CN107067174A - 一种基于bim的分布式能源系统三维设计评估方法 - Google Patents
一种基于bim的分布式能源系统三维设计评估方法 Download PDFInfo
- Publication number
- CN107067174A CN107067174A CN201710240357.0A CN201710240357A CN107067174A CN 107067174 A CN107067174 A CN 107067174A CN 201710240357 A CN201710240357 A CN 201710240357A CN 107067174 A CN107067174 A CN 107067174A
- Authority
- CN
- China
- Prior art keywords
- model
- project
- points
- distributed energy
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种基于BIM的分布式能源系统三维设计评估方法,包括步骤:S101,使用Revit三维设计软件进行分布式能源设备模型建模和集成设计,其中分布式能源设备模型包括原动机模型和主要设备模型;S102,使用Navisworks模型浏览软件进行软件的检查和审核;S103,针对已建或在建的项目,根据搭建的模型,模拟实际的施工情况,从模型搭建中找出施工的实际问题,并改进改善模型库。还包括对系统模型的工程量、工程进度和工程顺序分析,以及结构或者管道的碰撞预警及修改。
Description
技术领域
本发明属于新能源技术领域,特别涉及一种基于BIM的分布式能源系统三维设计评估方法。
背景技术
分布式能源技术目前正处在一个高速发展的状态,由于其使用清洁能源进行高效利用的原理,全球各国都在大力支持该领域技术的发展和实际运用,并提供一定的优惠政策,在这样的背景下,对于分布式能源系统的设计及实施规模也变得日趋庞大和复杂。
传统的分布式能源系统设计,仍旧是基于AutoCAD的二维图纸设计模式,这样的设计渐渐无法满足复杂系统的可见性要求,对于后期图纸定稿之后的施工形成了很多困难,前期无法预计的管道碰撞、工程顺序紊乱以及工程量的估计不足,都会一定程度的影响整个工程的投资成本。
BIM技术(Building Information Modeling“建筑信息模型”)是在AutoCAD等技术基础上发展起来的多维模型信息集成技术,是对建筑工程物理特征和功能特性信息的数字化描述,并利用这些数字化信息创建数字化模型,对建设项目设计、施工和运营全过程进行可视化表达和管理。这一技术目前主要运用于建筑行业,并在我国有一定的发展基础:国家体育场、青岛海湾大桥、广州西塔等工程项目成功实现4D施工动态集成管理。上海中心项目工程总承包招标,明确要求应用BIM技术。上海金融交易广场和广联达信息大厦项目都已规划面向建筑生命期的BIM应用整体方案,并在方案设计阶段就引入了BIM技术。这些大型工程项目的首当其冲,引起了设计、施工企业的广泛关注,势必对我国建筑业BIM技术的广泛应用起到重要的示范作用。
发明内容
本发明所要解决的技术问题,就是通过将BIM技术运用到分布式能源系统设计领域,提升目前分布式能源系统设计的可视化程度,从而提高分布式能源系统的工程预评估能力,在设计阶段就可以对整个系统的工程量、工程进度、工程顺序有一个比较准确的判断。
本发明的技术方案是,基于BIM的分布式能源系统三维设计评估方法,包括以下步骤:
S101,使用Revit三维设计软件进行分布式能源设备模型建模和集成设计,其中分布式能源设备模型包括原动机模型和主要设备模型;
S102,使用Navisworks模型浏览软件进行软件的检查和审核;
S103,针对已建或在建的项目,根据搭建的模型,模拟实际的施工情况,从模型搭建中找出施工的实际问题,并改进改善模型库。
进一步的,还包括对系统模型的工程量、工程进度和工程顺序分析,以及结构或者管道的碰撞预警及修改。
分布式能源系统的工程经济性评估值:F=Ft+Fq
其中,F是分布式能源系统项目经济性的标准积分,分值分类如下,
100-80:优秀项目,
80-60:一定经济性项目,
60-40:考虑只供设备,不参与总包的项目,
40分以下:经济性不良项目,
Ft:工程进度时间积分,分值分类如下,
按规模区分,装机容量10MW以下的项目:
6个月-9个月:50分,
9个月-1年:40分,
1年-2年:30分,
2年以上:10分,
装机容量10MW以上的项目:
9个月-1.5年:50分,
1.5年-2年:40分,
2年-3年:30分,
3年以上:10分,
Fq:工程量积分,以相对机型的标准预估价为基础,工程量得出成本价格与标准预估价基本持平的为50分,每降低10%加10分,每升高10%减10分。
工程进度控制中,项目分类包括土方工程、护坡工程、地基处理、基础工程、主体工程、二次结构砌体、门窗工程、抹灰工程、屋面工程、外装、内装、给排水工程、消防工程、电气工程、高低压配电工程、暖通工程、电梯工程和弱电工程。
本发明在分布式能源系统设计中运用三维技术的软件和族库,使用Revit建筑建模软件,配合新建分布式能源主要设备模型库,从而以设备族库为基础可以进行分布式能源系统的三维模型搭建。在模型搭建完成后,连接的附件(管道、阀门等)可以通过软件很方便的作出工程量计算。三维搭建的模型可以自动检查结构干涉部分,方便做修改和调整,还可以模拟整个工程的实际安装顺序,对实施工程有一个预判的效果。
具体实施方式
本发明的基于BIM的分布式能源系统三维设计方法,包括以下步骤:
S101,使用Revit三维设计软件进行分布式能源设备模型建模和集成设计,其中分布式能源设备模型包括原动机模型和主要设备模型;
S102,使用Navisworks模型浏览软件进行软件的检查和审核;
S103,针对已建或在建的项目,根据搭建的模型,模拟实际的施工情况,从模型搭建中找出施工的实际问题,并改进改善模型库;
S104,对系统模型的工程量、工程进度和工程顺序分析,以及结构或者管道的碰撞预警及修改。
本发明中分布式能源系统的工程经济性评估标准公式F=Ft+Fq
F:评价一个项目经济性的标准积分
100-80:优秀项目
80-60:一定经济性项目
60-40:考虑只供设备不参与总包(包括供设备、安装、调试、试运行等)的项目
40分以下:经济性不良项目
Ft:工程进度时间积分
按规模区分,装机容量10MW以下的项目:
6个月-9个月:50分
9个月-1年:40分
1年-2年:30分
2年以上:10分
装机容量10MW以上的项目:
9个月-1.5年:50分
1.5年-2年:40分
2年-3年:30分
3年以上:10分
Fq:工程量积分
以相对机型的标准预估价为基础,工程量得出成本价格与标准预估价基本持平的为50分,每降低10%加10分,每升高10%减10分。
例:400kW内燃机发电机组,工程造价约320万元(整个工程的预估价),通过BIM技术搭建分布式能源系统模型,统计工程量(管道、阀门、仪表等),得出工程造价400万元。高出该型号机组预估价25%,则工程量积分在50分基础上减20分。
Claims (4)
1.一种基于BIM的分布式能源系统三维设计评估方法,其特征在于,包括以下步骤:
S101,使用Revit三维设计软件进行分布式能源设备模型建模和集成设计,其中分布式能源设备模型包括原动机模型和主要设备模型;
S102,使用Navisworks模型浏览软件进行软件的检查和审核;
S103,针对已建或在建的项目,根据搭建的模型,模拟实际的施工情况,从模型搭建中找出施工的实际问题,并改进改善模型库。
2.如权利要求1所述的基于BIM的分布式能源系统三维设计评估方法,其特征在于,还包括对系统模型的工程量、工程进度和工程顺序分析,以及结构或者管道的碰撞预警及修改。
3.如权利要求2所述的基于BIM的分布式能源系统三维设计评估方法,其特征在于,
分布式能源系统的工程经济性评估值:F=Ft+Fq
其中,F是分布式能源系统项目经济性的标准积分,分值分类如下,
100-80:优秀项目,
80-60:一定经济性项目,
60-40:考虑只供设备,不参与总包的项目,
40分以下:经济性不良项目,
Ft:工程进度时间积分,分值分类如下,
按规模区分,装机容量10MW以下的项目:
6个月-9个月:50分,
9个月-1年:40分,
1年-2年:30分,
2年以上:10分,
装机容量10MW以上的项目:
9个月-1.5年:50分,
1.5年-2年:40分,
2年-3年:30分,
3年以上:10分,
Fq:工程量积分,以相对机型的标准预估价为基础,工程量得出成本价格与标准预估价基本持平的为50分,每降低10%加10分,每升高10%减10分。
4.如权利要求3所述的基于BIM的分布式能源系统三维设计评估方法,其特征在于,
工程进度控制中,项目分类包括土方工程、护坡工程、地基处理、基础工程、主体工程、二次结构砌体、门窗工程、抹灰工程、屋面工程、外装、内装、给排水工程、消防工程、电气工程、高低压配电工程、暖通工程、电梯工程和弱电工程。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710240357.0A CN107067174A (zh) | 2017-04-13 | 2017-04-13 | 一种基于bim的分布式能源系统三维设计评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710240357.0A CN107067174A (zh) | 2017-04-13 | 2017-04-13 | 一种基于bim的分布式能源系统三维设计评估方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107067174A true CN107067174A (zh) | 2017-08-18 |
Family
ID=59599433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710240357.0A Pending CN107067174A (zh) | 2017-04-13 | 2017-04-13 | 一种基于bim的分布式能源系统三维设计评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107067174A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108364134A (zh) * | 2018-02-11 | 2018-08-03 | 武汉理工大学 | 基于bim技术的建筑工程成本管理系统 |
CN108428196A (zh) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | 基于bim装配式建筑构件的装车顺序确定方法及装置 |
CN108711773A (zh) * | 2018-06-07 | 2018-10-26 | 武汉鑫科信科技有限公司 | 一种建筑物综合布线设备间的设计方法 |
CN110427675A (zh) * | 2019-07-23 | 2019-11-08 | 江西博微新技术有限公司 | 一种用于三维设计评审的数据检测方法 |
CN110865615A (zh) * | 2019-11-05 | 2020-03-06 | 深圳供电局有限公司 | 一种能源分析方法及系统 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093017A (zh) * | 2011-11-04 | 2013-05-08 | 新奥科技发展有限公司 | 分布式能源系统设计方法 |
CN103337005A (zh) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | 一种工程进度及造价管理系统的管理方法 |
KR20130134908A (ko) * | 2012-05-31 | 2013-12-10 | 주식회사 썬앤라이트 | 웹을 활용한 에너지 성능 분석 시스템 및 방법 |
KR20150125457A (ko) * | 2014-04-30 | 2015-11-09 | 한양대학교 에리카산학협력단 | 건축물 평가를 위한 bim 기반 인증 평가 시스템 및 방법 |
CN105868440A (zh) * | 2016-03-21 | 2016-08-17 | 扬州大学 | 一种基于bim技术的建设工程数据建模方法 |
CN106022587A (zh) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | 一种基于挣值原理的bim项目进度及成本管理系统 |
CN106202831A (zh) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | 一种基于bim的管线综合优化方法 |
-
2017
- 2017-04-13 CN CN201710240357.0A patent/CN107067174A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093017A (zh) * | 2011-11-04 | 2013-05-08 | 新奥科技发展有限公司 | 分布式能源系统设计方法 |
KR20130134908A (ko) * | 2012-05-31 | 2013-12-10 | 주식회사 썬앤라이트 | 웹을 활용한 에너지 성능 분석 시스템 및 방법 |
CN103337005A (zh) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | 一种工程进度及造价管理系统的管理方法 |
KR20150125457A (ko) * | 2014-04-30 | 2015-11-09 | 한양대학교 에리카산학협력단 | 건축물 평가를 위한 bim 기반 인증 평가 시스템 및 방법 |
CN105868440A (zh) * | 2016-03-21 | 2016-08-17 | 扬州大学 | 一种基于bim技术的建设工程数据建模方法 |
CN106022587A (zh) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | 一种基于挣值原理的bim项目进度及成本管理系统 |
CN106202831A (zh) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | 一种基于bim的管线综合优化方法 |
Non-Patent Citations (1)
Title |
---|
向乐乐: "《工程项目审计》", 28 February 2012, 西南交通大学出版社 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108428196A (zh) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | 基于bim装配式建筑构件的装车顺序确定方法及装置 |
CN108428196B (zh) * | 2017-08-12 | 2021-12-17 | 中民筑友科技投资有限公司 | 基于bim装配式建筑构件的装车顺序确定方法及装置 |
CN108364134A (zh) * | 2018-02-11 | 2018-08-03 | 武汉理工大学 | 基于bim技术的建筑工程成本管理系统 |
CN108364134B (zh) * | 2018-02-11 | 2021-07-23 | 武汉理工大学 | 基于bim技术的建筑工程成本管理系统 |
CN108711773A (zh) * | 2018-06-07 | 2018-10-26 | 武汉鑫科信科技有限公司 | 一种建筑物综合布线设备间的设计方法 |
CN110427675A (zh) * | 2019-07-23 | 2019-11-08 | 江西博微新技术有限公司 | 一种用于三维设计评审的数据检测方法 |
CN110427675B (zh) * | 2019-07-23 | 2023-01-03 | 江西博微新技术有限公司 | 一种用于三维设计评审的数据检测方法 |
CN110865615A (zh) * | 2019-11-05 | 2020-03-06 | 深圳供电局有限公司 | 一种能源分析方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107067174A (zh) | 一种基于bim的分布式能源系统三维设计评估方法 | |
CN103093061B (zh) | 一种地铁机电工程综合管线碰撞优化方法 | |
CN204303029U (zh) | 用于地铁管线碰撞检测及后期运营维护的bim数据库系统 | |
Fabbri et al. | Heritage buildings and energy performance: Mapping with GIS tools | |
Ho et al. | Non-agricultural land use in post-reform China | |
Lou et al. | Study on construction quality control of urban complex project based on BIM | |
CN105117573B (zh) | 基于cad排水管网图纸信息的自动水力模型构建方法 | |
CN107808349A (zh) | 基于bim技术的既有建筑运维管理系统 | |
CN106446033A (zh) | 地下管线安全隐患信息管理系统及方法 | |
Wei et al. | Application of BIM technology in building water supply and drainage design | |
CN108257447A (zh) | 基于虚拟现实的气象雷达实训控制系统及方法、计算机 | |
Xiaer et al. | Design for safety (DFS) and building information modeling (BIM): A review | |
CN106651186A (zh) | 一种城市规划管控处理方法及系统 | |
Yu | Characteristics and Application Analysis of Building Design Based on Parametric BIM [J] | |
Chen et al. | The application of BIM technology in a comprehensive experimental building project | |
Duan | Research on the efficiency path of civil construction management engineering based on BIM technology | |
CN112580186A (zh) | 生成营销侧供电设备gis图的方法 | |
Chen | Design and optimization of construction equipment pipelines in cigarette factories based on BIM technology | |
Ting | Application of BIM Technology in Exhibition Complex Project of China Expo | |
Ou et al. | A BIM-based estimator for carbon emissions of a building at design stage | |
Wu | Application of BIM+ big data in the whole life cycle of engineering project | |
Liu et al. | Integration of Civil Engineering Intelligent Building Data System Based on BIM Technology | |
Na et al. | Application Research of Green Building Design System Based on BIM Technology | |
Miao et al. | Effect of Linear Building Blocks on the Wind Environment of Streets between High-Rise Buildings A case of Hong Kong | |
Yang et al. | Design, Modeling and Application of BIM Data Model Based on 3D Collaboration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |