CN107059650A - Suspension bridge main push device - Google Patents

Suspension bridge main push device Download PDF

Info

Publication number
CN107059650A
CN107059650A CN201710504417.5A CN201710504417A CN107059650A CN 107059650 A CN107059650 A CN 107059650A CN 201710504417 A CN201710504417 A CN 201710504417A CN 107059650 A CN107059650 A CN 107059650A
Authority
CN
China
Prior art keywords
thrustor
girder
fining twisted
twisted steel
main push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710504417.5A
Other languages
Chinese (zh)
Other versions
CN107059650B (en
Inventor
卢伟
黄松和
虞业强
李鸿飞
杨定军
武峰平
徐靖
张文桂
黄靓
关宇涵
余贵杨
杜传鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road and Bridge (Group) Co Ltd
Southwest Jiaotong University
Original Assignee
Sichuan Road and Bridge (Group) Co Ltd
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road and Bridge (Group) Co Ltd, Southwest Jiaotong University filed Critical Sichuan Road and Bridge (Group) Co Ltd
Priority to CN201710504417.5A priority Critical patent/CN107059650B/en
Publication of CN107059650A publication Critical patent/CN107059650A/en
Application granted granted Critical
Publication of CN107059650B publication Critical patent/CN107059650B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a suspension bridge main cable pushing device; after improvement, the front pushing device and the main cable are wound by a steel wire rope, and the hollow pushing jack realizes pushing; in the pushing process, the rear pushing device is positioned through the finish rolling deformed steel bar nut, the jack is operated manually to push the main cable to move for the single pushing stroke length corresponding to the support number, then the front pushing device is positioned through the finish rolling deformed steel bar nut, the rear pushing device is pushed for the same stroke length, and the process is circulated until the main cable is pushed to the target position. The device has simple integral structure, and can quickly realize the pushing operation of the main cable through the hollow pushing jack.

Description

A kind of main rope of suspension bridge thrustor
Technical field
It is specifically a kind of main rope of suspension bridge thrustor the present invention relates to a kind of main push-towing rope incremental launching device.
Background technology
Suspension bridge, also known as suspension bridge, including Sarasota, anchorage, main push-towing rope, hoist cable, cord clip, cable saddle, steel girder(Or concrete master Beam)Constructed Deng part.
Main push-towing rope is anchored in two sides by the cable saddle on Sarasota(Or bridge two ends)Basis(Anchorage)On, it is used as primary load bearing knot Structure, is typically made up of steel wire or steel chain rope, as the main beam structure of the main supporting member of traffic loading, then passes through hoist cable and rope Folder is contacted with main push-towing rope.
Its main push-towing rope geometry is determined that linear typically on upright plane is catenary by the equilibrium condition of power.And lead at present The projection of cable in the plane is generally parallel lines, is easy to construct and controls.
But for some particular designs, to increase the monolithic stability meter of structure, constructed using space main push-towing rope, i.e. plane projection For curve, this is calculated to design and construction process control brings great challenge, to ensure construction precision, it is necessary in erection of main beam Before, in advance by main push-towing rope by special device lateral pushing to design attitude, and high-altitude more than hundred meters completes above-mentioned operation, this It is the technical barrier not run into the past.Due to lacking efficient main push-towing rope thrustor, when to the urging action of bridge main push-towing rope, show Inefficiency is obtained, security is poor, cost is high.
The content of the invention
Therefore, in order to solve above-mentioned deficiency, the present invention provides a kind of main rope of suspension bridge thrustor herein;Lead to after improvement Wirerope-winding is crossed on preceding thrustor and main push-towing rope, hollow pushing tow jack realizes pushing tow;During pushing tow, pass through essence first Roll screw-thread steel nut to position rear thrustor, manually operated jack, promote the single top of main push-towing rope movement respective support numbering Haul distance is pushed away, then preceding thrustor is positioned by fining twisted steel nut, promotes equal stroke long rear thrustor Degree, circulates this flow, until main push-towing rope is pushed into target location.The device overall structure of the invention is simple, passes through hollow pushing tow thousand Quickly realize main push-towing rope urging action in jin top.
The present invention is achieved in that a kind of main rope of suspension bridge thrustor of construction, it is characterised in that:The main push-towing rope pushing tow Device includes girder, and the two ends of girder are respectively arranged with one group of preceding thrustor, rear thrustor;The two ends of girder are set respectively It is equipped with one group of screw thread bridle iron;Screwed on after passing through screw thread bridle iron by fining twisted steel nuts and washers fining twisted steel one end Fixed, the other end is fixed by the screw-thread steel support base on girder;Wherein, fining twisted steel is through preceding thrustor, rear top Pushing device, and preceding thrustor, rear thrustor pass through the fining twisted steel nut positioning on fining twisted steel;Preceding pushing tow Jack is provided between device, rear thrustor, the wirerope-winding between preceding thrustor and main push-towing rope;
The pushing tow work of the main push-towing rope adjusting apparatus is by wirerope-winding on preceding thrustor and main push-towing rope, and hollow pushing tow is very heavy Realize pushing tow in top;During pushing tow, rear thrustor is positioned by fining twisted steel nut first, manually operated jack, The single pushing tow haul distance of main push-towing rope movement respective support numbering is promoted, then by fining twisted steel nut by preceding thrustor Positioning, promotes equal haul distance by rear thrustor, this flow is circulated, until main push-towing rope is pushed into target location.
According to main rope of suspension bridge thrustor of the present invention, it is characterised in that:Thrustor is installed as follows:
Step 1:Girder is sling, positioned;
Step 2:Successively rear thrustor, preceding thrustor are installed on girder from end carriage side;
Step 3:Screw thread bridle iron, screw-thread steel support base are installed to girder relevant position;
Step 4:Fining twisted steel is passed through into preceding thrustor, rear thrustor;
Step 5:Forward and backward thrustor is positioned by fining twisted steel nut, it is ensured that equipment safety, and installed simultaneously very heavy Top;
Step 6:End carriage side fining twisted steel nuts and washers is screwed on, girder, urging portion are installed.
The invention has the advantages that:The present invention provides a kind of main rope of suspension bridge thrustor herein by improving, described Main push-towing rope thrustor includes girder, and the two ends of girder are respectively arranged with one group of preceding thrustor, rear thrustor;The two ends of girder Head is respectively arranged with one group of screw thread bridle iron;Fining twisted steel one end pass through after screw thread bridle iron by fining twisted steel nut and Packing ring screws on fixation, and the other end is fixed by the screw-thread steel support base on girder;Wherein, fining twisted steel is through preceding pushing tow dress Put, rear thrustor, and preceding thrustor, rear thrustor determined by the fining twisted steel nut on fining twisted steel Position;Jack is provided between preceding thrustor, rear thrustor, the wirerope-winding between preceding thrustor and main push-towing rope.This After invention is improved, the pushing tow work of the main push-towing rope adjusting apparatus passes through wirerope-winding on preceding thrustor and main push-towing rope, empty Heart pushing tow jack realizes pushing tow;During pushing tow, rear thrustor is positioned by fining twisted steel nut first, manually behaviour Make jack, promote the single pushing tow haul distance of main push-towing rope movement respective support numbering, then will by fining twisted steel nut Preceding thrustor positioning, promotes equal haul distance, this circulates this flow, until main push-towing rope is pushed into target by rear thrustor Position.
Brief description of the drawings
Fig. 1 is the overall structure diagram of main push-towing rope thrustor of the present invention;
Fig. 2 is main push-towing rope thrustor overall structure top view of the present invention
Fig. 3 is main push-towing rope thrustor overall structure side schematic view of the present invention;
Fig. 4 is the right part schematic diagram of shown main push-towing rope thrustor.
Embodiment
Below in conjunction with accompanying drawing 1- Fig. 4, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is entered Row is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole realities Apply example.Based on the embodiment in the present invention, those of ordinary skill in the art are obtained under the premise of creative work is not made Every other embodiment, belong to the scope of protection of the invention.
The present invention provides a kind of main rope of suspension bridge thrustor herein by improving, as Figure 1-Figure 4, can be according to such as Under type is practiced;The main push-towing rope thrustor includes girder 1, and the two ends of girder 1 are respectively arranged with thrustor before one group 2nd, rear thrustor 3;The two ends of girder 1 are respectively arranged with one group of screw thread bridle iron 4;The one end of fining twisted steel 5 passes through screw thread Fixation is screwed on by fining twisted steel nuts and washers after bridle iron 4, the other end is consolidated by the screw-thread steel support base 6 on girder 1 It is fixed;Wherein, fining twisted steel 5 is through preceding thrustor 2, rear thrustor 3, and preceding thrustor 2, rear thrustor 3 are positioned by the fining twisted steel nut on fining twisted steel 5;It is provided between preceding thrustor 2, rear thrustor 3 very heavy Top 7, the wirerope-winding between preceding thrustor 2 and main push-towing rope 8.
The installation of main push-towing rope thrustor of the present invention is as follows:
1. girder 1 is sling, position;
2. rear thrustor 3, preceding thrustor 2 are installed on girder 1 by priority from end carriage side;
3. screw thread bridle iron 4, screw-thread steel support base 6 are installed to the relevant position of girder 1;
4. fining twisted steel 5 is passed through into preceding thrustor 2, rear thrustor 3;
5. forward and backward thrustor is positioned by fining twisted steel nut, it is ensured that equipment safety, and jack 7 is installed simultaneously;
6. end carriage side fining twisted steel nuts and washers is screwed on, girder, urging portion are installed.
Thrustor function:
The pushing tow work of main push-towing rope adjusting apparatus passes through wirerope-winding on preceding thrustor 2 and main push-towing rope 8, hollow pushing tow jack 7 realize pushing tow;During pushing tow, rear thrustor 3 is positioned by fining twisted steel nut first, manually operated jack 7, The single pushing tow haul distance of the movement respective support numbering of main push-towing rope 8 is promoted, then preceding pushing tow is filled by fining twisted steel nut 2 positioning are put, rear thrustor 3 is promoted into equal haul distance, this flow is circulated, until main push-towing rope is pushed into target location.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (2)

1. a kind of main rope of suspension bridge thrustor, it is characterised in that:The main push-towing rope thrustor includes girder(1), girder(1)'s Two ends are respectively arranged with thrustor before one group(2), rear thrustor(3);Girder(1)Two ends be respectively arranged with one group of spiral shell Line bridle iron(4);Fining twisted steel(5)One end passes through screw thread bridle iron(4)Screwed on afterwards by fining twisted steel nuts and washers Fixed, the other end passes through girder(1)On screw-thread steel support base(6)It is fixed;Wherein, fining twisted steel(5)It is through preceding pushing tow Device(2), rear thrustor(3), and preceding thrustor(2), rear thrustor(3)Pass through fining twisted steel(5)On Fining twisted steel nut is positioned;Preceding thrustor(2), rear thrustor(3)Between be provided with jack(7), in preceding pushing tow dress Put(2)And main push-towing rope(8)Between wirerope-winding;
The pushing tow work of the main push-towing rope adjusting apparatus is by wirerope-winding in preceding thrustor(2)And main push-towing rope(8)On, hollow top Push away jack(7)Realize pushing tow;During pushing tow, first by fining twisted steel nut by rear thrustor(3)Positioning, manually Operate jack(7), promote main push-towing rope(8)The single pushing tow haul distance of mobile respective support numbering, then passes through finish rolling screw thread Steel nut is by preceding thrustor(2)Positioning, by rear thrustor(3)Equal haul distance is promoted, this flow is circulated, until that will lead Cable is pushed into target location.
2. main rope of suspension bridge thrustor according to claim 1, it is characterised in that:Thrustor is installed as follows:
Step 1:By girder(1)Sling, position;
Step 2:Successively by rear thrustor(3), preceding thrustor(2)Girder is installed to from end carriage side(1)On;
Step 3:By screw thread bridle iron(4), screw-thread steel support base(6)It is installed to girder(1)Relevant position;
Step 4:By fining twisted steel(5)Through preceding thrustor(2), rear thrustor(3);
Step 5:Forward and backward thrustor is positioned by fining twisted steel nut, it is ensured that equipment safety, and jack is installed simultaneously (7);
Step 6:End carriage side fining twisted steel nuts and washers is screwed on, girder, urging portion are installed.
CN201710504417.5A 2017-06-28 2017-06-28 Suspension bridge main push device Active CN107059650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710504417.5A CN107059650B (en) 2017-06-28 2017-06-28 Suspension bridge main push device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710504417.5A CN107059650B (en) 2017-06-28 2017-06-28 Suspension bridge main push device

Publications (2)

Publication Number Publication Date
CN107059650A true CN107059650A (en) 2017-08-18
CN107059650B CN107059650B (en) 2019-06-28

Family

ID=59613506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710504417.5A Active CN107059650B (en) 2017-06-28 2017-06-28 Suspension bridge main push device

Country Status (1)

Country Link
CN (1) CN107059650B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468724A (en) * 2019-08-30 2019-11-19 西安市政设计研究院有限公司 A kind of cable of space cable suspension bridge main cable construction auxiliary device and main cable construction method
CN110565535A (en) * 2019-09-29 2019-12-13 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method
CN113356054A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Cable tower and construction method thereof
CN113356072A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Suspension bridge main push device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2932139B2 (en) * 1993-09-06 1999-08-09 東京製綱株式会社 Railing structure of suspension bridge
CN101418542A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN102251465A (en) * 2011-05-03 2011-11-23 张志新 Suspension bridge with bearing cable having X-shaped curve
CN104060540A (en) * 2014-06-03 2014-09-24 长安大学 Temporary cross bracing of space cable suspension bridge and lifting-constructing method of temporary cross bracing
CN106284093A (en) * 2016-08-31 2017-01-04 中铁局集团有限公司 A kind of large span cable crane continuous cross sliding type construction method
CN206189285U (en) * 2016-08-31 2017-05-24 中铁十八局集团第五工程有限公司 Running gear who hangs basket is pour to bridge cantilever

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2932139B2 (en) * 1993-09-06 1999-08-09 東京製綱株式会社 Railing structure of suspension bridge
CN101418542A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN102251465A (en) * 2011-05-03 2011-11-23 张志新 Suspension bridge with bearing cable having X-shaped curve
CN104060540A (en) * 2014-06-03 2014-09-24 长安大学 Temporary cross bracing of space cable suspension bridge and lifting-constructing method of temporary cross bracing
CN106284093A (en) * 2016-08-31 2017-01-04 中铁局集团有限公司 A kind of large span cable crane continuous cross sliding type construction method
CN206189285U (en) * 2016-08-31 2017-05-24 中铁十八局集团第五工程有限公司 Running gear who hangs basket is pour to bridge cantilever

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468724A (en) * 2019-08-30 2019-11-19 西安市政设计研究院有限公司 A kind of cable of space cable suspension bridge main cable construction auxiliary device and main cable construction method
CN110565535A (en) * 2019-09-29 2019-12-13 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method
CN110565535B (en) * 2019-09-29 2021-01-26 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method
CN113356054A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Cable tower and construction method thereof
CN113356072A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Suspension bridge main push device
CN113356072B (en) * 2021-06-26 2023-02-10 山东省公路桥梁建设集团有限公司 Suspension bridge main push device
CN113356054B (en) * 2021-06-26 2023-02-14 山东省公路桥梁建设集团有限公司 Cable tower and construction method thereof

Also Published As

Publication number Publication date
CN107059650B (en) 2019-06-28

Similar Documents

Publication Publication Date Title
CN107059650A (en) Suspension bridge main push device
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN106522362A (en) Construction device and construction method of steel structure beam of corridor system
CN107700367A (en) A kind of integrated bridge machine
CN106368493A (en) Two-arm hydraulic drive-in type hard capping lattice type crossing frame
CN105155828A (en) Lifting platform and four-upright guide rail bracket thereof
CN203333185U (en) Trussed gantry crane
CN104164837A (en) Automatic-locating continuous pushing device for large box beams
CN202848946U (en) Rope guide wheel of construction winding engine
CN201118145Y (en) Powerline aerial spanning device
CN104452594A (en) Multi-support cable guide method cable replacement device
CN211142832U (en) Suspension bridge catwalk system
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN105484155B (en) Crossing floor system for on-line high-speed railway crossing equipment
CN210714046U (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN207646617U (en) A kind of integration bridge machine
CN203612860U (en) Steel wire rope winding device of large portal crane
CN205442204U (en) Steel strand wires pay -off
CN205206273U (en) Lift platform and four vertical guideway framves thereof
CN204847572U (en) Support frame that cable laying used
CN212000614U (en) Large cable clamp transport trolley walking on main cable of suspension bridge
CN203832507U (en) Flexible vehicle blocking bar lifting device
CN203096742U (en) Difunctional supporting hanging plate
CN202787930U (en) Hanging basket for high-place operations
CN103803436A (en) Automatic drilling line guide device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant