CN106968442A - A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall - Google Patents

A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall Download PDF

Info

Publication number
CN106968442A
CN106968442A CN201710261419.6A CN201710261419A CN106968442A CN 106968442 A CN106968442 A CN 106968442A CN 201710261419 A CN201710261419 A CN 201710261419A CN 106968442 A CN106968442 A CN 106968442A
Authority
CN
China
Prior art keywords
batten
partition wall
aerated concrete
construction method
sand aerated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710261419.6A
Other languages
Chinese (zh)
Other versions
CN106968442B (en
Inventor
胥通通
何俨
熊建平
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710261419.6A priority Critical patent/CN106968442B/en
Publication of CN106968442A publication Critical patent/CN106968442A/en
Application granted granted Critical
Publication of CN106968442B publication Critical patent/CN106968442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/02Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/18Power-operated hoists
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F15/00Crowbars or levers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall, comprise the following steps:A, line setting;B, sheet material are installed in place;C, reserved chase;Characterized in that, when sheet material is installed in place, first obtaining the suspender and pry of following structure:Suspender includes the support body using scaffolding steel pipe and cruciform fastening for falsework on-site consolidation, and the both sides of support body, which respectively have to set up between a brace that is symmetrical and diagonally setting, the other end of two braces, is provided with hoist engine;Pry include ripping bar and be fixed on ripping bar lower end lever up portion;The steel wire rope of hoist engine on suspender is bundled in batten on the position of end;After startup hoist engine slings batten vertically, batten bottom is levered up using pry and installation site is moved to.The present invention has the labor intensity of reduction workman, improves the security and efficiency of construction of construction, can effectively prevent the bottom of batten to be damaged, and is conducive to improving construction quality, the advantages of improving operating environment.

Description

A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall
Technical field
The present invention relates to technical field of building construction, in particular to a kind of autoclaved lightweight sand aerated concrete batten partition wall Construction method.
Background technology
Autoclaved lightweight sand aerated concrete batten is with cement, lime and sand(Flyash)For raw material, by high-pressure steaming and cultivating And "dead", the free of contamination porous, inorganic environment friendly wall material being made, using autoclaved lightweight sand aerated concrete batten generation For traditional air entrained concrete, the performances such as heat insulating and sound insulating, fire resistance, the water resistant permeability of wall are enhanced.Autoclaved lightweight sand Air entrained concrete batten partition wall is in construction, it usually needs after first batten is erect, and moves again to installation site, completes wall Install, then carry out fluting, the Holing work of hydropower installation.But, due to the length of autoclaved lightweight sand aerated concrete batten Longer, usually 2~4 meters, heavier-weight is operated, easily generation batten overthrow accident according to artificial, and a common lifting Put because volume is larger or heavier-weight, it is impossible to operated in floor gap;In addition, after batten is erect, it is also contemplated that how to facilitate Batten is moved to installation site by ground, reduces the damage to batten, improves the construction quality of wall.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problems to be solved by the invention are:It is light how a kind of steam pressure is provided The construction method of matter sand aerated concrete batten partition wall, easily and reliably can erect batten, improve the security of construction, and During mobile batten, the damage to batten is reduced, is conducive to improving the construction quality of wall.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall, comprises the following steps:A, line setting:According to work Journey floor plan and live orientation axis determine the installation site line of batten partition wall, and bar is ejected respectively on ground and ceiling The sideline of plate thickness direction both sides, as installation site line;B, sheet material are installed in place:Installation site is moved to after batten is erected, Fixed temporarily with timber wedge in the upper and lower ends of batten;After batten is in place, U types card or list are installed according to the wall position line To pipe clamp, and adjust perpendicularity and flatness;C, reserved chase:Pipeline position is carried out with moving towards on partition wall by design drawing Slotted or burrowed after snap the line positioning;
Characterized in that, when sheet material is installed in place, using following steps:
A1, the suspender and pry for first obtaining following structure:The suspender includes spelling using scaffolding steel pipe and cruciform fastening for falsework scene Respectively there are a brace that is symmetrical and diagonally setting, the upper end of the brace in the support body of dress, the both sides of the support body Extend upwardly to fixed mount between the outside formation cantilever of the support body, the cantilever of two braces and be provided with horizontally disposed horizontal stroke Bar, the height of the cross bar is more than the length of batten;Set up between the other end of two braces and hoist engine is installed, it is described The guide device of steel wire rope for guiding hoist engine is installed on cross bar;The pry includes ripping bar and is fixed on the ripping bar Lower end levers up portion;The portion of levering up includes horizontally disposed backing plate and is welded on the strut of the backing plate bottom, the support Bar is located at the middle part of the backing plate;One end of the strut is weldingly fixed on the end of the ripping bar, and with the ripping bar in blunt Angle is set;
A2, one end of batten is levered up using the pry obtained in the step A1 after, by the steel wire rope of the hoist engine on suspender Batten is bundled on the position of end;After startup hoist engine slings batten vertically, batten bottom is levered up using pry And it is moved to installation site.
In the above method, by using scaffolding steel pipe and the support body of cruciform fastening for falsework on-site consolidation suspender, it can solve to pass Suspender unite because volume is larger or heavier-weight, and can not be moved between floor or lifting operation can not be carried out between floor Problem.In addition, setting two inclined braces on support body, and cross bar is set up on the upper end cantilever of brace, can ensured On the premise of cross bar is highly more than the length of batten, the height of support body is reduced, meanwhile, only when cross bar is highly more than the length of batten Degree, just can guarantee that slinging that batten is erect completely.Further, because brace is obliquely installed, when higher at one end, the other end leads to It is often relatively low, hoist engine is set up and is arranged on the relatively low one end of two braces, operative can be facilitated.After above-mentioned suspender, Batten can be lifted by crane with convenient and reliable, reduce the labor intensity of workman, improve the security and efficiency of construction of construction.Again Person, carries out levering up operation to batten, because the portion of levering up is provided with backing plate, steaming is levered up using the pry by the pry of said structure When pressing lightweight sand aerated concrete batten, the contact area levered up between portion and batten is larger, scattered to lever up suffered by the sheet material of position Stress, it is to avoid sheet material is extruded breakage, can effectively prevent the bottom of batten to be damaged, and be conducive to improving construction quality.
Further, the guide device in the step A1 is the fixed pulley on the cross bar.
Due to fixed pulley can rotation, when lifting by crane batten, the steel wire of hoist engine is moved along the chute of fixed pulley so that fixed Pulley is relative to be rolled on steel wire, it is possible to prevente effectively from the abrasion of chute, is conducive to improving service life.
Further, the support body in the step A1 is additionally provided with balancing weight away from the side of the cross bar.
So, balancing weight is set away from the side of cross bar in support body, it is possible to use lever principle, balance batten applies Power, it is to avoid support body unstability, advantageously ensures that construction safety, improves the stability of support body.
Further, the bottom of the support body in the step A1 is additionally provided with the universal wheel of locking pedal.
So, mounting hanger can be moved to behind the position to be installed of batten, or lifting, batten is moved to and waits to pacify Holding position, reduces the distance subsequently prized and removed, and advantageously reduces the labor intensity of workman, improves the efficiency of work.
Further, the lower end of the ripping bar in the step A1 also has the rib welded side by side, the rib position In the ripping bar close to the side of the backing plate, the lower end of the rib is welded on the strut.
Using said structure, welding sets rib between the bottom of ripping bar and strut, is conducive to improving ripping bar and strut Between bonding strength, increase pry use reliability, extend pry service life.
Further, the bottom of the backing plate in the step A1 is also welded with horizontal bar, the horizontal bar and the strut It is perpendicular, and it is symmetrically distributed in the both sides of the strut.
Using said structure, the backing plate intensity of strut both sides can be increased, it is to avoid batten levers up rear left right avertence tiltedly, damages pad by pressure Plate.Be conducive to improving the service life of pry, improve the security of construction.
Further, the bottom of the backing plate in the step A1 has along away from described away from the side of the ripping bar The direction of ripping bar is acclivitous domatic.
So, operation can be easy to so that backing plate is extend into the gap of batten bottom during convenient use.
Further, the upper end of the ripping bar in the step A1 is set with plastic handles.
Further, when reserving chase construction, before being slotted or burrowed according to snap the line positioning, following structure is first obtained Fluting apparatus, including the grooving apparatus slotted for wall has the handle for gripping on the grooving apparatus;Also include The dust collect plant on the grooving apparatus is connected to, the dust collect plant includes the splicing being detachably connected on the handle Bucket, when making operation, the receiving hopper is located between the handle and wall;The bottom opening of the receiving hopper is connected by pipeline To closed disposal box, the negative-pressure air fan for making to produce negative pressure in case is provided with the disposal box.
Slot or burrow construction when, because disposal box is in the presence of negative-pressure air fan, inside produces negative pressure, and then makes splicing There is negative pressure, when carrying out fluting operation using grooving apparatus, produced dust is acted in the attraction of gravity and negative pressure at bucket Under, it is collected into receiving hopper, enters eventually through pipeline in disposal box.This way it is possible to avoid job site stirs up a cloud of dust, it is to avoid The secondary pollution of working face, is conducive to improving the operating environment of working site, is beneficial to the healthy of workman.
Further, there is the connecting rod set towards the handle, the connecting rod is vertically square on the receiving hopper To being provided with two, the top and bottom of the handle are corresponded to respectively;The connecting rod towards one end of the handle have with The circular groove that the periphery of the handle is engaged, the connecting rod is located at the side of the circular groove width Cassette tape is provided with, opposite side has the buckle being engaged with the cassette tape, and the cassette tape is around the handle removably clamping On the buckle.
So, rapidly receiving hopper can be arranged on different grooving apparatus, be conducive to improving the suitable of dust collect plant With scope, cost is reduced.
In summary, the present invention has the labor intensity of reduction workman, improves the security and efficiency of construction of construction, can be with Effectively prevent the bottom of batten to be damaged, be conducive to improving construction quality, the advantages of improving operating environment.
Brief description of the drawings
Fig. 1 is the structural representation of suspender.
Fig. 2 is pry structural representation.
Fig. 3 is the structural representation of fluting apparatus.
Embodiment
With reference to embodiment, the present invention is described in further detail.
During specific implementation:A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall, as shown in figure 1, first obtaining The suspender of following structure is taken, including using scaffolding steel pipe and the support body 11 of cruciform fastening for falsework on-site consolidation, the support body 11 Both sides respectively have one symmetrically and the brace 111 that diagonally sets, the upper end of the brace 111 extends upwardly to the frame The outside of body 11 forms fixed mount between cantilever, the cantilever of two braces 111 and is provided with horizontally disposed cross bar 112, described The height of cross bar 112 is more than the length of batten;Set up between the other end of two braces 111 and hoist engine 12, institute are installed State the guide device 13 that the steel wire rope for guiding hoist engine is provided with cross bar 112;The guide device 13 is installed in institute State the fixed pulley on cross bar 112.The support body 11 is additionally provided with balancing weight away from the side of the cross bar 112.The support body 11 Bottom be additionally provided with the universal wheel of locking pedal.
As shown in Fig. 2 obtain the pry of following structure, including ripping bar 21 and be fixed on the lower end of ripping bar 21 lever up portion 22;The portion 22 that levers up includes horizontally disposed backing plate 221 and is welded on the strut 222 of the bottom of backing plate 221, the support Bar 222 is located at the middle part of the backing plate 221;One end of the strut 222 is weldingly fixed on the end of the ripping bar 21, and with institute Ripping bar 21 is stated to set in obtuse angle;The lower end of the ripping bar 21 also has the rib 23 welded side by side, and the rib 23 is located at described Ripping bar 21 is welded on the strut 222 close to the side of the backing plate 221, the lower end of the rib 23.The backing plate 221 Bottom is also welded with horizontal bar, and the horizontal bar and the strut 222 are perpendicular, and are symmetrically distributed in the both sides of the strut 222.Institute State the bottom of backing plate 221 has the direction along the remote ripping bar acclivitous domatic away from the side of the ripping bar 21.Institute The upper end for stating ripping bar 21 is set with plastic handles.
During Specific construction:
Line setting:The installation site line of batten partition wall is determined according to engineering floor plan and live orientation axis, on ground With the sideline for ejecting bar plate thickness direction both sides on ceiling respectively, as installation site line;
Sheet material is installed in place:After one end of batten is levered up using pry, the steel wire rope of the hoist engine on suspender is bundled in bar Plate is on the position of end;After startup hoist engine slings batten vertically, batten bottom is levered up using pry and peace is moved to Holding position, is fixed temporarily in the upper and lower ends of batten with timber wedge;After batten is in place, U is installed according to the wall position line Type card or unidirectional pipe clamp, and adjust perpendicularity and flatness;
In the above method, by using scaffolding steel pipe and the support body of cruciform fastening for falsework on-site consolidation suspender, tradition can be solved and hung Tool can not be moved between floor because volume is larger or heavier-weight or asking for lifting operation can not be carried out between floor Topic.In addition, setting two inclined braces on support body, and cross bar is set up on the upper end cantilever of brace, can ensure horizontal On the premise of bar is highly more than the length of batten, the height of support body is reduced, meanwhile, only when cross bar is highly more than the length of batten Degree, just can guarantee that slinging that batten is erect completely.Further, because brace is obliquely installed, when higher at one end, the other end leads to It is often relatively low, hoist engine is set up and is arranged on the relatively low one end of two braces, operative can be facilitated.After above-mentioned suspender, Batten can be lifted by crane with convenient and reliable, reduce the labor intensity of workman, improve the security and efficiency of construction of construction.By In fixed pulley can rotation, when lifting by crane batten, the steel wire of hoist engine is moved along the chute of fixed pulley so that fixed pulley is relative to exist Rolled on steel wire, it is possible to prevente effectively from the abrasion of chute, is conducive to improving service life.Set in support body away from the side of cross bar Balancing weight, it is possible to use lever principle, the power that balance batten applies, it is to avoid support body unstability, advantageously ensures that construction safety, improves The stability of support body.Mounting hanger can be moved to by universal wheel behind the position to be installed of batten, or lifting, by batten Position to be installed is moved to, the distance subsequently prized and removed is reduced, the labor intensity of workman is advantageously reduced, the efficiency of work is improved.
Batten is carried out to lever up operation by the pry of said structure, because the portion of levering up is provided with backing plate, the pry is used When levering up autoclaved lightweight sand aerated concrete batten, the contact area levered up between portion and batten is larger, scattered to lever up positioning plate Stress suffered by material, it is to avoid sheet material is extruded breakage, can effectively prevent the bottom of batten to be damaged, and be conducive to improving construction quality. Welding sets rib between the bottom of ripping bar and strut, is conducive to improving the bonding strength between ripping bar and strut, increase sled The use reliability of tool, extends the service life of pry.Horizontal bar can increase the backing plate intensity of strut both sides, it is to avoid batten is levered up Rear left right avertence tiltedly, damages backing plate by pressure.Be conducive to improving the service life of pry, improve the security of construction.Set on backing plate domatic Operation can be easy to so that backing plate is extend into the gap of batten bottom during convenient use.
Reserved chase:As shown in figure 3, the fluting apparatus of following structure is obtained, including the fluting dress slotted for wall Put the handle 32 having on 31, the grooving apparatus 31 for gripping;Also include the dust being connected on the grooving apparatus 31 Device 33, the dust collect plant 33 includes the receiving hopper 331 being detachably connected on the handle 32, described when making operation Receiving hopper 331 is located between the handle 32 and wall;The bottom opening of the receiving hopper 331 is connected to closed by pipeline The negative-pressure air fan 35 for making to produce negative pressure in case is provided with disposal box 34, the disposal box 34.Then it will be managed by design drawing Line position is carried out after snap the line positioning with trend on partition wall, then is slotted or burrowed using above-mentioned fluting apparatus;
Slot or burrow construction when, because disposal box is in the presence of negative-pressure air fan, inside produces negative pressure, and then makes at receiving hopper With negative pressure, when carrying out fluting operation using grooving apparatus, produced dust is received under the attraction effect of gravity and negative pressure Collect in receiving hopper, enter eventually through pipeline in disposal box.This way it is possible to avoid job site stirs up a cloud of dust, it is to avoid work The secondary pollution in face, is conducive to improving the operating environment of working site, is beneficial to the healthy of workman.
There is the connecting rod 332 set towards the handle 32, the connecting rod 332 during implementation, on the receiving hopper 331 Vertically direction is provided with two, and the top and bottom of the handle 32 are corresponded to respectively;The connecting rod 332 is towards the handle One end there is the circular groove that is engaged with the periphery of the handle 32, the connecting rod 332 is located at the circular arc The side in recess width direction is provided with cassette tape, and opposite side has the buckle being engaged with the cassette tape, and the cassette tape is around institute Handle 32 is stated removably to be connected on the buckle.
So, rapidly receiving hopper can be arranged on different grooving apparatus, be conducive to improving the suitable of dust collect plant With scope, cost is reduced.
During implementation, the receiving hopper 331 is mobile side board 333, the mobile side board 333 away from the side of the handle 32 Lower end be hinged on the receiving hopper 331, the both sides of the mobile side board 333 pass through block cloth and the receiving hopper 331 respectively It is connected;It is additionally provided between the mobile side board 333 and the receiving hopper 331 along the direction away from the handle 32 and applies spring The spring of power.
Because during fluting, grooving apparatus needs to move inward along the direction of vertical wall, using said structure, Because mobile side board can rotate around bottom, when grooving apparatus is fed towards metope, can Compressive activities side plate rotation so that Receiving hopper is fitted all the time with metope, be conducive to improving dust collecting effect.
During implementation, the spring is the torsion spring for being arranged on the lower end of mobile side board 333.
So, structure can be simplified, be easily installed.
During implementation, the grooving apparatus 31 is cutting machine or drilling machine.
During implementation, the disposal box 34 is made using trolley, and the trolley is provided with cover plate, and the negative-pressure air fan 35 is pacified On the cover plate.
So, the need for can be according to construction, trolley be moved to the position for needing to slot, can be received with fast transfer The dust of collection, is conducive to improving operating efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation, all essences in the present invention with the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall, comprises the following steps:A, line setting:According to Engineering floor plan and live orientation axis determine the installation site line of batten partition wall, are ejected respectively on ground and ceiling The sideline of bar plate thickness direction both sides, as installation site line;B, sheet material are installed in place:Installation position is moved to after batten is erected Put, fixed temporarily with timber wedge in the upper and lower ends of batten;After batten is in place, U type cards are installed according to the wall position line Or unidirectional pipe clamp, and adjust perpendicularity and flatness;C, reserved chase:By design drawing by pipeline position with moving towards on partition wall Slotted or burrowed after carrying out snap the line positioning;
Characterized in that, when sheet material is installed in place, using following steps:
A1, the suspender and pry for first obtaining following structure:The suspender includes spelling using scaffolding steel pipe and cruciform fastening for falsework scene The support body of dress(11), the support body(11)Both sides respectively have one symmetrically and the brace that diagonally sets(111), institute State brace(111)Upper end extend upwardly to the support body(11)Outside formed cantilever, two braces(111)Cantilever Between fixed mount be provided with horizontally disposed cross bar(112), the cross bar(112)Height be more than batten length;Described in two Brace(111)The other end between set up hoist engine is installed(12), the cross bar(112)On be provided with for guiding hoist engine Steel wire rope guide device(13);The pry includes ripping bar(21)Be fixed on the ripping bar(21)Lower end levers up portion (22);It is described to lever up portion(22)Including horizontally disposed backing plate(221)And it is welded on the backing plate(221)The strut of bottom (222), the strut(222)Positioned at the backing plate(221)Middle part;The strut(222)One end be weldingly fixed on it is described Ripping bar(21)End, and with the ripping bar(21)Set in obtuse angle;
A2, one end of batten is levered up using the pry obtained in the step A1 after, by the steel wire rope of the hoist engine on suspender Batten is bundled on the position of end;After startup hoist engine slings batten vertically, batten bottom is levered up using pry And it is moved to installation site.
2. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The guide device in step A1(13)For installed in the cross bar(112)On fixed pulley.
3. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The support body in step A1(11)Away from the cross bar(112)Side be additionally provided with balancing weight.
4. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The support body in step A1(11)Bottom be additionally provided with the universal wheel of locking pedal.
5. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The ripping bar in step A1(21)Lower end also there is the rib that welds side by side(23), the rib(23)Positioned at the ripping bar (21)Close to the backing plate(221)Side, the rib(23)Lower end be welded on the strut(222)On.
6. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The backing plate in step A1(221)Bottom be also welded with horizontal bar, the horizontal bar and the strut(222)It is perpendicular and right Title is distributed in the strut(222)Both sides.
7. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The backing plate in step A1(221)Bottom deviate from the ripping bar(21)Side have along away from the ripping bar direction to It is upper inclined domatic.
8. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that described The ripping bar in step A1(21)Upper end be set with plastic handles.
9. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 1, it is characterised in that reserved When chase is constructed, before being slotted or burrowed according to snap the line positioning, the fluting apparatus of following structure is first obtained, including for wall The grooving apparatus of body fluting(31), the grooving apparatus(31)The upper handle with for gripping(32);Also include being connected to institute State grooving apparatus(31)On dust collect plant(33), the dust collect plant(33)Including being detachably connected to the handle(32) On receiving hopper(331), when making operation, the receiving hopper(331)Positioned at the handle(32)Between wall;The receiving hopper (331)Bottom opening closed disposal box is connected to by pipeline(34), the disposal box(34)On be provided with for making case The interior negative-pressure air fan for producing negative pressure(35).
10. the construction method of autoclaved lightweight sand aerated concrete batten partition wall as claimed in claim 9, it is characterised in that institute State receiving hopper(331)It is upper to have towards the handle(32)The connecting rod of setting(332), the connecting rod(332)It is vertically square To being provided with two, the handle is corresponded to respectively(32)Top and bottom;The connecting rod(332)Towards the one of the handle End has and the handle(32)The circular groove that is engaged of periphery, the connecting rod(332)Positioned at the circular arc The side in recess width direction is provided with cassette tape, and opposite side has the buckle being engaged with the cassette tape, and the cassette tape is around institute State handle(32)Removably it is connected on the buckle.
CN201710261419.6A 2017-04-20 2017-04-20 A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall Active CN106968442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710261419.6A CN106968442B (en) 2017-04-20 2017-04-20 A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710261419.6A CN106968442B (en) 2017-04-20 2017-04-20 A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall

Publications (2)

Publication Number Publication Date
CN106968442A true CN106968442A (en) 2017-07-21
CN106968442B CN106968442B (en) 2019-02-05

Family

ID=59333193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710261419.6A Active CN106968442B (en) 2017-04-20 2017-04-20 A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall

Country Status (1)

Country Link
CN (1) CN106968442B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547463A (en) * 2018-05-31 2018-09-18 中国二十二冶集团有限公司 Tall and big autoclaved aerated concrete batten installation equipment and installation method
CN109516395A (en) * 2018-11-24 2019-03-26 福建工程学院 A kind of assembled lifting device and its assembly technology
CN109853971A (en) * 2019-04-01 2019-06-07 中国二十二冶集团有限公司 Light partition wall board mounting assembly and its application method
CN110697639A (en) * 2019-08-26 2020-01-17 河北华丰能源科技发展有限公司 Device for stably moving heavy structure
CN111005477A (en) * 2019-08-30 2020-04-14 中国二十冶集团有限公司 Construction device for light partition board and use method thereof
CN111188497A (en) * 2019-12-12 2020-05-22 中冶天工集团天津有限公司 Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof
CN112707353A (en) * 2020-12-16 2021-04-27 山东大学 Railway bridge ballast retaining wall mold moving device and method
CN113585777A (en) * 2021-08-06 2021-11-02 北京建工四建工程建设有限公司 Construction method for installing autoclaved aerated concrete high and large plates in place
CN114197885A (en) * 2021-12-07 2022-03-18 中铁建工集团有限公司 Device convenient to installation secondary structure slat wall
WO2023078008A1 (en) * 2021-11-04 2023-05-11 中建三局第三建设工程有限责任公司 Prefabricated batten erecting device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04226850A (en) * 1990-07-28 1992-08-17 Hilti Ag Drill/chisel device having sucking device
DE19860182C2 (en) * 1998-12-24 2002-03-07 Bosch Gmbh Robert Suction device for a hand machine tool, in particular a hammer drill
JP2008229850A (en) * 2007-03-16 2008-10-02 Hitachi Koki Co Ltd Drilling tool with dust collection mechanism
CN101603340A (en) * 2009-07-10 2009-12-16 中建三局东方装饰设计工程有限公司 Installation process for autoclaved lightweight concrete board partition wall
CN205367632U (en) * 2016-03-09 2016-07-06 永康市丽猛机械设备有限公司 Take crow bar of overload protection function
CN105817674A (en) * 2016-06-07 2016-08-03 誉驰机电设备(上海)有限公司 Mechanical dustproof drilling device
CN205953370U (en) * 2016-08-30 2017-02-15 中建八局第二建设有限公司 Perpendicular transport means of unitized curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04226850A (en) * 1990-07-28 1992-08-17 Hilti Ag Drill/chisel device having sucking device
DE19860182C2 (en) * 1998-12-24 2002-03-07 Bosch Gmbh Robert Suction device for a hand machine tool, in particular a hammer drill
JP2008229850A (en) * 2007-03-16 2008-10-02 Hitachi Koki Co Ltd Drilling tool with dust collection mechanism
CN101603340A (en) * 2009-07-10 2009-12-16 中建三局东方装饰设计工程有限公司 Installation process for autoclaved lightweight concrete board partition wall
CN205367632U (en) * 2016-03-09 2016-07-06 永康市丽猛机械设备有限公司 Take crow bar of overload protection function
CN105817674A (en) * 2016-06-07 2016-08-03 誉驰机电设备(上海)有限公司 Mechanical dustproof drilling device
CN205953370U (en) * 2016-08-30 2017-02-15 中建八局第二建设有限公司 Perpendicular transport means of unitized curtain wall

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547463A (en) * 2018-05-31 2018-09-18 中国二十二冶集团有限公司 Tall and big autoclaved aerated concrete batten installation equipment and installation method
CN109516395A (en) * 2018-11-24 2019-03-26 福建工程学院 A kind of assembled lifting device and its assembly technology
CN109853971A (en) * 2019-04-01 2019-06-07 中国二十二冶集团有限公司 Light partition wall board mounting assembly and its application method
CN110697639A (en) * 2019-08-26 2020-01-17 河北华丰能源科技发展有限公司 Device for stably moving heavy structure
CN111005477A (en) * 2019-08-30 2020-04-14 中国二十冶集团有限公司 Construction device for light partition board and use method thereof
CN111188497A (en) * 2019-12-12 2020-05-22 中冶天工集团天津有限公司 Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof
CN112707353A (en) * 2020-12-16 2021-04-27 山东大学 Railway bridge ballast retaining wall mold moving device and method
CN113585777A (en) * 2021-08-06 2021-11-02 北京建工四建工程建设有限公司 Construction method for installing autoclaved aerated concrete high and large plates in place
CN113585777B (en) * 2021-08-06 2022-07-12 北京建工四建工程建设有限公司 Construction method for installing autoclaved aerated concrete high and large plates in place
WO2023078008A1 (en) * 2021-11-04 2023-05-11 中建三局第三建设工程有限责任公司 Prefabricated batten erecting device
CN114197885A (en) * 2021-12-07 2022-03-18 中铁建工集团有限公司 Device convenient to installation secondary structure slat wall
CN114197885B (en) * 2021-12-07 2022-12-20 中铁建工集团有限公司 Device convenient to installation secondary structure panel wall

Also Published As

Publication number Publication date
CN106968442B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN106968442A (en) A kind of construction method of autoclaved lightweight sand aerated concrete batten partition wall
WO2017084210A1 (en) Inner support wire saw lossless cutting and disassembling structure and construction method therefor
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN104652298B (en) A kind of whole dismounting system and construction method thereof transferred across box beam supported based on bridge floor
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN207347122U (en) A kind of automatic Lift-on/Lift-off System of bridge construction
CN206530050U (en) A kind of super large reserved opening hanging mould structure
CN201507112U (en) Sliding template system
CN205908031U (en) A rail mounted lifting device for high -rise building curtain wall construction
CN108675170A (en) Roofing monorail crane and its construction method
CN206753105U (en) A kind of skyscraper tears building machine open
CN206298286U (en) A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam
CN202658867U (en) Overhanging construction platform
CN208618838U (en) A kind of safety device
CN206799012U (en) A kind of concrete batten transport of small space and installation tool group
CN205973582U (en) Simple and easy hoisting accessory of cable cover plate
CN210236958U (en) Be fixed in portable hoist that is used for hanging chain block on H shaped steel roof beam
CN201105957Y (en) Tower crane engineering special-purpose gin pole hoist
CN207048333U (en) Lattice formula steel-pipe column and cloth machine base connecting device
CN206681389U (en) A kind of autoclaved lightweight sand aerated concrete batten mounting hanger
CN206636239U (en) A hang mounting system for installing intermediate layer girder steel
CN208586475U (en) A kind of underground railway track is manually scattered to spread shield well unloading rail constructing device
CN208564042U (en) A kind of dismounting system of glass curtain wall
CN208103761U (en) A kind of rescue equipment for building collapsing
CN207144468U (en) Receiving apparatus in the lower hanger of core tube construction form frame system

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant