CN106988371B - A kind of rare earth mining site land used face cubic metre of earth collecting device - Google Patents

A kind of rare earth mining site land used face cubic metre of earth collecting device Download PDF

Info

Publication number
CN106988371B
CN106988371B CN201710229856.XA CN201710229856A CN106988371B CN 106988371 B CN106988371 B CN 106988371B CN 201710229856 A CN201710229856 A CN 201710229856A CN 106988371 B CN106988371 B CN 106988371B
Authority
CN
China
Prior art keywords
shaft
runner
plate
welding
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710229856.XA
Other languages
Chinese (zh)
Other versions
CN106988371A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Green Bay Agricultural Development Co., Ltd.
Original Assignee
Xuzhou Green Bay Agricultural Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Green Bay Agricultural Development Co Ltd filed Critical Xuzhou Green Bay Agricultural Development Co Ltd
Priority to CN201710229856.XA priority Critical patent/CN106988371B/en
Publication of CN106988371A publication Critical patent/CN106988371A/en
Application granted granted Critical
Publication of CN106988371B publication Critical patent/CN106988371B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Soil Working Implements (AREA)

Abstract

The present invention relates to a kind of rare earth mining site equipment more particularly to a kind of rare earth mining site land used face cubic metre of earth collecting devices.The technical problem to be solved in the present invention is to provide a kind of rare earth mining site land used face cubic metre of earth collecting devices for using lesser equipment that can carry out more comprehensively collecting, collection process is time saving and energy saving to the earthwork.In order to solve the above-mentioned technical problem, the present invention provides such a rare earth mining site land used face cubic metre of earth collecting devices, include mounting plate, the first support base, first rotating shaft, the first runner, crawler belt item, collecting box, support plate, the first fixed plate, the second shaft, second runner etc.;The left and right sides is equipped with the first support base by welding on the downside of mounting plate, is connected with first rotating shaft on the downside of the first support base, the first runner is connected in first rotating shaft, crawler belt item is connected between the first runner.Invention achieves use lesser equipment the earthwork can be carried out it is more comprehensive collect, the effect that collection process is time saving and energy saving.

Description

A kind of rare earth mining site land used face cubic metre of earth collecting device
Technical field
The present invention relates to a kind of rare earth mining site equipment more particularly to a kind of rare earth mining site land used face cubic metre of earth collecting devices.
Background technique
Rare Earth Mine mainly exists in the earth's crust with mineral forms, there are mainly three types of: as the basic component of mineral, Rare earth preservation in the form of ionic compound constitutes the essential ingredient of mineral in mineral lattice.This kind of mineral are commonly referred to as For rare-earth mineral, such as monazite, bastnaesite.As the impurity element of mineral, in the form of isomorphous replacement, it is scattered in In rock-forming mineral and the mineral of rare metals, this kind of mineral can be described as the mineral containing rare earth element, such as apatite, fluorite, be in Ionic condition is adsorbed between the surface or particle of certain mineral.This kind of mineral are mainly various clay minerals, mica mineral. The rare earth element of this kind of state is easy to extract.
Rare earth has the laudatory title of " industrial vitamin ".Nowadays extremely important strategic resource is had become.Rare earth element oxidation Object refer to period of element atom ordinal number be 57 to 71 15 kinds of lanthanide oxides, and with lanthanide series chemical property The oxide of similar scandium and yttrium totally 17 kinds of elements.Rare earth element is in petroleum, chemical industry, metallurgy, weaving, ceramics, glass, permanent magnetism material Material etc. fields be all widely used, with advances in technology with the continuous breakthrough of application technology, the valence of rare earth oxide Value will be increasing.
At present when rare earth mining site is excavated, on ground how much can all exist it is some be difficult with large scale equipment into The earthwork that row is collected, because also not environmentally friendly enough using large scale equipment not enough economy, and these earthwork also contain some rare earth elements, If the processing that do not collected not only will cause the waste of resource, biggish destruction can be also caused to environment.
Therefore it needs to research and develop a kind of using lesser equipment can carry out the earthwork more comprehensive collection, collection process saves When labour-saving rare earth mining site land used face cubic metre of earth collecting device it is current when being collected to the earthwork on rare earth mining site to overcome Have the shortcomings that biggish equipment be difficult to be collected the earthwork, collection process it is time-consuming and laborious.
Summary of the invention
(1) technical problems to be solved
Current when being collected to the earthwork on rare earth mining site, there are biggish equipment to be difficult in order to overcome by the present invention The earthwork is collected, the disadvantage that collection process is time-consuming and laborious, it is lesser the technical problem to be solved in the present invention is to provide using A kind of rare earth mining site land used face earthwork that equipment can carry out the earthwork more comprehensively to collect, collection process is time saving and energy saving is collected Equipment.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a rare earth mining site land used face cubic metre of earth collecting device, It include mounting plate, the first support base, first rotating shaft, the first runner, crawler belt article, collecting box, support plate, the first fixed plate, Two shafts, the second runner, the first conveyer belt, first hook shovel, first motor, third runner and the first transmission item, mounting plate downside The left and right sides is equipped with the first support base by welding, is connected with first rotating shaft, first rotating shaft on the downside of the first support base On be connected with the first runner, crawler belt item is connected between the first runner, receipts are installed by bolted connection on mounting plate Header, mounting plate upper left side are equipped with support plate by welding, and middle part is installed by welding on rear side of support plate There is the first fixed plate, the first fixed plate upper right side and lower left are connected with the second shaft, have second turn in the second shaft to condense It takes turns, the first conveyer belt is connected between the second runner, the first fixed plate lower-left end is equipped with the first hook shovel by welding, Top is equipped with first motor by bolted connection on the right side of support plate, the first motor output shaft on front side of first motor and It is connected with third runner on front side of second shaft in upper right side, the first transmission item is connected between third runner.
Preferably, further include having the second hook shovel, the second hook shovel is evenly equipped on the first conveyer belt.
It preferably, further include having remaining earthwork collection device, remaining earthwork collection device includes the first connecting plate, second Fixed plate, third shaft, the 4th runner, the second conveyer belt, third hook shovel, the second motor, the 5th runner and the second transmission article, peace Remaining earthwork collection device is equipped on the right side of loading board, right side is equipped with the first connecting plate by welding on mounting plate, and first Connecting plate right end is equipped with the second fixed plate by welding, and the second fixed plate upper left side and lower right are connected with third and turn Axis is connected with the 4th runner in third shaft, the second conveyer belt is connected between the 4th runner, is evenly equipped on the second conveyer belt Three hook shovel, and middle side part is equipped with the second motor by bolted connection under the first connecting plate, and second on front side of the second motor It is connected with the 5th runner in the third shaft of motor output shaft and lower right, is connected with the second transmission article between the 5th runner.
It preferably, further include having guide sleeve, guide rail, the first screw rod and the first briquetting, mounting plate right end is by welding Guide sleeve is installed, guide sleeve inner sliding type is connected with guide rail, and guide rail upper end is mounted on by welding on the downside of the first connecting plate Left, guide sleeve lower right-hand side are provided with the first threaded hole, and the first threaded hole is internally screwed with the first screw rod, the first screw rod and the first threaded hole Cooperation, the first screw rod left end is rotatably connected with the first briquetting.
It preferably, further include having earth-moving equipment, earth-moving equipment includes the second connecting plate, third motor, cam, the 4th turn Axis, the first sliding rail, the first sliding block, the first spring, elevating lever, contact block, the 5th shaft, shovels native plate, the second support base at swingle With the 6th shaft, support plate left is equipped with earth-moving equipment, and top is equipped with the second connection by welding on the left of support plate Plate, the second connecting plate upper left side are equipped with third motor by bolted connection, and the third motor on front side of third motor is defeated Connect cam on shaft, right is connected with the 4th shaft on front side of cam, swingle is connected in the 4th shaft, on the second connecting plate Left side is equipped with the first sliding rail by bolted connection, and the first sliding rail is located at third motor left, sliding in the first sliding rail Formula is connected with the first sliding block, is equipped with elevating lever on the left of the first sliding block by welding, and top passes through weldering on the right side of elevating lever The mode connect is equipped with contact block, and elevating lever lower end is connected with the 5th shaft, and shoveling plate is connected in the 5th shaft, and shoveling plate is right Side, which issues, is provided with grooving, and top is equipped with the second support base by welding on the right side of shoveling plate, connects on the second support base There is the 6th shaft, swingle lower end is connected in the 6th shaft.
It preferably, further include having the second sliding rail, the second sliding block and the second screw rod, upside left is connected by bolt in support plate The mode connect is equipped with the second sliding rail, and the second sliding rail inner sliding type is connected with the second sliding block, passes through welding on the left of the second sliding block Mode is mounted on the right side of the second connecting plate, is provided with the second threaded hole on the upside of support plate, and the second threaded hole is internally screwed with the second screw rod, the Two screw rods and the second threaded hole cooperate, and the second screw rod lower end is rotatably connected on the upside of the second sliding block.
It preferably, further include having height of cutting regulating device, height of cutting regulating device includes third sliding rail, third cunning Block, the first push rod, handle, connecting rod, the second push rod, the 4th sliding rail, Four-slider, the 7th shaft and eight revolution axis, first is solid Fixed board is equipped with height of cutting regulating device, and front side is equipped with third sliding rail, third by bolted connection in mounting plate Sliding rail inner sliding type is connected with third sliding block, is equipped with handle, third sliding block left side on front side of third sliding block by welding First push rod is installed by welding, the first push rod left end is equipped with connecting rod by welding, in connecting rod End is equipped with the second push rod by welding, and it is sliding to be equipped with the 4th on front side of the first fixed plate by bolted connection Rail, the 4th sliding rail inner sliding type are connected with Four-slider, and the 7th shaft, the connection of the second push rod left end are connected on front side of Four-slider In the 7th shaft, middle part is connected with eight revolution axis on rear side of fixed plate, and eight revolution axis connection is in the first fixed plate upper right side.
Preferably, further include having nut and third screw rod, nut, spiral shell are installed by welding on the right side of third sliding rail Mother is internally screwed with third screw rod, and third screw rod and nut cooperate, and third screw rod left end is rotatably connected on the right side of third sliding block.
Working principle: when user needs to be collected the ground earthwork of rare earth mining site, user can push mounting plate It being moved to the left, mounting plate drives the first runner to rotate counterclockwise and is moved to the left, then opens first motor by crawler belt item, the One motor will drive upside third runner to rotate clockwise, and third runner rotation in upside drives downside third by the first transmission item Runner rotates clockwise, and third runner rotation in downside drives second shaft in upper right side to rotate clockwise, and second turn of upper right side Axis rotation drives second runner in upper right side to rotate clockwise, and the second runner rotation in upper right side is driven left by the first conveyer belt Second runner of lower section rotates clockwise, so that the first conveyer belt is driven to rotate clockwise, and first hooks shovel for the soil on ground Square spade falls on the first conveyer belt, is transported in collecting box by the first conveyer belt, when user pushes mounting plate equipment will be driven to move It is dynamic, to carry out the collection of larger area to the earthwork on ground.
Because further including having the second hook shovel, the second hook shovel is evenly equipped on the first conveyer belt, it in this way can be in the first conveyer belt It drives second to hook shovel rotation when rotation, makes the second hook shovel that can dig the more earthwork and transported.
Because further including having remaining earthwork collection device, remaining earthwork collection device includes the first connecting plate, second solid Fixed board, third shaft, the 4th runner, the second conveyer belt, third hook shovel, the second motor, the 5th runner and the second transmission article, installation Remaining earthwork collection device is equipped on the right side of plate, right side is equipped with the first connecting plate by welding on mounting plate, and first connects Fishplate bar right end is equipped with the second fixed plate by welding, and the second fixed plate upper left side and lower right are connected with third and turn Axis is connected with the 4th runner in third shaft, the second conveyer belt is connected between the 4th runner, is evenly equipped on the second conveyer belt Three hook shovel, and middle side part is equipped with the second motor by bolted connection under the first connecting plate, and second on front side of the second motor It is connected with the 5th runner in the third shaft of motor output shaft and lower right, is connected with the second transmission article between the 5th runner, when User opens the second motor while pushing mounting plate to be moved to the left, and the second motor drives upper left 5th runner counterclockwise Rotation, upper left 5th runner rotates counterclockwise drives the 5th runner of lower right to rotate counterclockwise by the second transmission article, 5th runner of lower right, which rotates, to be driven, and the 5th runner rotation of lower right drives the third shaft of lower right to rotate counterclockwise, The third shaft of lower right rotates counterclockwise drives the 4th runner of lower right to rotate counterclockwise, the 4th runner rotation of lower right Upper left 4th runner is driven to rotate counterclockwise by the second conveyer belt, so that the second conveyer belt is driven to rotate counterclockwise, from And third is driven to hook shovel rotation counterclockwise, third hooks shovel and will the earthwork on the right side of mounting plate is collected and be transported, and passes through second The transport of conveyer belt will fall off in collecting box.
Because further including having guide sleeve, guide rail, the first screw rod and the first briquetting, mounting plate right end is installed by welding There is guide sleeve, guide sleeve inner sliding type is connected with guide rail, and guide rail upper end is mounted on left on the downside of the first connecting plate by welding, Guide sleeve lower right-hand side is provided with the first threaded hole, and the first threaded hole is internally screwed with the first screw rod, and the first screw rod and the first threaded hole cooperate, First screw rod left end is rotatably connected with the first briquetting, when user needs change to be collected the earthwork on rear side of mounting plate When height, that is to say, that when needing to carry out the collection of the earthwork to different terrain, user can move up and down the first connecting plate, and first Connecting plate is moved up and down in guide sleeve by guide rail and is moved, and the first connecting plate is moved up and down to drive on the second conveyer belt and be moved down Dynamic, when being moved on desired position, user can rotate the first screw rod, and the first screw rod passes through the cooperation with the first threaded hole Precession to the left, the first screw rod push the first briquetting, and the first briquetting touches guide rail, so that guide rail, which is fixed on this, highly makes it No longer moved.
Because further including having earth-moving equipment, earth-moving equipment include the second connecting plate, third motor, cam, the 4th shaft, Swingle, the first sliding rail, the first sliding block, the first spring, elevating lever, contact block, the 5th shaft, shovel native plate, the second support base and 6th shaft, support plate left are equipped with earth-moving equipment, and top is equipped with the second connecting plate by welding on the left of support plate, Second connecting plate upper left side is equipped with third motor, the third motor output shaft on front side of third motor by bolted connection Upper connection cam, cam front side right are connected with the 4th shaft, swingle, the second connecting plate upper left side are connected in the 4th shaft First sliding rail is installed by bolted connection, the first sliding rail is located at third motor left, and the first sliding rail inner sliding type connects It is connected to the first sliding block, elevating lever is installed by welding on the left of the first sliding block, top passes through welding on the right side of elevating lever Mode is equipped with contact block, and elevating lever lower end is connected with the 5th shaft, is connected with shoveling plate in the 5th shaft, on the right side of shoveling plate under Hair is provided with grooving, and top is equipped with the second support base by welding on the right side of shoveling plate, and the is connected on the second support base Six shafts, swingle lower end are connected in the 6th shaft, and when the earthwork on front side of mounting plate is higher, user can open third electricity Machine, third motor band moving cam rotate counterclockwise, and cam is counterclockwise rotating contact pushes contact block to moving down to contact block Dynamic, contact block drives elevating lever to move down, and elevating lever moves down lower movement by the first sliding block in the first sliding rail, the One sliding block will also stretch the first spring simultaneously, and elevating lever, which moves down, will push the native plate of shovel to move down, and cam is counterclockwise To also the 4th shaft be driven to rotate around cam center of rotation while rotation, the 4th shaft will pull rotation while rotating Bar rotated around the 4th shaft and around cam center of rotation rotate, swingle rotate while pull on the second support base around Cam center of rotation moves up while rotation, makes to shovel native plate and rotates counterclockwise in the 5th shaft, and shoveling native plate also will simultaneously Also will be rotated counterclockwise in the 6th shaft, and shovel native plate move down and counterclockwise rotation will have been dug by grooving it is higher Cubic metre of earth, then when cam is not exposed to contact plate, the first spring will restore from tensional state, pulling the first sliding block to Upper movement, so that elevating lever be moved up, cam also will drive the 4th shaft to be located at the minimum point of cam at this time, and shovel is native at this time Plate falls to the earthwork in grooving on the first conveyer belt, and so operation will scoop up the higher earthwork and transported repeatedly It is defeated.
Because further including having the second sliding rail, the second sliding block and the second screw rod, upside left is bolted in support plate Mode the second sliding rail is installed, the second sliding rail inner sliding type is connected with the second sliding block, passes through the side of welding on the left of the second sliding block Formula is mounted on the right side of the second connecting plate, is provided with the second threaded hole on the upside of support plate, and the second threaded hole is internally screwed with the second screw rod, and second Screw rod and the second threaded hole cooperate, and the second screw rod lower end is rotatably connected on the upside of the second sliding block, when user needs to different height When the earthwork of degree carries out shoveling soil, user can pass through the cooperation with the second threaded hole with the second screw rod forward or reverse, the second screw rod It moves up and down, so that the second sliding block be driven to move up and down in the second sliding rail, the second sliding block, which moves up and down, connects drive second Plate moves up and down, so that the native plate of shovel be driven to move up and down.
Because further including having height of cutting regulating device, height of cutting regulating device include third sliding rail, third sliding block, First push rod, handle, connecting rod, the second push rod, the 4th sliding rail, Four-slider, the 7th shaft, eight revolution axis are connected with third Plate, the first fixed plate are equipped with height of cutting regulating device, and front side is equipped with third by bolted connection in mounting plate Sliding rail, third sliding rail inner sliding type are connected with third sliding block, are equipped with handle, third by welding on front side of third sliding block The first push rod is installed by welding on the left of sliding block, the first push rod left end is equipped with connecting rod by welding, Connecting rod upper end is equipped with the second push rod by welding, is equipped with by bolted connection on front side of the first fixed plate 4th sliding rail, the 4th sliding rail inner sliding type are connected with Four-slider, and the 7th shaft is connected on front side of Four-slider, and the second push rod is left End is connected in the 7th shaft, and middle part is connected with eight revolution axis on rear side of fixed plate, and eight revolution axis connection is in the first fixed plate upper right Side, the first fixed plate upper right side upside are equipped with third connecting plate by welding, pass through bolt on the right side of third connecting plate The mode of connection is equipped with first motor, when user needs the earthwork to the lower height on ground to transport, Huo Zhe When different landform carries out the transport of the earthwork, user can push handle to be moved to the left, and handle drives third sliding block sliding in third It being moved to the left in rail, third sliding block, which is moved to the left, pushes the first push rod to be moved to the left, and the first push rod pushes connecting rod to be moved to the left, Connecting rod pushes the second push rod to be moved to the left, the second push rod will push the 7th shaft and Four-slider in the 4th sliding rail to left down Fang Yidong, to drive the 4th sliding rail and the first fixed plate to rotate clockwise around eight revolution axis, thus by the first fixed plate Lower left is raised, and the first fixed plate lower left raises and reduces the first fixed plate upper right side, drives third connecting plate and the One motor rotates counterclockwise, so that the purpose transported to the earthwork of different height is played, if user needs to consolidate first If the lower left of fixed board reduces, user only needs to move right handle can.
Because further including having nut and third screw rod, nut, nut are installed by welding on the right side of third sliding rail It is internally screwed with third screw rod, third screw rod and nut cooperate, and third screw rod left end is rotatably connected on the right side of third sliding block, and user is also Third screw rod can be rotated, third screw rod is by the cooperation precession or back-out with nut, to drive third sliding block sliding in third Moved left and right in rail, in this way can be stable fix selected shovel soil height.
(3) beneficial effect
Invention achieves use lesser equipment that can carry out more comprehensive collection, the time saving province of collection process to the earthwork The effect of power is collected and is transported to the earthwork on the left of mounting plate by using the first conveyer belt plus the second conveyer belt to peace The mode that surplus earth on the right side of loading board is collected and transports is not only able to more thoroughly receive the earthwork on mining site Collection, moreover it is possible to collect the economy wasted when the earthwork and the energy to large scale equipment is saved.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view that the present invention first hooks shovel.
Fig. 3 is the schematic view of the front view of the remaining earthwork collection device of the present invention.
Fig. 4 is the schematic view of the front view of guide sleeve of the present invention.
Fig. 5 is the first schematic view of the front view of earth-moving equipment of the present invention.
Fig. 6 is second of schematic view of the front view of earth-moving equipment of the present invention.
Fig. 7 is the first schematic view of the front view of height of cutting regulating device of the present invention.
Fig. 8 is second of schematic view of the front view of height of cutting regulating device of the present invention.
The label in accompanying drawing is: 1- mounting plate, the first support base of 2-, 3- first rotating shaft, the first runner of 4-, 5- crawler belt item, 6- collecting box, 7- support plate, the first fixed plate of 8-, the second shaft of 9-, the second runner of 10-, the first conveyer belt of 11-, 12- first are hooked Shovel, 13- first motor, 14- third runner, 15- first are driven item, and 111- second, which is hooked, to be shoveled, 16- remnants' earthwork collection device, The first connecting plate of 161-, the second fixed plate of 162-, 163- third shaft, the 4th runner of 164-, the second conveyer belt of 165-, 166- Three hook shovel, the second motor of 167-, the 5th runner of 168-, the transmission item of 169- second, 1611- guide sleeve, 1612- guide rail, 1613- first Threaded hole, the first screw rod of 1614-, the first briquetting of 1615-, 17- earth-moving equipment, the second connecting plate of 171-, 172- third motor, 173- cam, the 4th shaft of 174-, 175- swingle, the first sliding rail of 176-, the first sliding block of 177-, the first spring of 178-, 179- Elevating lever, 1710- contact block, the 5th shaft of 1711-, 1712- shovel native plate, 1713- grooving, the second support base of 1714-, 1715- 6th shaft, the second sliding rail of 1721-, the second sliding block of 1722-, the second threaded hole of 1723-, the second screw rod of 1724-, 18- cut the earth high Spend regulating device, 181- third sliding rail, 182- third sliding block, the first push rod of 183-, 184- handle, 185- connecting rod, 186- the Two push rods, the 4th sliding rail of 187-, 188- Four-slider, the 7th shaft of 189-, 1810- eight revolution axis, 1811- third connecting plate, 1821- nut, 1822- third screw rod.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, include mounting plate 1, the first support base 2, First rotating shaft 3, the first runner 4, crawler belt item 5, collecting box 6, support plate 7, the first fixed plate 8, the second shaft 9, the second runner 10, First conveyer belt 11, first hooks shovel 12, first motor 13, third runner 14 and the first transmission item 15, left and right two on the downside of mounting plate 1 Side is equipped with the first support base 2 by welding, is connected with first rotating shaft 3 on the downside of the first support base 2, in first rotating shaft 3 It is connected with the first runner 4, crawler belt item 5 is connected between the first runner 4, is equipped with by bolted connection on mounting plate 1 Collecting box 6,1 upper left side of mounting plate are equipped with support plate 7, the side that 7 rear side middle part of support plate passes through welding by welding Formula is equipped with the first fixed plate 8, and 8 upper right side of the first fixed plate and lower left are connected with the second shaft 9, coagulates in the second shaft 9 The second runner 10 is had, the first conveyer belt 11, the side that 8 lower-left end of the first fixed plate passes through welding are connected between the second runner 10 Formula is equipped with the first hook shovel 12, and 7 right side top of support plate is equipped with first motor 13, first motor by bolted connection Be connected with third runner 14 on front side of 13 output shaft of first motor of 13 front sides and second shaft 9 in upper right side, third runner 14 it Between be connected with the first transmission item 15.
Embodiment 2
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, include mounting plate 1, the first support base 2, First rotating shaft 3, the first runner 4, crawler belt item 5, collecting box 6, support plate 7, the first fixed plate 8, the second shaft 9, the second runner 10, First conveyer belt 11, first hooks shovel 12, first motor 13, third runner 14 and the first transmission item 15, left and right two on the downside of mounting plate 1 Side is equipped with the first support base 2 by welding, is connected with first rotating shaft 3 on the downside of the first support base 2, in first rotating shaft 3 It is connected with the first runner 4, crawler belt item 5 is connected between the first runner 4, is equipped with by bolted connection on mounting plate 1 Collecting box 6,1 upper left side of mounting plate are equipped with support plate 7, the side that 7 rear side middle part of support plate passes through welding by welding Formula is equipped with the first fixed plate 8, and 8 upper right side of the first fixed plate and lower left are connected with the second shaft 9, coagulates in the second shaft 9 The second runner 10 is had, the first conveyer belt 11, the side that 8 lower-left end of the first fixed plate passes through welding are connected between the second runner 10 Formula is equipped with the first hook shovel 12, and 7 right side top of support plate is equipped with first motor 13, first motor by bolted connection Be connected with third runner 14 on front side of 13 output shaft of first motor of 13 front sides and second shaft 9 in upper right side, third runner 14 it Between be connected with the first transmission item 15.
Further include thering is the second hook to shovel 111, the second hook shovel 111 is evenly equipped on the first conveyer belt 11.
Embodiment 3
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, include mounting plate 1, the first support base 2, First rotating shaft 3, the first runner 4, crawler belt item 5, collecting box 6, support plate 7, the first fixed plate 8, the second shaft 9, the second runner 10, First conveyer belt 11, first hooks shovel 12, first motor 13, third runner 14 and the first transmission item 15, left and right two on the downside of mounting plate 1 Side is equipped with the first support base 2 by welding, is connected with first rotating shaft 3 on the downside of the first support base 2, in first rotating shaft 3 It is connected with the first runner 4, crawler belt item 5 is connected between the first runner 4, is equipped with by bolted connection on mounting plate 1 Collecting box 6,1 upper left side of mounting plate are equipped with support plate 7, the side that 7 rear side middle part of support plate passes through welding by welding Formula is equipped with the first fixed plate 8, and 8 upper right side of the first fixed plate and lower left are connected with the second shaft 9, coagulates in the second shaft 9 The second runner 10 is had, the first conveyer belt 11, the side that 8 lower-left end of the first fixed plate passes through welding are connected between the second runner 10 Formula is equipped with the first hook shovel 12, and 7 right side top of support plate is equipped with first motor 13, first motor by bolted connection Be connected with third runner 14 on front side of 13 output shaft of first motor of 13 front sides and second shaft 9 in upper right side, third runner 14 it Between be connected with the first transmission item 15.
Further include thering is the second hook to shovel 111, the second hook shovel 111 is evenly equipped on the first conveyer belt 11.
It further include having remaining earthwork collection device 16, remaining earthwork collection device 16 includes the first connecting plate 161, second Fixed plate 162, third shaft 163, the 4th runner 164, the second conveyer belt 165, third hook the 166, second motor the 167, the 5th of shovel Runner 168 and second is driven item 169, and remaining earthwork collection device 16 is equipped on the right side of mounting plate 1, and right side passes through weldering on mounting plate 1 The mode connect is equipped with the first connecting plate 161, and 161 right end of the first connecting plate is equipped with the second fixed plate by welding 162,162 upper left side of the second fixed plate and lower right are connected with third shaft 163, and the 4th runner is connected in third shaft 163 164, the second conveyer belt 165 is connected between the 4th runner 164, and third is evenly equipped on the second conveyer belt 165 and hooks shovel 166, first The lower middle side part of connecting plate 161 is equipped with the second motor 167, the second electricity of 167 front side of the second motor by bolted connection It is connected with the 5th runner 168 in the third shaft 163 of 167 output shaft of machine and lower right, is connected with second between the 5th runner 168 It is driven item 169.
Embodiment 4
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, include mounting plate 1, the first support base 2, First rotating shaft 3, the first runner 4, crawler belt item 5, collecting box 6, support plate 7, the first fixed plate 8, the second shaft 9, the second runner 10, First conveyer belt 11, first hooks shovel 12, first motor 13, third runner 14 and the first transmission item 15, left and right two on the downside of mounting plate 1 Side is equipped with the first support base 2 by welding, is connected with first rotating shaft 3 on the downside of the first support base 2, in first rotating shaft 3 It is connected with the first runner 4, crawler belt item 5 is connected between the first runner 4, is equipped with by bolted connection on mounting plate 1 Collecting box 6,1 upper left side of mounting plate are equipped with support plate 7, the side that 7 rear side middle part of support plate passes through welding by welding Formula is equipped with the first fixed plate 8, and 8 upper right side of the first fixed plate and lower left are connected with the second shaft 9, coagulates in the second shaft 9 The second runner 10 is had, the first conveyer belt 11, the side that 8 lower-left end of the first fixed plate passes through welding are connected between the second runner 10 Formula is equipped with the first hook shovel 12, and 7 right side top of support plate is equipped with first motor 13, first motor by bolted connection Be connected with third runner 14 on front side of 13 output shaft of first motor of 13 front sides and second shaft 9 in upper right side, third runner 14 it Between be connected with the first transmission item 15.
Further include thering is the second hook to shovel 111, the second hook shovel 111 is evenly equipped on the first conveyer belt 11.
It further include having remaining earthwork collection device 16, remaining earthwork collection device 16 includes the first connecting plate 161, second Fixed plate 162, third shaft 163, the 4th runner 164, the second conveyer belt 165, third hook the 166, second motor the 167, the 5th of shovel Runner 168 and second is driven item 169, and remaining earthwork collection device 16 is equipped on the right side of mounting plate 1, and right side passes through weldering on mounting plate 1 The mode connect is equipped with the first connecting plate 161, and 161 right end of the first connecting plate is equipped with the second fixed plate by welding 162,162 upper left side of the second fixed plate and lower right are connected with third shaft 163, and the 4th runner is connected in third shaft 163 164, the second conveyer belt 165 is connected between the 4th runner 164, and third is evenly equipped on the second conveyer belt 165 and hooks shovel 166, first The lower middle side part of connecting plate 161 is equipped with the second motor 167, the second electricity of 167 front side of the second motor by bolted connection It is connected with the 5th runner 168 in the third shaft 163 of 167 output shaft of machine and lower right, is connected with second between the 5th runner 168 It is driven item 169.
It further include having guide sleeve 1611, guide rail 1612, the first screw rod 1614 and the first briquetting 1615,1 right end of mounting plate passes through The mode of welding is equipped with guide sleeve 1611, and 1611 inner sliding type of guide sleeve is connected with guide rail 1612, and 1612 upper end of guide rail passes through welding Mode be mounted on 161 downside left of the first connecting plate, 1611 lower right-hand side of guide sleeve is provided with the first threaded hole 1613, the first screw thread Hole 1613 is internally screwed with the first screw rod 1614, and the first screw rod 1614 and the first threaded hole 1613 cooperate, the rotation of 1614 left end of the first screw rod It is rotatable to be connected with the first briquetting 1615.
Further include having earth-moving equipment 17, earth-moving equipment 17 include the second connecting plate 171, third motor 172, cam 173, 4th shaft 174, swingle 175, the first sliding rail 176, the first sliding block 177, the first spring 178, elevating lever 179, contact block 1710, the native plate 1712 of the 5th shaft 1711, shovel, the second support base 1714 and the 6th shaft 1715,7 left of support plate, which is equipped with, cuts the earth Device 17,7 left side top of support plate are equipped with the second connecting plate 171 by welding, and 171 upper left side of the second connecting plate is logical It crosses bolted mode and third motor 172 is installed, connected on 172 output shaft of third motor of 172 front side of third motor convex Wheel 173,173 front side right of cam is connected with the 4th shaft 174, and swingle 175, the second connection are connected in the 4th shaft 174 171 upper left side of plate is equipped with the first sliding rail 176 by bolted connection, and it is left that the first sliding rail 176 is located at third motor 172 Side, 176 inner sliding type of the first sliding rail are connected with the first sliding block 177, and 177 left side of the first sliding block is equipped with liter by welding Bar 179 drops, and the right side of elevating lever 179 top is equipped with contact block 1710 by welding, and 179 lower end of elevating lever is connected with the Five shafts 1711 are connected with shoveling plate in the 5th shaft 1711, issue on the right side of shoveling plate and is provided with grooving 1713, on the right side of shoveling plate on Side is equipped with the second support base 1714 by welding, and the 6th shaft 1715 is connected on the second support base 1714, rotates 175 lower end of bar is connected in the 6th shaft 1715.
It further include having the second sliding rail 1721, the second sliding block 1722 and the second screw rod 1724, upside left passes through in support plate 7 Bolted mode is equipped with the second sliding rail 1721, and 1721 inner sliding type of the second sliding rail is connected with the second sliding block 1722, and second 1722 left side of sliding block is mounted on 171 right side of the second connecting plate by welding, is provided with the second threaded hole on the upside of support plate 7 1723, the second threaded hole 1723 is internally screwed with the second screw rod 1724, and the second screw rod 1724 and the second threaded hole 1723 cooperate, the second spiral shell 1724 lower end of bar is rotatably connected to 1722 upside of the second sliding block.
It further include having height of cutting regulating device 18, height of cutting regulating device 18 includes third sliding rail 181, third cunning Block 182, the first push rod 183, handle 184, connecting rod 185, the second push rod 186, the 4th sliding rail 187, Four-slider the 188, the 7th Shaft 189 and eight revolution axis 1810, the first fixed plate 8 are equipped with height of cutting regulating device 18, and front side passes through spiral shell in mounting plate 1 It tethers the mode connect and third sliding rail 181 is installed, 181 inner sliding type of third sliding rail is connected with third sliding block 182, third sliding block 182 front sides are equipped with handle 184 by welding, and 182 left side of third sliding block is equipped with first by welding and pushes away Bar 183,183 left end of the first push rod are equipped with connecting rod 185, the side that 185 upper end of connecting rod passes through welding by welding Formula is equipped with the second push rod 186, and 8 front side of the first fixed plate is equipped with the 4th sliding rail 187 by bolted connection, and the 4th is sliding 187 inner sliding type of rail is connected with Four-slider 188, and the 7th shaft 189 is connected on front side of Four-slider 188, and the second push rod 186 is left End is connected in the 7th shaft 189, and middle part is connected with eight revolution axis 1810 on rear side of fixed plate, and eight revolution axis 1810 is connected to first 8 upper right side of fixed plate.
It further include having nut 1821 and third screw rod 1822,181 right side of third sliding rail is equipped with spiral shell by welding Mother 1821, nut 1821 are internally screwed with third screw rod 1822, and third screw rod 1822 and nut 1821 cooperate, 1822 left end of third screw rod Rotatably it is connected to 182 right side of third sliding block.
Working principle: when user needs to be collected the ground earthwork of rare earth mining site, user can push mounting plate 1 It is moved to the left, mounting plate 1 drives the first runner 4 to rotate counterclockwise and is moved to the left, then opens first motor by crawler belt item 5 13, first motor 13 will drive upside third runner 14 to rotate clockwise, and the rotation of upside third runner 14 passes through the first transmission item 15 drive downside third runner 14 to rotate clockwise, and the rotation of downside third runner 14 drives second shaft 9 in upper right side clockwise The second shaft 9 rotation of rotation, upper right side drives second runner 10 in upper right side to rotate clockwise, second runner 10 in upper right side Rotation drives the second runner 10 of lower left to rotate clockwise by the first conveyer belt 11, to drive 11 up time of the first conveyer belt Needle rotation, and the first hook shovel 12 slide tackles the earthwork on ground on the first conveyer belt 11, transports receipts by the first conveyer belt 11 In header 6, when user pushes mounting plate 1 that equipment will be driven mobile, to carry out the collection of larger area to the earthwork on ground.
Because further including having the second hook to shovel 111, the second hook shovel 111 is evenly equipped on the first conveyer belt 11, it in this way can be the It drives second to hook 111 rotation of shovel when one conveyer belt 11 rotates, so that the second hook shovel 111 is dug the more earthwork and transported It is defeated.
Because further including having remaining earthwork collection device 16, remaining earthwork collection device 16 include the first connecting plate 161, Second fixed plate 162, third shaft 163, the 4th runner 164, the second conveyer belt 165, third hook shovel the 166, second motor 167, 5th runner 168 and the second transmission article 169 are equipped with remaining earthwork collection device 16 on the right side of mounting plate 1, and right side is logical on mounting plate 1 The mode for crossing welding is equipped with the first connecting plate 161, and it is fixed that 161 right end of the first connecting plate is equipped with second by welding Plate 162,162 upper left side of the second fixed plate and lower right are connected with third shaft 163, and the 4th turn is connected in third shaft 163 164 are taken turns, is connected with the second conveyer belt 165 between the 4th runner 164, third is evenly equipped on the second conveyer belt 165 and hooks shovel 166, the The lower middle side part of one connecting plate 161 is equipped with the second motor 167 by bolted connection, and the second of 167 front side of the second motor It is connected with the 5th runner 168 in the third shaft 163 of 167 output shaft of motor and lower right, is connected between the 5th runner 168 Two transmission items 169, when user opens the second motor 167 while pushing mounting plate 1 to be moved to the left, the second motor 167 is driven The upper left rotation counterclockwise of 5th runner 168, rotation passes through the second transmission article 169 to upper left 5th runner 168 counterclockwise The 5th rotation counterclockwise of runner 168 of lower right is driven, the 5th runner 168 of lower right, which rotates, to be driven, and the 5th turn of lower right 168 rotation of wheel drives the third shaft 163 of lower right to rotate counterclockwise, and rotation drives the third shaft 163 of lower right counterclockwise 4th rotation counterclockwise of runner 164 of lower right, the 4th runner 164 rotation of lower right drive a left side by the second conveyer belt 165 4th rotation counterclockwise of runner 164 of top, so that the second rotation counterclockwise of conveyer belt 165 is driven, so that third be driven to hook shovel 166 rotations counterclockwise, third hook shovel 166 and will the earthwork on 1 right side of mounting plate be collected and be transported, and pass through the second conveyer belt 165 transport will fall off in collecting box 6.
Because further including having guide sleeve 1611, guide rail 1612, the first screw rod 1614 and the first briquetting 1615,1 right end of mounting plate Guide sleeve 1611 is installed by welding, 1611 inner sliding type of guide sleeve is connected with guide rail 1612, and 1612 upper end of guide rail passes through The mode of welding is mounted on 161 downside left of the first connecting plate, and 1611 lower right-hand side of guide sleeve is provided with the first threaded hole 1613, and first Threaded hole 1613 is internally screwed with the first screw rod 1614, and the first screw rod 1614 and the first threaded hole 1613 cooperate, and the first screw rod 1614 is left End is rotatably connected with the first briquetting 1615, when user needs to change the height being collected for the earthwork of 1 rear side of mounting plate When, that is to say, that when needing to carry out the collection of the earthwork to different terrain, user can move up and down the first connecting plate 161, and first Connecting plate 161 is moved up and down in guide sleeve 1611 by guide rail 1612 and is moved, and the first connecting plate 161, which moves up and down, will drive Two conveyer belts 165 move up and down, and when being moved on desired position, user can rotate the first screw rod 1614, the first screw rod 1614 push the first briquetting 1615, the first briquetting by the cooperation precession to the left with the first threaded hole 1613, the first screw rod 1614 1615 touch guide rail 1612, move it no longer so that guide rail 1612 is fixed on this highly.
Because further including having earth-moving equipment 17, earth-moving equipment 17 includes the second connecting plate 171, third motor 172, cam 173, the 4th shaft 174, swingle 175, the first sliding rail 176, the first sliding block 177, the first spring 178, elevating lever 179, contact Block 1710, the 5th shaft 1711 shovel native plate 1712, the second support base 1714 and the 6th shaft 1715, and 7 left of support plate, which is equipped with, to be dug Native device 17,7 left side top of support plate are equipped with the second connecting plate 171,171 upper left side of the second connecting plate by welding Third motor 172 is installed by bolted connection, is connected on 172 output shaft of third motor of 172 front side of third motor Cam 173,173 front side right of cam are connected with the 4th shaft 174, and swingle 175 is connected in the 4th shaft 174, and second connects 171 upper left side of fishplate bar is equipped with the first sliding rail 176 by bolted connection, and it is left that the first sliding rail 176 is located at third motor 172 Side, 176 inner sliding type of the first sliding rail are connected with the first sliding block 177, and 177 left side of the first sliding block is equipped with liter by welding Bar 179 drops, and the right side of elevating lever 179 top is equipped with contact block 1710 by welding, and 179 lower end of elevating lever is connected with the Five shafts 1711 are connected with shoveling plate in the 5th shaft 1711, issue on the right side of shoveling plate and is provided with grooving 1713, on the right side of shoveling plate on Side is equipped with the second support base 1714 by welding, and the 6th shaft 1715 is connected on the second support base 1714, rotates 175 lower end of bar is connected in the 6th shaft 1715, and when the earthwork of 1 front side of mounting plate is higher, user can open third motor 172, third motor 172 rotates counterclockwise with moving cam 173, and the rotating contact counterclockwise of cam 173 is pushed to contact block 1710 Contact block 1710 moves down, and contact block 1710 drives elevating lever 179 to move down, and elevating lever 179 is existed by the first sliding block 177 Moved down and lower movement in first sliding rail 176, the first sliding block 177 will also stretch the first spring 178 simultaneously, elevating lever 179 to Lower movement will push the native plate 1712 of shovel to move down, and cam 173 also will the 4th shaft 174 of drive while rotation counterclockwise It is rotated around 173 rotation center of cam, the 4th shaft 174 will pull while rotating swingle 175 around the 4th shaft 174 It rotates and is rotated around 173 rotation center of cam, swingle 175 pulls on the second support base 1714 around cam while rotation 173 rotation centers move up while rotation, make to shovel native plate 1712 and rotate counterclockwise in the 5th shaft 1711, shovel native plate 1712 will also will also rotate counterclockwise in the 6th shaft 1715 simultaneously, and shovel moving down and rotating counterclockwise for native plate 1712 The higher earthwork will be dug by grooving 1713, then when cam 173 is not exposed to contact plate, the first spring 178 It will restore from tensional state, the first sliding block 177 is pulled to move up, so that elevating lever 179 be moved up, cam 173 at this time Also the minimum point that the 4th shaft 174 will be driven to be located at cam 173 shovels native plate 1712 at this time and falls to the earthwork in grooving 1713 On first conveyer belt 11, so operation will scoop up the higher earthwork and transported repeatedly.
Because further including having the second sliding rail 1721, the second sliding block 1722 and the second screw rod 1724, upside left in support plate 7 Second sliding rail 1721 is installed by bolted connection, 1721 inner sliding type of the second sliding rail is connected with the second sliding block 1722, Second sliding block, 1722 left side is mounted on 171 right side of the second connecting plate by welding, is provided with the second screw thread on the upside of support plate 7 Hole 1723, the second threaded hole 1723 are internally screwed with the second screw rod 1724, and the second screw rod 1724 and the second threaded hole 1723 cooperate, and second 1724 lower end of screw rod is rotatably connected to 1722 upside of the second sliding block, when user needs the earthwork to different height to carry out shovel soil When, user can with the second screw rod 1724 forward or reverse, the second screw rod 1724 by the cooperation with the second threaded hole 1723 above and below Mobile, so that the second sliding block 1722 be driven to move up and down in the second sliding rail 1721, the second sliding block 1722 is moved up and down and will be driven Second connecting plate 171 moves up and down, so that the native plate 1712 of shovel be driven to move up and down.
Because further including having height of cutting regulating device 18, height of cutting regulating device 18 includes third sliding rail 181, Three sliding blocks 182, the first push rod 183, handle 184, connecting rod 185, the second push rod 186, the 4th sliding rail 187, Four-slider 188, 7th shaft 189, eight revolution axis 1810 and third connecting plate 1811, the first fixed plate 8 are equipped with height of cutting regulating device 18, Front side is equipped with third sliding rail 181 by bolted connection in mounting plate 1, and 181 inner sliding type of third sliding rail is connected with the Three sliding blocks 182,182 front side of third sliding block are equipped with handle 184 by welding, pass through welding on the left of third sliding block 182 Mode the first push rod 183 is installed, 183 left end of the first push rod is equipped with connecting rod 185, connecting rod by welding 185 upper ends are equipped with the second push rod 186 by welding, and 8 front side of the first fixed plate is installed by bolted connection There is the 4th sliding rail 187,187 inner sliding type of the 4th sliding rail is connected with Four-slider 188, is connected with the 7th on front side of Four-slider 188 Shaft 189,186 left end of the second push rod are connected in the 7th shaft 189, and middle part is connected with eight revolution axis 1810 on rear side of fixed plate, Eight revolution axis 1810 is connected to 8 upper right side of the first fixed plate, is equipped with by welding on the upside of 8 upper right side of the first fixed plate Third connecting plate 1811,1811 right side of third connecting plate are equipped with first motor 13 by bolted connection, when user needs When being transported to the earthwork of the lower height on ground, or when different landform carries out the transport of the earthwork, Yong Huke To push handle 184 to be moved to the left, handle 184 drives third sliding block 182 to be moved to the left in third sliding rail 181, third sliding block 182, which are moved to the left the first push rod 183 of promotion, is moved to the left, and the first push rod 183 pushes connecting rod 185 to be moved to the left, connecting rod 185 The second push rod 186 is pushed to be moved to the left, the second push rod 186 will push the 7th shaft 189 and Four-slider 188 in the 4th sliding rail It is mobile to lower left in 187, so that the 4th sliding rail 187 and the first fixed plate 8 is driven to rotate clockwise around eight revolution axis 1810, To raising the lower left of the first fixed plate 8, and 8 lower left of the first fixed plate raises and drops 8 upper right side of the first fixed plate It is low, it drives third connecting plate 1811 and first motor 13 to rotate counterclockwise, the earthwork of different height is transported to play Purpose, if user needs to reduce the lower left of the first fixed plate 8, user only needs to move right handle 184 just It can be with.
Because further including having nut 1821 and third screw rod 1822,181 right side of third sliding rail is installed by welding There is nut 1821, nut 1821 is internally screwed with third screw rod 1822, and third screw rod 1822 and nut 1821 cooperate, third screw rod 1822 Left end is rotatably connected to the right side of third sliding block 182, and user can also rotate third screw rod 1822, third screw rod 1822 by with The cooperation precession or back-out of nut 1821 in this way can so that third sliding block 182 be driven to move left and right in third sliding rail 181 Stable fixes selected shovel soil height.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (8)

1. a kind of rare earth mining site land used face cubic metre of earth collecting device, which is characterized in that include mounting plate (1), the first support base (2), first rotating shaft (3), the first runner (4), crawler belt item (5), collecting box (6), support plate (7), the first fixed plate (8), second Shaft (9), the second runner (10), the first conveyer belt (11), first hook shovel (12), first motor (13), third runner (14) and First transmission item (15), mounting plate (1) the downside left and right sides are equipped with the first support base (2) by welding, and first It is connected with first rotating shaft (3), is connected in first rotating shaft (3) the first runner (4), the first runner connects between (4) on the downside of support seat (2) It is connected to crawler belt item (5), is equipped with by bolted connection on mounting plate (1) collecting box (6), mounting plate (1) upper left side is logical The mode for crossing welding is equipped with support plate (7), and middle part is equipped with the first fixed plate by welding on rear side of support plate (7) (8), the first fixed plate (8) upper right side and lower left are connected with the second shaft (9), have second turn in the second shaft (9) to condense It takes turns (10), is connected with the first conveyer belt (11) between the second runner (10), the first fixed plate (8) lower-left end is by welding First hook shovel (12) is installed, top is equipped with first motor (13) by bolted connection on the right side of support plate (7), and first Third runner (14) are connected on front side of the second shaft (9) of first motor (13) output shaft and upper right side on front side of motor (13), The first transmission item (15) is connected between third runner (14).
2. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 1, which is characterized in that further include having the Two hook shovel (111), and the second hook shovel (111) is evenly equipped on the first conveyer belt (11).
3. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 2, which is characterized in that further include have it is residual Remaining earthwork collection device (16), remaining earthwork collection device (16) include the first connecting plate (161), the second fixed plate (162), Third shaft (163), the 4th runner (164), the second conveyer belt (165), third hook shovel (166), the second motor (167), the 5th Runner (168) and the second transmission item (169), are equipped with remaining earthwork collection device (16) on the right side of mounting plate (1), on mounting plate (1) Right side is equipped with the first connecting plate (161) by welding, and the first connecting plate (161) right end is installed by welding Have the second fixed plate (162), the second fixed plate (162) upper left side and lower right are connected with third shaft (163), third shaft (163) it is connected with the 4th runner (164) on, is connected with the second conveyer belt (165) between the 4th runner (164), the second conveyer belt (165) it is evenly equipped with third on and hooks shovel (166), middle side part is equipped with the by bolted connection under the first connecting plate (161) Two motors (167), the second motor (167) output shaft on front side of the second motor (167) and connect in the third shaft (163) of lower right It is connected to the 5th runner (168), is connected with the second transmission article (169) between the 5th runner (168).
4. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 3, which is characterized in that further include leading Cover (1611), guide rail (1612), the first screw rod (1614) and the first briquetting (1615), the side that mounting plate (1) right end passes through welding Formula is equipped with guide sleeve (1611), and guide sleeve (1611) inner sliding type is connected with guide rail (1612), and guide rail (1612) upper end passes through welding Mode be mounted on left on the downside of the first connecting plate (161), guide sleeve (1611) lower right-hand side is provided with the first threaded hole (1613), the One threaded hole (1613) is internally screwed with the first screw rod (1614), and the first screw rod (1614) and the first threaded hole (1613) cooperate, and first Screw rod (1614) left end is rotatably connected with the first briquetting (1615).
5. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 4, which is characterized in that further include having digging Native device (17), earth-moving equipment (17) include the second connecting plate (171), third motor (172), cam (173), the 4th shaft (174), swingle (175), the first sliding rail (176), the first sliding block (177), the first spring (178), elevating lever (179), contact Block (1710), the 5th shaft (1711) shovel native plate (1712), the second support base (1714) and the 6th shaft (1715), support plate (7) left is equipped with earth-moving equipment (17), and top is equipped with the second connecting plate (171) by welding on the left of support plate (7), Second connecting plate (171) upper left side is equipped with third motor (172) by bolted connection, on front side of third motor (172) Third motor (172) output shaft on connect cam (173), right is connected with the 4th shaft (174) on front side of cam (173), the It is connected in four shafts (174) swingle (175), the second connecting plate (171) upper left side is equipped with by bolted connection First sliding rail (176), the first sliding rail (176) are located at third motor (172) left, and the first sliding rail (176) inner sliding type is connected with First sliding block (177), the first sliding block (177) left side are equipped with elevating lever (179) by welding, and elevating lever (179) is right Upper side is equipped with contact block (1710) by welding, and elevating lever (179) lower end is connected with the 5th shaft (1711), the It is connected with shoveling plate in five shafts (1711), issues and is provided with grooving (1713) on the right side of shoveling plate, top passes through weldering on the right side of shoveling plate The mode connect is equipped with the second support base (1714), and the 6th shaft (1715), swingle are connected on the second support base (1714) (175) lower end is connected in the 6th shaft (1715).
6. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 5, which is characterized in that further include having the Two sliding rails (1721), the second sliding block (1722) and the second screw rod (1724), the interior upside left of support plate (7) are bolted Mode is equipped with the second sliding rail (1721), and the second sliding rail (1721) inner sliding type is connected with the second sliding block (1722), the second sliding block (1722) left side is mounted on by welding on the right side of the second connecting plate (171), is provided with the second threaded hole on the upside of support plate (7) (1723), the second threaded hole (1723) is internally screwed with the second screw rod (1724), the second screw rod (1724) and the second threaded hole (1723) Cooperation, the second screw rod (1724) lower end are rotatably connected on the upside of the second sliding block (1722).
7. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 6, which is characterized in that further include having digging Native height adjustment device (18), height of cutting regulating device (18) include third sliding rail (181), third sliding block (182), first Push rod (183), handle (184), connecting rod (185), the second push rod (186), the 4th sliding rail (187), Four-slider (188), Seven shafts (189) and eight revolution axis (1810), the first fixed plate (8) are equipped with height of cutting regulating device (18), mounting plate (1) Interior front side is equipped with third sliding rail (181) by bolted connection, and it is sliding that third sliding rail (181) inner sliding type is connected with third Block (182), third sliding block (182) front side are equipped with handle (184) by welding, pass through on the left of third sliding block (182) The mode of welding is equipped with the first push rod (183), and the first push rod (183) left end is equipped with connecting rod by welding (185), connecting rod (185) upper end is equipped with the second push rod (186) by welding, is passed through on front side of the first fixed plate (8) Bolted mode is equipped with the 4th sliding rail (187), and the 4th sliding rail (187) inner sliding type is connected with Four-slider (188), the It is connected with the 7th shaft (189) on front side of Four-slider (188), the second push rod (186) left end is connected in the 7th shaft (189), Gu Middle part is connected with eight revolution axis (1810) on rear side of fixed board, and eight revolution axis (1810) is connected to the first fixed plate (8) upper right side.
8. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 7, which is characterized in that further include having spiral shell Female (1821) and third screw rod (1822), third sliding rail (181) right side are equipped with nut (1821), nut by welding (1821) it is internally screwed with third screw rod (1822), third screw rod (1822) and nut (1821) cooperate, third screw rod (1822) left end It is rotatably connected on the right side of third sliding block (182).
CN201710229856.XA 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device Active CN106988371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710229856.XA CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710229856.XA CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Publications (2)

Publication Number Publication Date
CN106988371A CN106988371A (en) 2017-07-28
CN106988371B true CN106988371B (en) 2019-07-16

Family

ID=59414999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710229856.XA Active CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Country Status (1)

Country Link
CN (1) CN106988371B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740456B (en) * 2017-10-27 2020-11-13 乐清市曙晟科技有限公司 Equipment for digging channel in sand and soil field for electric power construction
CN114541498B (en) * 2022-02-24 2023-07-07 浙江广聚建设有限公司 Portable building site shovel sand device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851159A (en) * 2006-05-03 2006-10-25 赵大力 Shovel loader
CN201437600U (en) * 2009-07-10 2010-04-14 北京中矿环保科技股份有限公司 Dredging conveyer
CN202718675U (en) * 2012-05-31 2013-02-06 白国钦 Movable placer mining and dressing machine
KR20130046157A (en) * 2011-10-27 2013-05-07 (주)한서정공 Attachment style snow blower
CN105275031A (en) * 2015-09-18 2016-01-27 杨娇仔 Land rehabilitation excavating gear special for opencast bauxite mine
CN205000376U (en) * 2015-05-07 2016-01-27 张萌 Forklift device for construction
CN205907741U (en) * 2016-04-25 2017-01-25 宁波高新区围海工程技术开发有限公司 Earthwork conveyer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851159A (en) * 2006-05-03 2006-10-25 赵大力 Shovel loader
CN201437600U (en) * 2009-07-10 2010-04-14 北京中矿环保科技股份有限公司 Dredging conveyer
KR20130046157A (en) * 2011-10-27 2013-05-07 (주)한서정공 Attachment style snow blower
CN202718675U (en) * 2012-05-31 2013-02-06 白国钦 Movable placer mining and dressing machine
CN205000376U (en) * 2015-05-07 2016-01-27 张萌 Forklift device for construction
CN105275031A (en) * 2015-09-18 2016-01-27 杨娇仔 Land rehabilitation excavating gear special for opencast bauxite mine
CN205907741U (en) * 2016-04-25 2017-01-25 宁波高新区围海工程技术开发有限公司 Earthwork conveyer

Also Published As

Publication number Publication date
CN106988371A (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN106881165B (en) A kind of efficient grinding equipment of rare earth processing building stones
CN107051632A (en) A kind of rare earth processing quickly smashes equipment with building stones
CN107100221A (en) A kind of construction site ground irrigation canals and ditches excavating equipment
CN106988371B (en) A kind of rare earth mining site land used face cubic metre of earth collecting device
CN106894456B (en) A kind of drilling is bulldozed compacting equipment with soil block
CN106944209B (en) A kind of rare earth processing rare earth ore disintegrating apparatus
CN201747367U (en) Opencut coal mine coal mining and stripping machine with adjustable roller height
CN105571330A (en) Automatic dust-free slag removing machine for smelting magnesium through Pidgeon process
CN117432406A (en) Filling and tunneling device for coal mining
CN203158840U (en) Movable crushing truck loader
CN107142980B (en) Earthwork treatment device and method
CN213688995U (en) Ground breaking device for engineering geological investigation
CN209100033U (en) a mine quarry
CN107119733B (en) Earthwork processing device and earthwork processing system
CN107100223A (en) A kind of quick collecting device in rare earth mining site land used face cubic metre of earth
CN207119438U (en) A kind of building waste classification processing unit
CN217450463U (en) Integrated crushing system for backfilling soil
CN207348865U (en) A kind of municipal administration is holed equipment with high efficiency
CN206646570U (en) A kind of multi-angle loading machine discharge chute
CN205259240U (en) Power shovel of automatic sieve material of auger formula
CN106703811B (en) A high-efficiency mining device for rare earth raw materials
CN114832930A (en) Integrated crushing system for backfill materials
CN202055283U (en) Novel crushing and sieving scraper bucket
CN112177669A (en) Mineral resource exploitation equipment
CN115136880B (en) Integrated intelligent trolley for tree planting and irrigation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190408

Address after: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 330038 Red Valley Road 1568, Red Valley, Nanchang, Jiangxi, China. The Red Valley triumph commercial office complex and commercial six 301-15 room (third floors)

Applicant before: Nanchang first leaf Technology Co., Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190620

Address after: 221200 1 Fu Fu Street, Wei Ji Town, Suining County, Xuzhou, Jiangsu

Applicant after: Xuzhou Green Bay Agricultural Development Co., Ltd.

Address before: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant before: Hefei dragon totem Information Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant