CN107053051A - Dry van container right panel assembly tooling - Google Patents
Dry van container right panel assembly tooling Download PDFInfo
- Publication number
- CN107053051A CN107053051A CN201710141673.2A CN201710141673A CN107053051A CN 107053051 A CN107053051 A CN 107053051A CN 201710141673 A CN201710141673 A CN 201710141673A CN 107053051 A CN107053051 A CN 107053051A
- Authority
- CN
- China
- Prior art keywords
- right panel
- fix bar
- bar
- annex
- van container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001125 extrusion Methods 0.000 claims abstract description 52
- 238000009434 installation Methods 0.000 claims abstract description 48
- 238000000151 deposition Methods 0.000 claims abstract description 3
- 238000009987 spinning Methods 0.000 claims description 17
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 241000826860 Trapezium Species 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 4
- 230000000739 chaotic effect Effects 0.000 abstract description 3
- 238000005259 measurement Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 11
- 230000008569 process Effects 0.000 description 11
- 239000000463 material Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 239000004743 Polypropylene Substances 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 239000004484 Briquette Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
- B25B11/02—Assembly jigs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Assembled Shelves (AREA)
- Rigid Containers With Two Or More Constituent Elements (AREA)
Abstract
The invention belongs to dry van container mounting technology field.To solve, the arrangement of container assembling line present in prior art is chaotic, time-consuming, the low technical problem of efficiency, and the present invention provides a kind of dry van container right panel assembly tooling, and the assembly tooling includes frock body;The frock body includes the right panel installation frame for being used to assemble dry van container right panel;The rotating extrusion device of fixed dry van container right panel, the first stopping means for fixing dry van container right panel, the second stopping means of installation annex for fixing dry van container right panel are respectively provided with the right panel installation frame and for the additional supporting device for the installation annex for depositing dry van container right panel.The present invention without carry out upset and annex measurement and positioning, it is time saving and energy saving, can both sides simultaneously assembled, lifted efficiency of assembling.
Description
Technical field
The invention belongs to dry van container mounting technology field, and in particular to a kind of dry van container right panel dress assembled for dry van container
With frock.
Background technology
According to vehicle lightweight demand, new material is more and more used in vehicle manufacture, wherein light weight, close
PP (polypropylene) cellular board of envelope good waterproof performance is more and more applied in container production and will turn into the hair of industry
Exhibition trend.Understand according to investigations, existing container assembly equal use level platform in side plate annex assembling process, in front, annex is filled
The assembling of another side annex is carried out after the completion of matching somebody with somebody by manually carrying out turn-over, because container board dimension is larger, quality is larger, turn over
There is sheet material and contact with platform in risk that is laborious and there is scuffing sheet material and remaining annex during turning, the assembling process after upset
The scuffing equivalent risk that face relative motion is formed, in addition, the no sizing of the assembling of annex on sheet material, assembling process needs correlation
Measurer ensured, time-consuming and assembling uniformity is poor.In magnificent poly- container workshop, the production assembling of container side plate is using letter
Container side plate is carried out bearing diagonal by easy workbench even seat, container lateral plates than larger one three-leg simple frame of making
After carry out assembly manipulation, frock function is simple, it is impossible to ensure product quality and homogeneity of product.However, existing technology is still
In the presence of following defect:
1st, annex needs to be assembled in view of container side plate both sides, therefore the technical side of container side plate assembly tooling
With regard to considering container side plate being placed in triangular support frock to carry out assembly manipulation in case, but supporting tool just plays support and made
With, without other dependent interactions, in assembling process there are still wasting time and energy, product quality and the phenomenon such as homogeneity of product is poor.
2nd, time-consuming:By taking honeycomb briquette plate dry van container as an example, the packing of right side door-plate and general assembly total time were more than 100 minutes.
3rd, efficiency is low:Need to assemble after integral slab is overturn after the completion of the assembling of container plate front;Homogeneity of product
Difference:It is not fixed during the packing of container plate, the parts position in assembling process is not fixed, and product is consistent after assembling
Property is poor;
4th, production-line arrangement is chaotic:Because assembly tooling does not carry out compatible with material frame, there is erecting yard frock, material
Frame etc. is more, occupies production site, causes production-line arrangement chaotic.
5th, the assembling process of current dry van container packing both sides annex is protected in section bar on the outside of first assembling, then reverse side assembling inner side
Plate, the annexes such as goods groove are blocked, need integrally to overturn container plate in assembling process, the accessory position in another assembling process need to often cover
It is measured, is wasted time and energy in overall assembling process.
The content of the invention
It is an object of the invention to solve technical problem present in above prior art at least one of there is provided a kind of nothing
The good dry van container right panel assembler of short, efficiency high that upset is measured with annex, time saving and energy saving, time-consuming, assembling quality need to be carried out
Dress.
The purpose of the present invention is achieved through the following technical solutions:
A kind of dry van container right panel assembly tooling, the assembly tooling includes frock body;The frock body includes being used for
Assemble the right panel installation frame of dry van container right panel;The rotation of fixed dry van container right panel is respectively provided with the right panel installation frame
Turn pressurizing unit, the first stopping means for fixing dry van container right panel, the of installation annex for fixing dry van container right panel
Two stopping means and the additional supporting device for installing annex for depositing dry van container right panel.
Further improve is that the right panel installation frame includes frame body, annex fix bar and right panel fix bar;Institute
State rectangle or square structure that frame body is a side opening;The frame body includes push rod, left side bar and right-hand rod;It is described
One end of left side bar is connected by push rod with one end of right-hand rod;The left side bar is fixed by annex fix bar and right panel respectively
Bar is connected with right-hand rod, and the annex fix bar and right panel fix bar are parallel to each other, and the middle part of the annex fix bar, right panel are solid
The middle part of fixed pole, the middle part of push rod are connected with each other by reinforcing bar.
Further improve is that the rotating extrusion device includes several first rotating extrusion devices and several respectively
Second rotating extrusion device;Each first rotating extrusion device includes the first swingle, the first spinning block and the first element body,
First element body is " L " shape structure, and first element body includes riser and the transverse slat being connected with one end of riser;
The other end of the riser is provided with contiguous block, and one end of first swingle is connected through transverse slat with the first spinning block, institute
The first swingle is stated to be threadedly coupled with the first element body;
Each second rotating extrusion device includes the second swingle, the second spinning block and the second element body, described second
Element body is " z " shape structure, and second element body includes the first transverse sheet, transverse sheet connection sheet and the second horizontal stroke being sequentially connected
Piece;Second swingle is connected through the first transverse sheet with the second spinning block, and second swingle and the first transverse sheet screw thread connect
Connect;Second transverse sheet is provided with hinge hole.
Further improve is that several described first rotating extrusion devices are respectively provided on left side bar and right-hand rod, if
Dry first rotating extrusion device is connected by contiguous block with left side bar and right-hand rod respectively;Several described second rotary squeezings
Device is respectively provided in annex fix bar and right panel fix bar, and several second rotating extrusion devices pass through the hinge hole respectively
It is hinged with annex fix bar and right panel fix bar.
Further improve is that first stopping means includes two right panel corner locating parts and several right panels are spacing
Part;Right panel corner locating part is " L " shape structure, and described two right panel corners locating part is respectively provided at close to right panel fix bar
Left side bar and right-hand rod on;Several described right panel locating parts are rectangle or square structure, several described right panel locating parts
Uniformly it is located in right panel fix bar, the width of several right panel locating parts is less than the width of right panel fix bar, and several right panels
Locating part is located at the side inside the trapezium structure of frock body in right panel fix bar, and second rotating extrusion device is set
In the right panel fix bar close to right panel locating part.
Further improve is that second stopping means includes several spacing catch, several described spacing catch
Uniformly it is located in annex fix bar, each spacing catch is square or rectangular configuration, side and the annex of each spacing catch are consolidated
Fixed pole is welded, and space is left between the other end and annex fix bar of each spacing catch.
Further improve is that the additional supporting device includes the first support meanss and the second support meanss;Described
One support meanss include the first montant and the second montant, one end of first montant and the second montant respectively with right panel fix bar
Connection;Be sequentially provided with respectively on the side of first montant and the second montant away from frock body several positions it is relative
First support bar on one support bar, first montant and the second montant is used in conjunction with each other;
Second support meanss include several second support bar groups;Each support bar group includes four second supports
Bar;Four support bars of each support bar group in same level, one end of four support bars respectively with left side bar, the
One montant, the second montant and right-hand rod connection, the other end of each second support bar are provided with lug boss.
Further improve is that the frock body is hexahedron structure, and the frock body includes upper framework, lower frame
Frame, left frame, correct frame, front baffle and afterframe;The right panel installation frame is located on left frame and/or correct frame, described
Left frame and/or correct frame are rectangle or square structure, and the front baffle and afterframe are isosceles trapezoidal structure.
Further improve is that the right panel fixture of more than two is additionally provided with the middle part side of the right panel fix bar,
The right panel fixture is parallel with neighbouring right panel locating part and is located in right panel fix bar the right panel locating part phase neighbouring with this
To side on.
The present invention is relative to the beneficial effect of prior art:
1st, the present invention can fix outside, all annex rigging position sizes in inner side by container board placing in frock, only
Drilling assembling need to be carried out, the measurement and positioning without carrying out upset and annex is time saving and energy saving.
2nd, trapezium structure, can both sides simultaneously assembled, lifted efficiency of assembling;
3rd, sheet material is fixed in frock, and remaining parts is positioned, and parts need not be carried out in assembling process
Measurement and positioning;
4th, using assembling vacant position, it would be desirable to which the parts of assembling are placed in frock, parts are taken assembling, section nearby
About installation time and space.
5th, production efficiency is improved:Do not utilize before the invention frock, the assembling of parts and general assembly need to be separated and carried out
Assembling, installation time is longer, and using installation time is substantially reduced after the invention frock, when being surveyed according to production assembling, frock is not used
Installation time is 100 minutes or so before, is foreshortened to using installation time after the assembly tooling within 40 minutes;
6th, product quality is ensured:Assembling parts have carried out location and installation, it is ensured that product quality and uniformity.
Brief description of the drawings
The overall structure diagram of Fig. 1 present invention.
The overall structure diagram of the first rotating extrusion device of Fig. 2 present invention.
The overall structure diagram of the second rotating extrusion device of Fig. 3 present invention.
A partial enlarged drawing in Fig. 4 Fig. 1 of the present invention.
B partial enlarged drawing in Fig. 5 Fig. 1 of the present invention.
C partial enlarged drawing in Fig. 6 Fig. 1 of the present invention.
D partial enlarged drawing in Fig. 7 Fig. 1 of the present invention.
Fig. 8 Fig. 1 of the present invention right view.
Wherein, corresponding reference is in accompanying drawing, 1- annex fix bars, 2- right panel fix bars, 3- push rods, on the left of 4-
Bar, 5- right-hand rods, 6- reinforcing bars, the swingles of 7- first, 8- the first spinning blocks, 9- risers, 10- transverse slats, 11- contiguous blocks, 12-
Two swingles, 13- the second spinning blocks, the transverse sheets of 14- first, 15- transverse sheet connection sheets, the transverse sheets of 16- second, 17- right panels corner is spacing
Part, 18- right panel locating parts, the rotating extrusion devices of 19- first, the rotating extrusion devices of 20- second, 21- lug bosses, 22- second
Strut, 23- hinge holes, 24- right panel fixtures, the spacing catch of 25-, the montants of 26- first, the montants of 27- second, 28- first is supported
Bar.
Embodiment
Technical scheme is described in detail with accompanying drawing with reference to embodiments, it should be noted that with
Under be only the preferred embodiment of the present invention, for the person of ordinary skill of the art, do not departing from the invention structure
On the premise of think of, various modifications and improvements can be made, these should belong to protection scope of the present invention.
Dry van container is prior art, and dry van container is that the right panel of the dry van container in hexahedral rectangular configuration, the present invention refers to
It is the side plate with doorframe, in general, the side plate includes two pieces of short slabs and a doorframe, and doorframe is arranged in two short slabs
Between, and the right panel inner side install inner casing, block the annexes such as goods groove.The present invention is carried out for the assembling of the dry van container right panel
Improve.
Embodiment
As shown in figures 1-8, a kind of dry van container right panel assembly tooling, the assembly tooling includes frock body;The work
Dress body includes the right panel installation frame for being used to assemble dry van container right panel;Fixation is respectively provided with the right panel installation frame
The rotating extrusion device of dry van container right panel, the first stopping means for fixing dry van container right panel, for fixing dry van container right panel
Installation annex the second stopping means and for deposit dry van container right panel installation annex additional supporting device.
As shown in figure 1, the dry van container right panel assembly tooling of the present invention, its section is trapezium structure, in order to more easily right
The right panel of dry van container is assembled;Preferably, right panel installation frame is located to the left surface or right flank of the trapezium structure such as Fig. 1
On, in order to which preferably right panel is fixed, being provided with the side of right panel installation frame and internal relevant position is used to fix right
The right panel of the rotating extrusion device of plate, its size shape and dry van container matches;Preferably, right panel installation frame is rectangle knot
Structure;In order that the right panel of dry van container is preferably fixed on right panel installation frame, the first limit is provided with right panel installation frame
Position device;In order to more easily take the installation annex of right panel, additional supporting device is provided with right panel installation frame, is used for
Installation annex needed for storage assembling right panel, in order to preferably install corresponding positions of the installation annex in right panel installation frame of right panel
Put there is provided the second stopping means is fixed to installing annex.
Further improve is that the right panel installation frame includes frame body, annex fix bar and right panel fix bar;Institute
State rectangle or square structure that frame body is a side opening;The frame body includes push rod, left side bar and right-hand rod;It is described
One end of left side bar is connected by push rod with one end of right-hand rod;The left side bar is fixed by annex fix bar and right panel respectively
Bar is connected with right-hand rod, and the annex fix bar and right panel fix bar are parallel to each other, and the middle part of the annex fix bar, right panel are solid
The middle part of fixed pole, the middle part of push rod are connected with each other by reinforcing bar.
Specifically, as shown in figure 1, on the right panel installation frame, frame body to be set to the rectangle knot of a side opening
Structure, the left side bar and right-hand rod of frame body is connected with each other by annex fix bar and right panel fix bar, in order to improve annex
The weight capacity of fix bar and right panel fix bar, a reinforcing bar is set at the middle part of annex fix bar and right panel fix bar, plus
Gu the upper end of bar is connected with push rod, the center section of reinforcing bar is connected with annex fix bar, and lower end and the right panel of reinforcing bar are fixed
Bar is connected;So as to which reinforcing bar connects as one push rod, annex fix bar and right panel fix bar, play a part of scattered pressure.
Further improve is that the rotating extrusion device includes several first rotating extrusion devices and several respectively
Second rotating extrusion device;Each first rotating extrusion device includes the first swingle, the first spinning block and the first element body,
First element body is " L " shape structure, and first element body includes riser and the transverse slat being connected with one end of riser;
The other end of the riser is provided with contiguous block, and one end of first swingle is connected through transverse slat with the first spinning block, institute
The first swingle is stated to be threadedly coupled with the first element body;
Specifically, as shown in Figures 2 and 3, rotating extrusion device of the invention includes the first rotating extrusion device and the second rotation
Turn pressurizing unit, as shown in figure 1, on the left side bar and right-hand rod near annex fix bar and right panel fix bar, setting respectively
There are two the first rotating extrusion devices;As shown in figure 8, the center section point in the annex fix bar and right panel fix bar of the present invention
She You not two the second rotating extrusion devices.So as to which the stronger right panel for being fixed on the present invention of two pieces of short slabs of right panel be installed
On framework.
Specifically, because the first rotating extrusion device is arranged on the left side bar and right-hand rod of right panel installation frame, by
One rotating extrusion device is set to structure as shown in Figure 2, is welded by contiguous block 11 and left side bar or right-hand rod;So as to preferably
Realize the fixation of the marginal portion to two pieces of short slabs of dry van container right panel, the first swingle and the first casting die sheet of " L " shape structure
The threaded connection of body, by rotating the first swingle so as to realize above and below the first spinning block being connected with the first swingle lower end
Motion, so that the tightness fixed to right panel is adjusted, in use, the marginal portion of two pieces of short slabs of right panel, is put into the
The first swingle is rotated in space between the first spinning block body and contiguous block of one rotating extrusion device to compress to realize
Fixation to two pieces of short slabs of right panel.
Each second rotating extrusion device includes the second swingle, the second spinning block and the second element body, described second
Element body is " z " shape structure, and second element body includes the first transverse sheet, transverse sheet connection sheet and the second horizontal stroke being sequentially connected
Piece;Second swingle is connected through the first transverse sheet with the second spinning block, and second swingle and the first transverse sheet screw thread connect
Connect;Second transverse sheet is provided with hinge hole.
In order to which preferably the center section of right panel can be fixed for the second rotating extrusion device, the second rotating device passes through
Hinge hole is connected in annex fix bar and right panel fix bar, by the operation principle similar with the first rotating extrusion device,
By rotating the second swingle and the second element body threads turn, right panel is pressed in annex fix bar and the right side by the second spinning block
So as to realize fixation in plate fix bar.Second element body is " z " shape structure, it is preferable that the first transverse sheet, transverse sheet connection sheet
It is mutually perpendicular to the second transverse sheet.
Further improve is that several described first rotating extrusion devices are respectively provided on left side bar and right-hand rod, if
Dry first rotating extrusion device is connected by contiguous block with left side bar and right-hand rod respectively;Several described second rotary squeezings
Device is respectively provided in annex fix bar and right panel fix bar, and several second rotating extrusion devices pass through the hinge hole respectively
It is hinged with annex fix bar and right panel fix bar.
Specifically, the structure of the second rotating extrusion device, as shown in Figure 3;Due to the second rotating extrusion device be arranged on it is attached
In part fix bar and right panel fix bar, in order that the second rotating extrusion device is in the corresponding of more preferable two pieces of short slabs for fixing right panel
Part while, can be rotated around its pin joint, so that convenient use, the present invention is using in the second rotating extrusion device
Hinge hole is set on second transverse sheet, several second rotating extrusion devices are cut with scissors with annex fix bar or right panel fix bar respectively
Connect, thus realize the second rotating extrusion device in two pieces of short slabs of fixed right panel can more flexible convenience, it is convenient short to two pieces
Plate is fixed and pulled down so as to improving efficiency of assembling.
Further improve is that first stopping means includes two right panel corner locating parts and several right panels are spacing
Part;Right panel corner locating part is " L " shape structure, and described two right panel corners locating part is respectively provided at close to right panel fix bar
Left side bar and right-hand rod on;Several described right panel locating parts are rectangle or square structure, several described right panel locating parts
Uniformly it is located in right panel fix bar, the width of several right panel locating parts is less than the width of right panel fix bar, and several right panels
Locating part is located at the side inside the trapezium structure of frock body in right panel fix bar, and second rotating extrusion device is set
In the right panel fix bar close to right panel locating part.
As shown in figure 4, in order to which the short slab of two pieces of rectangular configurations to right panel is preferably fixed, preventing the mistake in assembling
Slided up and down in journey, the present invention employs locating part by the first stopping means to two pieces of short slabs of right panel and the corner of doorframe
It is fixed, several right panel corner locating parts of the invention, which are respectively arranged on, is used for the angle for fixing right panel on left side bar and right-hand rod
Portion, it is preferable that several right panel corner locating parts be " L " shape structure, by the corner of right panel be placed in the locating part of corner so as to
The fixation to the corner of right panel is realized, in order to limit stabilization to right panel is further, if with being provided with annex fix bar
The right panel locating part of dry rectangular or square configuration;The side of two pieces of short slabs of right panel is fixed.
Further improve is that second stopping means includes several spacing catch, several described spacing catch
Uniformly it is located in annex fix bar, each spacing catch is square or rectangular configuration, side and the annex of each spacing catch are consolidated
Fixed pole is welded, and space is left between the other end and annex fix bar of each spacing catch.
As shown in fig. 7, being assembled for convenience to two pieces of short slabs installation annex of the right panel of dry van container, fixed in annex
Several square or rectangle catch are welded on the side of bar, one end of catch is welded with annex fix bar or other fixations connect
Connect, space is left between the other end and annex fix bar of catch, the space is used to placing fixed inner casing, to block goods groove etc. attached
Part, so that the fixation to installing annex is realized, so that the connection to annex and right panel of being more convenient in assembling is installed (such as drilling riveting
Connect).
Further improve is that the additional supporting device includes the first support meanss and the second support meanss;Described
One support meanss include the first montant and the second montant, one end of first montant and the second montant respectively with right panel fix bar
Connection;Be sequentially provided with respectively on the side of first montant and the second montant away from frock body several positions it is relative
First support bar on one support bar, first montant and the second montant is used in conjunction with each other;
Second support meanss include several second support bar groups;Each support bar group includes four second supports
Bar;Four support bars of each support bar group in same level, one end of four support bars respectively with left side bar, the
One montant, the second montant and right-hand rod connection, the other end of each second support bar are provided with lug boss.
As shown in Fig. 1, Fig. 6 and Fig. 8, in order to ensure the assembling of dry van container right panel in assembling each annex is installed can be compared with
Fast, preferably installed, the bottom of the right panel installation frame in frock of the invention and medial surface are provided with the first support
Device and the second support meanss, the first support meanss of the invention as shown in fig. 6, including the first montant and the second montant, both
Upper end be connected with right panel fix bar, set on a corresponding position on the first montant and the second montant several first support
Bar, it is preferable that the quantity of the first montant and the first support bar on the second montant is on 4~8, the first montant and the second montant
On relative position on two first support bars are in same level and use cooperatively, the installation annex of right panel can be placed
In first support bar on the first montant and the second montant, two positions are placed on relatively and same by the way that annex will be installed
Accommodating parts will be installed on hand by being realized on two support bars on horizontal plane, be easy to take at any time;In addition, the first montant and
The quantity of first support bar on two montants can be adjusted according to actual conditions.
In order that being placed in support meanss of can consolidating of some installation annexes of dry van container, the second support dress of the invention
Put as shown in figure 4, including several second support bar groups, each second support bar is rectangular configuration, each second support bar
One end is connected with right panel installation frame, and the other end is provided with lug boss, for preventing that install annex slides from the second support meanss
Under.In order to strengthen the firm effect of the second support meanss, as shown in figure 1, the same level position in the bottom of right panel installation frame
Put, left side bar, the first montant, the second montant, a second support bar, i.e. second support bar group are set respectively on right-hand rod;
As shown in figure 1, being provided with three second support bar groups on the right panel installation frame of the present invention.So that when in use, each second
The installation annex of strip can be placed in four second support bars of support bar group, prevents from sliding and causes the mixed of assembling process
Disorderly.
Further improve is that the frock body is hexahedron structure, and the frock body includes upper framework, lower frame
Frame, left frame, correct frame, front baffle and afterframe;The right panel installation frame is located on left frame and/or correct frame, described
Left frame and/or correct frame are rectangle or square structure, and the front baffle and afterframe are isosceles trapezoidal structure.
As shown in figure 1, the frock body of the present invention is hexahedron structure, front baffle and afterframe are isosceles trapezoidal structure,
Preferably, the height of the height and operator of front baffle and afterframe is adapted, and when needing assembling, is assembled in the outside of right panel
After end, the inside of frock can be entered by front baffle and afterframe, the inner side of right panel is assembled, so as to improve work
Make efficiency, it is to avoid error.Preferably, left frame of the invention and correct frame are designed with right panel installation frame, so as to further carry
High installation effectiveness.
Further improve is that the right panel fixture of more than two is additionally provided with the middle part side of the right panel fix bar,
The right panel fixture is parallel with neighbouring right panel locating part and is located in right panel fix bar the right panel locating part phase neighbouring with this
To side on.
As shown in figure 5, in order to further enhance the fixed effect to right panel, right panel of the present invention near right panel locating part
The middle part side of fix bar is provided with two right panel fixtures, it is preferable that right panel fixture, right panel locating part, consolidate with being located at right panel
The second rotating extrusion device in the middle part of fixed pole is used cooperatively.As shown in figure 5, during right panel installation, being placed on right panel locating part and right panel
On room between fixture, the second rotating extrusion device is rotated to relevant position by hinge hole, by rotary squeezing by the right side
Plate is squeezed on the side of right panel locating part and is fixed, so as to realize the more firm fixation to right panel, right panel fixture
It can prevent right panel from being skidded off from right panel fixed frame.
Technical scheme can preferably be realized according to the record of this specification.
Claims (9)
1. a kind of dry van container right panel assembly tooling, it is characterised in that the assembly tooling includes frock body;The frock body
Including the right panel installation frame for assembling dry van container right panel;Fixed dry van container is respectively provided with the right panel installation frame
The rotating extrusion device of right panel, the first stopping means for fixing dry van container right panel, the installation for fixing dry van container right panel
Second stopping means of annex and the additional supporting device for installing annex for depositing dry van container right panel.
2. dry van container right panel assembly tooling according to claim 1, it is characterised in that the right panel installation frame includes frame
Frame body, annex fix bar and right panel fix bar;The frame body is the rectangle or square structure of a side opening;The framework
Body includes push rod, left side bar and right-hand rod;One end of the left side bar is connected by push rod with one end of right-hand rod;The left side
Side lever is connected by annex fix bar and right panel fix bar with right-hand rod respectively, and the annex fix bar and right panel fix bar are mutual
Parallel, middle part, the middle part of right panel fix bar, the middle part of push rod of the annex fix bar are connected with each other by reinforcing bar.
3. dry van container right panel assembly tooling according to claim 2, it is characterised in that the rotating extrusion device is wrapped respectively
Include several first rotating extrusion devices and several second rotating extrusion devices;Each first rotating extrusion device includes first
Swingle, the first spinning block and the first element body, first element body are " L " shape structure, first element body
The transverse slat being connected including riser and with one end of riser;The other end of the riser is provided with contiguous block, first swingle
One end be connected through transverse slat with the first spinning block, first swingle is threadedly coupled with the first element body;
Each second rotating extrusion device includes the second swingle, the second spinning block and the second element body, second casting die
Body is " z " shape structure, and second element body includes the first transverse sheet, transverse sheet connection sheet and the second transverse sheet being sequentially connected;
Second swingle is connected through the first transverse sheet with the second spinning block, and second swingle is threadedly coupled with the first transverse sheet;
Second transverse sheet is provided with hinge hole.
4. dry van container right panel assembly tooling according to claim 3, it is characterised in that several described first rotary squeezings
Device is respectively provided on left side bar and right-hand rod, and several first rotating extrusion devices pass through contiguous block and left side bar and the right side respectively
Side lever is connected;Several described second rotating extrusion devices are respectively provided in annex fix bar and right panel fix bar, and several
Two rotating extrusion devices are hinged by the hinge hole with annex fix bar and right panel fix bar respectively.
5. dry van container right panel assembly tooling according to claim 4, it is characterised in that first stopping means includes two
Individual right panel corner locating part and several right panel locating parts;Right panel corner locating part is " L " shape structure, described two right panels
Corner locating part is respectively provided on the left side bar and right-hand rod of right panel fix bar;Several described right panel locating parts are rectangle
Or square structure, several described right panel locating parts are uniformly located in right panel fix bar, and the width of several right panel locating parts is small
In the width of right panel fix bar, and several right panel locating parts are located in right panel fix bar in the trapezium structure of frock body
The side in portion, second rotating extrusion device is located in the right panel fix bar of right panel locating part.
6. dry van container right panel assembly tooling according to claim 5, it is characterised in that if second stopping means includes
Dry spacing catch, several described spacing catch are uniformly located in annex fix bar, and each spacing catch is square or rectangle
Structure, side and the annex fix bar of each spacing catch are welded, between the other end and annex fix bar of each spacing catch
Leave space.
7. dry van container right panel assembly tooling according to claim 6, it is characterised in that the additional supporting device includes the
One support meanss and the second support meanss;First support meanss include the first montant and the second montant, first montant
It is connected respectively with right panel fix bar with one end of the second montant;The side of first montant and the second montant away from frock body
The upper first support bar being sequentially provided with respectively on the relative first support bar in several positions, first montant and the second montant
It is used in conjunction with each other;
Second support meanss include several second support bar groups;Each support bar group includes four second support bars;Often
Four support bars of individual support bar group are in same level, and one end of four support bars is erected with left side bar, first respectively
Bar, the second montant and right-hand rod connection, the other end of each second support bar are provided with lug boss.
8. dry van container right panel assembly tooling according to claim 7, it is characterised in that the frock body is hexahedron knot
Structure, the frock body includes upper framework, underframe, left frame, correct frame, front baffle and afterframe;The right panel installing frame
Be erected on left frame and/or correct frame, the left frame and/or correct frame are rectangle or square structure, the front baffle and
Afterframe is isosceles trapezoidal structure.
9. dry van container right panel assembly tooling according to claim 8, it is characterised in that the medial side of the right panel fix bar
The right panel fixture of more than two is additionally provided with face, the right panel fixture is parallel with neighbouring right panel locating part and is located at right panel
In fix bar on the side relative with the neighbouring right panel locating part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710141673.2A CN107053051B (en) | 2017-03-10 | 2017-03-10 | Dry van container right panel assembly tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710141673.2A CN107053051B (en) | 2017-03-10 | 2017-03-10 | Dry van container right panel assembly tooling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107053051A true CN107053051A (en) | 2017-08-18 |
CN107053051B CN107053051B (en) | 2019-01-18 |
Family
ID=59622463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710141673.2A Expired - Fee Related CN107053051B (en) | 2017-03-10 | 2017-03-10 | Dry van container right panel assembly tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107053051B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108858042A (en) * | 2018-09-10 | 2018-11-23 | 江苏德尔森汽车有限公司 | A kind of hydraulic booster pump production components assembling equipment |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101288935A (en) * | 2007-04-16 | 2008-10-22 | 中国国际海运集装箱(集团)股份有限公司 | A container door assembly platform |
CN201573019U (en) * | 2009-12-23 | 2010-09-08 | 胜狮货柜技术研发(上海)有限公司 | Container door plate assembly platform |
CN201833163U (en) * | 2010-10-15 | 2011-05-18 | 中国国际海运集装箱(集团)股份有限公司 | Container top plate assembling device |
CN202088135U (en) * | 2011-05-27 | 2011-12-28 | 中国国际海运集装箱(集团)股份有限公司 | Assembling fixture |
KR101348307B1 (en) * | 2012-04-26 | 2014-01-06 | 이경선 | Zig Apparatus for Applying to Filling and Sealing of Cosmetic Container |
CN204236628U (en) * | 2014-11-20 | 2015-04-01 | 湖南晟通天力汽车有限公司 | Box type semi-trailer box apparatus for assembling |
CN104760786A (en) * | 2014-01-07 | 2015-07-08 | 广东新会中集特种运输设备有限公司 | Dry cargo container underframe part, dry cargo container and processing method thereof |
CN204711442U (en) * | 2015-05-08 | 2015-10-21 | 上海洱泰重工机械有限公司 | Container door mounts cover joins welding tooling |
CN205629722U (en) * | 2016-04-26 | 2016-10-12 | 江门市瑞世德机械有限公司 | Multi -functional assembly bench of frame before frozen products insulated container |
-
2017
- 2017-03-10 CN CN201710141673.2A patent/CN107053051B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101288935A (en) * | 2007-04-16 | 2008-10-22 | 中国国际海运集装箱(集团)股份有限公司 | A container door assembly platform |
CN201573019U (en) * | 2009-12-23 | 2010-09-08 | 胜狮货柜技术研发(上海)有限公司 | Container door plate assembly platform |
CN201833163U (en) * | 2010-10-15 | 2011-05-18 | 中国国际海运集装箱(集团)股份有限公司 | Container top plate assembling device |
CN202088135U (en) * | 2011-05-27 | 2011-12-28 | 中国国际海运集装箱(集团)股份有限公司 | Assembling fixture |
KR101348307B1 (en) * | 2012-04-26 | 2014-01-06 | 이경선 | Zig Apparatus for Applying to Filling and Sealing of Cosmetic Container |
CN104760786A (en) * | 2014-01-07 | 2015-07-08 | 广东新会中集特种运输设备有限公司 | Dry cargo container underframe part, dry cargo container and processing method thereof |
CN204236628U (en) * | 2014-11-20 | 2015-04-01 | 湖南晟通天力汽车有限公司 | Box type semi-trailer box apparatus for assembling |
CN204711442U (en) * | 2015-05-08 | 2015-10-21 | 上海洱泰重工机械有限公司 | Container door mounts cover joins welding tooling |
CN205629722U (en) * | 2016-04-26 | 2016-10-12 | 江门市瑞世德机械有限公司 | Multi -functional assembly bench of frame before frozen products insulated container |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108858042A (en) * | 2018-09-10 | 2018-11-23 | 江苏德尔森汽车有限公司 | A kind of hydraulic booster pump production components assembling equipment |
CN108858042B (en) * | 2018-09-10 | 2024-04-19 | 江苏德尔森汽车有限公司 | Spare part equipment is used in hydraulic pressure booster pump production |
Also Published As
Publication number | Publication date |
---|---|
CN107053051B (en) | 2019-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206371180U (en) | A kind of graden machine arranging apparatus | |
CN203914034U (en) | Multifunctional tool box | |
CN205166905U (en) | Deposit goods shelves and be used for aeroengine assembly manufacturing's device | |
CN107053051A (en) | Dry van container right panel assembly tooling | |
CN206702532U (en) | Dry van container right panel assembly tooling | |
CN211632594U (en) | Commodity circulation is quick travel goods shelves for storage | |
CN206942180U (en) | A kind of protection network fixed mount for building | |
CN206956989U (en) | A kind of building curtain wall of installation easy to disassemble | |
CN209567346U (en) | A kind of dust-proof dehumidifying storage box of communication power supply equipment | |
CN208905497U (en) | A kind of shelf | |
CN207292821U (en) | A kind of Large centrifugal compressors pallet for transporting | |
CN207693334U (en) | A kind of novel Bidirectional drawing type displaying metal shelf | |
CN221736123U (en) | A hydraulic support pad integrated storage rack | |
CN206520840U (en) | A kind of foldable storage cage | |
CN209211634U (en) | A kind of container house and multi-deck container house building | |
CN221740974U (en) | Bridge construction safety hanging basket | |
CN221662572U (en) | Lifting device and lifting vehicle for construction engineering | |
CN222539534U (en) | A container that is easy to disassemble and install | |
CN210868489U (en) | Joint formula indoor rack | |
CN206816539U (en) | A kind of steel C-type steel bracket connecting apparatus | |
CN201585677U (en) | Vertical pull rod placing rack | |
CN214690907U (en) | A packing box convenient for fruit transportation | |
CN106627304B (en) | Agricultural management machine flip type cargo box | |
CN208412649U (en) | A kind of double-layered transporting open-width batcher auxiliary clamping rack | |
CN208022155U (en) | A kind of tri-coupling type military vehicle parts container |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190118 Termination date: 20210310 |