CN106988294A - A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method - Google Patents
A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method Download PDFInfo
- Publication number
- CN106988294A CN106988294A CN201710296884.3A CN201710296884A CN106988294A CN 106988294 A CN106988294 A CN 106988294A CN 201710296884 A CN201710296884 A CN 201710296884A CN 106988294 A CN106988294 A CN 106988294A
- Authority
- CN
- China
- Prior art keywords
- reel
- steel wire
- wire rope
- floating drum
- lifting system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 54
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 99
- 239000010959 steel Substances 0.000 claims abstract description 99
- 238000007667 floating Methods 0.000 claims abstract description 70
- 230000008878 coupling Effects 0.000 claims description 29
- 238000010168 coupling process Methods 0.000 claims description 29
- 238000005859 coupling reaction Methods 0.000 claims description 29
- 235000013351 cheese Nutrition 0.000 claims description 19
- 238000003825 pressing Methods 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 238000004804 winding Methods 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 6
- 238000012546 transfer Methods 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000007689 inspection Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 5
- 240000002129 Malva sylvestris Species 0.000 description 3
- 235000006770 Malva sylvestris Nutrition 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 3
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 2
- 235000011613 Pinus brutia Nutrition 0.000 description 2
- 241000018646 Pinus brutia Species 0.000 description 2
- 244000062793 Sorghum vulgare Species 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 235000019713 millet Nutrition 0.000 description 2
- 238000005303 weighing Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02C—SHIP-LIFTING DEVICES OR MECHANISMS
- E02C5/00—Mechanisms for lifting ships vertically
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02C—SHIP-LIFTING DEVICES OR MECHANISMS
- E02C5/00—Mechanisms for lifting ships vertically
- E02C5/02—Mechanisms for lifting ships vertically with floating chambers
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The present invention provides a kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method, belongs to ship lift installation Technology field.The Waterpower type ship elevator lifting system includes floating drum and running block, reel and deadman's brake, connecting shaft, steel wire rope.The high-efficiency high-quality that can realize hydraulic-floating lifting means by lifting system construction method of the present invention is installed, and solves to provide the installation key technology difficulty of the lifting system of driving force for ship lift.By carrying out installation accuracy control to lifting system, the accurate control of lifting means installation quality and the integrated regulation after assembling can be realized, Reliable guarantee is provided for the safety of Waterpower type ship elevator, steady and smooth operation, improves ship elevator efficiency.
Description
Technical field
The invention belongs to ship lift installation Technology field, it is related to a kind of Waterpower type ship elevator lifting system construction method
And installation accuracy control method, the Ship Lift System construction being particularly suitable for use in using hydraulic-floating structure lifting ship reception chamber
Method and installation accuracy control method.
Background technology
With the exploitation and the construction of high dam engineering of hydroelectric resources, as main navigation structure ship lift also by
To increasing application.Being presently used for the ship lift form of high dam navigation mainly has steel wire rope winding type, rack-and-pinion to climb
Formula, and hydraulic-floating ship lift is a kind of pioneering new vertical ship lift with independent intellectual property right of China, its principle is
Change floating drum stress by adjusting SEA LEVEL VARIATION, drive the lifting of ship reception chamber side to run through steel wire rope.Ship is risen for hydraulic-floating
The lifting system structure that machine provides driving force is different from steel wire rope winding type and rack-and-pinion climbing type, because designing unpowered system
System, the installation of its main lift equipment there is no similar projects to use for reference.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of Waterpower type ship elevator lifting system construction method and installation
Accuracy control method, to realize that the high-efficiency high-quality of ship lift main lift equipment is installed and whole group joint debugging, solution hydraulic floating
The installation key technology difficulty of formula lifting system, to ensure that the safety of Waterpower type ship elevator, steady and smooth are run.
The object of the invention is realized by following technical proposals:
An object of the present invention is to provide a kind of Waterpower type ship elevator lifting system construction method, including following step
Suddenly:
1) floating drum is respectively saved and assembles and be locked in Shaft bank, lift by crane running block, complete running block and floating drum top
Connection;
2) dead block bearing is installed, reel is lifted by crane and wears axle with bearing and be connected, safety is installed in the side of reel and made
Dynamic device;
3) spingle carrier bar is installed, connecting shaft is hoisted between reel, reel and connecting shaft are completed by shaft coupling
Assembling;
4) interim auxiliary drive is laid, deadman's brake power supply is accessed, rotating drum twines the steel wire rope on cheese
Around coiling, continue to transfer steel wire rope to ship reception chamber side, be extremely connected with ship reception chamber;Using bridge machine by the remaining steel wire rope on cheese
Decentralization is to floating drum side, after steel wire penetrating running block, is connected with balanced oil cylinder;
5) reel for having installed steel wire rope is disengaged into shaft coupling and puts into the deadman's brake of reel, repeat step 4) carry out
The steel wire rope of other reels is installed;
6) after full reel steel wire rope is installed, pull down interim auxiliary drive, return dress shaft coupling by reel again
Shaft coupling;
By above-mentioned steps, that is, the assembling of Ship Lift System is completed with being linked and packed.
It is described floating as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention
Cylinder is merogenesis arrival, is assembled section by section from top to bottom;The Shaft bank is provided with locking device.
It is described dynamic as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention
Assembly pulley is arranged at the top of floating drum, and the running block is rotatably installed in floating drum top support.
It is used as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention, the step
The rapid installation control line for 2) being additionally provided with measuring reel and connection axle series before;And the installation control line is with ship reception chamber center line
On the basis of.
It is described to face as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention
When auxiliary drive and the coaxial arrangement of reel, be fixedly connected, faced by Electronic control with the connecting shaft of reel through decelerator
When auxiliary drive, can be achieved reel rotation forward or backwards.
It is used as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention, the volume
Cylinder middle is provided with anchor point, and pressing plate is provided with anchor point, can be fixed steel wire rope middle with pressing plate, the pressing plate is many
It is individual.
It is used as an a kind of specific embodiment of Waterpower type ship elevator lifting system construction method of the present invention, the rope
Disk and reel alignment, before steel wire rope is installed, access the deadman's brake power supply of reel;Wire rope roll around and decentralization when, peace
Full application of brake device can put into braking at any time.
Another object of the present invention is to provide a kind of using above-mentioned construction method progress lifting system installation accuracy control side
Method, comprises the following steps:
A) after floating drum is completed, floating drum is sling and static, carry out floating drum weigh and each group floating drum between balance match somebody with somebody
Weight, after checking that the perpendicularity of floating drum full-height scope meets the requirements, by floating drum axis-penetrating locking in Shaft bank;
B) when running block is installed, adjustment each movable pulley center discrepancy in elevation and coaxiality deviation reach and are fixed after requirement;
C) the installation control line of measuring reel and connection axle series is in same measuring instrument, same measuring station, once
Property complete measurement and positioning;
D) reel is lifted in place, strict control reel vertical, horizontal central axis and adjacent reel during adjustment using bridge machine
The axiality of the center discrepancy in elevation, reel group, the reference for installation requirement for making it meet reel;Deadman's brake is connected with fluid pressure line
Afterwards, brake clearance is adjusted after carrying out pressure test, pass the test;
E) when connecting shaft is assembled, the flange bolt for tightening up connecting shaft and shaft coupling again is first loosened, to reduce the peace of connecting shaft
Fill moment of torsion;
F) wirerope-winding direction is consistent with reel rotation direction;Steel wire rope install after, floating drum is unlocked, carry out floating drum and
Ship reception chamber has water running, after after the abundant tensioning of steel wire rope, balanced oil cylinder is adjusted again, makes each steel wire rope uniform force.
G) after whole main lifting equipments and annex installation, carry out repetition measurement and inspect for acceptance and make a record.
Waterpower type ship elevator lifting system construction method and installation accuracy control method that the present invention is provided, with having as follows
Beneficial effect:
1st, carry out weighing and comparing and counterweight after floating drum is completed, be easy to the equilibrium allocations of whole floating drum balance weights with
Weight-matched, is conducive to the symmetrical even running of ship reception chamber;
2nd, the disposable measuring for completing reel and connection axle series installation control line, is conducive to the peace of overall control lifting system
Fill benchmark and installation accuracy;
3rd, coordinate steel wire rope to install using interim auxiliary drive and bridge machine, solve the big straight of unpowered lifting system
Wire-diameter steel rope mounting technique problem, method convenient and efficient;In steel wire rope installation process, the deadman's brake of reel can be put at any time
Braking, will be fixed in the middle part of steel wire rope by the pressing plate on reel when steel wire rope is transferred, and can avoid slippery, greatly improved and applies
Work security;
4th, when connecting shaft is assembled, it is close to the flange bolt of spindle and shaft coupling again by first pine, reduces the peace of connecting shaft
Fill moment of torsion, it is ensured that the long-term safety operating of connection axle series;
5th, there is water running by floating drum and ship reception chamber, make the abundant tensioning of steel wire rope, balanced oil cylinder is adjusted again, steel wire can be made
Rope uniform force, is more beneficial for the steady and smooth operation of ship lift.
Brief description of the drawings
Fig. 1 is Waterpower type ship elevator lifting system device structure layout drawing of the invention.
Fig. 2 is reel and steel wire rope dish structure layout drawing.
Fig. 3 is the overlooking structure figure of reel and connection axle series.
Reference:1- floating drums;2- running blocks;3- reels;4- connecting shafts;5- deadman's brakes;6- steel wire ropes;7- restricts
Disk;8- ship reception chambers;9- equilibrium oil cylinders;10- locking devices;11- shaft couplings.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Waterpower type ship elevator lifting system device structure arrangement of the present invention is as shown in Fig. 1, Fig. 2 and Fig. 3.The lifting system
Including reel 3, connecting shaft 4, deadman's brake 5, cheese 7, running block 2, floating drum 1, balanced oil cylinder 9, the grade part of shaft coupling 11.
The connecting shaft 4 is located between two reels 3, for connecting reel 3.The deadman's brake 5 is located at the side of reel 3, uses
To be controlled to reel 3;The cheese 7 and the alignment of reel 3, rotation and whole system operation for reel 3 provide steel
Cord 6.The running block 2 is located at the top of floating drum 1, and the balanced oil cylinder 9 is fixed on fine strain of millet, and one end of main rope 6 is passed through
Running block 2 is fixed on balanced oil cylinder 9.Be provided with shaft coupling 11 between the adjacent connecting shaft 4, adjacent reel 3 it
Between be also equipped with shaft coupling 11, between reel 3 and connecting shaft 4, reel 3 and reel 3, their axle is all connected by shaft coupling 11
Connect.
A total of 16 reels 3 of Waterpower type ship elevator lifting system of the present invention, each reel 3 corresponds to a safety arrestment
5,4 cheeses 7 of device, a running block 2, a floating drum 1, a balanced oil cylinder 9.Two reels 3 constitute a lift unit,
Connecting shaft 4 is located between two reels 3, for realizing the connection of two reels 3.16 reels 3 of lifting system of the present invention and
Equipment is divided into 8 units, and each unit realizes the connection to ship reception chamber 8 and floating drum 1, can so disperse each list respectively
The pulling force born on element device and steel wire rope 6, increases the reliability of lifting system, improves the use longevity of equipment and steel wire rope 6
Life, reduces cost.
In addition, one 4 cheese 7 of correspondence of reel 3 of the present invention, are provided with 4 groovings, each grooving on each reel 3
Corresponding to a cheese 7 and steel cable 6.
According to a kind of above-mentioned lifting system progress Waterpower type ship elevator lifting system construction method of the present invention, including with
Lower step:
1) by floating drum 1, respectively section assembles and is locked in Shaft bank, lifts by crane running block 2, completes running block 2 and floating drum 1
The connection at top;
2) bearing of dead block 3 is installed, reel 3 is lifted by crane and wears axle with bearing be connected, is installed safely in the side of reel 3
Brake 5;
3) support of connecting shaft 4 is installed, connecting shaft 4 is hoisted between reel 3, reel 3 is completed with connecting by shaft coupling 11
The assembling of spindle 4;
4) interim auxiliary drive is laid, the power supply of deadman's brake 5, rotating drum 3, by the steel wire on cheese 7 is accessed
Rope 6 winds coiling 3, continues to transfer steel wire rope 6 to the side of ship reception chamber 8, is extremely connected with ship reception chamber 8;Using bridge machine by cheese 7
Remaining steel wire rope 6 is transferred to the side of floating drum 1, and steel wire rope 6 is passed through after running block 2, connected with balanced oil cylinder 9;
5) reel 3 for having installed steel wire rope 6 is disengaged into shaft coupling 11 and puts into the deadman's brake 5 of reel, repeat step
4) steel wire rope 6 for carrying out other reels 3 is installed;
6) after the steel wire rope 6 of full reel 3 is installed, interim auxiliary drive is pulled down, dress shaft coupling 11 is returned by reel 3
Again shaft coupling;
By above-mentioned steps, that is, the assembling of Ship Lift System is completed with being linked and packed.
Further, step 1) in, the floating drum 1 is merogenesis arrival, is assembled section by section from top to bottom;The Shaft bank is installed
There is locking device 10.The running block 2 is arranged at the top of floating drum 1, and the running block 2 is rotatably installed in the top of floating drum 1
On bearing.
Further, the step 2) it is additionally provided with the installation control line that measuring reel 3 and connecting shaft 4 are before;And it is described
Control line is installed on the basis of the center line of ship reception chamber 8.The measuring of reel 3 of the present invention and the installation control line of connecting shaft 4 is 16
(for one group, to be divided into 8 groups two-by-two) that reel 3 is completed together, according to reel 3 and the specific installation requirement of connecting shaft 4 to installing
Control line is measured and planned, 16 reels 3 then are carried out into installation positioning.After whole reels 3, which installs positioning, to be finished,
The position at center and each reel 3 to reel 3 is adjusted, and is conducive to improving the reference for installation and installation accuracy of reel 3.
Further, above-mentioned steps 4) in, the interim auxiliary drive and the coaxial arrangement of reel 3, through decelerator and
The connecting shaft of reel 3 is fixedly connected, and by the interim auxiliary drive of Electronic control, turning forward or backwards for reel 3 can be achieved
It is dynamic.Interim auxiliary drive is used for being controlled the rotation direction of reel 3, provides interim power for the rotation of reel 3, saves
Human-saving.
Further, above-mentioned steps 4) in, anchor point is provided with the middle of reel 3, pressing plate is provided with anchor point, pressing plate is used
The middle of steel wire rope 6 can be fixed, the pressing plate is multiple.Because reel 3 is provided with a piece steel of installing in 4 groovings, every grooving
Cord 6, to keep spacing between steel wire rope 6, avoiding cross-slip, be designed with the middle of reel 3 anchor point and pressing plate,
Telltale mark is provided with the respective distances of steel wire rope 6.Before the steel wire rope 6 is wound, according to the distance and volume of telltale mark to fag end
3 diameters of cylinder accurately calculate initial position of the cable wire end in the grooving of reel 3, and the fag end of steel wire rope 6 on cheese is untied,
Traction is to the initial position in the grooving of reel 3 and fixes temporarily.Rotating drum 3, when steel wire rope 6 is wound at telltale mark
When, just overlapped with the anchor point and pressing plate on reel 3, pressing plate is installed and positions the middle part of steel wire rope 6.Due to accurately calculating rope
The initial position of head, during winding, the telltale mark on steel wire rope 6 is just overlapped with the anchor point on reel 3, can avoid steel wire
The deviations of the winding of rope 6 are exceeded and repeat to do over again.Further, the anchor point is at about 92.5 meters away from the fag end of steel wire rope 6,
The middle of steel wire rope 6 is fixed on reel 3 with positioning pressuring plate, it is reliable solid in the middle part of the achievable body of reel 3 and steel wire rope 6
It is fixed, make the independent operating of every steel wire rope 6 that steel wire rope 6 is not likely to produce on play and rolling sliding, reel 3, do not interfere with each other, it is ensured that
The stability of lifting system.
Further, the cheese 7 and the alignment of reel 3, before steel wire rope 6 is installed, access the deadman's brake 5 of reel 3
Power supply;When steel wire rope 6 winds and transferred, deadman's brake 5 can put into braking at any time.Deadman's brake 5 is used for turning to reel 3
Dynamic and direction is controlled, it is ensured that the security of the device of reel 3.
After the plant-grid connection of deadman's brake 5, the steel wire rope 6 on cheese 7 is wound coiling 3 by rotating drum 3, continue to
Steel wire rope 6 is transferred in the side of ship reception chamber 8, is extremely connected with ship reception chamber 8;Further, fixing device, the steel of decentralization are provided with ship reception chamber 8
Cord 6 is connected with the regulation device set on ship reception chamber 8.It is to realize the connection of steel wire rope 6 and ship reception chamber 8 by this step.
Then the remaining steel wire rope 6 on cheese 7 is transferred to the side of floating drum 1 using bridge machine, it is and equal through after running block 2
Weighing apparatus oil cylinder 9 is connected.The present invention uses bridge machine disposably to transfer the remaining steel wire rope 6 on a cheese 7 to the side of floating drum 1, will
This root steel wire rope 6 is passed through after a grooving on the running block 2 at the top of floating drum 1, with the balanced oil cylinder 9 being located on fixed fine strain of millet seat
Connection.Then according to it is above-mentioned by root decentralization mounting means will on other three cheeses 7 residue steel wire rope 6 pass through running block respectively
Connected after grooving on 2 with the balanced oil cylinder 9 being located on fixed beam seat.In order to relative with four steel wire ropes 6 on four cheeses 7
Should, 4 groovings are provided with the running block 2.It is to realize the connection of steel wire rope 6 and floating drum 1 by this step.
After according to above-mentioned installation method by one group of lifting system installation, the reel 3 for having installed steel wire rope 6 is disengaged
Shaft coupling 11 and the deadman's brake 5 for putting into reel, repeat step 4) carry out other groups of reels 3 steel wire rope 6 install, until eight
Group lifting system is installed.After the steel wire rope 6 of full reel 3 is installed, interim auxiliary drive is pulled down, dress shaft coupling is returned
Device 11 is by reel 3 again shaft coupling.Because the unitary rotation inertia of reel 3 for having installed steel wire rope 6 is larger, and the two of steel wire rope 6
End is connected with ship reception chamber 8 and balanced oil cylinder 9, after one group of lifting system installation is completed, will install the volume of steel wire rope 6
Cylinder 3 disengages shaft coupling 11 and puts into the deadman's brake 5 of reel 3, and the reel 3 for having installed steel wire rope 6 can be made not to be rotated further by, keep
It is stable, disengage after shaft coupling 11, the steel wire rope 6 for being convenient for other unloaded reels 3 is installed.In eight groups of lifting system installations
Afterwards, interim auxiliary drive is pulled down, dress shaft coupling 11 is returned by reel 3 again shaft coupling, forms overall reel connecting shaft lifting
System.The interim auxiliary drive is only interim during installation to be provided driving force, solves major diameter drum 3 during installation
Unpowered technical barrier, can exit after lifting system installation and use, and turn to provide drive by floating drum and steel wire rope 6
Power.
It is to realize the connection of steel wire rope 6 and ship reception chamber 8 and floating drum 1 by above-mentioned steps, when by eight groups of reels 3 and steel wire rope
After 6 installations, fluctuated by floating drum 1 in vertical shaft, drive the side of ship reception chamber 8 to move up and down through steel wire rope 6, realized and rise ship
The lifting operation of machine lifting system.
One kind carries out lifting system installation accuracy control method using above-mentioned construction method, comprises the following steps:
1) after floating drum 1 is completed, floating drum 1 is sling and static, carry out floating drum 1 weigh and each group floating drum 1 between it is flat
Weigh counterweight, after checking that the perpendicularity of the full-height scope of floating drum 1 meets the requirements, by the axis-penetrating locking of floating drum 1 in Shaft bank;
2) when running block 2 is installed, adjustment each movable pulley center discrepancy in elevation and coaxiality deviation reach and are fixed after requirement;
3) the installation control line that measuring reel 3 and connecting shaft 4 are is in same measuring instrument, same measuring station, one
Secondary property completes measurement and positioning;
4) reel 3 is lifted in place using bridge machine, the strict control vertical, horizontal central axis of reel 3 and adjacent volume during adjustment
The 3 center discrepancy in elevation of cylinder, the axiality of 3 groups of reel, the reference for installation requirement for making it meet reel 3;Deadman's brake 5 and fluid pressure line
After connection, brake clearance is adjusted after carrying out pressure test, pass the test;
5) when connecting shaft 4 is assembled, the flange bolt for tightening up connecting shaft 4 and shaft coupling 11 again is first loosened, to reduce connecting shaft 4
Installation moment of torsion;
6) winding direction of steel wire rope 6 is consistent with the rotation direction of reel 3;After steel wire rope 6 is installed, floating drum 1 is unlocked, floated
Cylinder 1 and ship reception chamber 8 have water running, after after the abundant tensioning of steel wire rope 6, balanced oil cylinder 9 is adjusted again, makes each stress of steel wire rope 6 equal
It is even.
7) after whole main lifting equipments and annex installation, carry out repetition measurement and inspect for acceptance and make a record.
In implementation process, floating drum 1 is unlocked and water filling thereto, water injection rate reach setting value when, the weight of floating drum 1 with
Ship reception chamber 8 is equal in weight, the both sides torque of reel 3 reaches poised state;Water delivery or draining into the vertical shaft where floating drum 1, pass through
Control water level of drilled shaft change makes floating drum 1 be fluctuated in vertical shaft, drives the side of ship reception chamber 8 to move up and down through steel wire rope 6, realizes and rise
The lifting operation of ship machine lifting system.
Using construction method described in the embodiment of the present invention and installation accuracy control method to Waterpower type ship elevator equipment and steel
Cord 6 carries out installation, has the advantages that:
1st, after floating drum 1 is completed weigh comparing and counterweight, be easy to the equilibrium allocation of whole balance weights of floating drum 1
With weight-matched, be conducive to the symmetrical even running of ship reception chamber 8;
2nd, the disposable reel 3 and connecting shaft 4 of completing is to install the measuring of control line, is conducive to overall control lifting system
Reference for installation and installation accuracy;
3rd, coordinate steel wire rope 6 to install using interim auxiliary drive and bridge machine, solve the big of unpowered lifting system
The mounting technique problem of diameter steel cord 6, method convenient and efficient;In the installation process of steel wire rope 6, the deadman's brake 5 of reel 3 can be with
When input braking, when steel wire rope 6 is transferred, by the pressing plate on reel 3 will the middle part of steel wire rope 6 it is fixed, construction peace greatly improved
Quan Xing;
4th, when connecting shaft 4 is assembled, it is close to the flange bolt of spindle 4 and shaft coupling 11 again by first pine, reduces connecting shaft 4
Installation moment of torsion, it is ensured that the operating of long-term safety that connecting shaft 4 is;
5th, there is water running by floating drum 1 and ship reception chamber 8, make the abundant tensioning of steel wire rope 6, balanced oil cylinder 9 is adjusted again, can be made
The uniform force of steel wire rope 6, is more beneficial for the steady and smooth operation of ship lift.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.
Claims (8)
1. a kind of Waterpower type ship elevator lifting system construction method, it is characterised in that comprise the following steps:
1) floating drum is respectively saved and assembles and be locked in Shaft bank, lift by crane running block, complete running block and the company at the top of floating drum
Connect;
2) dead block bearing is installed, reel is lifted by crane and wears axle with bearing and be connected, in the side installation deadman's brake of reel;
3) spingle carrier bar is installed, connecting shaft is hoisted between reel, the assembling of reel and connecting shaft is completed by shaft coupling;
4) interim auxiliary drive is laid, deadman's brake power supply, rotating drum, by the wirerope-winding on cheese is accessed
Reel, continues to transfer steel wire rope to ship reception chamber side, is extremely connected with ship reception chamber;The remaining steel wire rope on cheese is transferred using bridge machine
To floating drum side, after steel wire penetrating running block, connected with balanced oil cylinder;
5) reel for having installed steel wire rope is disengaged into shaft coupling and put into the deadman's brake of reel, repeat step 4) carry out it is other
The steel wire rope of reel is installed;
6) after full reel steel wire rope is installed, interim auxiliary drive is pulled down, dress shaft coupling is returned by reel again shaft coupling;
By above-mentioned steps, that is, the assembling of Ship Lift System is completed with being linked and packed.
2. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that the floating drum is to divide
Arrival is saved, is assembled section by section from top to bottom;The Shaft bank is provided with locking device.
3. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that the running block
The top of floating drum is arranged at, the running block is rotatably installed in floating drum top support.
4. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that the step 2) it
Before be additionally provided with the installation control lines of measuring reel and connection axle series;And the installation control line is using ship reception chamber center line as base
It is accurate.
5. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that the interim auxiliary
Drive device and the coaxial arrangement of reel, are fixedly connected with the connecting shaft of reel through decelerator, are aided in temporarily by Electronic control
Drive device, can be achieved the rotation forward or backwards of reel.
6. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that in the middle of the reel
Place is provided with anchor point, and pressing plate is provided with anchor point, steel wire rope middle can be fixed with pressing plate, and the pressing plate is multiple.
7. a kind of Waterpower type ship elevator lifting system construction method as claimed in claim 1, it is characterised in that the cheese and volume
Cylinder alignment, before steel wire rope is installed, accesses the deadman's brake power supply of reel;Wire rope roll around and decentralization when, safety arrestment
Device can put into braking at any time.
8. the construction method described in a kind of any one of use claim 1 to 7 carries out lifting system installation accuracy control method, its
It is characterised by, comprises the following steps:
A) after floating drum is completed, floating drum is sling and static, carry out floating drum weigh and each group floating drum between counterweight, inspection
Look into floating drum full-height scope perpendicularity meet the requirements after, by floating drum axis-penetrating locking in Shaft bank;
B) when running block is installed, adjustment each movable pulley center discrepancy in elevation and coaxiality deviation reach and are fixed after requirement;
C) the installation control line of measuring reel and connection axle series be in same measuring instrument, same measuring station, it is disposable complete
Into measurement and positioning;
D) reel is lifted in place, strict control reel vertical, horizontal central axis and adjacent reel center during adjustment using bridge machine
The axiality of the discrepancy in elevation, reel group, the reference for installation requirement for making it meet reel;After deadman's brake is connected with fluid pressure line, enter
Brake clearance is adjusted after row pressure test, pass the test;
E) when connecting shaft is assembled, first loosen the flange bolt for tightening up connecting shaft and shaft coupling again, turned round with the installation for reducing connecting shaft
Square;
F) wirerope-winding direction is consistent with reel rotation direction;After steel wire rope is installed, floating drum is unlocked, floating drum is carried out and holds ship
There is water running in railway carriage or compartment, after after the abundant tensioning of steel wire rope, balanced oil cylinder is adjusted again, makes each steel wire rope uniform force.
G) after whole main lifting equipments and annex installation, carry out repetition measurement and inspect for acceptance and make a record.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710296884.3A CN106988294B (en) | 2017-04-28 | 2017-04-28 | A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710296884.3A CN106988294B (en) | 2017-04-28 | 2017-04-28 | A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106988294A true CN106988294A (en) | 2017-07-28 |
CN106988294B CN106988294B (en) | 2018-12-07 |
Family
ID=59418412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710296884.3A Expired - Fee Related CN106988294B (en) | 2017-04-28 | 2017-04-28 | A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106988294B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914373A (en) * | 2019-04-18 | 2019-06-21 | 中国电建集团昆明勘测设计研究院有限公司 | Torque symmetric hydraulic type ship lift water delivery system |
CN114162746A (en) * | 2021-12-28 | 2022-03-11 | 中国建筑第二工程局有限公司 | Temporary article lifting platform for building construction and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU562618A1 (en) * | 1971-12-02 | 1977-06-25 | Hydraulic lift | |
CN2403818Y (en) * | 1999-12-25 | 2000-11-01 | 中国长江三峡工程开发总公司 | Hydraulic floating torque balancing ship lift |
CN201292523Y (en) * | 2008-11-07 | 2009-08-19 | 中国水电顾问集团昆明勘测设计研究院 | Hydraulic hoisting ship elevator |
CN202131594U (en) * | 2011-06-24 | 2012-02-01 | 中国水电顾问集团昆明勘测设计研究院 | Synchronous shaft system of hydraulic ship lifter |
CN104775411A (en) * | 2015-02-11 | 2015-07-15 | 河海大学 | Hydraulic floating type ship lift and discrimination method for lateral overturning stability of synchronizing system of same |
CN106351200A (en) * | 2016-10-21 | 2017-01-25 | 中国葛洲坝集团机电建设有限公司 | Hydraulic ship lift buoy counterweight construction system and method |
-
2017
- 2017-04-28 CN CN201710296884.3A patent/CN106988294B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU562618A1 (en) * | 1971-12-02 | 1977-06-25 | Hydraulic lift | |
CN2403818Y (en) * | 1999-12-25 | 2000-11-01 | 中国长江三峡工程开发总公司 | Hydraulic floating torque balancing ship lift |
CN201292523Y (en) * | 2008-11-07 | 2009-08-19 | 中国水电顾问集团昆明勘测设计研究院 | Hydraulic hoisting ship elevator |
CN202131594U (en) * | 2011-06-24 | 2012-02-01 | 中国水电顾问集团昆明勘测设计研究院 | Synchronous shaft system of hydraulic ship lifter |
CN104775411A (en) * | 2015-02-11 | 2015-07-15 | 河海大学 | Hydraulic floating type ship lift and discrimination method for lateral overturning stability of synchronizing system of same |
CN106351200A (en) * | 2016-10-21 | 2017-01-25 | 中国葛洲坝集团机电建设有限公司 | Hydraulic ship lift buoy counterweight construction system and method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914373A (en) * | 2019-04-18 | 2019-06-21 | 中国电建集团昆明勘测设计研究院有限公司 | Torque symmetric hydraulic type ship lift water delivery system |
CN109914373B (en) * | 2019-04-18 | 2024-03-12 | 中国电建集团昆明勘测设计研究院有限公司 | Torque symmetric hydraulic ship lift water delivery system |
CN114162746A (en) * | 2021-12-28 | 2022-03-11 | 中国建筑第二工程局有限公司 | Temporary article lifting platform for building construction and construction method thereof |
CN114162746B (en) * | 2021-12-28 | 2023-03-21 | 中国建筑第二工程局有限公司 | Temporary article lifting platform for building construction and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106988294B (en) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018250351B2 (en) | Elastomeric load compensators for load compensation of cranes | |
US20160251863A1 (en) | System and method for automatically regulating tensions of guide ropes of flexible cable suspension platform | |
CN101215615A (en) | Combination method mounting technique for ultra-large type steel converter | |
CN115730487B (en) | Finite element calculation method for strength and rigidity of large winding drum set of main hoisting machine of submersible ship lift | |
CN109374325B (en) | Pulley blocks formula vertical shaft hoisting joint debugging test device and method | |
CN106988294A (en) | A kind of Waterpower type ship elevator lifting system construction method and installation accuracy control method | |
CN112429666B (en) | Installation method and installation system device of megawatt tower type photo-thermal power generation heat collector | |
CN110409398A (en) | A kind of full balance friction-driving vertical ship lift of the high lift application of suitable heavy duty | |
CN207263351U (en) | The experiment detection device of drawworks brake power and winch capacity | |
CN111172892A (en) | Bilateral balance traction device and method for steel structure frame bridge | |
CN101104501A (en) | Double main bear multiple hanging point crane | |
CN110761187B (en) | Active control method for bridge horizontal rotation construction | |
CN101559285A (en) | Towed rotary vertical section-to-section assembling construction system for large-sized spoke type ferris wheel disc | |
CN205822163U (en) | Ship lift release mechanism | |
CN106544957B (en) | Length adjustment device, stiffening girder of suspension bridge mounting system and method | |
CN106120692A (en) | Ship lift release mechanism and installation method thereof | |
CN214030574U (en) | Heat absorber sliding device | |
CN112097877B (en) | Wheel pressure measuring system for vehicle set installed by ocean platform block in translation mode and measuring and controlling method | |
CN103614973A (en) | Construction method for four-cable-face split steel box girder bridge cantilevers | |
CN107389366A (en) | Big pull test platform | |
KR101184874B1 (en) | Double mian girder and multi hanging point crane | |
CN112378621A (en) | Floating body test system device | |
CN107059832A (en) | A kind of construction method of Waterpower type ship elevator main rope | |
CN206308620U (en) | Length adjustment device and stiffening girder of suspension bridge installation system | |
CN206174486U (en) | Alignment, levelling device of nuclear power station metal reactor core shell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |