CN107013213A - 一种型模预设巷道的方法 - Google Patents
一种型模预设巷道的方法 Download PDFInfo
- Publication number
- CN107013213A CN107013213A CN201710341465.7A CN201710341465A CN107013213A CN 107013213 A CN107013213 A CN 107013213A CN 201710341465 A CN201710341465 A CN 201710341465A CN 107013213 A CN107013213 A CN 107013213A
- Authority
- CN
- China
- Prior art keywords
- pattern
- occupy
- tunnel
- place
- presets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000007599 discharging Methods 0.000 claims abstract description 29
- 230000018044 dehydration Effects 0.000 claims abstract description 8
- 238000006297 dehydration reaction Methods 0.000 claims abstract description 8
- 239000002002 slurry Substances 0.000 claims abstract description 8
- 238000009412 basement excavation Methods 0.000 claims abstract description 5
- 238000012856 packing Methods 0.000 claims description 6
- 239000004746 geotextile Substances 0.000 claims description 4
- 239000004576 sand Substances 0.000 claims description 4
- 238000009958 sewing Methods 0.000 claims description 4
- 238000004880 explosion Methods 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000005065 mining Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明属于矿山地下开采技术领域,具体涉及一种型模预设巷道的方法,该方法在一步骤采场空区底部预先铺设占位型模,然后在占位型模内充填非胶结料浆,脱水后即可开始一步骤采场充填工作,一步骤采场充填结束后,采用普通的挖掘方式即可形成二步骤采场的出矿巷道,实现了型模预设出矿巷道;避免了在充填体内重新凿岩爆破掘进出矿巷道,不仅大幅提升了采准巷道的掘进效率和作业安全性,而且降低了掘进费用。
Description
技术领域
本发明属于矿山地下开采技术领域,具体涉及一种型模预设巷道的方法。
背景技术
目前,硬岩矿山开采通常采用凿岩爆破的方法掘进巷道,巷道掘进成本和效率的高低对矿山生产影响巨大。对于采用两步骤回采充填法的矿山,相邻的二步骤采场回采时,通常需要在一步骤采场的充填体内重新凿岩爆破掘进出矿巷道,这不仅降低了充填体的稳定性和出矿巷道的安全性,而且增加了掘进费用。
发明内容
本发明的目的是提供一种型模预设巷道的方法,避免了在充填体内重新凿岩爆破掘进出矿巷道,不仅大幅提升了采准巷道的掘进效率和作业安全性,而且降低了掘进费用。
本发明的技术方案包括以下步骤:
一种型模预设巷道的方法,在一步骤采场空区底部预先铺设占位型模,然后在占位型模内充填非胶结料浆,脱水后即可开始一步骤采场充填工作,一步骤采场充填结束后,采用普通的挖掘方式即可形成二步骤采场的出矿巷道,实现了型模预设出矿巷道。
所述型模预设巷道方法的具体步骤如下:
步骤一、在采场空区底部预设出矿巷道的位置上铺设占位型模3,占位型模3的形状和尺寸根据所需预设出矿巷道的形状和尺寸确定;
步骤二、利用矿山充填系统管路或移动式充填泵将充填体4输送到占位型模3中,直至将整个占位型模3充满;
步骤三、待占位型模3内的充填体4脱水成型后,进行一步骤采场1充填作业;
步骤四、待一步骤采场1充填作业结束,占位型模3内的充填体4终凝后,采用铲运机挖掘占位型模3中的充填体4并将其运出,则形成了二步骤采场2的出矿巷道5;
所述的占位型模3由具有必要强度且滤水性能好的土工布按照预设出矿巷道的轮廓缝制而成;
所述的充填体4为由尾砂或河砂等非胶结料制备的料浆。
本发明的有益效果:
本发明公开了一种型模预设巷道的方法,在一步骤采场空区底部预先铺设占位型模,然后在占位型模内充填非胶结料浆,脱水后即可开始一步骤采场充填工作,一步骤采场充填结束后,采用普通的挖掘方式形成二步骤采场的出矿巷道,实现了型模预设出矿巷道,从而避免了在充填体内重新凿岩爆破掘进出矿巷道,不仅大幅提升了采准巷道的掘进效率和作业安全性,而且降低了掘进费用。
附图说明
图1为本发明的施工示意图;
图2为本发明形成出矿巷道示意图;
图中:1一步骤采场;2二步骤采场;3占位型模;4充填体;5出矿巷道。
具体实施方式
为进一步阐述本发明所述技术方案,结合说明书附图,本发明的具体实施方式如下:
一种型模预设巷道的方法,在一步骤采场空区底部预先铺设占位型模,然后在占位型模内充填非胶结料浆,脱水后即可开始一步骤采场充填工作,一步骤采场充填结束后,采用普通的挖掘方式即可形成二步骤采场的出矿巷道,实现了型模预设出矿巷道。
本实施例要预设一个断面规格为2.8m×2.8m且总长度为25m的拱形出矿巷道,所述型模预设巷道方法的具体步骤如下:
步骤一、在采场空区底部预设出矿巷道的位置上铺设占位型模3,占位型模3为由土工布缝制而成的横截面规格为2.8m×2.8m且总长度为25m的拱形型模;
步骤二、利用矿山充填系统管路或移动式充填泵将充填体4输送到占位型模3中,直至将整个占位型模3充满;
步骤三、待占位型模3内的充填体4脱水成型后,进行一步骤采场1充填作业;
步骤四、待一步骤采场1充填作业结束,占位型模3内的充填体4终凝后,采用铲运机挖掘占位型模3中的充填体4并将其运出,则形成了二步骤采场2的出矿巷道5;
所述的占位型模3由具有必要强度且滤水性能好的土工布按照预设出矿巷道的轮廓缝制而成;
所述的充填体4为由河砂制备的料浆。
Claims (3)
1.一种型模预设巷道的方法,在一步骤采场空区底部预先铺设占位型模,然后在占位型模内充填非胶结料浆,脱水后即可开始一步骤采场充填工作,一步骤采场充填结束后,采用普通的挖掘方式即可形成二步骤采场的出矿巷道,实现了型模预设出矿巷道。
所述型模预设巷道方法的具体步骤如下:
步骤一、在采场空区底部预设出矿巷道的位置上铺设占位型模(3),占位型模(3)的形状和尺寸根据所需预设出矿巷道的形状和尺寸确定;
步骤二、利用矿山充填系统管路或移动式充填泵将充填体(4)输送到占位型模(3)中,直至将整个占位型模(3)充满;
步骤三、待占位型模(3)内的充填体(4)脱水成型后,进行一步骤采场(1)的充填作业;
步骤四、待一步骤采场(1)充填作业结束,占位型模(3)内的充填体(4)终凝后,采用铲运机挖掘占位型模(3)中的充填体(4)并将其运出,则形成了二步骤采场(2)的出矿巷道(5)。
2.根据权利要求1所述的一种型模预设巷道的方法,其特征在于,所述的占位型模(3)由土工布按照预设出矿巷道的轮廓缝制而成。
3.根据权利要求2所述的一种型模预设巷道的方法,其特征在于,所述的充填体(4)为由尾砂或河砂等非胶结料制备的料浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341465.7A CN107013213B (zh) | 2017-05-16 | 2017-05-16 | 一种型模预设巷道的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341465.7A CN107013213B (zh) | 2017-05-16 | 2017-05-16 | 一种型模预设巷道的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107013213A true CN107013213A (zh) | 2017-08-04 |
CN107013213B CN107013213B (zh) | 2019-01-01 |
Family
ID=59449143
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710341465.7A Active CN107013213B (zh) | 2017-05-16 | 2017-05-16 | 一种型模预设巷道的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107013213B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112943250A (zh) * | 2021-04-02 | 2021-06-11 | 湖南科技大学 | 充填区内预留巷道的方法 |
CN114607417A (zh) * | 2022-03-25 | 2022-06-10 | 长沙矿山研究院有限责任公司 | 充填体内高安全性的运输通道及其构建方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4724897A (en) * | 1986-03-24 | 1988-02-16 | Press Technology Corporation | Method of and apparatus for horizontal continuous casting |
CN205445614U (zh) * | 2016-03-22 | 2016-08-10 | 姜仁义 | 一种充填法两步回采矿块柱墙组合式构造 |
CN105888668A (zh) * | 2016-06-15 | 2016-08-24 | 山东华联矿业股份有限公司 | 预控顶上向高分段中深孔嗣后充填采矿方法 |
CN106437718A (zh) * | 2016-11-30 | 2017-02-22 | 长沙矿山研究院有限责任公司 | 主动接顶两步骤条带充填采矿法 |
CN106640079A (zh) * | 2015-11-03 | 2017-05-10 | 哈尔滨市永恒鑫科技开发有限公司 | 一种大直径深孔崩矿嗣后充镇采矿方法 |
-
2017
- 2017-05-16 CN CN201710341465.7A patent/CN107013213B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4724897A (en) * | 1986-03-24 | 1988-02-16 | Press Technology Corporation | Method of and apparatus for horizontal continuous casting |
CN106640079A (zh) * | 2015-11-03 | 2017-05-10 | 哈尔滨市永恒鑫科技开发有限公司 | 一种大直径深孔崩矿嗣后充镇采矿方法 |
CN205445614U (zh) * | 2016-03-22 | 2016-08-10 | 姜仁义 | 一种充填法两步回采矿块柱墙组合式构造 |
CN105888668A (zh) * | 2016-06-15 | 2016-08-24 | 山东华联矿业股份有限公司 | 预控顶上向高分段中深孔嗣后充填采矿方法 |
CN106437718A (zh) * | 2016-11-30 | 2017-02-22 | 长沙矿山研究院有限责任公司 | 主动接顶两步骤条带充填采矿法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112943250A (zh) * | 2021-04-02 | 2021-06-11 | 湖南科技大学 | 充填区内预留巷道的方法 |
CN112943250B (zh) * | 2021-04-02 | 2023-07-25 | 湖南科技大学 | 充填区内预留巷道的方法 |
CN114607417A (zh) * | 2022-03-25 | 2022-06-10 | 长沙矿山研究院有限责任公司 | 充填体内高安全性的运输通道及其构建方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107013213B (zh) | 2019-01-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405437B (zh) | 一种固体充填与综采混合式工作面开采方法 | |
CN102996131B (zh) | 一种预掘两巷前进式固体充填采煤方法 | |
US8820847B2 (en) | Block caving method | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN102146794B (zh) | 注浆固结沿空掘巷工艺方法 | |
CN104481540A (zh) | 一种利用高位钻孔注浆控制多种煤矿开采灾害的方法 | |
CN104500070B (zh) | 一种连续采煤机膏体充填开采方法 | |
CN109209382B (zh) | 无煤柱无掘巷z型工作面回采方法 | |
CN107133381B (zh) | 一种巷道支护用锚杆的长度确定方法 | |
CN104775819A (zh) | 一种深部倾斜煤层回采巷道矿压控制开采方法 | |
CN107829742A (zh) | 一种崩落‑充填‑空场‑崩落采矿方法 | |
CN103306713A (zh) | 一种高突煤层穿层钻孔网络化加固方法 | |
CN112253115B (zh) | 近水平煤层巷式胶结充填开采方法 | |
CN111608726A (zh) | 一种间隔式覆岩碎胀充填钢筋笼囊袋注浆减损方法 | |
CN108397227A (zh) | 一种倾向递进消突巷道布置方法 | |
CN103993881A (zh) | 一种长壁巷式胶结充填开采方法 | |
CN102979526B (zh) | 中深孔分段采矿出矿堑沟充填法构筑工艺 | |
CN106907177A (zh) | 一种薄煤层沿空留巷巷旁充填支护方法 | |
CN106468177A (zh) | 一种煤与瓦斯协调开采方法 | |
CN115680653A (zh) | 煤巷掘进工作面煤层顶板水力压裂增渗抽采方法 | |
CN107013213B (zh) | 一种型模预设巷道的方法 | |
CN105240012A (zh) | 一种实现煤柱同采的f型区段采煤方法 | |
CN108952725B (zh) | 一种适用于缓倾斜薄矿体的低贫化采矿方法 | |
CN110714759B (zh) | 一种开采遗失煤炭的方法 | |
CN114673502B (zh) | 一种基于底板岩巷的多模灾害链式治理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 130012 nanhu road, Jilin, Changchun, No. 6760 Patentee after: CHANGCHUN GOLD RESEARCH INSTITUTE Co.,Ltd. Address before: 130012 nanhu road, Jilin, Changchun, No. 6760 Patentee before: CHANGCHUN GOLD Research Institute |
|
CP01 | Change in the name or title of a patent holder |