CN106988371A - A kind of rare earth mining site land used face cubic metre of earth collecting device - Google Patents

A kind of rare earth mining site land used face cubic metre of earth collecting device Download PDF

Info

Publication number
CN106988371A
CN106988371A CN201710229856.XA CN201710229856A CN106988371A CN 106988371 A CN106988371 A CN 106988371A CN 201710229856 A CN201710229856 A CN 201710229856A CN 106988371 A CN106988371 A CN 106988371A
Authority
CN
China
Prior art keywords
rotating shaft
runner
plate
welding
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710229856.XA
Other languages
Chinese (zh)
Other versions
CN106988371B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Green Bay Agricultural Development Co., Ltd.
Original Assignee
Nanchang First Leaf Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang First Leaf Technology Co Ltd filed Critical Nanchang First Leaf Technology Co Ltd
Priority to CN201710229856.XA priority Critical patent/CN106988371B/en
Publication of CN106988371A publication Critical patent/CN106988371A/en
Application granted granted Critical
Publication of CN106988371B publication Critical patent/CN106988371B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Soil Working Implements (AREA)

Abstract

The present invention relates to a kind of rare earth mining site equipment, more particularly to a kind of rare earth mining site land used face cubic metre of earth collecting device.The technical problem to be solved in the present invention is to provide the earthwork can be carried out more comprehensively collecting using less equipment, collect a kind of process time saving and energy saving rare earth mining site land used face cubic metre of earth collecting device.In order to solve the above-mentioned technical problem, the invention provides such a rare earth mining site land used face cubic metre of earth collecting device, include installing plate, the first support base, first rotating shaft, the first runner, crawler belt bar, collecting box, supporting plate, the first fixed plate, the second rotating shaft, second runner etc.;The left and right sides is provided with to be connected with first rotating shaft, first rotating shaft on the downside of the first support base, the first support base by way of welding on the downside of installing plate is connected with the first runner, and crawler belt bar is connected between the first runner.Invention achieves the earthwork can be carried out more comprehensively collecting using less equipment, collect the time saving and energy saving effect of process.

Description

A kind of rare earth mining site land used face cubic metre of earth collecting device
Technical field
The present invention relates to a kind of rare earth mining site equipment, more particularly to a kind of rare earth mining site land used face cubic metre of earth collecting device.
Background technology
Rare Earth Mine mainly exists in the earth's crust with mineral forms, and it mainly has three kinds:As the basic component of mineral, Rare earth in mineral lattice, constitutes the essential composition of mineral with ionic compound form preservation.This kind of mineral are commonly referred to as For rare-earth mineral, such as monazite, bastnaesite.As the impurity element of mineral, in the form of isomorphous replacement, it is scattered in In rock-forming mineral and the mineral of rare metals, this kind of mineral can be described as the mineral containing rare earth element, and such as apatite, fluorite are in Ionic condition is adsorbed between the surface of some mineral or particle.This kind of mineral are mainly various clay minerals, mica mineral. The rare earth element of this kind of state is easy to extract.
Rare earth has the laudatory title of " industrial vitamin ".Nowadays extremely important strategic resource is turned into.Rare earth element is aoxidized Thing refer to period of element atom ordinal number be 57 to 71 15 kinds of lanthanide oxides, and with lanthanide series chemical property The oxide of similar scandium and yttrium totally 17 kinds of elements.Rare earth element is in oil, chemical industry, metallurgy, weaving, ceramics, glass, permanent magnetism material The fields such as material, which are obtained for, to be widely applied, with the progress and the continuous breakthrough of application technology of science and technology, the valency of rare earth oxide Value will be increasing.
How much all large scale equipment can be difficult with present when rare earth mining site is excavated, on ground in the presence of some to enter The earthwork that row is collected, because also not environmentally friendly enough using large scale equipment not enough economy, and these earthwork also contain some rare earth elements, If the processing do not collected, the waste of resource can be not only caused, larger destruction can be also caused to environment.
Therefore research and development are needed badly a kind of using less equipment more can comprehensively be collected to earthwork progress, collection process is saved When labour-saving rare earth mining site land used face cubic metre of earth collecting device come when overcoming the current earthwork on to rare earth mining site to be collected Have the shortcomings that larger equipment be difficult the earthwork is collected, collection process wastes time and energy.
The content of the invention
(1)The technical problem to be solved
The present invention is difficult to soil to there is larger equipment when overcoming the current earthwork on to rare earth mining site to be collected Side is collected, the shortcoming that collection process wastes time and energy, and the technical problem to be solved in the present invention is to provide use less equipment A kind of rare earth mining site land used face cubic metre of earth collection that can carry out more comprehensively collecting, collection process is time saving and energy saving to the earthwork is set It is standby.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a rare earth mining site land used face cubic metre of earth collecting device, including Have installing plate, the first support base, first rotating shaft, the first runner, crawler belt bar, collecting box, supporting plate, the first fixed plate, second turn Axle, the second runner, the first conveyer belt, first hook left and right on the downside of shovel, the first motor, the 3rd runner and the first transmission article, installing plate Both sides are provided with to be connected with first rotating shaft, first rotating shaft on the downside of the first support base, the first support base by way of welding to be connected It is connected to and is connected with the mode being bolted on crawler belt bar, installing plate between the first runner, the first runner collecting box is installed, Installing plate upper left side is provided with middle part on rear side of supporting plate, supporting plate by way of welding and first is provided with by way of welding Fixed plate, the first fixed plate upper right side and lower left are connected with the second rotating shaft, the second rotating shaft has the second runner, second to condense The first conveyer belt is connected between runner, the first fixed plate lower-left end is provided with the first hook shovel, supporting plate by way of welding The mode being bolted above right side is provided with the first motor output shaft and upper right side on front side of the first motor, the first motor The second rotating shaft on front side of be connected between the 3rd runner, the 3rd runner and be connected with the first transmission article.
Preferably, also include and the second hook shovel is evenly equipped with the second hook shovel, the first conveyer belt.
Preferably, remaining earthwork collection device is also included, remaining earthwork collection device includes the first connecting plate, second Fixed plate, the 3rd rotating shaft, the 4th runner, the second conveyer belt, the 3rd hook shovel, the second motor, the 5th runner and the second transmission article, peace Fill and the first connecting plate, first are installed by way of welding on the right side of being provided with the right side of plate on remaining earthwork collection device, installing plate Connecting plate right-hand member is provided with the second fixed plate by way of welding, and the second fixed plate upper left side and lower right are connected with the 3rd turn It is connected with axle, the 3rd rotating shaft between the 4th runner, the 4th runner and is connected with the second conveyer belt, is evenly equipped with the second conveyer belt Three hook second that the mode that middle side part is bolted under shovel, the first connecting plate is provided with front side of the second motor, the second motor It is connected with 3rd rotating shaft of motor output shaft and lower right between the 5th runner, the 5th runner and is connected with the second transmission article.
Preferably, guide pin bushing, guide rail, the first screw rod and the first briquetting are also included, installing plate right-hand member is by way of welding Guide pin bushing is installed, guide pin bushing inner sliding type is connected with guide rail, and guide rail upper end is arranged on the downside of the first connecting plate by way of welding Left, guide pin bushing lower right-hand side, which is provided with the first screwed hole, the first screwed hole, is rotary with the first screw rod, the first screw rod and the first screwed hole Coordinate, the first screw rod left end is rotatably connected with the first briquetting.
Preferably, also include shoveling device, shoveling device include the second connecting plate, the 3rd motor, cam, the 4th turn Axle, swingle, the first slide rail, the first sliding block, the first spring, elevating lever, contact block, the 5th rotating shaft, the native plate of shovel, the second support base With the 6th rotating shaft, supporting plate left is provided with top on the left of shoveling device, supporting plate and the second connection is provided with by way of welding Plate, the 3rd motor that the mode that the second connecting plate upper left side is bolted is provided with front side of the 3rd motor, the 3rd motor is defeated Cam is connected on shaft, cam front side right, which is connected with the 4th rotating shaft, the 4th rotating shaft, is connected with swingle, on the second connecting plate Pass on left bolted mode and the first slide rail is installed, the first slide rail, which is located in the 3rd motor left, the first slide rail, to be slided Formula is connected with the first sliding block, and the mode that the first sliding block passes on left welding is provided with elevating lever, and elevating lever right side top passes through weldering The mode connect is provided with contact block, and elevating lever lower end, which is connected with the 5th rotating shaft, the 5th rotating shaft, is connected with shoveling plate, and shoveling plate is right Side, which is issued, is provided with grooving, and top is provided with the second support base, the second support base by way of welding and connected on the right side of shoveling plate There is the 6th rotating shaft, swingle lower end is connected in the 6th rotating shaft.
Preferably, also include upside left in the second slide rail, the second sliding block and the second screw rod, supporting plate by bolt to connect The mode connect is provided with the second slide rail, and the second slide rail inner sliding type is connected with the second sliding block, and the second sliding block passes on left welding Mode is arranged on the right side of the second connecting plate, is provided with the upside of supporting plate in the second screwed hole, the second screwed hole and is rotary with the second screw rod, the Two screw rods and the second screwed hole coordinate, and the second screw rod lower end is rotatably connected on the upside of the second sliding block.
Preferably, height of cutting adjusting means is also included, height of cutting adjusting means includes the 3rd slide rail, the 3rd cunning Block, the first push rod, handle, connecting rod, the second push rod, the 4th slide rail, Four-slider, the 7th rotating shaft and eighth-turn axle, first consolidates Fixed board is provided with the mode that front side is bolted in height of cutting adjusting means, installing plate and is provided with the 3rd slide rail, the 3rd Slide rail inner sliding type is connected with front side of the 3rd sliding block, the 3rd sliding block is provided with handle by way of welding, on the left of the 3rd sliding block First push rod is installed by way of welding, the first push rod left end is provided with by way of welding in connecting rod, connecting rod End is provided with the mode being bolted on front side of the second push rod, the first fixed plate by way of welding and is provided with the 4th cunning Rail, the 4th slide rail inner sliding type, which is connected with front side of Four-slider, Four-slider, is connected with the 7th rotating shaft, the connection of the second push rod left end In the 7th rotating shaft, middle part is connected with eighth-turn axle on rear side of fixed plate, and eighth-turn axle is connected to the first fixed plate upper right side.
Preferably, also include and nut, spiral shell are installed by way of welding on the right side of nut and the 3rd screw rod, the 3rd slide rail The 3rd screw rod is rotary with mother, the 3rd screw rod coordinates with nut, and the 3rd screw rod left end is rotatably connected on the right side of the 3rd sliding block.
Operation principle:When user needs the ground earthwork to rare earth mining site to be collected, user can promote installing plate It is moved to the left, installing plate drives the first runner rotate counterclockwise by crawler belt bar and is moved to the left, and then opens the first motor, the One motor will drive the 3rd runner of upside to turn clockwise, and the rotation of the runner of upside the 3rd drives downside the 3rd by the first transmission article Runner turns clockwise, and the rotation of the runner of downside the 3rd drives second rotating shaft in upper right side to turn clockwise, second turn of upper right side Axle rotation drives second runner in upper right side to turn clockwise, and the second runner rotation in upper right side is left by the drive of the first conveyer belt Second runner of lower section turns clockwise, so that drive the first conveyer belt to turn clockwise, and first hooks shovel by the soil on ground Square spade falls on the first conveyer belt, by the first conveyer belt transport in collecting box, when user promotes installing plate to drive equipment It is mobile, so as to carry out the collection of larger area to the earthwork on ground.
The second hook shovel is evenly equipped with the second hook shovel, the first conveyer belt because also including, so can be in the first conveyer belt Drive second to hook shovel rotation when rotation, the second hook shovel is dug the more earthwork and transported.
Because also including remaining earthwork collection device, remaining earthwork collection device include the first connecting plate, second consolidate Fixed board, the 3rd rotating shaft, the 4th runner, the second conveyer belt, the 3rd hook shovel, the second motor, the 5th runner and the second transmission article, install Provided with remaining earthwork collection device on the right side of plate, right side is provided with the first connecting plate by way of welding on installing plate, and first connects Fishplate bar right-hand member is provided with the second fixed plate by way of welding, and the second fixed plate upper left side and lower right are connected with the 3rd turn It is connected with axle, the 3rd rotating shaft between the 4th runner, the 4th runner and is connected with the second conveyer belt, is evenly equipped with the second conveyer belt Three hook second that the mode that middle side part is bolted under shovel, the first connecting plate is provided with front side of the second motor, the second motor It is connected with 3rd rotating shaft of motor output shaft and lower right between the 5th runner, the 5th runner and is connected with the second transmission article, when User opens the second motor while promoting installing plate to be moved to the left, and the second motor drives upper left 5th runner counterclockwise Rotation, upper left 5th runner rotate counterclockwise drives the 5th runner rotate counterclockwise of lower right by the second transmission article, The 5th runner rotation of lower right drives, and the 5th runner rotation of lower right drives the 3rd rotating shaft rotate counterclockwise of lower right, 3rd rotating shaft rotate counterclockwise of lower right drives the 4th runner rotate counterclockwise of lower right, the 4th runner rotation of lower right Upper left 4th runner rotate counterclockwise is driven by the second conveyer belt, so that the second conveyer belt rotate counterclockwise is driven, from And drive the 3rd to hook shovel rotate counterclockwise, the 3rd, which hooks shovel, to be collected and transport to the earthwork on the right side of installing plate, passes through second The transport of conveyer belt will fall off in collecting box.
Because also including guide pin bushing, guide rail, the first screw rod and the first briquetting, installing plate right-hand member is installed by way of welding There is guide pin bushing, guide pin bushing inner sliding type is connected with guide rail, and guide rail upper end is arranged on left on the downside of the first connecting plate by way of welding, Guide pin bushing lower right-hand side, which is provided with the first screwed hole, the first screwed hole, is rotary with the first screw rod, and the first screw rod and the first screwed hole coordinate, First screw rod left end is rotatably connected with the first briquetting, when user needs to change what is be collected for the earthwork on rear side of installing plate During height, that is to say, that when needing to carry out the collection of the earthwork to different terrain, user can move up and down the first connecting plate, first Connecting plate is moved up and down by guide rail and moved in guide pin bushing, and the first connecting plate is moved up and down to drive on the second conveyer belt and moved down Dynamic, when being moved on desired position, user can rotate the first screw rod, and the first screw rod passes through the cooperation with the first screwed hole Precession to the left, the first screw rod promotes the first briquetting, and the first briquetting touches guide rail, so that guide rail is fixed on into this highly makes it No longer move.
Because also including shoveling device, shoveling device include the second connecting plate, the 3rd motor, cam, the 4th rotating shaft, Swingle, the first slide rail, the first sliding block, the first spring, elevating lever, contact block, the 5th rotating shaft, the native plate of shovel, the second support base and 6th rotating shaft, supporting plate left is provided with top on the left of shoveling device, supporting plate and the second connecting plate is provided with by way of welding, The mode that second connecting plate upper left side is bolted is provided with the 3rd motor output shaft on front side of the 3rd motor, the 3rd motor Right, which is connected with the 4th rotating shaft, the 4th rotating shaft, on front side of upper connection cam, cam is connected with swingle, the second connecting plate upper left side The mode being bolted is provided with the first slide rail, and the first slide rail is located at the 3rd motor left, and the first slide rail inner sliding type connects The first sliding block is connected to, the mode that the first sliding block passes on left welding is provided with elevating lever, and elevating lever right side top passes through welding Mode is provided with contact block, and elevating lever lower end, which is connected with the 5th rotating shaft, the 5th rotating shaft, is connected with shoveling plate, under shoveling plate right side Hair is provided with grooving, and top, which is provided with by way of welding on the second support base, the second support base, on the right side of shoveling plate is connected with the Six rotating shafts, swingle lower end is connected in the 6th rotating shaft, when the earthwork on front side of installing plate is higher, and user can open the 3rd electricity Machine, the 3rd motor belt motor moving cam rotate counterclockwise, cam rotate counterclockwise touches contact block, and promotes contact block to moving down Dynamic, contact block drives elevating lever to move down, and elevating lever is moved down and lower movement by the first sliding block in the first slide rail, the One sliding block will also stretch the first spring simultaneously, and elevating lever, which is moved down, will promote the native plate of shovel to move down, and cam is counterclockwise To also the 4th rotating shaft be driven to be rotated around cam center of rotation while rotation, the 4th rotating shaft will pull rotation while rotation Bar rotated around the 4th rotating shaft and around cam center of rotation rotation, swingle rotate while pull on the second support base around Cam center of rotation is moved up while rotation, makes the native plate rotate counterclockwise in the 5th rotating shaft of shovel, the native plate of shovel also will simultaneously Also will in the 6th rotating shaft rotate counterclockwise, and shoveling native moving down for plate will dig higher with rotate counterclockwise by grooving Cubic metre of earth, then when cam is not exposed to contact plate, the first spring will recover from extended state, pulling the first sliding block to Upper movement, so that elevating lever be moved up, now cam now shovels soil also by the minimum point for driving the 4th rotating shaft to be located at cam Plate drops to the earthwork in grooving on the first conveyer belt, and the higher earthwork will be scooped up and transported by so running repeatedly It is defeated.
Because also including the second slide rail, the second sliding block and the second screw rod, upside left is bolted in supporting plate Mode the second slide rail is installed, the second slide rail inner sliding type is connected with the second sliding block, and the second sliding block passes on left the side of welding Formula is arranged on the right side of the second connecting plate, is provided with the upside of supporting plate in the second screwed hole, the second screwed hole and is rotary with the second screw rod, second Screw rod and the second screwed hole coordinate, and the second screw rod lower end is rotatably connected on the upside of the second sliding block, when user is needed to different height When the earthwork of degree carries out shovel soil, user can pass through the cooperation with the second screwed hole with the screw rod of forward or reverse second, the second screw rod Move up and down, so as to drive the second sliding block to be moved up and down in the second slide rail, the second sliding block, which is moved up and down, will drive second to connect Plate is moved up and down, so as to drive the native plate of shovel to move up and down.
Because also including height of cutting adjusting means, height of cutting adjusting means include the 3rd slide rail, the 3rd sliding block, First push rod, handle, connecting rod, the second push rod, the 4th slide rail, Four-slider, the 7th rotating shaft, eighth-turn axle and the 3rd connection Plate, the first fixed plate is provided with the mode that front side is bolted in height of cutting adjusting means, installing plate and is provided with the 3rd Slide rail, the 3rd slide rail inner sliding type is connected with front side of the 3rd sliding block, the 3rd sliding block and handle, the 3rd is provided with by way of welding The mode that sliding block passes on left welding is provided with the first push rod, and the first push rod left end is provided with connecting rod by way of welding, Connecting rod upper end is provided with the mode being bolted on front side of the second push rod, the first fixed plate by way of welding and is provided with 4th slide rail, the 4th slide rail inner sliding type, which is connected with front side of Four-slider, Four-slider, is connected with the 7th rotating shaft, and the second push rod is left End is connected in the 7th rotating shaft, and middle part is connected with eighth-turn axle on rear side of fixed plate, and eighth-turn axle is connected to the first fixed plate upper right It is provided with the upside of side, the first fixed plate upper right side by way of welding on the right side of the 3rd connecting plate, the 3rd connecting plate and passes through bolt The mode of connection is provided with the first motor, when user needs the earthwork to the lower height on ground to transport, Huo Zhe When different landform carries out the transport of the earthwork, user can promote handle to be moved to the left, and handle drives the 3rd sliding block to be slided the 3rd It is moved to the left in rail, the 3rd sliding block is moved to the left the first push rod of promotion and is moved to the left, and the first push rod promotes connecting rod to be moved to the left, Connecting rod promotes the second push rod to be moved to the left, the second push rod will promote the 7th rotating shaft and Four-slider in the 4th slide rail to left down Fang Yidong, so as to drive the 4th slide rail and the first fixed plate to be turned clockwise around eighth-turn axle, so that by the first fixed plate Lower left is raised, and the first fixed plate lower left is raised and will reduce the first fixed plate upper right side, drives the 3rd connecting plate and the One motor rotate counterclockwise, so that the purpose that the earthwork to different height is transported is played, if user needs to consolidate first If the lower left reduction of fixed board, user only needs to move right handle just can be with.
Because also including nut and the 3rd screw rod, nut, nut are installed by way of welding on the right side of the 3rd slide rail The 3rd screw rod is inside rotary with, the 3rd screw rod coordinates with nut, and the 3rd screw rod left end is rotatably connected on the right side of the 3rd sliding block, user is also The 3rd screw rod can be rotated, the 3rd screw rod is by the cooperation precession or back-out with nut, so as to drive the 3rd sliding block in the 3rd cunning Moved left and right in rail, what can so be stablized fixes the shovel soil height chosen.
(3)Beneficial effect
Invention achieves that can be carried out using less equipment to the earthwork more, comprehensively collection, collection process are time saving and energy saving Effect, is collected and transports to the earthwork on the left of installing plate by using the first conveyer belt plus the second conveyer belt to installing plate The mode that the surplus earth on right side is collected and transported, is not only able to more thoroughly be collected the earthwork on mining site, also The economy and the energy wasted when can collect the earthwork to saving large scale equipment.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention.
Fig. 2 hooks the main structure diagram of shovel for the present invention first.
Fig. 3 is the main structure diagram of the remaining earthwork collection device of the present invention.
Fig. 4 is the main structure diagram of guide pin bushing of the present invention.
Fig. 5 is the first main structure diagram of shoveling device of the present invention.
Fig. 6 is second of main structure diagram of shoveling device of the present invention.
Fig. 7 is the first main structure diagram of height of cutting adjusting means of the present invention.
Fig. 8 is second of main structure diagram of height of cutting adjusting means of the present invention.
Mark in accompanying drawing for:1- installing plates, the support bases of 2- first, 3- first rotating shafts, the runners of 4- first, 5- crawler belt bars, 6- collecting boxs, 7- supporting plates, the fixed plates of 8- first, the rotating shafts of 9- second, the runners of 10- second, the conveyer belts of 11- first, 12- first is hooked Shovel, the motors of 13- first, the runners of 14- the 3rd, the transmission bars of 15- first, 111- second, which is hooked, to be shoveled, 16- remnants earthwork collection devices, The connecting plates of 161- first, the fixed plates of 162- second, the rotating shafts of 163- the 3rd, the runners of 164- the 4th, the conveyer belts of 165- second, 166- Three hook shovel, the motors of 167- second, the runners of 168- the 5th, the transmission bars of 169- second, 1611- guide pin bushings, 1612- guide rails, 1613- first Screwed hole, the screw rods of 1614- first, the briquettings of 1615- first, 17- shoveling devices, the connecting plates of 171- second, the motors of 172- the 3rd, 173- cams, the rotating shafts of 174- the 4th, 175- swingles, the slide rails of 176- first, the sliding blocks of 177- first, the springs of 178- first, 179- Elevating lever, 1710- contact blocks, the rotating shafts of 1711- the 5th, the native plate of 1712- shovels, 1713- groovings, the support bases of 1714- second, 1715- 6th rotating shaft, the slide rails of 1721- second, the sliding blocks of 1722- second, the screwed holes of 1723- second, the screw rods of 1724- second, 18- cuts the earth high Spend adjusting means, the slide rails of 181- the 3rd, the sliding blocks of 182- the 3rd, the push rods of 183- first, 184- handles, 185- connecting rods, 186- the Two push rods, the slide rails of 187- the 4th, 188- Four-sliders, the rotating shafts of 189- the 7th, 1810- eighth-turn axles, the connecting plates of 1811- the 3rd, 1821- nuts, the screw rods of 1822- the 3rd.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, includes installing plate 1, the first support base 2, first Rotating shaft 3, the first runner 4, crawler belt bar 5, collecting box 6, supporting plate 7, the first fixed plate 8, the second rotating shaft 9, the second runner 10, first Conveyer belt 11, first hooks the 12, first motor 13 of shovel, the 3rd runner 14 and the first transmission article 15, and the downside left and right sides of installing plate 1 leads to The mode for crossing welding is provided with the first support base 2, and the downside of the first support base 2 is connected with first rotating shaft 3, first rotating shaft 3 and connected Have and be connected with the mode being bolted on crawler belt bar 5, installing plate 1 between the first runner 4, the first runner 4 collection is installed Case 6, the upper left side of installing plate 1 is provided with supporting plate 7 by way of welding, and the rear side of supporting plate 7 middle part is pacified by way of welding Equipped with the first fixed plate 8, the upper right side of the first fixed plate 8 and lower left are connected with the second rotating shaft 9, the second rotating shaft 9 to be had to condense The first conveyer belt 11 is connected between second runner 10, the second runner 10, the lower-left end of the first fixed plate 8 is pacified by way of welding Shovel 12 is hooked equipped with first, the mode that the right side of supporting plate 7 top is bolted is provided with before the first motor 13, the first motor 13 The output shaft of the first motor 13 of side and the front side of the second rotating shaft 9 in upper right side are connected between the 3rd runner 14, the 3rd runner 14 and connected It is connected to the first transmission bar 15.
Embodiment 2
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, includes installing plate 1, the first support base 2, first Rotating shaft 3, the first runner 4, crawler belt bar 5, collecting box 6, supporting plate 7, the first fixed plate 8, the second rotating shaft 9, the second runner 10, first Conveyer belt 11, first hooks the 12, first motor 13 of shovel, the 3rd runner 14 and the first transmission article 15, and the downside left and right sides of installing plate 1 leads to The mode for crossing welding is provided with the first support base 2, and the downside of the first support base 2 is connected with first rotating shaft 3, first rotating shaft 3 and connected Have and be connected with the mode being bolted on crawler belt bar 5, installing plate 1 between the first runner 4, the first runner 4 collection is installed Case 6, the upper left side of installing plate 1 is provided with supporting plate 7 by way of welding, and the rear side of supporting plate 7 middle part is pacified by way of welding Equipped with the first fixed plate 8, the upper right side of the first fixed plate 8 and lower left are connected with the second rotating shaft 9, the second rotating shaft 9 to be had to condense The first conveyer belt 11 is connected between second runner 10, the second runner 10, the lower-left end of the first fixed plate 8 is pacified by way of welding Shovel 12 is hooked equipped with first, the mode that the right side of supporting plate 7 top is bolted is provided with before the first motor 13, the first motor 13 The output shaft of the first motor 13 of side and the front side of the second rotating shaft 9 in upper right side are connected between the 3rd runner 14, the 3rd runner 14 and connected It is connected to the first transmission bar 15.
Also include and the second hook shovel 111 is evenly equipped with the second hook shovel 111, the first conveyer belt 11.
Embodiment 3
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, includes installing plate 1, the first support base 2, first Rotating shaft 3, the first runner 4, crawler belt bar 5, collecting box 6, supporting plate 7, the first fixed plate 8, the second rotating shaft 9, the second runner 10, first Conveyer belt 11, first hooks the 12, first motor 13 of shovel, the 3rd runner 14 and the first transmission article 15, and the downside left and right sides of installing plate 1 leads to The mode for crossing welding is provided with the first support base 2, and the downside of the first support base 2 is connected with first rotating shaft 3, first rotating shaft 3 and connected Have and be connected with the mode being bolted on crawler belt bar 5, installing plate 1 between the first runner 4, the first runner 4 collection is installed Case 6, the upper left side of installing plate 1 is provided with supporting plate 7 by way of welding, and the rear side of supporting plate 7 middle part is pacified by way of welding Equipped with the first fixed plate 8, the upper right side of the first fixed plate 8 and lower left are connected with the second rotating shaft 9, the second rotating shaft 9 to be had to condense The first conveyer belt 11 is connected between second runner 10, the second runner 10, the lower-left end of the first fixed plate 8 is pacified by way of welding Shovel 12 is hooked equipped with first, the mode that the right side of supporting plate 7 top is bolted is provided with before the first motor 13, the first motor 13 The output shaft of the first motor 13 of side and the front side of the second rotating shaft 9 in upper right side are connected between the 3rd runner 14, the 3rd runner 14 and connected It is connected to the first transmission bar 15.
Also include and the second hook shovel 111 is evenly equipped with the second hook shovel 111, the first conveyer belt 11.
Also include remaining earthwork collection device 16, remaining earthwork collection device 16 includes the first connecting plate 161, second Fixed plate 162, the 3rd rotating shaft 163, the 4th runner 164, the second conveyer belt the 165, the 3rd hook the 166, second motor the 167, the 5th of shovel Runner 168 and second is driven bar 169, and the right side of installing plate 1 is provided with right side on remaining earthwork collection device 16, installing plate 1 and passes through weldering The mode connect is provided with the first connecting plate 161, and the right-hand member of the first connecting plate 161 is provided with the second fixed plate by way of welding 162, the upper left side of the second fixed plate 162 and lower right are connected with the 3rd rotating shaft 163, the 3rd rotating shaft 163 and are connected with the 4th runner 164, it is connected with the second conveyer belt 165, the second conveyer belt 165 between the 4th runner 164 and is evenly equipped with the 3rd hook shovel 166, first The mode that 161 times middle side parts of connecting plate are bolted is provided with the second motor 167, the second electricity of the front side of the second motor 167 It is connected with 3rd rotating shaft 163 of the output shaft of machine 167 and lower right between the 5th runner 168, the 5th runner 168 and is connected with second It is driven bar 169.
Embodiment 4
A kind of rare earth mining site land used face cubic metre of earth collecting device, as shown in figures 1-8, includes installing plate 1, the first support base 2, first Rotating shaft 3, the first runner 4, crawler belt bar 5, collecting box 6, supporting plate 7, the first fixed plate 8, the second rotating shaft 9, the second runner 10, first Conveyer belt 11, first hooks the 12, first motor 13 of shovel, the 3rd runner 14 and the first transmission article 15, and the downside left and right sides of installing plate 1 leads to The mode for crossing welding is provided with the first support base 2, and the downside of the first support base 2 is connected with first rotating shaft 3, first rotating shaft 3 and connected Have and be connected with the mode being bolted on crawler belt bar 5, installing plate 1 between the first runner 4, the first runner 4 collection is installed Case 6, the upper left side of installing plate 1 is provided with supporting plate 7 by way of welding, and the rear side of supporting plate 7 middle part is pacified by way of welding Equipped with the first fixed plate 8, the upper right side of the first fixed plate 8 and lower left are connected with the second rotating shaft 9, the second rotating shaft 9 to be had to condense The first conveyer belt 11 is connected between second runner 10, the second runner 10, the lower-left end of the first fixed plate 8 is pacified by way of welding Shovel 12 is hooked equipped with first, the mode that the right side of supporting plate 7 top is bolted is provided with before the first motor 13, the first motor 13 The output shaft of the first motor 13 of side and the front side of the second rotating shaft 9 in upper right side are connected between the 3rd runner 14, the 3rd runner 14 and connected It is connected to the first transmission bar 15.
Also include and the second hook shovel 111 is evenly equipped with the second hook shovel 111, the first conveyer belt 11.
Also include remaining earthwork collection device 16, remaining earthwork collection device 16 includes the first connecting plate 161, second Fixed plate 162, the 3rd rotating shaft 163, the 4th runner 164, the second conveyer belt the 165, the 3rd hook the 166, second motor the 167, the 5th of shovel Runner 168 and second is driven bar 169, and the right side of installing plate 1 is provided with right side on remaining earthwork collection device 16, installing plate 1 and passes through weldering The mode connect is provided with the first connecting plate 161, and the right-hand member of the first connecting plate 161 is provided with the second fixed plate by way of welding 162, the upper left side of the second fixed plate 162 and lower right are connected with the 3rd rotating shaft 163, the 3rd rotating shaft 163 and are connected with the 4th runner 164, it is connected with the second conveyer belt 165, the second conveyer belt 165 between the 4th runner 164 and is evenly equipped with the 3rd hook shovel 166, first The mode that 161 times middle side parts of connecting plate are bolted is provided with the second motor 167, the second electricity of the front side of the second motor 167 It is connected with 3rd rotating shaft 163 of the output shaft of machine 167 and lower right between the 5th runner 168, the 5th runner 168 and is connected with second It is driven bar 169.
Also include guide pin bushing 1611, guide rail 1612, the first screw rod 1614 and the first briquetting 1615, the right-hand member of installing plate 1 passes through The mode of welding is provided with guide pin bushing 1611, and the inner sliding type of guide pin bushing 1611 is connected with guide rail 1612, and the upper end of guide rail 1612 passes through welding Mode be arranged on the downside left of the first connecting plate 161, the lower right-hand side of guide pin bushing 1611 is provided with the first screwed hole 1613, the first screw thread The first screw rod 1614 is rotary with hole 1613, the first screw rod 1614 coordinates with the first screwed hole 1613, the rotation of the left end of the first screw rod 1614 It is rotatable to be connected with the first briquetting 1615.
Also include shoveling device 17, shoveling device 17 include the second connecting plate 171, the 3rd motor 172, cam 173, 4th rotating shaft 174, swingle 175, the first slide rail 176, the first sliding block 177, the first spring 178, elevating lever 179, contact block 1710th, the 5th rotating shaft 1711, the native plate 1712 of shovel, the second support base 1714 and the 6th rotating shaft 1715, the left of supporting plate 7 is provided with shoveling Device 17, the left side of supporting plate 7 top is provided with the second connecting plate 171 by way of welding, and the upper left side of the second connecting plate 171 leads to Cross on the output shaft of the 3rd motor 172 that bolted mode is provided with front side of the 3rd motor 172, the 3rd motor 172 and connect convex Wheel 173, the front side right of cam 173, which is connected with the 4th rotating shaft 174, the 4th rotating shaft 174, is connected with swingle 175, the second connection The mode that the upper left side of plate 171 is bolted is provided with the first slide rail 176, and it is left that the first slide rail 176 is located at the 3rd motor 172 Side, the inner sliding type of the first slide rail 176 is connected with the first sliding block 177, and the mode that the first sliding block 177 passes on left welding is provided with liter Bar 179 drops, the right side of elevating lever 179 top is provided with contact block 1710 by way of welding, the lower end of elevating lever 179 is connected with the It is connected with to issue on the right side of shoveling plate, shoveling plate in five rotating shafts 1711, the 5th rotating shaft 1711 and is provided with grooving 1713, on shoveling plate right side Side, which is provided with by way of welding on the second support base 1714, the second support base 1714, is connected with the 6th rotating shaft 1715, rotates The lower end of bar 175 is connected in the 6th rotating shaft 1715.
Also include upside left in the second slide rail 1721, the second sliding block 1722 and the second screw rod 1724, supporting plate 7 to pass through Bolted mode is provided with the second slide rail 1721, and the inner sliding type of the second slide rail 1721 is connected with the second sliding block 1722, second The mode that sliding block 1722 passes on left welding is arranged on the right side of the second connecting plate 171, and the upside of supporting plate 7 is provided with the second screwed hole 1723, the second screw rod 1724 is rotary with the second screwed hole 1723, and the second screw rod 1724 coordinates with the second screwed hole 1723, the second spiral shell The lower end of bar 1724 is rotatably connected to the upside of the second sliding block 1722.
Also include height of cutting adjusting means 18, height of cutting adjusting means 18 includes the 3rd slide rail 181, the 3rd cunning Block 182, the first push rod 183, handle 184, connecting rod 185, the second push rod 186, the 4th slide rail 187, Four-slider the 188, the 7th Rotating shaft 189 and eighth-turn axle 1810, the first fixed plate 8 are provided with front side in height of cutting adjusting means 18, installing plate 1 and pass through spiral shell Tether the mode connect and the 3rd slide rail 181 is installed, the inner sliding type of the 3rd slide rail 181 is connected with the 3rd sliding block 182, the 3rd sliding block 182 front sides are provided with handle 184 by way of welding, and the mode that the 3rd sliding block 182 passes on left welding is provided with first and pushed away Bar 183, the left end of the first push rod 183 is provided with connecting rod 185, the side that the upper end of connecting rod 185 passes through welding by way of welding Formula is provided with the second push rod 186, and the mode that the front side of the first fixed plate 8 is bolted is provided with the 4th slide rail 187, and the 4th slides The inner sliding type of rail 187 is connected with Four-slider 188, and the front side of Four-slider 188 is connected with the 7th rotating shaft 189, and the second push rod 186 is left End is connected in the 7th rotating shaft 189, and middle part is connected with eighth-turn axle 1810 on rear side of fixed plate, and eighth-turn axle 1810 is connected to first The upper right side of fixed plate 8.
Also include the screw rod 1822 of nut 1821 and the 3rd, the right side of the 3rd slide rail 181 is provided with spiral shell by way of welding The 3rd screw rod 1822 is rotary with mother 1821, nut 1821, the 3rd screw rod 1822 coordinates with nut 1821, the left end of the 3rd screw rod 1822 It is rotary to be connected to the right side of the 3rd sliding block 182.
Operation principle:When user needs the ground earthwork to rare earth mining site to be collected, user can promote installing plate 1 It is moved to the left, installing plate 1 drives the rotate counterclockwise of the first runner 4 by crawler belt bar 5 and is moved to the left, and then opens the first motor 13, the first motor 13 will drive the 3rd runner 14 of upside to turn clockwise, and the rotation of the runner 14 of upside the 3rd passes through the first transmission article 15 drive the 3rd runner 14 of downside to turn clockwise, and the rotation of the runner 14 of downside the 3rd drives second rotating shaft 9 in upper right side clockwise Rotation, the second rotating shaft 9 rotation in upper right side drives second runner 10 in upper right side to turn clockwise, second runner 10 in upper right side Rotation drives the second runner 10 of lower left to turn clockwise by the first conveyer belt 11, so as to drive the up time of the first conveyer belt 11 Pin rotates, and first hooks shovel and 12 the earthwork on ground slide tackled on the first conveyer belt 11, by the first conveyer belt 11 transport In collecting box 6, when user promotes installing plate 1 to drive equipment movement, so as to carry out the receipts of larger area to the earthwork on ground Collection.
Because also including the second hook shovel 111, the second hook shovel 111 is evenly equipped with the first conveyer belt 11, so can be the Drive second to hook shovel 111 when the rotation of one conveyer belt 11 to rotate, the second hook shovel 111 is dug the more earthwork and transported It is defeated.
Because also including remaining earthwork collection device 16, remaining earthwork collection device 16 include the first connecting plate 161, Second fixed plate 162, the 3rd rotating shaft 163, the 4th runner 164, the second conveyer belt the 165, the 3rd hook shovel the 166, second motor 167, 5th runner 168 and the second transmission article 169, it is logical that the right side of installing plate 1 is provided with right side on remaining earthwork collection device 16, installing plate 1 The mode for crossing welding is provided with the first connecting plate 161, and the right-hand member of the first connecting plate 161 is provided with the second fixation by way of welding Plate 162, the upper left side of the second fixed plate 162 and lower right are connected with the 3rd rotating shaft 163, the 3rd rotating shaft 163 and are connected with the 4th turn It is connected between wheel 164, the 4th runner 164 on the second conveyer belt 165, the second conveyer belt 165 and is evenly equipped with the 3rd hook shovel 166, the The mode that one middle side part of connecting plate 161 times is bolted is provided with the second motor 167, the second of the front side of the second motor 167 It is connected with 3rd rotating shaft 163 of the output shaft of motor 167 and lower right between the 5th runner 168, the 5th runner 168 and is connected with Two transmission bars 169, open the second motor 167, the second motor 167 drives while user is promoting installing plate 1 to be moved to the left The upper left rotate counterclockwise of 5th runner 168, the upper left rotate counterclockwise of 5th runner 168 passes through the second transmission article 169 The rotate counterclockwise of the 5th runner 168 of lower right is driven, the 5th runner 168 rotation of lower right drives, the 5th turn of lower right The rotation of wheel 168 drives the rotate counterclockwise of the 3rd rotating shaft 163 of lower right, and the rotate counterclockwise of the 3rd rotating shaft 163 of lower right drives The rotate counterclockwise of the 4th runner 164 of lower right, the 4th runner 164 rotation of lower right drives a left side by the second conveyer belt 165 The rotate counterclockwise of the 4th runner 164 of top, so that the rotate counterclockwise of the second conveyer belt 165 is driven, so as to drive the 3rd hook shovel 166 rotate counterclockwises, the 3rd, which hooks shovel 166, is collected the earthwork to the right side of installing plate 1 and transports, passes through the second conveyer belt 165 transport will fall off in collecting box 6.
Because also including guide pin bushing 1611, guide rail 1612, the first screw rod 1614 and the first briquetting 1615, the right-hand member of installing plate 1 Guide pin bushing 1611 is installed by way of welding, the inner sliding type of guide pin bushing 1611 is connected with guide rail 1612, and the upper end of guide rail 1612 passes through The mode of welding is arranged on the downside left of the first connecting plate 161, and the lower right-hand side of guide pin bushing 1611 is provided with the first screwed hole 1613, first The first screw rod 1614 is rotary with screwed hole 1613, the first screw rod 1614 coordinates with the first screwed hole 1613, the first screw rod 1614 is left End is rotatably connected with the first briquetting 1615, when user needs to change the height being collected for the earthwork of the rear side of installing plate 1 When, that is to say, that when needing to carry out the collection of the earthwork to different terrain, user can move up and down the first connecting plate 161, first Connecting plate 161 is moved up and down by guide rail 1612 and moved in guide pin bushing 1611, and the first connecting plate 161, which is moved up and down, will drive Two conveyer belts 165 are moved up and down, when being moved on desired position, and user can rotate the first screw rod 1614, the first screw rod 1614 promote the first briquetting 1615, the first briquetting by the cooperation precession to the left with the first screwed hole 1613, the first screw rod 1614 1615 touch guide rail 1612, it is no longer moved so that guide rail 1612 is fixed on into this.
Because also including shoveling device 17, shoveling device 17 includes the second connecting plate 171, the 3rd motor 172, cam 173rd, the 4th rotating shaft 174, swingle 175, the first slide rail 176, the first sliding block 177, the first spring 178, elevating lever 179, contact Block 1710, the 5th rotating shaft 1711, the native plate 1712 of shovel, the second support base 1714 and the 6th rotating shaft 1715, the left of supporting plate 7 is provided with digging Native device 17, the left side of supporting plate 7 top is provided with the second connecting plate 171, the upper left side of the second connecting plate 171 by way of welding The mode being bolted is provided with the 3rd motor 172, the output shaft of the 3rd motor 172 of the front side of the 3rd motor 172 and connected Cam 173, the front side right of cam 173, which is connected with the 4th rotating shaft 174, the 4th rotating shaft 174, is connected with swingle 175, and second connects The mode that the upper left side of fishplate bar 171 is bolted is provided with the first slide rail 176, and it is left that the first slide rail 176 is located at the 3rd motor 172 Side, the inner sliding type of the first slide rail 176 is connected with the first sliding block 177, and the mode that the first sliding block 177 passes on left welding is provided with liter Bar 179 drops, the right side of elevating lever 179 top is provided with contact block 1710 by way of welding, the lower end of elevating lever 179 is connected with the It is connected with to issue on the right side of shoveling plate, shoveling plate in five rotating shafts 1711, the 5th rotating shaft 1711 and is provided with grooving 1713, on shoveling plate right side Side, which is provided with by way of welding on the second support base 1714, the second support base 1714, is connected with the 6th rotating shaft 1715, rotates The lower end of bar 175 is connected in the 6th rotating shaft 1715, and when the earthwork of the front side of installing plate 1 is higher, user can open the 3rd motor 172, the 3rd motor 172 is with the rotate counterclockwise of moving cam 173, and the rotate counterclockwise of cam 173 touches contact block 1710, and promotes Contact block 1710 is moved down, and contact block 1710 drives elevating lever 179 to move down, and elevating lever 179 is existed by the first sliding block 177 Moved down and lower movement in first slide rail 176, the first sliding block 177 will also stretch the first spring 178 simultaneously, elevating lever 179 to Lower movement will promote the native plate 1712 of shovel to move down, and cam 173 will also drive the 4th rotating shaft 174 while rotate counterclockwise Around the rotation of the pivot of cam 173, the 4th rotating shaft 174 will pull swingle 175 around the 4th rotating shaft 174 while rotation Rotate and around the rotation of the pivot of cam 173, swingle 175 pulls on the second support base 1714 around cam while rotation 173 pivots are moved up while rotation, make the native rotate counterclockwise in the 5th rotating shaft 1711 of plate 1712 of shovel, the native plate of shovel 1712 also will simultaneously also will in the 6th rotating shaft 1715 rotate counterclockwise, and shovel moving down and rotate counterclockwise for native plate 1712 The higher earthwork will be dug by grooving 1713, then when cam 173 is not exposed to contact plate, the first spring 178 It will recover from extended state, and pull the first sliding block 177 to move up, so that elevating lever 179 be moved up, now cam 173 Also by the minimum point for driving the 4th rotating shaft 174 to be located at cam 173, now shovel native plate 1712 and drop to the earthwork in grooving 1713 On first conveyer belt 11, the higher earthwork will be scooped up and transported by so running repeatedly.
Because also including the second slide rail 1721, the second sliding block 1722 and the second screw rod 1724, upside left in supporting plate 7 The mode being bolted is provided with the second slide rail 1721, and the inner sliding type of the second slide rail 1721 is connected with the second sliding block 1722, The mode that second sliding block 1722 passes on left welding is arranged on the right side of the second connecting plate 171, and the upside of supporting plate 7 is provided with the second screw thread The second screw rod 1724 is rotary with hole 1723, the second screwed hole 1723, the second screw rod 1724 coordinates with the second screwed hole 1723, second The lower end of screw rod 1724 is rotatably connected to the upside of the second sliding block 1722, when user needs the earthwork to different height to carry out shovel soil When, user can with the second screw rod of forward or reverse 1724, the second screw rod 1724 by the cooperation with the second screwed hole 1723 above and below Mobile, so as to drive the second sliding block 1722 to be moved up and down in the second slide rail 1721, the second sliding block 1722 is moved up and down and will driven Second connecting plate 171 is moved up and down, so as to drive the native plate 1712 of shovel to move up and down.
Because also including height of cutting adjusting means 18, height of cutting adjusting means 18 includes the 3rd slide rail 181, Three sliding blocks 182, the first push rod 183, handle 184, connecting rod 185, the second push rod 186, the 4th slide rail 187, Four-slider 188, 7th rotating shaft 189, the connecting plate 1811 of eighth-turn axle 1810 and the 3rd, the first fixed plate 8 are provided with height of cutting adjusting means 18, The mode that front side is bolted in installing plate 1 is provided with the 3rd slide rail 181, and the inner sliding type of the 3rd slide rail 181 is connected with the Three sliding blocks 182, the front side of the 3rd sliding block 182 is provided with handle 184 by way of welding, and the 3rd sliding block 182 passes on left welding Mode the first push rod 183 is installed, the left end of the first push rod 183 is provided with connecting rod 185, connecting rod by way of welding 185 upper ends are provided with the second push rod 186 by way of welding, and the mode that the front side of the first fixed plate 8 is bolted is installed There is the 4th slide rail 187, the inner sliding type of the 4th slide rail 187 is connected with Four-slider 188, and the front side of Four-slider 188 is connected with the 7th Rotating shaft 189, the left end of the second push rod 186 is connected in the 7th rotating shaft 189, and middle part is connected with eighth-turn axle 1810 on rear side of fixed plate, Eighth-turn axle 1810 is connected on the upside of the upper right side of the first fixed plate 8, the upper right side of the first fixed plate 8 and is provided with by way of welding 3rd connecting plate 1811, the mode that the right side of the 3rd connecting plate 1811 is bolted is provided with the first motor 13, when user needs When being transported to the earthwork of the lower height on ground, or when different landform carries out the transport of the earthwork, Yong Huke To promote handle 184 to be moved to the left, handle 184 drives the 3rd sliding block 182 to be moved to the left in the 3rd slide rail 181, the 3rd sliding block 182, which are moved to the left the first push rod 183 of promotion, is moved to the left, and the first push rod 183 promotes connecting rod 185 to be moved to the left, connecting rod 185 The second push rod 186 is promoted to be moved to the left, the second push rod 186 will promote the 7th rotating shaft 189 and Four-slider 188 in the 4th slide rail Moved in 187 to lower left, so that drive the 4th slide rail 187 and the first fixed plate 8 to be turned clockwise around eighth-turn axle 1810, So that the lower left of the first fixed plate 8 be raised, and the lower left of the first fixed plate 8 is raised and will drop the upper right side of the first fixed plate 8 It is low, the 3rd connecting plate 1811 and the rotate counterclockwise of the first motor 13 are driven, so that the earthwork played to different height is transported Purpose, if user is needed the reduction of the lower left of the first fixed plate 8, user only needs to move right handle 184 just Can be with.
Because also including the screw rod 1822 of nut 1821 and the 3rd, the right side of the 3rd slide rail 181 is installed by way of welding Have and the 3rd screw rod 1822 is rotary with nut 1821, nut 1821, the 3rd screw rod 1822 coordinates with nut 1821, the 3rd screw rod 1822 Left end is rotatably connected to the right side of the 3rd sliding block 182, and user can also rotate the 3rd screw rod 1822, the 3rd screw rod 1822 by with The cooperation precession or back-out of nut 1821, so as to drive the 3rd sliding block 182 to be moved left and right in the 3rd slide rail 181, so can Stable fixes the shovel soil height chosen.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of rare earth mining site land used face cubic metre of earth collecting device, it is characterised in that include installing plate(1), the first support base (2), first rotating shaft(3), the first runner(4), crawler belt bar(5), collecting box(6), supporting plate(7), the first fixed plate(8), second Rotating shaft(9), the second runner(10), the first conveyer belt(11), first hook shovel(12), the first motor(13), the 3rd runner(14)With First transmission bar(15), installing plate(1)The downside left and right sides is provided with the first support base by way of welding(2), first Support seat(2)Downside is connected with first rotating shaft(3), first rotating shaft(3)On be connected with the first runner(4), the first runner(4)Between connect It is connected to crawler belt bar(5), installing plate(1)On the mode that is bolted collecting box is installed(6), installing plate(1)Upper left side leads to The mode for crossing welding is provided with supporting plate(7), supporting plate(7)The first fixed plate is installed by way of welding in the middle part of rear side (8), the first fixed plate(8)Upper right side and lower left are connected with the second rotating shaft(9), the second rotating shaft(9)On have second turn to condense Wheel(10), the second runner(10)Between be connected with the first conveyer belt(11), the first fixed plate(8)Lower-left end is by way of welding First hook shovel is installed(12), supporting plate(7)The mode being bolted above right side is provided with the first motor(13), first Motor(13)First motor of front side(13)Output shaft and second rotating shaft in upper right side(9)Front side is connected with the 3rd runner(14), 3rd runner(14)Between be connected with the first transmission bar(15).
2. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 1, it is characterised in that also include the Two hook shovel(111), the first conveyer belt(11)On be evenly equipped with the second hook shovel(111).
3. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 2, it is characterised in that also include residual Remaining earthwork collection device(16), remaining earthwork collection device(16)Include the first connecting plate(161), the second fixed plate(162)、 3rd rotating shaft(163), the 4th runner(164), the second conveyer belt(165), the 3rd hook shovel(166), the second motor(167), the 5th Runner(168)With the second transmission bar(169), installing plate(1)Right side is provided with remaining earthwork collection device(16), installing plate(1)On Right side is provided with the first connecting plate by way of welding(161), the first connecting plate(161)Right-hand member is installed by way of welding There is the second fixed plate(162), the second fixed plate(162)Upper left side and lower right are connected with the 3rd rotating shaft(163), the 3rd rotating shaft (163)On be connected with the 4th runner(164), the 4th runner(164)Between be connected with the second conveyer belt(165), the second conveyer belt (165)On be evenly equipped with the 3rd hook shovel(166), the first connecting plate(161)The mode that lower middle side part is bolted is provided with Two motors(167), the second motor(167)Second motor of front side(167)Output shaft and the 3rd rotating shaft of lower right(163)Upper company It is connected to the 5th runner(168), the 5th runner(168)Between be connected with the second transmission bar(169).
4. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 3, it is characterised in that also include and lead Set(1611), guide rail(1612), the first screw rod(1614)With the first briquetting(1615), installing plate(1)The side that right-hand member passes through welding Formula is provided with guide pin bushing(1611), guide pin bushing(1611)Inner sliding type is connected with guide rail(1612), guide rail(1612)Upper end passes through welding Mode be arranged on the first connecting plate(161)Downside left, guide pin bushing(1611)Lower right-hand side is provided with the first screwed hole(1613), the One screwed hole(1613)Inside it is rotary with the first screw rod(1614), the first screw rod(1614)With the first screwed hole(1613)Coordinate, first Screw rod(1614)Left end is rotatably connected with the first briquetting(1615).
5. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 4, it is characterised in that also include digging Native device(17), shoveling device(17)Include the second connecting plate(171), the 3rd motor(172), cam(173), the 4th rotating shaft (174), swingle(175), the first slide rail(176), the first sliding block(177), the first spring(178), elevating lever(179), contact Block(1710), the 5th rotating shaft(1711), the native plate of shovel(1712), the second support base(1714)With the 6th rotating shaft(1715), supporting plate (7)Left is provided with shoveling device(17), supporting plate(7)The second connecting plate is installed by way of welding above left side(171), Second connecting plate(171)The mode that upper left side is bolted is provided with the 3rd motor(172), the 3rd motor(172)Front side The 3rd motor(172)Cam is connected on output shaft(173), cam(173)Front side right is connected with the 4th rotating shaft(174), the Four rotating shafts(174)On be connected with swingle(175), the second connecting plate(171)The mode that upper left side is bolted is provided with First slide rail(176), the first slide rail(176)Positioned at the 3rd motor(172)Left, the first slide rail(176)Inner sliding type is connected with First sliding block(177), the first sliding block(177)The mode for passing on left welding is provided with elevating lever(179), elevating lever(179)It is right Contact block is installed by way of welding above side(1710), elevating lever(179)Lower end is connected with the 5th rotating shaft(1711), the Five rotating shafts(1711)On be connected with shoveling plate, issued on the right side of shoveling plate and be provided with grooving(1713), shoveling plate right side top passes through weldering The mode connect is provided with the second support base(1714), the second support base(1714)On be connected with the 6th rotating shaft(1715), swingle (175)Lower end is connected to the 6th rotating shaft(1715)On.
6. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 5, it is characterised in that also include the Two slide rails(1721), the second sliding block(1722)With the second screw rod(1724), supporting plate(7)What interior upside left was bolted Mode is provided with the second slide rail(1721), the second slide rail(1721)Inner sliding type is connected with the second sliding block(1722), the second sliding block (1722)The mode for passing on left welding is arranged on the second connecting plate(171)Right side, supporting plate(7)Upside is provided with the second screwed hole (1723), the second screwed hole(1723)Inside it is rotary with the second screw rod(1724), the second screw rod(1724)With the second screwed hole(1723) Coordinate, the second screw rod(1724)Lower end is rotatably connected to the second sliding block(1722)Upside.
7. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 6, it is characterised in that also include digging Native arrangement for adjusting height(18), height of cutting adjusting means(18)Include the 3rd slide rail(181), the 3rd sliding block(182), first Push rod(183), handle(184), connecting rod(185), the second push rod(186), the 4th slide rail(187), Four-slider(188), Seven rotating shafts(189)With eighth-turn axle(1810), the first fixed plate(8)It is provided with height of cutting adjusting means(18), installing plate(1) The mode that interior front side is bolted is provided with the 3rd slide rail(181), the 3rd slide rail(181)Inner sliding type is connected with the 3rd cunning Block(182), the 3rd sliding block(182)Front side is provided with handle by way of welding(184), the 3rd sliding block(182)Pass on left The mode of welding is provided with the first push rod(183), the first push rod(183)Left end is provided with connecting rod by way of welding (185), connecting rod(185)Upper end is provided with the second push rod by way of welding(186), the first fixed plate(8)Front side passes through Bolted mode is provided with the 4th slide rail(187), the 4th slide rail(187)Inner sliding type is connected with Four-slider(188), the Four-slider(188)Front side is connected with the 7th rotating shaft(189), the second push rod(186)Left end is connected to the 7th rotating shaft(189)On, Gu Middle part is connected with eighth-turn axle on rear side of fixed board(1810), eighth-turn axle(1810)It is connected to the first fixed plate(8)Upper right side.
8. a kind of rare earth mining site land used face cubic metre of earth collecting device according to claim 7, it is characterised in that also include spiral shell It is female(1821)With the 3rd screw rod(1822), the 3rd slide rail(181)Right side is provided with nut by way of welding(1821), nut (1821)Inside it is rotary with the 3rd screw rod(1822), the 3rd screw rod(1822)With nut(1821)Coordinate, the 3rd screw rod(1822)Left end Rotatably it is connected to the 3rd sliding block(182)Right side.
CN201710229856.XA 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device Active CN106988371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710229856.XA CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710229856.XA CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Publications (2)

Publication Number Publication Date
CN106988371A true CN106988371A (en) 2017-07-28
CN106988371B CN106988371B (en) 2019-07-16

Family

ID=59414999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710229856.XA Active CN106988371B (en) 2017-04-10 2017-04-10 A kind of rare earth mining site land used face cubic metre of earth collecting device

Country Status (1)

Country Link
CN (1) CN106988371B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740456A (en) * 2017-10-27 2018-02-27 贺欣豪 A kind of power construction husky mud soil site digs canal equipment
CN114541498A (en) * 2022-02-24 2022-05-27 谢文娟 Portable construction ground shovel sand device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851159A (en) * 2006-05-03 2006-10-25 赵大力 Shovel loader
CN201437600U (en) * 2009-07-10 2010-04-14 北京中矿环保科技股份有限公司 Dredging conveyer
CN202718675U (en) * 2012-05-31 2013-02-06 白国钦 Movable placer mining and dressing machine
KR20130046157A (en) * 2011-10-27 2013-05-07 (주)한서정공 Attachment style snow blower
CN105275031A (en) * 2015-09-18 2016-01-27 杨娇仔 Land rehabilitation excavating gear special for opencast bauxite mine
CN205000376U (en) * 2015-05-07 2016-01-27 张萌 Forklift device for construction
CN205907741U (en) * 2016-04-25 2017-01-25 宁波高新区围海工程技术开发有限公司 Earthwork conveyer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851159A (en) * 2006-05-03 2006-10-25 赵大力 Shovel loader
CN201437600U (en) * 2009-07-10 2010-04-14 北京中矿环保科技股份有限公司 Dredging conveyer
KR20130046157A (en) * 2011-10-27 2013-05-07 (주)한서정공 Attachment style snow blower
CN202718675U (en) * 2012-05-31 2013-02-06 白国钦 Movable placer mining and dressing machine
CN205000376U (en) * 2015-05-07 2016-01-27 张萌 Forklift device for construction
CN105275031A (en) * 2015-09-18 2016-01-27 杨娇仔 Land rehabilitation excavating gear special for opencast bauxite mine
CN205907741U (en) * 2016-04-25 2017-01-25 宁波高新区围海工程技术开发有限公司 Earthwork conveyer

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740456A (en) * 2017-10-27 2018-02-27 贺欣豪 A kind of power construction husky mud soil site digs canal equipment
CN107740456B (en) * 2017-10-27 2020-11-13 乐清市曙晟科技有限公司 Equipment for digging channel in sand and soil field for electric power construction
CN114541498A (en) * 2022-02-24 2022-05-27 谢文娟 Portable construction ground shovel sand device

Also Published As

Publication number Publication date
CN106988371B (en) 2019-07-16

Similar Documents

Publication Publication Date Title
CN106881165B (en) A kind of efficient grinding equipment of rare earth processing building stones
CN107051632A (en) A kind of rare earth processing quickly smashes equipment with building stones
Helios-Rybicka et al. Competitive sorption/desorption of Zn, Cd, Pb, Ni, Cu, and Cr by clay-bearing mining wastes
CN108049266B (en) A kind of railway changes pillow device and its operational method
CN107100221A (en) A kind of construction site ground irrigation canals and ditches excavating equipment
CN106988371A (en) A kind of rare earth mining site land used face cubic metre of earth collecting device
CN108940800A (en) A kind of sandstone screening plant
CN117772384A (en) Mineralized refuse exploitation crushing and sorting conveyor
CN103343688B (en) Surface mine clear end machine
CN205926274U (en) Bucket type screening machine
CN217344647U (en) Overturning and conveying device for machining of cutter plate of loader
CN213688995U (en) Ground breaking device for engineering geological investigation
CN206376296U (en) A kind of power shovel
CN107119733B (en) Earthwork processing device and earthwork processing system
CN207348865U (en) A kind of municipal administration is holed equipment with high efficiency
CN207119438U (en) A kind of building waste classification processing unit
CN107100223A (en) A kind of quick collecting device in rare earth mining site land used face cubic metre of earth
CN217450463U (en) Integrated crushing system for backfilling soil
CN205259240U (en) Power shovel of automatic sieve material of auger formula
CN206829145U (en) Deep Foundation Pit Excavation vertical-lift goes out indigenous equipment
CN202055283U (en) Novel crushing and sieving scraper bucket
CN208357016U (en) A kind of gangue impurity screening plant
CN208632888U (en) A kind of railway changes pillow device
CN215977462U (en) Crawler excavator anticreep device
CN201381119Y (en) Mini-size shovel truck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190408

Address after: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 330038 Red Valley Road 1568, Red Valley, Nanchang, Jiangxi, China. The Red Valley triumph commercial office complex and commercial six 301-15 room (third floors)

Applicant before: Nanchang first leaf Technology Co., Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190620

Address after: 221200 1 Fu Fu Street, Wei Ji Town, Suining County, Xuzhou, Jiangsu

Applicant after: Xuzhou Green Bay Agricultural Development Co., Ltd.

Address before: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant before: Hefei dragon totem Information Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant