CN107013245A - Pipeline fixing device - Google Patents

Pipeline fixing device Download PDF

Info

Publication number
CN107013245A
CN107013245A CN201710400824.1A CN201710400824A CN107013245A CN 107013245 A CN107013245 A CN 107013245A CN 201710400824 A CN201710400824 A CN 201710400824A CN 107013245 A CN107013245 A CN 107013245A
Authority
CN
China
Prior art keywords
anchor pole
pipeline
fixing device
lifting part
flexible lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710400824.1A
Other languages
Chinese (zh)
Inventor
郭相参
安建英
葛启发
杜贵文
孙扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201710400824.1A priority Critical patent/CN107013245A/en
Publication of CN107013245A publication Critical patent/CN107013245A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/02Suspension devices for tubes or the like, e.g. for ventilating ducts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of pipeline fixing device, for pipeline to be fixed in chamber or tunnel.Pipeline fixing device includes:For the anchor pole on the wall of chamber or tunnel, the Part I of anchor pole is stretched into wall, and at least one section shape of cross section and/or size of the part are different, and the remainder of anchor pole is located at outside wall;Flexible lifting part, flexible lifting part is detachably mounted to the remainder of anchor pole, and wound on the periphery wall of pipeline so that pipeline is hung to the outside of the wall.Pipeline fixing device according to embodiments of the present invention, by using the anchor pole and connected flexible lifting part of said structure, so as to reduce installation accuracy and the requirement of pipeline, it is easy to pipeline being fixed in the chamber of any contour surface or tunnel, applicability is good.Also, pipeline fixing device is simple in construction, processing is simple, easy for installation, and speed is fast, and cost performance is high, occupies little space, can fix many pipelines.

Description

Pipeline fixing device
Technical field
The present invention relates to pipeline technique for fixing field, more particularly, to a kind of pipeline fixing device.
Background technology
Because the chamber or the wall in tunnel in underground engineering are uneven, operating condition is poor, space is limited, greatly increases The installation difficulty of pipeline is added.
The content of the invention
It is contemplated that at least solving one of technical problem present in prior art.Therefore, the present invention proposes a kind of pipe Line fixing device, the pipeline fixing device is simple in construction, and installation accuracy requires low.
Pipeline fixing device according to embodiments of the present invention, for the pipeline to be fixed in chamber or tunnel, pipeline Fixing device includes:For the anchor pole on the wall in the chamber or the tunnel, the Part I of the anchor pole is stretched into In the wall, and at least one section shape of cross section and/or size of the part are different, and the remainder of the anchor pole is positioned at described Outside wall;Flexible lifting part, the flexible lifting part is detachably mounted to the remainder of the anchor pole, and wound on the pipe The periphery wall of line is so that the pipeline is hung to the outside of the wall.
Pipeline fixing device according to embodiments of the present invention, by using the anchor pole and connected flexibility of said structure Lifting part, so as to reduce installation accuracy and the requirement of pipeline, be easy to by pipeline be fixed on any contour surface chamber or In tunnel, applicability is good.Also, the pipeline fixing device is simple in construction, processing is simple, easy for installation, and speed is fast, sexual valence Than high, occupy little space, many pipelines can be fixed.Therefore, pipeline fixing device both can be used for earth's surface engineering, can also use In underground engineering, the rough contour surface of underground engineering can be well adapted for, installation accuracy requires low, taken after installation Space it is small, it is ensured that the safe operation of equipment, while low to the working condition requirement of installation site, Fast Installation can be realized, made It is fine with effect.
According to optional embodiment of the present invention, at least one section formation fried dough twist structure of the Part I of the anchor pole.
Alternatively, the Part I of the anchor pole stretches into the wall in the chamber or the tunnel and solid by Anchor Agent It is fixed.
According to optional embodiment of the present invention, the end of the remainder of the anchor pole is formed hangs for connecting the flexibility The suspension hook of piece installing.
According to further embodiment of the present invention, in addition to:Connector, the two ends of the flexible lifting part pass through the company Fitting connects to form ring-type to hang the pipeline to the anchor pole, or the flexible lifting part two ends respectively by described Connector is connected to hang the pipeline to the anchor pole with the anchor pole.
Alternatively, the connector includes:It is plugged on the flexible lifting part two ends or is plugged on the flexible lifting Bolt on part and the anchor pole and with the bolted nut.
According to one embodiment of present invention, the chamber or the wall in the tunnel have roof and/or vertically The side wall of extension, the anchor pole includes many of horizontally spaced setting, and the every anchor pole is located at the side-wall outer side One end be connected with to form the flexible lifting part of ring-type the pipeline is fixed into the roof or the side wall.
According to another of the invention embodiment, the chamber or the tunnel have a roof, the anchor pole include many and Every two anchor poles are that two anchor poles in one group, every group are connected with the two ends of the flexible lifting part with by the pipe respectively Line is fixed to the roof.
Alternatively, the flexible lifting part forms flexible lifting rope.
Alternatively, the flexible lifting part includes multiple suspension ring all linked with one another.
Alternatively, the flexible lifting part forms chain and including multiple chain links being hinged successively.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from description of the accompanying drawings below to embodiment is combined Substantially and be readily appreciated that, wherein:
Fig. 1 is the structural representation of pipeline fixing device according to an embodiment of the invention;
Fig. 2 is the structural representation of pipeline fixing device in accordance with another embodiment of the present invention;
Fig. 3 is the structural representation of the pipeline fixing device according to another embodiment of the invention;
Fig. 4 is the structural representation of the flexible lifting part of the pipeline fixing device according to multiple embodiments of the invention.
Reference:
Pipeline fixing device 100,
Anchor pole 11, fried dough twist structure 111, suspension hook 112,
Flexible lifting part 12, suspension ring 121,
Bolt 131, nut 132, pad 133;
Pipeline 200, country rock 300, Anchor Agent 400.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the invention, it is to be understood that term " " center ", " length ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " axial direction ", " radial direction ", " week To " etc. instruction orientation or position relationship be based on orientation shown in the drawings or position relationship, be for only for ease of description this hair Bright and simplified description, rather than instruction or the signified device of hint or element must be with specific orientation, with specific orientation Construction and operation, therefore be not considered as limiting the invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
The installation of pipeline, which is fixed, to be present among the various engineerings such as mine, building, traffic, municipal administration, for different purposes Pipeline, its installation requirement is also not quite similar.No matter which kind of operating mode, can pipeline smoothly put into early for it in installation Using suffering from important influence.The contour surface of chamber or tunnel particularly in underground engineering is often uneven, operation Condition is poor, space is limited, and the installation to pipeline brings great inconvenience.
Existing pipeline fixing device processing difficulties, cost is high, and installation accuracy requires high, not easy to install, influences duration, dimension Repair inconvenience.The installation accuracy, it is necessary to higher is fixed by pipe clamp in pipeline in correlation technique, and occupancy chamber or tunnel are net The space of section is big, from the point of view of practical application effect, its installation difficulty, and operation intensity is high, and speed is slow, or even influences the peace of equipment Row for the national games.
Therefore, the present invention proposes a kind of pipeline fixing device, the pipeline fixing device processing is simple, operation intensity is low, For ease of maintenaince, applicability is good.
Pipeline fixing device 100 according to embodiments of the present invention is described below with reference to Fig. 1-Fig. 4.
As Figure 1-Figure 4, pipeline fixing device 100 according to an embodiment of the invention is used to fix pipeline 200 In chamber or tunnel.Pipeline fixing device 100 includes:Hung for the anchor pole 11 and flexibility on the wall of chamber or tunnel Piece installing 12.
The Part I of anchor pole 11 is stretched into wall, and at least one section shape of cross section and/or size of the part are different.Example Such as, anchor pole 11 stretches into that shape of cross section of the one end in wall in different sections is different, or anchor pole 11 stretch into wall one The shape of cross section at end is identical, but cross-sectional area, thereby guarantees that anchor pole 11 can be securely fixed in wall.Anchor pole 11 remainder is located at outside wall, for connecting pipeline 200.Flexible lifting part 12 is detachably mounted to its remaining part of anchor pole 11 Point, and wound on the periphery wall of pipeline 200 so that pipeline 200 is hung to the outside of wall.
Pipeline fixing device 100 according to embodiments of the present invention, by using said structure anchor pole 11 and be connected thereto Flexible lifting part 12, so as to reduce installation accuracy and the requirement of pipeline 200, be easy to pipeline 200 being fixed on any profile In the chamber on surface or tunnel, applicability is good.Also, the pipeline fixing device 100 is simple in construction, processing is simple, peace Dress is convenient, and speed is fast, and cost performance is high, occupies little space, can fix many pipelines 200.
Therefore, pipeline fixing device 100 both can be used for earth's surface engineering, can also be used in underground engineering, can be well The rough contour surface of underground engineering is adapted to, installation accuracy requires low, and the space taken after installation is small, it is ensured that equipment Safe operation, at the same it is low to the working condition requirement of installation site, Fast Installation can be realized, using effect is fine.
According to optional embodiment of the present invention, there is anchor hole, the axis of anchor hole can edge on the wall in chamber or tunnel Horizontal direction extends, and either vertically extends or is inclined at an angle relative to horizontal direction and vertical direction Extension.
At least one section of the Part I of anchor pole 11 forms fried dough twist structure 111.Thereby guarantee that anchor pole 11 can be inserted securely It is connected in anchor hole.Alternatively, the Part I of anchor pole 11 is stretched into the wall in chamber or tunnel, then passes through Anchor Agent 400 again It is filled in anchor hole, makes itself and chamber or the rigid contact of the country rock in tunnel 300, connects more reliable.
According to optional embodiment of the present invention, the end of the remainder of anchor pole 11 is formed for connecting flexible lifting part 12 Suspension hook 112, convenient one end stretched out outside wall that flexible lifting part 12 is suspended on to anchor pole 11, connection is more convenient, is difficult hair Life comes off.
As shown in Figure 1-Figure 3, in some optional examples, pipeline fixing device 100 also includes:Connector, Mei Gerou The two ends of property lifting part 12 connect to form ring-type to hang pipeline 200 to anchor pole 11 by connector.
In other optional examples, the two ends of every flexible lifting part 12 are set by connector with two intervals respectively The anchor pole 11 put is connected, so that by part suspension to flexible lifting part 12 of pipeline 200.
As shown in figure 1, according to one embodiment of present invention, the wall in chamber or tunnel has the side vertically extended Wall, pipeline 200 needs to be horizontally fixed on the wall of side.
In some instances, anchor pole 11 includes many of horizontally spaced setting, and every anchor pole 11 is located at outside the wall of side One end (outer end as shown in Figure 1) of side is connected with the flexible lifting part 12 to form ring-type, so that a part for pipeline 200 be hanged In the annular region for hanging over every flexible lifting part 12, thus pipeline 200 is fixed on the side wall in chamber or tunnel.
Alternatively, connector includes:The spiral shell for being plugged on the bolt 131 at the flexible two ends of lifting part 12 and being connected with bolt 131 Mother 132.The two ends of each flexibility lifting part 12 form annular by bolt 131 and the connection of nut 132, convenient by flexible lifting part 12 are hung on the anchor rods 11, and thus pipeline 200 is hanging in the annular region of each flexible lifting part 12.
Further, connector also includes pad 133, and pad is provided between the head of bolt 131 and flexible lifting part 12 133, pad 133 also is provided between nut 132 and flexible lifting part 12, so as to ensure the connection of connector and flexible lifting part 12 Reliability, it is to avoid depart from.
According to another embodiment of the invention, chamber or tunnel have roof, and pipeline 200 needs to be horizontally fixed on chamber Or on the roof in tunnel.
As shown in Fig. 2 in some instances, anchor pole 11 includes many of horizontally spaced setting, every anchor pole 11 Vertically (above-below direction as shown in Figure 2) it can insert from bottom to top in the anchor hole of roof.The position of every anchor pole 11 One end on the outside of roof is connected with the flexible lifting part 12 to form ring-type, so that a part for pipeline 200 is suspended on into every In the annular region of flexible lifting part 12, thus pipeline 200 is fixed on the roof in chamber or tunnel.
As shown in figure 3, in some instances, anchor pole 11 includes many and every two anchor poles 11 are one group, multigroup anchor pole 11 It is horizontally spaced to set, and every anchor pole 11 vertically (above-below direction as shown in Figure 2) can insert from bottom to top Enter in the anchor hole of roof.Two ends of two anchor poles 11 respectively with a flexible lifting part 12 in every group are connected, so that will pipe Line 200 is placed on the flexible lifting part 12 of many formation U-shapeds, and then pipeline 200 is fixed on the roof in chamber or tunnel.
In some instances, connector includes:It is plugged on flexible lifting part 12 and the bolt 131 and and bolt on anchor pole 11 The nut 132 of 131 connections, i.e., the two ends of flexible lifting part 12 are connected to two anchor poles 11 by bolt 131 and nut 132 respectively On.Further, connector also includes pad 133, between the head of bolt 131 and flexible lifting part 12, nut 132 and anchor pole Pad 133 is equipped between 11, it is ensured that connection reliability.
Explanation is needed exist for, chamber of the invention or the sidewall surfaces in tunnel are not limited to what is vertically extended Vertical plane, can also form the inclined-plane for vertically tilting extension, or irregular contour surface.Similarly, it is of the invention Chamber or the roof in tunnel are not limited to horizontally extending horizontal plane, and can also be formed with respect to the horizontal plane has necessarily The inclined-plane at inclination angle, or irregular contour surface.The body of rod of the anchor pole 11 of the present invention can be processed by whole steel, anchor pole 11 anchored end can be processed into twisted shape, and the exposed junction of anchor pole 11 can process circlewise or hook-shaped, for hanging pipeline 200。
During installation, in the body of rod insertion anchor hole of anchor pole 11, chamber or the country rock in tunnel are anchored in by Anchor Agent 400 In 300, if being anchored with cement mortar, rod end can be not provided with fried dough twist structure 111;The length of flexible lifting part 12 can be by The operating mode of in-site installation position is adjusted, and the flexible ring of lifting part 12 lives pipeline 200, is sealed by bolt 131 and the connection of nut 132 Cyclization is closed, is hung on anchor pole 11, specifically, can be according to the specification of bolt 131, from supporting pad 133 and nut 132。
Thus, the pipeline fixing device 100 of the embodiment of the present invention using cooperatively by anchor pole 11 and flexible lifting part 12, The installation question that underground chamber or tunnel contour surface out-of-flatness are brought is solved well, simplifies installation procedure, operation Low intensity, installation rate is fast.Pipeline 200 can abut chamber or the wall in tunnel, realize 2 points of supports, take chamber or tunnel is net The space of section is small, relatively increases the use space of chamber or drift section.
As shown in figure 4, in some instances, flexible lifting part 12 forms flexible lifting rope, it is for instance possible to use size is thinner Reinforcing bar rope, the two ends of flexible lifting rope can be tied to form the annular of closing.
In another example, flexible lifting part 12 formation chain and including multiple chain links being hinged successively, chain can be with Connect to form closed-loop by connector, the link position of chain can also be adjusted as needed, so as to adjust chain formation The size of closed-loop.
In other examples, flexible lifting part 12 includes multiple suspension ring 121 all linked with one another, the two of flexible lifting part 12 Any suspension ring 121 on end can be connected by connector, so that flexible lifting part 12 to be formed to the annular of closing, be lived for ring Suspension ring 121 on pipeline 200, or the two ends of flexible lifting part 12 can be connected correspondingly with two anchor poles 11 respectively, Make the flexible formation of lifting part 12 U-shaped.
Thus, the problem of anchor pole 11 is uneven on profile is solved by adjusting the length of flexible lifting ring, both ensured The anchorage length of anchor pole 11, the process that the scene of saving again lengthens anchor pole 11.Pipeline 200 passes through flexible lifting ring suspension and anchor pole 11 On, while the wall with chamber or tunnel is contacted again, 2 points of supports are realized, stability is good.The combination of anchor pole 11 and flexible lifting ring should Good with applicability, operation intensity is low, easy for installation, and the fried dough twist structure 111 of the end of anchor pole 11 can more fully stir Anchor Agent 400, provide facility for construction.
Certainly, the structure of the flexible lifting part 12 of the embodiment of the present invention is not limited to this, for underground piping and lining 200 Fixed form can also use the flexible lifting part 12 of other structures.Table 1 be electric hoist, bracket type, flexible lifting ring formula it is excellent lack Point contrast table.
The pipeline fixed form of table 1 is contrasted
Pipeline fixing device 100 according to embodiments of the present invention, it is easy to which scene processing, installation exercise low intensity, speed are fast, Maintenance time is also saved simultaneously, cost is reduced.It is applicable not only to different purposes, the fixation of various sizes of pipeline 200, also Suitable for the fixation of the pipeline 200 under various operating modes.In the underground engineering of outer contour surface out-of-flatness, anchor is lengthened without scene Bar 11, the length of anchor pole 11 can be made up by adjusting the length of flexible lifting ring, both ensure that the anchorage length of anchor pole 11, and simple Change operation procedure, greatly shortened the activity duration, overcome the problem of underground engineering installation accuracy control is difficult.
Furthermore, the pipeline fixing device 100 is not required installation site, and the hole of anchor pole 11 can be any angle, peace Holding position is regardless of whether smooth.With good economic benefit and social benefit.
Other of pipeline fixing device 100 according to embodiments of the present invention are constituted and operated for ordinary skill All it is known for personnel, is not detailed herein.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example are described Structure, material or feature are contained at least one embodiment of the present invention or example.In this manual, to above-mentioned term Schematic representation is not necessarily referring to identical embodiment or example.Moreover, specific features, structure, material or the spy of description Point can in an appropriate manner be combined in any one or more embodiments or example.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this The scope of invention is limited by claim and its equivalent.

Claims (11)

1. a kind of pipeline fixing device, for the pipeline to be fixed in chamber or tunnel, it is characterised in that including:
For the anchor pole on the wall in the chamber or the tunnel, the Part I of the anchor pole is stretched into the wall, And at least one section shape of cross section and/or size of the part are different, the remainder of the anchor pole is located at outside the wall;
Flexible lifting part, the flexible lifting part is detachably mounted to the remainder of the anchor pole, and wound on the pipe The periphery wall of line is so that the pipeline is hung to the outside of the wall.
2. pipeline fixing device according to claim 1, it is characterised in that at least one section of the Part I of the anchor pole Form fried dough twist structure.
3. pipeline fixing device according to claim 1 or 2, it is characterised in that the Part I of the anchor pole stretches into institute State in the wall in chamber or the tunnel and fixed by Anchor Agent.
4. pipeline fixing device according to claim 1, it is characterised in that the end of the remainder of the anchor pole is formed Suspension hook for connecting the flexible lifting part.
5. pipeline fixing device according to claim 1, it is characterised in that also include:Connector, the flexible lifting part Two ends connect to form ring-type to hang the pipeline to the anchor pole by the connector, or
The two ends of the flexible lifting part are connected with by the pipe by the anchor pole of the connector and correspondence position respectively Line is hung to the anchor pole.
6. pipeline fixing device according to claim 5, it is characterised in that the connector includes:It is plugged on described soft Property lifting part two ends or the bolt that is plugged on the flexible lifting part and the anchor pole and with the bolted nut.
7. pipeline fixing device according to claim 3, it is characterised in that the chamber or the wall in the tunnel have top Wall and/or the side wall vertically extended,
The anchor pole includes many of horizontally spaced setting, and one end that the every anchor pole is located at the side-wall outer side connects It is connected to form the flexible lifting part of ring-type the pipeline is fixed into the roof or the side wall.
8. pipeline fixing device according to claim 3, it is characterised in that the anchor pole include many and it is every two described in Anchor pole is connected the pipeline being fixed to institute with the two ends of the flexible lifting part respectively for two anchor poles in one group, every group State roof.
9. pipeline fixing device according to claim 1, it is characterised in that the flexible lifting part forms flexible lifting rope.
10. pipeline fixing device according to claim 1, it is characterised in that the flexible lifting part includes multiple ring rings The suspension ring interlocked.
11. pipeline fixing device according to claim 1, it is characterised in that the flexible lifting part formation chain and bag Include multiple chain links being hinged successively.
CN201710400824.1A 2017-05-31 2017-05-31 Pipeline fixing device Pending CN107013245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710400824.1A CN107013245A (en) 2017-05-31 2017-05-31 Pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710400824.1A CN107013245A (en) 2017-05-31 2017-05-31 Pipeline fixing device

Publications (1)

Publication Number Publication Date
CN107013245A true CN107013245A (en) 2017-08-04

Family

ID=59451898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710400824.1A Pending CN107013245A (en) 2017-05-31 2017-05-31 Pipeline fixing device

Country Status (1)

Country Link
CN (1) CN107013245A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387161A (en) * 2017-08-11 2017-11-24 中国恩菲工程技术有限公司 Tunnel pipeline supporting construction
CN107829781A (en) * 2017-11-03 2018-03-23 中国恩菲工程技术有限公司 Pipeline fixing device
CN110318804A (en) * 2018-03-28 2019-10-11 中国有色集团抚顺红透山矿业有限公司 Underground mining field hoisting structure and installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202544875U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
US20130099068A1 (en) * 2011-10-21 2013-04-25 Donna E. Lacour Pipe hanger assembly
US20130174931A1 (en) * 2012-01-05 2013-07-11 Christopher J. Hendershot Support system for process piping and method of installation
CN203239394U (en) * 2013-05-23 2013-10-16 伊犁新矿煤业有限责任公司 Adjustable coal mine underground pipeline hoisting device
CN103775734A (en) * 2013-12-31 2014-05-07 山西四建集团有限公司 Large-diameter underground gas drainage pipeline system construction method
CN104806292A (en) * 2015-05-05 2015-07-29 中国恩菲工程技术有限公司 Tunnel pipeline fixing device
CN106285747A (en) * 2016-09-27 2017-01-04 中国恩菲工程技术有限公司 Anchor rod component and the anchor with it
CN106437846A (en) * 2016-11-11 2017-02-22 中国恩菲工程技术有限公司 Under-well pipeline mounting component
CN206903692U (en) * 2017-05-31 2018-01-19 中国恩菲工程技术有限公司 Pipeline fixing device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202544875U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
US20130099068A1 (en) * 2011-10-21 2013-04-25 Donna E. Lacour Pipe hanger assembly
US20130174931A1 (en) * 2012-01-05 2013-07-11 Christopher J. Hendershot Support system for process piping and method of installation
CN203239394U (en) * 2013-05-23 2013-10-16 伊犁新矿煤业有限责任公司 Adjustable coal mine underground pipeline hoisting device
CN103775734A (en) * 2013-12-31 2014-05-07 山西四建集团有限公司 Large-diameter underground gas drainage pipeline system construction method
CN104806292A (en) * 2015-05-05 2015-07-29 中国恩菲工程技术有限公司 Tunnel pipeline fixing device
CN106285747A (en) * 2016-09-27 2017-01-04 中国恩菲工程技术有限公司 Anchor rod component and the anchor with it
CN106437846A (en) * 2016-11-11 2017-02-22 中国恩菲工程技术有限公司 Under-well pipeline mounting component
CN206903692U (en) * 2017-05-31 2018-01-19 中国恩菲工程技术有限公司 Pipeline fixing device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387161A (en) * 2017-08-11 2017-11-24 中国恩菲工程技术有限公司 Tunnel pipeline supporting construction
CN107829781A (en) * 2017-11-03 2018-03-23 中国恩菲工程技术有限公司 Pipeline fixing device
CN110318804A (en) * 2018-03-28 2019-10-11 中国有色集团抚顺红透山矿业有限公司 Underground mining field hoisting structure and installation method

Similar Documents

Publication Publication Date Title
CN107013245A (en) Pipeline fixing device
CN106838465B (en) The existing pipe excavation of underground pipe gallery protects construction method
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN104989449B (en) Filling mining pipeline erecting and filling method
CN106586811A (en) Hoisting overturning device for concrete tower drum and hoisting overturning method
CN105238420A (en) Coke oven riser tube replacement apparatus and coke oven riser tube replacement method
CN206903692U (en) Pipeline fixing device
CN108708756A (en) A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN105905793B (en) Automatically-unhooked hanger
CN110644370B (en) Cable hoisting system of space self-anchored suspension bridge and construction method thereof
CN208605185U (en) Tunnel portal support device
CN209068999U (en) A kind of kiln top hanging structure
CN207470228U (en) Pipeline fixing device
CN205811471U (en) The scalable cable clip device that a kind of mine down-hole is easy for installation
CN209066490U (en) A kind of dedicated bearing diagonal component of piping lane
CN210767793U (en) Detachable pre-embedded structure for fixing safety rope
CN204225491U (en) The support chock of formwork keel
CN209637198U (en) A kind of hook-hang type safety anti-tilt device
CN209510392U (en) A kind of external conduit device of shield tunnel
CN107100090A (en) A kind of Bridge Erector and its construction method for suspension bridge
CN104370202B (en) A kind of segment lifting appliance
CN205709483U (en) Automatically-unhooked hanger
CN207162473U (en) Pedestal assembly for portable lighting
CN105864517B (en) A kind of umbilical distribution method for mining with stowing
CN205472231U (en) Gallows is transported to aluminium bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication