of architectural engineering
CN110666947A (en) Automatic material distributing machine
CN207538833U (en) Pick, anchor, the integrated pick Anchor Care machine of shield
CN206391479U (en) Feather ball collection arrangement
CN110004810A (en) Road construction tamping apparatus
CN108149552A (en) A kind of earth shoulder constructing device
CN204874468U (en) White spirit of applicable a wide range of wine rice steamer is made rice steamer and is shed machine
CN108593383A (en) Material laying apparatus in a kind of simulation of metallic ore gongwu and its multi-function vehicle
CN107882335A (en) A kind of intelligent greenhouse feeding, rammed earth, walling all-in-one
CN207365090U (en) A kind of fire coal feed arrangement
CN216560581U (en) Soil-rock mixture landslide model test device capable of adjusting form of sliding bed

Legal Events

Date Code Title Description