CN107062727A - A kind of freezing and refrigeration cabinet performance testing device artificial snow-making system - Google Patents

A kind of freezing and refrigeration cabinet performance testing device artificial snow-making system Download PDF

Info

Publication number
CN107062727A
CN107062727A CN201710191371.6A CN201710191371A CN107062727A CN 107062727 A CN107062727 A CN 107062727A CN 201710191371 A CN201710191371 A CN 201710191371A CN 107062727 A CN107062727 A CN 107062727A
Authority
CN
China
Prior art keywords
water
water tank
artificial snow
making
freezing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710191371.6A
Other languages
Chinese (zh)
Other versions
CN107062727B (en
Inventor
张忠斌
陈智明
徐冠依
黄虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Normal University
Original Assignee
Nanjing Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Normal University filed Critical Nanjing Normal University
Priority to CN201710191371.6A priority Critical patent/CN107062727B/en
Publication of CN107062727A publication Critical patent/CN107062727A/en
Application granted granted Critical
Publication of CN107062727B publication Critical patent/CN107062727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C3/00Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow
    • F25C3/04Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow for sledging or ski trails; Producing artificial snow
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2303/00Special arrangements or features for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Special arrangements or features for producing artificial snow
    • F25C2303/048Snow making by using means for spraying water
    • F25C2303/0481Snow making by using means for spraying water with the use of compressed air

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The present invention relates to a kind of freezing and refrigeration cabinet performance testing device artificial snow-making system.The present invention mixes spray unit, water tank including steam and mixes the air compressor that spray unit provides compressed air to steam, water tank bottom surface is provided with delivery port and artificial snow-making feed water inlet, side of the water tank away from delivery port and artificial snow-making feed water inlet is provided with water inlet, water tank is connected with cooling by wind by delivery port, water inlet and forms Water-cooling circulating loop, and artificial snow-making feed water inlet is connected with steam mixing spray unit.Water flows from top to bottom in water tank of the present invention, water inlet flows into the low water of temperature and mixed with the water inside water tank, mixed process is longer, then temperature cooling is more uniform, so the artificial snow-making Water District domain of temperature homogeneous constant the most is just naturally form in water tank bottom region, avoid water tank to be internally formed vortex and cause thermal loss simultaneously, it is ensured that the stabilization of artificial snow-making coolant-temperature gage, improve artificial snow-making density and artificial snow-making efficiency.

Description

A kind of freezing and refrigeration cabinet performance testing device artificial snow-making system
Technical field
The invention belongs to freezing and refrigeration cabinet performance testing device field, a kind of freezing and refrigeration cabinet performance test is specifically related to Device artificial snow-making system.
Background technology
More and more extensive with the use of freezing and refrigeration, the impacts of performance of various freezing and refrigeration cabinets has increasingly caused people next Attention, therefore be also particularly important to the apparatus system of freezing and refrigeration cabinet performance test, and in performance testing device system Artificial snow-making system be the most important thing again.
Freezing and refrigeration cabinet directly carries out heat exchange with external environment, external environment to the runnability of freezing and refrigeration cabinet, make All have a great impact with the life-span, in order to obtain normally running under climatic environment of the freezing and refrigeration cabinet residing for it, its system The relation of cold energy power and external environment condition, whether adapt to various extreme climate environments to carry out related environmental test.Such as winter In the case of snowy, the snowflake that the fin clearance of freezing and refrigeration cabinet heat exchanger can be inhaled into is blocked, and causes exchanger heat exchange energy Power declines.If test device possesses artificial snow-making condition, so that it may obtain performance impact data of the snowfall to freezing and refrigeration cabinet, be conducive to The performance improvement of freezing and refrigeration cabinet.
Existing is water source artificial snow-making system by cold water storage cistern, by controlling the operation of handpiece Water Chilling Units to keep water temperature in cold water storage cistern It is stable, cold water storage cistern inner float ball valve automatic controlling running water inflow supplement snowfall water consumption.But because water tank volume is big and lacks Temperature sensor, easily causes water tank and is internally formed thermal stratification, the inhomogeneities of water temperature largely have impact on artificial snow-making effect Really, such as artificial snow-making density is small, efficiency is low.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of freezing and refrigeration cabinet performance testing device artificial snow-making system, The system artificial snow-making density is big, efficiency high.
In order to realize the purpose of the present invention, present invention employs following technical scheme:
A kind of freezing and refrigeration cabinet performance testing device artificial snow-making system, including steam mixing spray unit, water tank and to The steam mixing spray unit provides the air compressor of compressed air, and the water tank bottom surface is supplied provided with delivery port and artificial snow-making The mouth of a river, side of the water tank away from the delivery port and artificial snow-making feed water inlet is provided with water inlet, and the water tank passes through described Delivery port, water inlet are connected with cooling by wind and form Water-cooling circulating loop, and the artificial snow-making feed water inlet is mixed with the steam Close spray unit connection.
Further, the delivery port and artificial snow-making feed water inlet are close to the first side of the water tank, and the delivery port And the line of artificial snow-making feed water inlet, parallel to the first side, the water inlet is positioned at the water tank and the first side In the relative second side and bottom surface away from the water tank.
Further, steam mixing spray unit includes connecting with the artificial snow-making feed water inlet and along length side between test To the jet pipe of arrangement and the tracheae connected with the air compressor, the jet pipe is provided between multiple length directions along jet pipe It is in charge of every the vertical water spray of arrangement, the water spray is in charge of end and is provided with shower nozzle, and the shower nozzle is provided with and connected with the tracheae Compressed air inlet port, gas-liquid mixture is towards wall between test in the shower nozzle and sprays diagonally downward, the shower nozzle and The angle being in charge of between axis of spraying water is 30~60 °.
Further, the water tank is made up of double-deck 304 stainless steel plate, provided with hair in the middle of double-deck 304 stainless steel plate Steep the 304 stainless steel plates composition shell outside polyurethane sandwich, the water tank and thickness is inside 1~1.2mm, the water tank 304 stainless steel plates constitute inner bag and thickness is 1.8~2.2mm, and the thickness of interlayer is 30~50mm.
Further, the air compressor selects oil-free air compressor, and the cooling by wind is from industrial Handpiece Water Chilling Units.
Further, the first side of the water tank is provided with water supplement port and is provided with level monitoring pipe, the water supplement port The highly a little higher than water inlet of arrangement;The water tank bottom surface is provided with overfall, the water tank described provided with being vertically connected on Overflow pipe at overfall, a little higher than water supplement port of height of the overflow pipe;The tank top is provided with tank lid, described Tank lid is provided with the liquid level electricity installed in two level electrode installing ports away from each other, two level electrode installing ports Difference in height between pole is in 25~35mm;Threeth side adjacent with first side of the water tank, which is provided with, to be used to monitor water temperature RTD installing port and being provided be easy to the staircase that personnel overhaul, the RTD installing port is close to water tank bottom surface cloth Put;Water tank bottom center position is provided with discharge outlet.
Further, runner is provided with the shower nozzle, the runner includes entering along the liquid that fluid stream outgoing direction is arranged Section, steam mixing section and steam spray section, and the steam mixing section is provided with the air inlet, and the air inlet is located at steam Mixing section middle part, the end flow diameter of the liquid approach section is gradually reduced and in closing in shape, and the steam sprays section Flow diameter gradually increase and opening-like.
Further, the vertical water spray that the jet pipe end positions are installed be in charge of and shower nozzle density be every meter of jet pipe it is first-class between Every installing 8~12, the vertical water spray that the jet pipe centre position is installed be in charge of with shower nozzle density be on every meter of jet pipe at equal intervals Install 6~8.
Further, the closing in angle of the end runner of the liquid approach section is 30~45 °, and the steam sprays section The opening angle of runner is 45~60 °.
The beneficial effects of the present invention are:
(1) present invention is when for artificial snow-making between test:The water tank by the delivery port, water inlet with it is described air-cooled cold Water dispenser group constitutes Water-cooling circulating loop so that artificial snow-making carries out cooling processing with water by the cooling by wind in water tank, it is ensured that Water temperature reaches temperature needed for artificial snow-making in water tank.The delivery port, artificial snow-making feed water inlet are respectively positioned on water tank bottom surface, and water inlet position Arranged in water tank side and away from the delivery port, artificial snow-making feed water inlet, the advantage being arranged so as to:Water is from top to bottom in water tank Flowing, water inlet flows into the low water of temperature and mixed with the water inside water tank, and mixed process is longer, then temperature cooling is more uniform, So the artificial snow-making Water District domain of temperature homogeneous constant the most is just naturally form in water tank bottom region, while avoiding inside water tank Form vortex and cause thermal loss, it is ensured that the stabilization of artificial snow-making coolant-temperature gage, improve artificial snow-making density and artificial snow-making efficiency.
Water tank described in the system without needing additional special agitating equipment, the delivery port, artificial snow-making feed water inlet with it is described The distance of water inlet, which is tried one's best, to be set a little further, it is ensured that water can be realized by the Water-cooling circulating of pilot system well in water tank Heat dissipates and combined balance system process, it is ensured that artificial snow-making Water District domain water temperature is constant in water tank.
(2) gas-liquid mixture of the present invention sprays towards metope between test, and high speed water mist runs into quick rebound after metope, And moved to center between test, water smoke speed slows down gradually to fall while cold air is contacted between test, is piled into snow, should The state that on the one hand structure can slowly snow during simulation is real very well, on the other hand can cause the high speed water mist to have foot Low temperature environment between enough time and space engaged tests, snows beneficial to formation.The shower nozzle and water spray are in charge of shape between axis Into the effect of 30~60 ° of angles:The injector stroke of the gas-liquid mixture is effectively increased, makes low temperature ring between high speed water mist and test Border is fully contacted, and is significantly improved artificial snow-making density and artificial snow-making efficiency, is saved artificial snow-making system under limited space conditions between test The space for occupancy of uniting, so present invention is particularly suitable between the limited artificial snow-making test environment in space.
(3) heat-insulating property of water tank of the present invention is good and easily fabricated.The water tank needs to keep liquid when in use Position it is constant, the present invention detects liquid level in water tank by the level electrode, and two level electrodes pass through tank lid respectively On installing port stretch into water, be divided into the electrode of fixed water level upper limit and the electrode of a fixed water level lower limit, pass through water Electric action be to realize circuit communication and can start that liquid level in water tank is measured and controlled, when liquid level be less than lower limit set During value, corresponding control system opens water pump and fills into Xin Shui into the water tank by the water supplement port, when liquid level exceedes the upper limit During setting value, then the water pump is closed, unnecessary water is then overflowed by the overflow pipe, and the level monitoring pipe is also allowed in addition Staff intuitively views the water level in water tank.The RTD is close to water tank bottom surface, i.e., close to the artificial snow-making Water District Domain is arranged, it is ensured that the water temperature measured by the RTD is the water temperature in artificial snow-making Water District domain, beneficial to technical staff according to water temperature Change in time Water-cooling circulating is adjusted to ensure the constant of artificial snow-making coolant-temperature gage.
(4) the end flow diameter of liquid approach section of the present invention is gradually reduced and in closing in shape, and the structure is beneficial to subtract Small liquid enters the pressure of steam mixing section, is easy to reduce due to the vortex that flow diameter is mutated and is caused, prevents sprinkler pressure It is excessive and cause damage, improve shower nozzle service life.The flow diameter of liquid approach section end of the present invention is minimum, beneficial to increasing Added water the flowpath pressure of vapour mixing section so that gas-liquid is sufficiently mixed, so that gas-liquid preferably be sprayed.
(5) length and width between being tested disclosure is particularly well suited to be supported the use between long and narrow test, between so-called long and narrow test Than more than 2.5, then return air inlet and air outlet in long and narrow test on return air plate are generally located at length direction between test respectively Two ends, so the wind speed at length direction two ends is greater than the wind speed at middle part between test between test, then in order to ensure between test Snowfall situation at the uniformity of interior snowfall, more preferable simulation in actual environment, the vertical spray that the jet pipe end positions are installed Moisture pipe and shower nozzle density are greater than the vertical water spray installed in the jet pipe centre position and are in charge of and shower nozzle density.
(6) the closing in angle value of the end runner of liquid approach section of the present invention and the steam spray the runner of section Angular aperture angle value be to test to obtain by artificial snow-making, the shower nozzle is under the conditions of these design parameters, and artificial snow-making is uniform and artificial snow-making Density is big, artificial snow-making efficiency high.Shower nozzle of the present invention it is simple in construction, artificial snow-making effect is good, is that freezing and refrigeration cabinet performance test is carried Supply to ensure.
Brief description of the drawings
Fig. 1 is systematic schematic diagram of the invention.
Fig. 2 is constant temperature water tank front view of the present invention.
Fig. 3 is constant temperature water tank left view of the present invention
Fig. 4 is constant temperature water tank top view of the present invention.
Fig. 5 is constant temperature water tank internal view of the present invention.
Fig. 6 is in charge of the scheme of installation with shower nozzle for water spray.
Fig. 7 is shower nozzle sectional view in the present invention.
The implication marked in accompanying drawing is as follows:
1- water tanks;11- delivery ports;12- artificial snow-makings feed water inlet;13- water inlets;14- water supplement ports;15- level monitoring pipes;16- Overflow pipe;17- tank lid;171- level electrode installing ports;18- RTD installing ports;19- discharge outlet;2- air compressors;3- Cooling by wind;Between 4- tests;51- jet pipes;52- tracheaes;53- water sprays are in charge of;54- shower nozzles;54a- liquid approach sections;54b- Steam mixing section;54c- steam sprays section;541- air inlets;6- staircases;A- first sides;B- second sides;The sides of C- the 3rd; The sides of D- the 4th.
Embodiment
More specific detail is made to technical solution of the present invention with reference to embodiment:
As shown in figure 1, the present invention includes steam mixing spray unit, water tank 1 and mixes spray unit to the steam The air compressor 2 of compressed air is provided, it is characterised in that:The bottom surface of water tank 1 is provided with delivery port 11 and artificial snow-making feed water inlet 12, side of the water tank 1 away from the delivery port 11 and artificial snow-making feed water inlet 12 is provided with water inlet 13, and the water tank 1 leads to Cross the delivery port 11, water inlet 13 to connect with cooling by wind 3 and form Water-cooling circulating loop, the artificial snow-making feed water inlet 12 Connected with steam mixing spray unit.
The present invention is when for 4 artificial snow-making between test:The water tank 1 passes through the delivery port 11, water inlet 13 and the wind Cold handpiece Water Chilling Units 3 constitute Water-cooling circulating loop so that artificial snow-making carries out cooling with water by the cooling by wind 3 in water tank 1 Reason, it is ensured that water temperature reaches temperature needed for artificial snow-making in water tank 1.The delivery port 11, artificial snow-making feed water inlet 12 are respectively positioned on the bottom surface of water tank 1, And the water inlet 13 is located at the side of water tank 1 and is arranged away from the delivery port 11, artificial snow-making feed water inlet 12, is arranged so as to Advantage:Water flows from top to bottom in water tank 1, and water inlet 13 flows into the low water of temperature and mixed with the water inside water tank 1, mixed process Longer, then temperature cooling is more uniform, so just naturally form the artificial snow-making of temperature homogeneous constant the most in the bottom section of water tank 1 Water District domain, while avoiding water tank 1 from being internally formed vortex and cause thermal loss, it is ensured that the stabilization of artificial snow-making coolant-temperature gage, is carried High artificial snow-making density and artificial snow-making efficiency.
The delivery port 11 and artificial snow-making feed water inlet 12 close to the water tank 1 first side, and the delivery port 11 with And the line of artificial snow-making feed water inlet 12, parallel to the first side, the water inlet 13 is positioned at the water tank 1 and described first Sideways in relative second side and away from the water tank 1 bottom surface.Water tank 1 described in the system is without needing additional special stir Dynamic equipment, the distance of the delivery port 11, artificial snow-making feed water inlet 12 and the water inlet 13, which is tried one's best, to be set a little further, it is ensured that water tank Water can realize that heat dissipates and combined balance system process by the Water-cooling circulating of pilot system well in 1, it is ensured that be made in water tank 1 Avenge the constant of Water District domain water temperature.
The steam mixing spray unit includes connecting and arranging along 4 length directions between test with the artificial snow-making feed water inlet 12 Jet pipe 51 and the tracheae 52 that is connected with the air compressor 2, the jet pipe 51 is provided with multiple along the length side of jet pipe 51 Be in charge of 53 to spaced apart vertical water spray, the water spray is in charge of 53 ends and is provided with shower nozzle 54, the shower nozzle 54 be provided with Gas-liquid mixture is towards 4 walls between test in the compressed air inlet port 541 that the tracheae 52 is connected, the shower nozzle 54 and tilts Spray downwards, the shower nozzle 54 and the angle being in charge of between 53 axis of spraying water are 30~60 °.Gas-liquid mixed of the present invention Thing sprays towards 4 metopes between test, and high speed water mist runs into quick rebound after metope, and is moved to 4 centers between test, water smoke speed Slow down gradually to fall while cold air is contacted between test 4, be piled into snow, the structure on the one hand can simulation very well The state slowly snowed in reality, on the other hand can cause the high speed water mist to have between time enough and space engaged test 4 low temperature environment, snows beneficial to formation.The shower nozzle 54 and water spray are in charge of the effect of 30~60 ° of angles of formation between 53 axis: The injector stroke of the gas-liquid mixture is effectively increased, 4 low temperature environments between high speed water mist and test is fully contacted, significantly improves Artificial snow-making density and artificial snow-making efficiency, save the space of artificial snow-making system occupancy between test under 4 limited space conditions, so this Invention is particularly suitable for use between the limited artificial snow-making test environment in space.
As shown in fig. 6, being provided with runner in the shower nozzle 54, the runner includes entering along the liquid that fluid stream outgoing direction is arranged Enter a section 54a, steam mixing section 54b and steam spray section 54c, the steam mixing section 54b and is provided with the air inlet 541, The air inlet 541 is located at steam mixing section 54b middle parts, and the end flow diameter of the liquid approach section 54a gradually subtracts Small and in closing in shape, the flow diameter that the steam sprays section 54c gradually increases and opening-like.Liquid of the present invention enters Section 54a end flow diameter is gradually reduced and in closing in shape, and the structure is beneficial to reduce the pressure that liquid enters steam mixing section 54b Power, is easy to reduce due to the vortex that flow diameter is mutated and is caused, and prevents that the pressure of shower nozzle 54 is excessive and causes to damage, improves shower nozzle 54 service lifes.The flow diameter of liquid approach section 54a ends of the present invention is minimum, beneficial to the runner of increase steam mixing section Pressure so that gas-liquid is sufficiently mixed, so that gas-liquid preferably be sprayed.
The vertical water spray that the end positions of jet pipe 51 are installed be in charge of 53 and the density of shower nozzle 54 be every meter of jet pipe 51 it is first-class between Every installing 8~12, the vertical water spray that the centre position of jet pipe 51 is installed is in charge of 53 and the density of shower nozzle 54 is every meter of jet pipe 51 On install 6~8 at equal intervals.Disclosure is particularly well suited to be supported the use between long and narrow test, tested between so-called long and narrow test Between length-width ratio be more than 2.5, then return air inlet and air outlet in long and narrow test on return air plate are generally located at 4 between test respectively The two ends of length direction, so the wind speed at 4 length direction two ends is greater than the wind speed at 4 middle parts between test between test, then in order to Ensure the snowfall situation in actual environment, the end positions of jet pipe 51 at the uniformity of snowfall in 4 between testing, more preferable simulation The vertical water spray installed be in charge of 53 and the density of shower nozzle 54 be greater than the vertical water spray centre position of jet pipe 51 installed and be in charge of 53 With the density of shower nozzle 54.
The closing in angle of the end runner of the liquid approach section 54a is 30~45 °, and the steam sprays section 54c stream The opening angle in road is 45~60 °.The closing in angle value and the water of liquid approach section 54a of the present invention end runner The angular aperture angle value that vapour sprays section 54c runner is to test to obtain by artificial snow-making, and the shower nozzle 54 is in these design parameter bars Under part, artificial snow-making is uniform and artificial snow-making density is big, artificial snow-making efficiency high.Shower nozzle 54 of the present invention it is simple in construction, artificial snow-making effect is good, is The performance test of freezing and refrigeration cabinet, which is provided, to be ensured.
The water tank 1 is made up of double-deck 304 stainless steel plate, and polyurathamc is provided with the middle of double-deck 304 stainless steel plate 304 stainless steel plates outside interlayer, the water tank 1 constitute shell and thickness be inside 1~1.2mm, the water tank 1 304 not The steel plate that becomes rusty constitutes inner bag and thickness is 1.8~2.2mm, and the thickness of interlayer is 30~50mm.The heat-insulating property of the water tank 1 is good And it is easily fabricated.
The air compressor 2 selects oil-free air compressor, and the cooling by wind 3 must assure that leaving water temperature is It will not still be shut down at 3 DEG C, therefore, using industrial water unit.Oilless (oil free) compressor not only substantially increases the matter of compressed air Amount, at the same ensure that air without oiliness so as to ensureing oil-free in water at low temperature, it is ensured that oily pure water is free from, so as to normally make Snow, and oil-free air compressor power consumption is relatively low;Industrial water unit ensure that the water in water tank 1 is stable relatively low Temperature levels, and industrial water unit operation is stable, and machine halt trouble will not occur during low temperature, and this is required for artificial snow-making Water at low temperature, which is provided, to be ensured.
As shown in Fig. 2,3,4,5, the first side of the water tank 1 is provided with water supplement port 14 and is provided with level monitoring pipe 15, the water supplement port 14 arranges the highly a little higher than water inlet 13;The bottom surface of water tank 1 is provided with overfall, the water tank 1 Provided with the overflow pipe 16 being vertically connected at the overfall, a little higher than water supplement port 14 of height of the overflow pipe 16;Institute State the top of water tank 1 and be provided with tank lid 17, the tank lid 17 is provided with two level electrode installing ports 171 away from each other;Institute Threeth side adjacent with first side for stating water tank 1 is provided with the RTD installing port 18 for being used for monitoring water temperature and is provided with The staircase 6 for being easy to personnel to overhaul, the RTD installing port 18 is close to the sole arrangement of water tank 1;The bottom center of water tank 1 Position is provided with discharge outlet 19.The water tank 1 need when in use keep liquid level it is constant, the present invention by the level electrode come The liquid level in water tank 1 is detected, two level electrodes are stretched into water by the level electrode installing port 171 in tank lid 17 respectively, It is divided into the electrode of fixed water level upper limit and the electrode of a fixed water level lower limit, the electric action by water is to realize circuit Connect and can start that liquid level in water tank 1 is measured and controlled, when liquid level is less than lower limit set value, corresponding control system is opened Open water pump and Xin Shui is filled into the water tank 1 by the water supplement port 14, when liquid level exceedes upper limit set value, then close institute State water pump, the length differences of described two level electrodes is in 25~35mm, the too short then frequent moisturizing of distance, apart from oversize then moisturizing not Foot easily causes water shortage in water tank, and unnecessary water is then overflowed by the overflow pipe 16, and the level monitoring pipe 15 is also just in addition The water level in water tank 1 is intuitively viewed in staff.The RTD is used close to the bottom surface of water tank 1 close to the artificial snow-making Aqua region arrange, it is ensured that the water temperature measured by the RTD is the water temperature in artificial snow-making Water District domain, beneficial to technical staff according to The change of water temperature adjusts to ensure the constant of artificial snow-making coolant-temperature gage to Water-cooling circulating in time.
The specific size of water tank 1 described in the present embodiment is:
The height of overflow pipe 16 is the height of water tank 1 13/16~15/16, the overflow pipe 16 with first side A and with 4th side D distance is the 1/16~3/16 of the bottom surface length of side of water tank 1;The RTD installing port 18 sets height to be water tank 1 height 1/8~3/8, the distance of the RTD installing port 18 to second side B is the 1/8~3/8 of the bottom surface length of side of water tank 1;Institute It is the height of water tank 1 5/8~7/8 to state the height of water inlet 13, and the distance of the side D of water inlet 13 to the 4th is the bottom surface side of water tank 1 Long 1/8~3/8;The height of water supplement port 14 is the 3/4~7/8 of the height of water tank 1, the side D's of water supplement port 14 to the 4th Distance is the 1/8~3/8 of the bottom surface length of side of water tank 1;The level monitoring pipe 15 is an external transparent pipe, the level monitoring The lower port of pipe 15 is communicated at the low liquid level of water tank 1, and the upper port of level monitoring pipe 15 is communicated at the high level of water tank 1, The lower port of level monitoring pipe 15 is located at the 1/16~3/16 of the height of water tank 1, the side C's of level monitoring pipe 15 to the 3rd Distance is the 1/8~3/8 of the bottom surface length of side of water tank 1, and the upper port of level monitoring pipe 15 is highly put down with the overflow inlet of overflow pipe 16 Neat and a little higher than water supplement port 14, the highly a little higher than water inlet 13 of the water supplement port 14.
The delivery port 11 is arranged side by side with artificial snow-making feed water inlet 12 in the bottom surface of constant temperature water tank 1, and the delivery port 11 is away from Three side C, and with the 4th side D distance is the bottom surface length of side of water tank 1 1/8~3/8;The artificial snow-making feed water inlet 12 is close to the 3rd Side C, and with the 3rd side C distance is the bottom surface length of side of water tank 1 1/8~3/8;The delivery port 11 and artificial snow-making feed water inlet 12 Line perpendicular to the 3rd side C;The tank lid 17 is 300~500mm of diameter cylindrical tank lid, and the tank lid 17 is justified Distance of the heart away from the 3rd side C and second side B is 200~300mm;2 level electrode installing ports 171 are located at circle On the diameter line of shape tank lid 17 and both are uniform arranged apart, at a distance of 200~300mm.

Claims (9)

1. a kind of freezing and refrigeration cabinet performance testing device artificial snow-making system, including steam mixing spray unit, water tank (1) and to The steam mixing spray unit provides the air compressor (2) of compressed air, it is characterised in that:Water tank (1) bottom surface is set There are delivery port (11) and artificial snow-making feed water inlet (12), the water tank (1) is away from the delivery port (11) and artificial snow-making feed water inlet (12) side is provided with water inlet (13), and the water tank (1) passes through the delivery port (11), water inlet (13) and wind-cooled cold-water Unit (3) connects and forms Water-cooling circulating loop, and the artificial snow-making feed water inlet (12) connects with steam mixing spray unit.
2. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 1, it is characterised in that:The delivery port (11) and artificial snow-making feed water inlet (12) are close to the first side of described water tank (1), and the delivery port (11) and artificial snow-making supply water The line of mouthful (12) is parallel to the first side, the water inlet (13) is located at the water tank (1) and the first side In the relative second side and bottom surface away from the water tank (1).
3. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 1, it is characterised in that:The steam is mixed Close spray unit include connect with the artificial snow-making feed water inlet (12) and along between test (4) length direction arrangement jet pipe (51) and The tracheae (52) connected with the air compressor (2), the jet pipe (51) is provided with multiple along between jet pipe (51) length direction It is in charge of (53) every the vertical water spray of arrangement, the water spray, which is in charge of (53) end and is provided with shower nozzle (54), the shower nozzle (54), to be set Have in the compressed air inlet port (541) connected with the tracheae (52), the shower nozzle (54) between the test of gas-liquid mixture direction (4) wall and spray diagonally downward, the shower nozzle (54) and the angle being in charge of between (53) axis of spraying water are 30~60 °.
4. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 1, it is characterised in that:The water tank (1) it is made up of double-deck 304 stainless steel plate, polyurathamc interlayer, the water tank is provided with the middle of double-deck 304 stainless steel plate (1) 304 outside stainless steel plates constitute shell and thickness is 1~1.2mm, and 304 internal stainless steel plates of the water tank (1) are constituted Inner bag and thickness are 1.8~2.2mm, and the thickness of interlayer is 30~50mm.
5. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 1, it is characterised in that:The air pressure Contracting machine (2) selects oil-free air compressor, and the cooling by wind (3) selects industrial water unit.
6. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 2, it is characterised in that:The water tank (1) first side is provided with water supplement port (14) and is provided with level monitoring pipe (15), and water supplement port (14) the arrangement height is slightly Higher than the water inlet (13);Water tank (1) bottom surface is provided with overfall, the water tank (1) described provided with being vertically connected on Overflow pipe (16) at overfall, a little higher than water supplement port (14) of height of the overflow pipe (16);At the top of the water tank (1) Provided with tank lid (17), the tank lid (17) is provided with two level electrode installing ports (171) away from each other, described in two Difference in height between the level electrode installed in level electrode installing port (171) is in 25~35mm;The water tank (1) with first The 3rd adjacent side, which is provided with the RTD installing port (18) for being used for monitoring water temperature and is provided with, sideways is easy to personnel to overhaul Staircase (6), the RTD installing port (18) is close to the water tank (1) sole arrangement;Water tank (1) the bottom center position Provided with discharge outlet (19).
7. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 3, it is characterised in that:The shower nozzle (54) runner is provided with, the runner includes liquid approach section (54a), the steam mixing section arranged along fluid stream outgoing direction (54b) and steam spray section (54c), and the steam mixing section (54b) is provided with the air inlet (541), the air inlet (541) be located at steam mixing section (54b) middle part, the end flow diameter of the liquid approach section (54a) be gradually reduced and In closing in shape, the flow diameter that the steam sprays section (54c) gradually increases and opening-like.
8. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 3, it is characterised in that:The jet pipe (51) the vertical water spray that end positions are installed be in charge of (53) and shower nozzle (54) density be install 8 on every meter of jet pipe (51) at equal intervals~ 12, the vertical water spray that jet pipe (51) centre position is installed is in charge of (53) and shower nozzle (54) density on every meter of jet pipe (51) 6~8 are installed at equal intervals.
9. freezing and refrigeration cabinet performance testing device artificial snow-making system as claimed in claim 6, it is characterised in that:The liquid enters The closing in angle for entering the end runner of section (54a) is 30~45 °, and the opening angle that the steam sprays the runner of section (54c) is 45~60 °.
CN201710191371.6A 2017-03-28 2017-03-28 Snow making system for performance testing device of freezing and refrigerating cabinet Active CN107062727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710191371.6A CN107062727B (en) 2017-03-28 2017-03-28 Snow making system for performance testing device of freezing and refrigerating cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710191371.6A CN107062727B (en) 2017-03-28 2017-03-28 Snow making system for performance testing device of freezing and refrigerating cabinet

Publications (2)

Publication Number Publication Date
CN107062727A true CN107062727A (en) 2017-08-18
CN107062727B CN107062727B (en) 2020-06-02

Family

ID=59618172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710191371.6A Active CN107062727B (en) 2017-03-28 2017-03-28 Snow making system for performance testing device of freezing and refrigerating cabinet

Country Status (1)

Country Link
CN (1) CN107062727B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108870819A (en) * 2018-05-16 2018-11-23 何晓明 A kind of spray high temperature snowmaker
CN109253565A (en) * 2018-08-21 2019-01-22 珠海格力电器股份有限公司 Snowfall simulation system and snowfall control method
CN113514235A (en) * 2021-04-28 2021-10-19 北京建筑大学 Nozzle and nucleon device test equipment for snow maker
CN114370728A (en) * 2021-12-14 2022-04-19 合肥通用机械研究院有限公司 Real-time monitoring method and device for snow making density of snow making machine and readable storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2248921B (en) * 1990-09-28 1995-02-15 Clulow Malcom George Snow making
CA2237428C (en) * 1995-11-13 2003-03-18 Snow Economics, Inc. Method and apparatus for making snow
US6543699B1 (en) * 2001-10-15 2003-04-08 Herman K. Dupre Method and apparatus for making snow
CN102706679A (en) * 2012-05-31 2012-10-03 东南大学 Constant-temperature water tank for water cooling chiller performance testing system
CN202973701U (en) * 2012-11-08 2013-06-05 中国电器科学研究院有限公司 Snowfall device for artificial climate environmental test chamber
CN203002560U (en) * 2013-01-06 2013-06-19 华大赛 Liquid-gas mixing ultrasonic atomization nozzle
CN103591745A (en) * 2013-11-15 2014-02-19 国家电网公司 Snow making device for V-shaped insulator chain snow covering test and operation method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2248921B (en) * 1990-09-28 1995-02-15 Clulow Malcom George Snow making
CA2237428C (en) * 1995-11-13 2003-03-18 Snow Economics, Inc. Method and apparatus for making snow
US6543699B1 (en) * 2001-10-15 2003-04-08 Herman K. Dupre Method and apparatus for making snow
CN102706679A (en) * 2012-05-31 2012-10-03 东南大学 Constant-temperature water tank for water cooling chiller performance testing system
CN202973701U (en) * 2012-11-08 2013-06-05 中国电器科学研究院有限公司 Snowfall device for artificial climate environmental test chamber
CN203002560U (en) * 2013-01-06 2013-06-19 华大赛 Liquid-gas mixing ultrasonic atomization nozzle
CN103591745A (en) * 2013-11-15 2014-02-19 国家电网公司 Snow making device for V-shaped insulator chain snow covering test and operation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108870819A (en) * 2018-05-16 2018-11-23 何晓明 A kind of spray high temperature snowmaker
CN109253565A (en) * 2018-08-21 2019-01-22 珠海格力电器股份有限公司 Snowfall simulation system and snowfall control method
CN113514235A (en) * 2021-04-28 2021-10-19 北京建筑大学 Nozzle and nucleon device test equipment for snow maker
CN113514235B (en) * 2021-04-28 2023-05-12 北京建筑大学 Nozzle for snowmaking machine and nucleon testing equipment
CN114370728A (en) * 2021-12-14 2022-04-19 合肥通用机械研究院有限公司 Real-time monitoring method and device for snow making density of snow making machine and readable storage medium
CN114370728B (en) * 2021-12-14 2024-02-02 合肥通用机械研究院有限公司 Real-time monitoring method and device for snow making density of snow making machine and readable storage medium

Also Published As

Publication number Publication date
CN107062727B (en) 2020-06-02

Similar Documents

Publication Publication Date Title
CN107062727A (en) A kind of freezing and refrigeration cabinet performance testing device artificial snow-making system
WO2018133168A1 (en) Cabinet in data centre, and gravity spraying system thereof
CN201697250U (en) Naturally stratified open-type chilled water storage device
CN106091728B (en) Step cooling down water with composite construction prepares cooling tower
CN201059724Y (en) Condensate water recycling and utilizing device of water cooled central air-conditioning
CN103292401B (en) Multifunctional transverse flow type heat source tower device
CN206019394U (en) The step cooling down water combined with wind cooling temperature lowering by water-cooled cooling prepares cooling tower
CN202869944U (en) Spraying device of composite salt fog test chamber
CN206755926U (en) A kind of efficient air cooling apparatus
CN102914176A (en) Surface evaporation type cooling device adopting single-row finned pipes
CN106684723B (en) Automatically control cooling energy-saving type substation
CN205747560U (en) A kind of water-cooled cooling water machine
CN210740587U (en) Novel water storage device based on chilled water storage
CN214199757U (en) Protective water tank for closed cooling tower
CN210425650U (en) Surface ribbed tube falling film evaporation condenser
CN209410061U (en) A kind of air-conditioner set used for rail vehicle with spray cooling device
CN107782167B (en) Water chiller system
CN1862126A (en) Natural ice energy-accumulation air-conditioner central cold supply apparatus system
CN208382630U (en) A kind of spray-type evaporator
CN201772572U (en) Reservoir structure using low valley electricity to store energy
CN207583593U (en) Oilless air compressor chilled water unit
CN212778749U (en) Industry closed thick liquid heat sink
CN210738667U (en) Novel steam condensation device for diesel generator
CN220556220U (en) Counterflow evaporative condenser
CN219607766U (en) Anti-icing cooling tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant