CN107060246A - Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method - Google Patents
Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method Download PDFInfo
- Publication number
- CN107060246A CN107060246A CN201710364334.0A CN201710364334A CN107060246A CN 107060246 A CN107060246 A CN 107060246A CN 201710364334 A CN201710364334 A CN 201710364334A CN 107060246 A CN107060246 A CN 107060246A
- Authority
- CN
- China
- Prior art keywords
- mine tailing
- tailing base
- layer
- resistant layer
- crack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 44
- 238000005034 decoration Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 10
- 239000010410 layer Substances 0.000 claims description 166
- 239000000463 material Substances 0.000 claims description 36
- 239000002002 slurry Substances 0.000 claims description 30
- 238000002156 mixing Methods 0.000 claims description 28
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 18
- 239000000839 emulsion Substances 0.000 claims description 13
- 235000011837 pasties Nutrition 0.000 claims description 10
- 239000004576 sand Substances 0.000 claims description 10
- 239000011265 semifinished product Substances 0.000 claims description 10
- 238000002360 preparation method Methods 0.000 claims description 9
- 239000002994 raw material Substances 0.000 claims description 9
- 238000004026 adhesive bonding Methods 0.000 claims description 8
- 239000004568 cement Substances 0.000 claims description 7
- 239000000853 adhesive Substances 0.000 claims description 5
- 230000001070 adhesive effect Effects 0.000 claims description 5
- 239000003638 chemical reducing agent Substances 0.000 claims description 5
- 239000003795 chemical substances by application Substances 0.000 claims description 5
- 238000001035 drying Methods 0.000 claims description 5
- 238000010438 heat treatment Methods 0.000 claims description 5
- 239000000047 product Substances 0.000 claims description 5
- 238000007493 shaping process Methods 0.000 claims description 5
- 239000013530 defoamer Substances 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 4
- 239000003365 glass fiber Substances 0.000 claims description 3
- 239000011490 mineral wool Substances 0.000 claims description 3
- 239000007800 oxidant agent Substances 0.000 claims description 3
- 230000001590 oxidative effect Effects 0.000 claims description 3
- 239000004814 polyurethane Substances 0.000 claims description 3
- 229920002635 polyurethane Polymers 0.000 claims description 3
- 239000011247 coating layer Substances 0.000 claims description 2
- 238000004321 preservation Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 7
- 239000002910 solid waste Substances 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 abstract description 3
- 239000002699 waste material Substances 0.000 abstract description 3
- 238000005336 cracking Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 4
- 239000011230 binding agent Substances 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 239000000956 alloy Substances 0.000 description 2
- 229910045601 alloy Inorganic materials 0.000 description 2
- 229920001971 elastomer Polymers 0.000 description 2
- 210000004209 hair Anatomy 0.000 description 2
- 239000011505 plaster Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001802 infusion Methods 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0866—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements composed of several layers, e.g. sandwich panels or layered panels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B19/00—Machines or methods for applying the material to surfaces to form a permanent layer thereon
- B28B19/0015—Machines or methods for applying the material to surfaces to form a permanent layer thereon on multilayered articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B19/00—Machines or methods for applying the material to surfaces to form a permanent layer thereon
- B28B19/0092—Machines or methods for applying the material to surfaces to form a permanent layer thereon to webs, sheets or the like, e.g. of paper, cardboard
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0875—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
Abstract
The invention discloses a kind of mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method, mine tailing base decorating board includes mine tailing base crack-resistant layer, enhancement layer, flexible mine tailing base crack-resistant layer and dope layer, the enhancement layer is arranged on the upper surface of mine tailing base crack-resistant layer, the flexible mine tailing base crack-resistant layer is arranged on the upper surface of enhancement layer, and the dope layer is arranged on the upper surface of the flexible mine tailing base crack-resistant layer.The present invention has good effect of prestressed, takes full advantage of Industrial Solid Waste mine tailing base, saves the energy, reduce the consumption of resource, solve pollution of the Industrial Solid Waste to environment, turn waste into wealth, improves its attached value.
Description
Technical field
The present invention relates to a kind of mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method.
Background technology
At present, daily house fitting-up, requirement more and more higher of the people to ornament materials, the ornament materials that people need should
Easy construction, durable in use again but also cheap, wall, wall now to places such as family room, offices
When pushing up, hang the finishing of cupboard, directly using three-ply board, then again on three-ply board sand hair, bottoming, paint, glazing or paste pasting board,
Material of so both having taken a lot of work is time-consuming, and environment is polluted again;In addition, the exterior wall of prior art is by manually pasting various heat-insulation layers, it is this thin
Cracking that plastoring system occurs, come off, hollowing and phenomenon of growing dim.
The content of the invention
The technical problems to be solved by the invention be the defect for overcoming prior art there is provided a kind of mine tailing base decorating board,
It has good effect of prestressed, takes full advantage of Industrial Solid Waste mine tailing base, saves the energy, reduces the consumption of resource, solution
Determine pollution of the Industrial Solid Waste to environment, turned waste into wealth, improve its attached value.
In order to solve the above-mentioned technical problem, the technical scheme is that:A kind of mine tailing base decorating board, it includes:
Mine tailing base crack-resistant layer;
Enhancement layer, the enhancement layer is arranged on the upper surface of mine tailing base crack-resistant layer;
Flexible mine tailing base crack-resistant layer, the flexible mine tailing base crack-resistant layer is arranged on the upper surface of enhancement layer;
Dope layer, the dope layer is arranged on the upper surface of the flexible mine tailing base crack-resistant layer.
Further, the thickness of the mine tailing base crack-resistant layer is 2mm~3.5mm;And/or the flexible mine tailing base crack-resistant layer
Thickness is 2mm~2.5mm.
A kind of concrete structure of enhancement layer is further provided, the enhancement layer is made up of glass fiber reticular cloth.
Further, the gross thickness of the mine tailing base decorating board is 5mm~7mm.
Further for making it possess heat insulation effect, present invention also offers a kind of mine tailing base heat insulation decoration integrated plate, it
Including:
Mine tailing base decorating board;
Boundary layer, the boundary layer is arranged on the lower surface of mine tailing base crack-resistant layer of mine tailing base decorating board;
Heat-insulation layer, the heat-insulation layer is arranged on the lower surface of the boundary layer.
Further, the boundary layer is cementing oxidant layer.
Further, the heat-insulation layer is by EPS materials or extruded sheet material or polyurethane material or modified EPS material or rock wool
Insulation material is made.
Further, the thickness of the heat-insulation layer is 2cm~10cm.
Present invention also offers a kind of manufacture method of mine tailing base heat insulation decoration integrated plate, the step of method in contain:
(a) heat-insulation layer after a shaping is provided;
(b) it is coated with boundary layer on the upper surface of heat-insulation layer;
(c) mine tailing base crack-resistant layer is set on the upper surface of boundary layer;Wherein, the mixing that the mine tailing base crack-resistant layer is used
The component that includes of gelling slurry and each component mass percent are:CHARACTERISTICS OF TAILINGS SAND:60%~80%;Cement:20%~25%;It is gluing
Emulsion:5%~10%;Surplus is functional auxiliary material, amounts to 100%;The system for the mixing gelling slurry that mine tailing base crack-resistant layer is used
Standby process is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed and pasty state is added water to, obtained
The mixing gelling slurry that mine tailing base crack-resistant layer is used;
(d) enhancement layer is set on the upper surface of mine tailing base crack-resistant layer;
(e) flexible mine tailing base crack-resistant layer is set on the upper surface of enhancement layer, semi-finished product are formed;Wherein, the flexible tail
The mixing component that includes of gelling slurry and each component mass percent that ore deposit base crack-resistant layer is used be:CHARACTERISTICS OF TAILINGS SAND:50%~70%;
Cement:25%~30%;Flexible emulsion:8%~10%;Surplus is functional auxiliary material, amounts to 100%;The flexible mine tailing base
The preparation process for the mixing gelling slurry that crack-resistant layer is used is as follows:Got the raw materials ready according to each component and each component mass percent;Will be each
Component mixes and adds water to pasty state, obtains the mixing gelling slurry that flexible mine tailing base crack-resistant layer is used;
(f) semi-finished product enter temperature and dried for 40 DEG C~80 DEG C of steam heating and humidifying drying tunnel;
(g) 3~10 days are stood after restocking;
(h) again after arrangement and repairing, in flexible mine tailing base crack-resistant layer coating layer, finished product is formed.
Further, in the functional auxiliary material in step (c) and/or step (e) containing adhesive, early strength agent, water reducer, disappear
Infusion, reinforced wire and retarder.
Employ after above-mentioned technical proposal, mine tailing base crack-resistant layer, reinforcement are employed in mine tailing base decorating board of the invention
Layer and flexible mine tailing base crack-resistant layer, the superposition of these stratified layers cause mine tailing base decorating board to have stronger effect of prestressed, solution
Cracking that thin-coat plaster system of having determined occurs, come off, hollowing and phenomenon of growing dim;In addition, in the mine tailing base crack-resistant layer of the present invention fully
Mine tailing base is make use of, is turned waste into wealth, the energy is saved, consumption is reduced, pollution of the Industrial Solid Waste to environment is solved, improves
Its attached value;The present invention adds heat-insulation layer again on the basis of this, makes it have heat insulation effect.
Brief description of the drawings
Fig. 1 is the structural representation of the mine tailing base decorating board of the present invention;
Fig. 2 is the structural representation of the mine tailing base heat insulation decoration integrated plate of the present invention.
Embodiment
In order that present disclosure is easier to be clearly understood, it is right below according to specific embodiment and with reference to accompanying drawing
The present invention is described in further detail.
Embodiment one
As shown in figure 1, a kind of mine tailing base decorating board, it includes:
Mine tailing base crack-resistant layer 1;
Enhancement layer 2, the enhancement layer 2 is arranged on the upper surface of mine tailing base crack-resistant layer 1;
Flexible mine tailing base crack-resistant layer 3, the flexible mine tailing base crack-resistant layer 3 is arranged on the upper surface of enhancement layer 2;
Dope layer 4, the dope layer 4 is arranged on the upper surface of the flexible mine tailing base crack-resistant layer 3.
The thickness of the mine tailing base crack-resistant layer 1 is 2mm~3.5mm;The thickness of the flexible mine tailing base crack-resistant layer 3 is 2mm
~2.5mm.
The enhancement layer 2 is made up of glass fiber reticular cloth, but not limited to this.
The gross thickness of the mine tailing base decorating board is 5mm~7mm.
Embodiment two
As shown in Fig. 2 a kind of mine tailing base heat insulation decoration integrated plate, it includes:
Mine tailing base decorating board in embodiment one;
Boundary layer 5, the boundary layer 5 is arranged on the lower surface of mine tailing base crack-resistant layer 1 of mine tailing base decorating board;
Heat-insulation layer 6, the heat-insulation layer 6 is arranged on the lower surface of the boundary layer 5.
The boundary layer 5 is cementing oxidant layer, but not limited to this.
The heat-insulation layer 6 is by EPS materials or extruded sheet material or polyurethane material or modified EPS material or rock wool heat-preservation material
Material is made, but not limited to this.
The thickness of the heat-insulation layer 6 is 2cm~10cm.
Embodiment three
Contain in the step of manufacture method of mine tailing base heat insulation decoration integrated plate in embodiment two:
(a) heat-insulation layer 6 after a shaping is provided;
(b) boundary layer 5 is coated with the upper surface of heat-insulation layer 6;
(c) mine tailing base crack-resistant layer 1 is set on the upper surface of boundary layer 5;The technique that the mode specifically set is used is painting
Cloth;Wherein, the mixing component that includes of gelling slurry and each component mass percent that the mine tailing base crack-resistant layer 1 is used be:Tail
Ore in sand form:60%;Cement:20%;Gluing emulsion:10%;Surplus is functional auxiliary material, amounts to 100%;Mine tailing base crack-resistant layer 1 makes
The preparation process of mixing gelling slurry is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed
Stir and add water to pasty state, obtain the mixing gelling slurry that mine tailing base crack-resistant layer 1 is used;Wherein, gluing emulsion is also referred to as breast
Liquid type binding agent, is the material that in the market can be bought.
(d) enhancement layer 2 is set on the upper surface of mine tailing base crack-resistant layer 1;
(e) flexible mine tailing base crack-resistant layer 3 is set on the upper surface of enhancement layer 2, semi-finished product are formed;Wherein, the flexibility
The mixing component that includes of gelling slurry and each component mass percent that mine tailing base crack-resistant layer 3 is used be:CHARACTERISTICS OF TAILINGS SAND:50%;Water
Mud:25%;Flexible emulsion:10%;Surplus is functional auxiliary material, amounts to 100%;What the flexible mine tailing base crack-resistant layer 3 was used
The preparation process of mixing gelling slurry is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed
And pasty state is added water to, obtain the mixing gelling slurry that flexible mine tailing base crack-resistant layer 3 is used;
(f) semi-finished product enter temperature and dried for 40 DEG C of steam heating and humidifying drying tunnel, conserve 2 hours;
(g) 3 days are stood after restocking;
(h) again after arrangement and repairing, in the flexible coating of mine tailing base crack-resistant layer 3 layer 4, finished product is formed.
Contain adhesive, early strength agent, water reducer, defoamer, reinforcement in functional auxiliary material in step (c) and step (e)
Silk and retarder.
Example IV
Contain in the step of manufacture method of mine tailing base heat insulation decoration integrated plate in embodiment two:
(a) heat-insulation layer 6 after a shaping is provided;
(b) boundary layer 5 is coated with the upper surface of heat-insulation layer 6;
(c) mine tailing base crack-resistant layer 1 is set on the upper surface of boundary layer 5;Wherein, the mine tailing base crack-resistant layer 1 is used
The mixing component that includes of gelling slurry and each component mass percent are:CHARACTERISTICS OF TAILINGS SAND:70%;Cement:20%;Gluing emulsion:
5%;Surplus is functional auxiliary material, amounts to 100%;The preparation process for the mixing gelling slurry that mine tailing base crack-resistant layer 1 is used is as follows:
Got the raw materials ready according to each component and each component mass percent;Each component is mixed and pasty state is added water to, mine tailing base cracking resistance is obtained
The mixing gelling slurry that layer 1 is used;Gluing emulsion is also referred to as emulsion-type binding agent.
(d) enhancement layer 2 is set on the upper surface of mine tailing base crack-resistant layer 1;
(e) flexible mine tailing base crack-resistant layer 3 is set on the upper surface of enhancement layer 2, semi-finished product are formed;Wherein, the flexibility
The mixing component that includes of gelling slurry and each component mass percent that mine tailing base crack-resistant layer 3 is used be:CHARACTERISTICS OF TAILINGS SAND:65%;Water
Mud:25%;Flexible emulsion:8%;Surplus is functional auxiliary material, amounts to 100%;It is mixed that the flexible mine tailing base crack-resistant layer 3 is used
The preparation process that rubber alloy coagulates slurry is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed simultaneously
Pasty state is added water to, the mixing gelling slurry that flexible mine tailing base crack-resistant layer 3 is used is obtained;
(f) semi-finished product enter temperature and dried for 80 DEG C of steam heating and humidifying drying tunnel, conserve 2 hours;
(g) 5 days are stood after restocking;
(h) again after arrangement and repairing, in the flexible coating of mine tailing base crack-resistant layer 3 layer 4, finished product is formed.
Contain adhesive, early strength agent, water reducer, defoamer, reinforcement in functional auxiliary material in step (c) and step (e)
Silk and retarder.
Embodiment five
Contain in the step of manufacture method of mine tailing base heat insulation decoration integrated plate in embodiment two:
(a) heat-insulation layer 6 after a shaping is provided;
(b) boundary layer 5 is coated with the upper surface of heat-insulation layer 6;
(c) mine tailing base crack-resistant layer 1 is set on the upper surface of boundary layer 5;Wherein, the mine tailing base crack-resistant layer 1 is used
The mixing component that includes of gelling slurry and each component mass percent are:CHARACTERISTICS OF TAILINGS SAND:70%;Cement:23%;Gluing emulsion:
5%;Surplus is functional auxiliary material, amounts to 100%;The preparation process for the mixing gelling slurry that mine tailing base crack-resistant layer 1 is used is as follows:
Got the raw materials ready according to each component and each component mass percent;Each component is mixed and pasty state is added water to, mine tailing base cracking resistance is obtained
The mixing gelling slurry that layer 1 is used;Gluing emulsion is also referred to as emulsion-type binding agent.
(d) enhancement layer 2 is set on the upper surface of mine tailing base crack-resistant layer 1;
(e) flexible mine tailing base crack-resistant layer 3 is set on the upper surface of enhancement layer 2, semi-finished product are formed;Wherein, the flexibility
The mixing component that includes of gelling slurry and each component mass percent that mine tailing base crack-resistant layer 3 is used be:CHARACTERISTICS OF TAILINGS SAND:60%;Water
Mud:28%;Flexible emulsion:9%;Surplus is functional auxiliary material, amounts to 100%;It is mixed that the flexible mine tailing base crack-resistant layer 3 is used
The preparation process that rubber alloy coagulates slurry is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed simultaneously
Pasty state is added water to, the mixing gelling slurry that flexible mine tailing base crack-resistant layer 3 is used is obtained;
(f) semi-finished product enter temperature and dried for 60 DEG C of steam heating and humidifying drying tunnel, conserve 2 hours;
(g) 10 days are stood after restocking;
(h) again after arrangement and repairing, in the flexible coating of mine tailing base crack-resistant layer 3 layer 4, finished product is formed.
Contain adhesive, early strength agent, water reducer, defoamer, reinforcement in functional auxiliary material in step (c) and step (e)
Silk and retarder.
The operation principle of the present invention is as follows:
Mine tailing base crack-resistant layer 1, enhancement layer 2 and flexible mine tailing base crack-resistant layer are employed in the mine tailing base decorating board of the present invention
3, the superposition of these stratified layers causes mine tailing base decorating board to have stronger effect of prestressed, solves the appearance of thin-coat plaster system
Ftracture, come off, hollowing and phenomenon of growing dim;In addition, take full advantage of mine tailing base in the mine tailing base crack-resistant layer of the present invention, change give up into
Treasured, saves the energy, reduces consumption, solves pollution of the Industrial Solid Waste to environment, improves its attached value;The present invention is at this
On the basis of again add heat-insulation layer, make it have heat insulation effect.
Particular embodiments described above, pair present invention solves the technical problem that, technical scheme and beneficial effect carry out
It is further described, should be understood that the specific embodiment that the foregoing is only the present invention, is not limited to this
Invention, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. should be included in this hair
Within bright protection domain.
Claims (10)
1. a kind of mine tailing base decorating board, it is characterised in that it includes:
Mine tailing base crack-resistant layer (1);
Enhancement layer (2), the enhancement layer (2) is arranged on the upper surface of mine tailing base crack-resistant layer (1);
Flexible mine tailing base crack-resistant layer (3), the flexible mine tailing base crack-resistant layer (3) is arranged on the upper surface of enhancement layer (2);
Dope layer (4), the dope layer (4) is arranged on the upper surface of the flexible mine tailing base crack-resistant layer (3).
2. mine tailing base decorating board according to claim 1, it is characterised in that:The thickness of the mine tailing base crack-resistant layer (1)
For 2mm~3.5mm;And/or the thickness of the flexible mine tailing base crack-resistant layer (3) is 2mm~2.5mm.
3. mine tailing base decorating board according to claim 1, it is characterised in that:The enhancement layer (2) is by glass fiber reticular cloth
It is made.
4. mine tailing base decorating board according to claim 1, it is characterised in that:The gross thickness of the mine tailing base decorating board
For 5mm~7mm.
5. a kind of mine tailing base heat insulation decoration integrated plate, it is characterised in that it includes:
In Claims 1-4 it is any it is lower as described in mine tailing base decorating board;
Boundary layer (5), the boundary layer (5) is arranged on the lower surface of mine tailing base crack-resistant layer (1) of mine tailing base decorating board;
Heat-insulation layer (6), the heat-insulation layer (6) is arranged on the lower surface of the boundary layer (5).
6. mine tailing base heat insulation decoration integrated plate according to claim 5, it is characterised in that:The boundary layer (5) is cementing
Oxidant layer.
7. mine tailing base heat insulation decoration integrated plate according to claim 5, it is characterised in that:The heat-insulation layer (6) is by EPS materials
Material or extruded sheet material or polyurethane material or modified EPS material or rock wool heat-preservation material are made.
8. mine tailing base heat insulation decoration integrated plate according to claim 5, it is characterised in that:The thickness of the heat-insulation layer (6)
For 2cm~10cm.
9. a kind of manufacture method of mine tailing base heat insulation decoration integrated plate as any one of claim 5 to 8, its feature exists
Contain in the step of method:
(a) heat-insulation layer (6) after a shaping is provided;
(b) boundary layer (5) is coated with the upper surface of heat-insulation layer (6);
(c) mine tailing base crack-resistant layer (1) is set on the upper surface of boundary layer (5);Wherein, the mine tailing base crack-resistant layer (1) uses
The mixing component that includes of gelling slurry and each component mass percent be:CHARACTERISTICS OF TAILINGS SAND:60%~80%;Cement:20%~
25%;Gluing emulsion:5%~10%;Surplus is functional auxiliary material, amounts to 100%;The mixing that mine tailing base crack-resistant layer (1) is used
The preparation process of gelling slurry is as follows:Got the raw materials ready according to each component and each component mass percent;Each component is mixed and added
Water obtains the mixing gelling slurry that mine tailing base crack-resistant layer (1) is used to pasty state;
(d) enhancement layer (2) is set on the upper surface of mine tailing base crack-resistant layer (1);
(e) flexible mine tailing base crack-resistant layer (3) is set on the upper surface of enhancement layer (2), semi-finished product are formed;Wherein, the flexibility
The mixing component that includes of gelling slurry and each component mass percent that mine tailing base crack-resistant layer (3) is used be:CHARACTERISTICS OF TAILINGS SAND:50%~
70%;Cement:25%~30%;Flexible emulsion:8%~10%;Surplus is functional auxiliary material, amounts to 100%;The flexible tail
The preparation process for the mixing gelling slurry that ore deposit base crack-resistant layer (3) is used is as follows:It is standby according to each component and each component mass percent
Material;Each component is mixed and pasty state is added water to, the mixing gelling slurry that flexible mine tailing base crack-resistant layer (3) uses is obtained;
(f) semi-finished product enter temperature and dried for 40 DEG C~80 DEG C of steam heating and humidifying drying tunnel, and conserve;
(g) 3~10 days are stood after restocking;
(h) again after arrangement and repairing, in flexible mine tailing base crack-resistant layer (3) coating layer (4), finished product is formed.
10. the manufacture method according to claim 9, it is characterised in that:Feature in step (c) and/or step (e)
Contain adhesive, early strength agent, water reducer, defoamer, reinforced wire and retarder in auxiliary material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364334.0A CN107060246A (en) | 2017-05-22 | 2017-05-22 | Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710364334.0A CN107060246A (en) | 2017-05-22 | 2017-05-22 | Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107060246A true CN107060246A (en) | 2017-08-18 |
Family
ID=59609681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710364334.0A Pending CN107060246A (en) | 2017-05-22 | 2017-05-22 | Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060246A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101648790A (en) * | 2009-08-19 | 2010-02-17 | 长春金世纪矿业技术开发有限公司 | Manufacturing method of gangue heat-preserving dry-mixed mortar |
CN101806127A (en) * | 2010-03-12 | 2010-08-18 | 王琰 | Polyphenyl composite decorative board and manufacture process thereof |
CN101851960A (en) * | 2010-05-10 | 2010-10-06 | 陈岳朝 | Insulation system with polycrystalline anti-cracking and waterproofing mortar |
CN201991087U (en) * | 2011-03-22 | 2011-09-28 | 重庆邦瑞建筑保温工程有限公司 | Outer heat-preserving layer for outer wall |
CN103833289A (en) * | 2014-03-14 | 2014-06-04 | 福州皇家地坪有限公司 | Quick-setting anti-crack polymeric mortar |
CN104230238A (en) * | 2014-09-09 | 2014-12-24 | 广西横县恒丰建材有限责任公司 | Ready-mixed plastering mortar for exterior wall, and production method thereof |
CN105669153A (en) * | 2016-01-12 | 2016-06-15 | 贵州腾峰科技有限责任公司 | Gypsum-based pre-mixed mortar and preparation method thereof |
CN106082847A (en) * | 2016-06-14 | 2016-11-09 | 马鞍山十七冶工程科技有限责任公司 | A kind of for heat preserving crack resistant mortar for exterior wall formula |
WO2016177324A1 (en) * | 2015-05-05 | 2016-11-10 | 马兴爱 | Thin plastering heat preservation and decoration integrated plate, production system and production method |
CN106278002A (en) * | 2015-06-10 | 2017-01-04 | 嘉华特种水泥股份有限公司 | A kind of concrete duct resistant abrasion mending mortar |
-
2017
- 2017-05-22 CN CN201710364334.0A patent/CN107060246A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101648790A (en) * | 2009-08-19 | 2010-02-17 | 长春金世纪矿业技术开发有限公司 | Manufacturing method of gangue heat-preserving dry-mixed mortar |
CN101806127A (en) * | 2010-03-12 | 2010-08-18 | 王琰 | Polyphenyl composite decorative board and manufacture process thereof |
CN101851960A (en) * | 2010-05-10 | 2010-10-06 | 陈岳朝 | Insulation system with polycrystalline anti-cracking and waterproofing mortar |
CN201991087U (en) * | 2011-03-22 | 2011-09-28 | 重庆邦瑞建筑保温工程有限公司 | Outer heat-preserving layer for outer wall |
CN103833289A (en) * | 2014-03-14 | 2014-06-04 | 福州皇家地坪有限公司 | Quick-setting anti-crack polymeric mortar |
CN104230238A (en) * | 2014-09-09 | 2014-12-24 | 广西横县恒丰建材有限责任公司 | Ready-mixed plastering mortar for exterior wall, and production method thereof |
WO2016177324A1 (en) * | 2015-05-05 | 2016-11-10 | 马兴爱 | Thin plastering heat preservation and decoration integrated plate, production system and production method |
CN106278002A (en) * | 2015-06-10 | 2017-01-04 | 嘉华特种水泥股份有限公司 | A kind of concrete duct resistant abrasion mending mortar |
CN105669153A (en) * | 2016-01-12 | 2016-06-15 | 贵州腾峰科技有限责任公司 | Gypsum-based pre-mixed mortar and preparation method thereof |
CN106082847A (en) * | 2016-06-14 | 2016-11-09 | 马鞍山十七冶工程科技有限责任公司 | A kind of for heat preserving crack resistant mortar for exterior wall formula |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100585105C (en) | Insulating decoration integral board for building exterior wall | |
CN201198640Y (en) | External heat insulation decorative machining structure body | |
CN201056807Y (en) | Composite thermal-insulation decorative board | |
CN103321375A (en) | Composite inorganic thermal-insulation decoration plate and manufacturing method thereof | |
CN201198641Y (en) | External heat insulation decorative machining structure body | |
CN206016173U (en) | Surface arranges EPS moulding used for building exterior wall and the system thereof of architectural surface | |
CN106830862B (en) | A kind of lime base raw-soil texture ornament materials and preparation method thereof | |
CN105856786A (en) | Production technology for soft ceramic polyurethane heat-insulating decorative compound plate | |
CN104131677B (en) | A kind of method utilizing sliver to prepare thick china | |
CN103895440B (en) | The manufacture craft of the large-scale seamless mural painting of a kind of imitative sandstone embossment | |
CN104695663A (en) | Polystyrene foam insulation board decoration component and preparation method thereof | |
CN107060246A (en) | Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate and its manufacture method | |
CN107345368A (en) | A kind of self-adhesion grid cloth | |
CN107143106A (en) | Mine tailing base decorative panel and its preparation technology | |
CN206538953U (en) | Structure of plastering is exempted from a kind of Novel interior wall gypsum bottoming | |
CN105859199B (en) | Steel structure " machine sprays-exempt from calcined gypsum-reflective heat-insulation paint " goes along with sb. to guard him heat preservation composite wall system | |
CN206928562U (en) | Mine tailing base decorating board and mine tailing base heat insulation decoration integrated plate | |
CN206053005U (en) | Prefabricated thin-coat plaster composite insulation boards | |
CN201991160U (en) | Heat-preserving and decorative integrated external wall board | |
CN105906239B (en) | Steel structure " machine spray-fluorgypsum-reflective heat-insulation paint " goes along with sb. to guard him heat preservation composite wall system | |
CN206928577U (en) | Mine tailing base decorative panel | |
CN201809869U (en) | Thermal insulation and energy-saving composite plate | |
CN212249033U (en) | Inorganic infiltration A level heated board moulding | |
CN205369602U (en) | Decorate insulation construction integration template | |
CN101565972A (en) | Plastering-type phenolic composite construction energy-saving and heat-insulation board and producing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |