CN106961741B - A kind of uplink resource allocating method and device - Google Patents

A kind of uplink resource allocating method and device Download PDF

Info

Publication number
CN106961741B
CN106961741B CN201710308940.0A CN201710308940A CN106961741B CN 106961741 B CN106961741 B CN 106961741B CN 201710308940 A CN201710308940 A CN 201710308940A CN 106961741 B CN106961741 B CN 106961741B
Authority
CN
China
Prior art keywords
carrying
logic channel
grant
priority
numerology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710308940.0A
Other languages
Chinese (zh)
Other versions
CN106961741A (en
Inventor
赵亚利
皮埃尔
李心宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201710308940.0A priority Critical patent/CN106961741B/en
Publication of CN106961741A publication Critical patent/CN106961741A/en
Priority to PCT/CN2018/081558 priority patent/WO2018201833A1/en
Application granted granted Critical
Publication of CN106961741B publication Critical patent/CN106961741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network

Abstract

The embodiment of the invention provides a kind of uplink resource allocating method and device, method includes: that terminal receives one or more uplink scheduling authorization UL grant;The terminal is when carrying out ascending resource distribution on each UL grant, mapping relations based on carrying or logic channel and baseband parameter numerology and/or Transmission Time Interval TTI length, maximum numerology and/or TTI length for that can support is equal to the corresponding numerology and/or TTI length of the UL grant, and the carrying for having data to need to transmit or logical channel assignment ascending resource.It solves the problems, such as low priority but the transfer resource of the business more sensitive to time delay is seized by high-priority service.

Description

A kind of uplink resource allocating method and device
Technical field
The present invention relates to field of communication technology more particularly to a kind of uplink resource allocating methods and device.
Background technique
1) LCP (the Logical Channel of tradition LTE (Long Term Evolution, long term evolution) system Prioritization, priority of logical channels) process
The LCP of LTE system is the single RB (Radio Bearer, radio bearer) based on network configuration corresponding preferential Grade parameter priority is carried out.Specific implementation procedure is as follows:
Step 1: carrying out first according to the sequence of the priority parameters priority descending of all logic channels for having token Take turns resource allocation.(Prioritized Bit Rate is prioritized ratio to PBR of the first round resource allocation based on each logic channel Special rate) it carries out.Each available token number of logic channel is updated according to ascending resource distribution condition simultaneously.
Step 2: if carrying out the second wheel resource allocation there are also surplus resources.Second wheel resource allocation is according to institute The order-assigned of the priority parameters priority descending for the logic channel for having data to transmit is the data distribution money except PBR Source.Resource allocation is until the data of all logic channels for having token are all assigned with resource or resource exhaustion.
2) introduction to business that 5G (the 5th third-generation mobile communication) NR (New Radio newly eats dishes without rice or wine) is supported
5G NR system mainly supports three classes business:
EMBB (enhanced Mobile Broadband, enhanced broadband connections)
MMTC (massive Machine Type Communications, a large amount of machine type communications)
URLLC (Ultra-Reliable and Low Latency Communications, highly reliable low time delay communication)
Wherein the delay requirement of URLLC business is especially high, end-to-end time delay 0.5ms.But core net configures QoS When (Quality of Service, service quality) parameter, since the priority parameters priority in qos parameter does not need to examine Consider time delay, URLLC service priority is likely lower than eMBB service priority.
3)Numerology
Numerology is a technical term of 3GPP RAN1, can be translated as baseband parameter.Different numerology Between the main distinction be that the subcarrier spacing that different numerology are supported is different.Such as the subcarrier that 5G NR system is supported Interval includes at least: 15KHz, 60KHz, and the corresponding numerology in the two different sub-carrier intervals is exactly two independent numerology。
In general, the numerology difference that the numerology that high-speed terminal uses is used with low speed terminal;High frequency The numerology that terminal and low frequency terminal use is not also identical.The use of different numerology in addition to movement speed and Outside frequency dependence, industry there are also a kind of understanding be exactly the numerology that can be used of different business may also difference, such as The numerology that URLLC and eMBB are used may be different.
4) TTI (Transmission Time interval, Transmission Time Interval)
In traditional LTE system, TTI length is 1ms.Since LTE R14, in order to support time delay to reduce, introduce not With TTI length, such as 1 OFDM symbol length.Different TTI length are continued to use in 5G system and be can be applied to each On numerology, i.e. different TTI length can be used in difference numerology in 5G NR, and identical TTI long also can be used Degree, and can be dynamic change for the TTI length that different terminals use on any one some numerology of moment.
The selection of TTI length is main related to service delay, such as URLLC business because of the delay requirement of its support It is relatively high, it is possible that the TTI length that length can be selected shorter, such as the TTI length of 1 OFDM symbol.
Priority parameters priority and service delay relationship for wireless communication system, in current operation qos parameter Less.But system for 5G and later, with URLLC (Ultra-Reliable and Low Latency Communications, the communication of highly reliable low time delay) business introducing, if priority parameters are still unrelated with time delay, A problem may be will appear, be exactly that the transfer resource of URLLC business is seized by the business of higher priority, lead to URLLC The delay requirement of business is unable to satisfy.
Summary of the invention
In view of above-mentioned technical problem, the embodiment of the present invention provides one kind, solves low priority but more sensitive to time delay The problem of transfer resource of business is seized by high-priority service.
First aspect according to an embodiment of the present invention provides a kind of uplink resource allocating method, which comprises
Terminal receives one or more uplink scheduling authorization UL grant;
The terminal is joined when carrying out ascending resource distribution on each UL grant based on carrying or logic channel and base band The mapping relations of number numerology and/or Transmission Time Interval TTI length, for the maximum numerology that can support and/ Or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and have data need the carrying transmitted or Logical channel assignment ascending resource.
Optionally, in the terminal when carrying out ascending resource distribution on each UL grant, based on carrying or logic letter The mapping relations in road and numerology and/or TTI length, for the maximum numerology and/or TTI length etc. that can be supported In the corresponding numerology and/or TTI length of the UL grant, and the carrying or logical channel assignment for thering are data to need to transmit After ascending resource, the method also includes:
If corresponding UL grant there are also remaining ascending resource, based on carrying or logic channel and numerology and/or The mapping relations of TTI length, it is corresponding that the maximum numerology and/or TTI length for that can support is greater than the UL grant Numerology and/or TTI length, and the carrying for thering are data to need to transmit or logical channel assignment ascending resource.
Optionally, the mapping relations of the carrying or logic channel and numerology and/or TTI length are that network side is matched It sets or protocol conventions.
Optionally, the carrying or logic channel and the mapping relations of numerology and/or TTI length include:
All numerology and/or TTI length combinations that carrying or logic channel and the carrying or logic channel use Mapping relations;Or
The maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Mapping relations.
Optionally, the terminal on each UL grant carry out resource allocation when, based on carrying or logic channel with The mapping relations of numerology and/or TTI length, the maximum numerology and/or TTI length for that can support is equal to should The corresponding numerology and/or TTI length of UL grant, and the carrying or logical channel assignment uplink for thering are data to need to transmit Resource, comprising:
It determines the processing sequence of the multiple UL grant, generates UL grant processing priority queue;
According to UL grant in the UL grant processing priority queue processing priority sequence from high to low according to Secondary selection UL grant to be processed, and determine the corresponding numerology and/or TTI length of UL grant to be processed;
According to carrying or the corresponding relationship of logic channel and numerology and/or TTI length, the maximum supported is selected Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of UL grant to be processed and has number According to needing the carrying transmitted or logic channel, to the carrying or logic channel chosen according to the preferential of carrying or logic channel Grade is ranked up, and generates carrying or priority of logical channels queue;
According to scheduled resource distribution mode to it is described carrying or priority of logical channels queue in carrying or logic believe Road carries out ascending resource distribution, until the corresponding ascending resource of UL grant all in UL grant processing priority queue is whole The data to be transmitted of assigned or all carryings or logic channel is all assigned with ascending resource.
Optionally, the processing sequence of the multiple UL grant is perhaps configured or is depended on by network side by protocol conventions It is realized in terminal.
Optionally, the scheduled resource distribution mode is by network configuration, perhaps by protocol conventions or depending on terminal It realizes.
Optionally, the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit Rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also in residue Row resource then has remaining data to need the carrying transmitted or patrol again against each in carrying or priority of logical channels queue The remaining data for collecting channel carries out the second wheel remaining data resource allocation, until the ascending resource of corresponding UL grant is all divided Match or carries or the data to be transmitted of all carryings in priority of logical channels queue or logic channel is all assigned with uplink Resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to institute's available for transmission number Resource allocation is carried out according to measuring, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels The data to be transmitted of all carryings or logic channel in queue is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first PBR resource allocation is taken turns, wherein not needing to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel need to distribute ascending resource for its total data then in first round PBR resource allocation;If first Wheel PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels The remaining data of each carrying or logic channel for having remaining data to need to transmit in queue carries out the second wheel remaining data money Source distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in institute There is the data to be transmitted of carrying or logic channel to be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first Take turns PBR resource allocation, wherein do not need to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel do not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR provides Source distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against in carrying or priority of logical channels queue The remaining data of each carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
Optionally, if the corresponding UL grant is there are also remaining ascending resource, based on carrying or logic channel with The mapping relations of numerology and/or TTI length, the maximum numerology and/or TTI length for that can support is greater than should The corresponding numerology and/or TTI length of UL grant, and the carrying for thering are data to need to transmit or logical channel assignment money Source, comprising:
If corresponding UL grant there are also remaining ascending resource, according to carrying or logic channel and numerology and/or The corresponding relationship of TTI length selects the maximum numerology and/or TTI length supported to be greater than UL grant couple to be processed Numerology the and/or TTI length answered, and some or all of carrying for thering are data to need to transmit or logic channel;
The carrying or logic channel chosen is ranked up according to the priority of carrying or logic channel, generates carrying Or priority of logical channels queue, to the carrying or logic channel progress uplink in the carrying or priority of logical channels queue Resource allocation, until the whole assigned or all carryings being mapped on the UL grant of ascending resource or the institute of logic channel There are data to be all assigned with ascending resource.
Optionally, the method also includes:
The terminal merges the ascending resource for distributing to the same carrying or logic channel, then determines carrying or logic The data volume of channel, and for a carrying or one media access control MAC service data unit SDU of logic channel tissue; Or
The terminal is raw for the carrying or logic channel to a carrying or a logic channel ascending resource of every distribution At a MAC SDU.
The second aspect according to an embodiment of the present invention additionally provides a kind of ascending resource distributor, described device packet It includes:
Receiving module, for receiving one or more uplink scheduling authorization UL grant;
First resource distribution module, for when carrying out ascending resource distribution on each UL grant, based on carrying or patrol The mapping relations of channel and baseband parameter numerology and/or Transmission Time Interval TTI length are collected, for the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and has data needs The carrying of transmission or logical channel assignment ascending resource.
Optionally, described device further include:
Secondary resource distribution module, if there are also remaining ascending resources for corresponding UL grant, based on carrying or logic The mapping relations of channel and numerology and/or TTI length, for the maximum numerology and/or TTI length that can be supported Numerology and/or TTI length corresponding greater than the UL grant, and the carrying for thering are data to need to transmit or logic channel point With ascending resource.
Optionally, the mapping relations of the carrying or logic channel and numerology and/or TTI length are that network side is matched It sets or protocol conventions.
Optionally, the carrying or logic channel and the mapping relations of numerology and/or TTI length include:
All numerology and/or TTI length combinations that carrying or logic channel and the carrying or logic channel use Mapping relations;Or
The maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Mapping relations.
Optionally, the first resource distribution module includes:
It is preferential to generate UL grant processing for determining the processing sequence of the multiple UL grant for first determination unit Grade queue;
Second determination unit, for the processing priority according to UL grant in the UL grant processing priority queue Sequence from high to low successively selects UL grant to be processed, and determines that the UL grant to be processed is corresponding Numerology and/or TTI length;
First queue generation unit, for corresponding with numerology and/or TTI length according to carrying or logic channel Relationship selects the maximum numerology and/or TTI length supported to be equal to the corresponding numerology of UL grant to be processed And/or TTI length and there are data to need the carrying transmitted or logic channel, to the carrying or logic channel chosen according to holding It carries or the priority of logic channel is ranked up, generate carrying or priority of logical channels queue;
First resource allocation unit is used for according to scheduled resource distribution mode to the carrying or priority of logical channels Carrying or logic channel in queue carry out ascending resource distribution, until all UL in UL grant processing priority queue The corresponding ascending resource of grant is all assigned or the data to be transmitted of all carryings or logic channel is all assigned with uplink money Source.
Optionally, the processing sequence of the multiple UL grant is perhaps configured or is depended on by network side by protocol conventions It is realized in terminal.
Optionally, the scheduled resource distribution mode is by network configuration, perhaps by protocol conventions or depending on terminal It realizes.
Optionally, the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit Rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also in residue Row resource then has remaining data to need the carrying transmitted or patrol again against each in carrying or priority of logical channels queue The remaining data for collecting channel carries out the second wheel remaining data resource allocation, until the ascending resource of corresponding UL grant is all divided Match or carries or the data to be transmitted of all carryings in priority of logical channels queue or logic channel is all assigned with uplink Resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to institute's available for transmission number Resource allocation is carried out according to measuring, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels The data to be transmitted of all carryings or logic channel in queue is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first PBR resource allocation is taken turns, wherein not needing to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel need to distribute ascending resource for its total data then in first round PBR resource allocation;If first Wheel PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels The remaining data of each carrying or logic channel for having remaining data to need to transmit in queue carries out the second wheel remaining data money Source distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in institute There is the data to be transmitted of carrying or logic channel to be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first Take turns PBR resource allocation, wherein do not need to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel do not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR provides Source distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against in carrying or priority of logical channels queue The remaining data of each carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
Optionally, the Secondary resource distribution module includes:
Selecting unit, if for corresponding UL grant there are also remaining ascending resource, according to carrying or logic channel with The corresponding relationship of numerology and/or TTI length selects the maximum numerology and/or TTI length supported to be greater than wait locate The corresponding numerology and/or TTI length of the UL grant of reason, and have data need some or all of carrying transmitted or Logic channel;
Second queue generation unit, for the carrying or logic channel chosen according to carrying or logic channel it is excellent First grade is ranked up, and generates carrying or priority of logical channels queue;
Secondary resource allocation unit, for it is described carrying or priority of logical channels queue in carrying or logic channel Ascending resource distribution is carried out, until the whole assigned or all carryings or logic being mapped on the UL grant of ascending resource All data of channel are all assigned with ascending resource.
Optionally, described device further include:
MAC SDU generation module, the ascending resource for that will distribute to the same carrying or logic channel merge, then really The data volume of fixed carrying or logic channel, and for a carrying or the one media access control MAC service of logic channel tissue Data cell SDU;Or
To a carrying or a logic channel ascending resource of every distribution, one is generated for the carrying or logic channel MAC SDU。
In terms of third according to an embodiment of the present invention, a kind of terminal is additionally provided, comprising: memory, processor and deposit The computer program that can be run on a memory and on a processor is stored up, the processor realizes institute as above when executing described program The step in uplink resource allocating method stated.
The 4th aspect according to an embodiment of the present invention, additionally provides a kind of computer readable storage medium, stores thereon There is computer program, which realizes the step in uplink resource allocating method as described above when being executed by processor.
A technical solution in above-mentioned technical proposal has the following advantages that or the utility model has the advantages that terminal receives N number of UL Grant (N >=1), when carrying out resource allocation on each UL grant, based on carrying or logic channel and numerology and/ Or the mapping relations of TTI length, it is preferably that the maximum numerology and/or TTI length that can be supported is equal to the UL grant Corresponding numerology and/or TTI length and the carrying or logical channel assignment resource for thering are data to need to transmit;Further Ground, if corresponding UL grant is there are also surplus resources, the maximum numerology and/or TTI length for that can support is greater than The corresponding numerology and/or TTI length of the UL grant and there are data to need the carrying or logical channel assignment transmitted Resource, avoids the problem that low priority but the transfer resource of the business more sensitive to time delay is seized by high-priority service.
Detailed description of the invention
Fig. 1 is the flow chart of the uplink resource allocating method in one embodiment of the present of invention;
Fig. 2 is the specific flow chart of step 102 in Fig. 1;
The flow chart of uplink resource allocating method in Fig. 3 another embodiment of the invention;
Fig. 4 is the specific flow chart of step 303 in Fig. 3;
Fig. 5 is the flow chart of the uplink resource allocating method in another embodiment of the invention;
Fig. 6 is the specific flow chart of step 502 in Fig. 5;
Fig. 7 is the block diagram of the ascending resource distributor in one embodiment of the invention;
Fig. 8 is the structural schematic diagram of terminal in one embodiment of the invention.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
Referring to Fig. 1, the process of uplink resource allocating method in one embodiment is shown in figure, the specific steps are as follows:
Step 101, terminal receive one or more UL grant;
UL grant: uplink scheduling authorization.
It should be noted that not limiting the particular number of UL grant in the present embodiment.
Step 102, terminal on each UL grant carry out ascending resource distribution when, based on carrying or logic channel with The mapping relations of numerology and/or TTI length, the maximum numerology and/or TTI length for that can support is equal to should The corresponding numerology and/or TTI length of UL grant, and the carrying or logical channel assignment uplink for thering are data to need to transmit Resource.
It should be noted that carrying in the present embodiment identical with the meaning that logic channel is expressed.
In the present embodiment, above-mentioned carrying or logic channel and the mapping relations of numerology and/or TTI length include Any one or more representation below:
The mapping relations of carrying and numerology;
The mapping relations of carrying and TTI length;
The mapping relations of carrying and numerology and TTI length;
The mapping relations of logic channel and numerology;
The mapping relations of logic channel and TTI length;
The mapping relations of logic channel and numerology and TTI length;
In the present embodiment, the corresponding numerology and/or TTI length of above-mentioned UL grant, including it is following any one Kind or multiform expression:
The corresponding numerology of UL grant;
The corresponding TTI length of UL grant;
The corresponding numerology and TTI length of UL grant.
In the present embodiment, the mapping relations of carrying or logic channel and numerology and/or TTI length can be net The configuration of network side or protocol conventions.
In the present embodiment, carrying or logic channel and the mapping relations of numerology and/or TTI length are specifically Refer to:
All numerology and/or TTI length combinations that carrying or logic channel and the carrying or logic channel use Mapping relations;Or
The maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Mapping relations are also not limited to this certainly.
Referring to fig. 2, above-mentioned steps 102 specifically include:
Step 1021, the processing sequence for determining multiple UL grant generate UL grant processing priority queue;
In the present embodiment, the processing sequence of multiple UL grant is by protocol conventions, for example, according to numerology and/or The sequence of TTI length from small to large arrange multiple UL grant processing sequence or multiple UL grant processing sequence by The processing sequence of network side configuration or multiple UL grant are realized depending on terminal.Certainly it is also not limited to this.
Step 1022, processing priority from high to low suitable according to UL grant in UL grant processing priority queue Sequence successively selects UL grant to be processed, and determines the corresponding numerology and/or TTI long of UL grant to be processed Degree;
In the present embodiment, the corresponding numerology of UL grant to be processed can be determined by existing mode And/or TTI length, it no longer repeats herein.
Step 1023, according to carrying or logic channel and numerology and/or TTI length corresponding relationship, selection prop up The maximum numerology and/or TTI length held is equal to the corresponding numerology and/or TTI long of UL grant to be processed It spends and there are data to need the carrying transmitted or logic channel, the carrying or logic channel chosen is believed according to carrying or logic The priority in road is ranked up, and generates carrying or priority of logical channels queue;
In the present embodiment, it is alternatively possible to determine carrying by Qos parameter corresponding with carrying or logic channel or patrol Collect the priority of channel.Certainly it is also not limited to this.
Step 1024, according to scheduled resource distribution mode to it is described carrying or priority of logical channels queue in carrying Or logic channel carries out ascending resource distribution, until the corresponding uplink of UL grant all in UL grant processing priority queue Resource is all assigned or all carryings or the data to be transmitted of logic channel are all assigned with ascending resource.
In the present embodiment, according to scheduled resource distribution mode to it is described carrying or priority of logical channels queue in Carrying or after logic channel carries out ascending resource distribution, repeat in step 1022,1023 and step 1024 by According to scheduled resource distribution mode to the carrying or logic channel progress uplink in the carrying or priority of logical channels queue Resource allocation, be all assigned until the corresponding ascending resource of UL grant all in UL grant processing priority queue or The data to be transmitted of all carryings or logic channel is all assigned with ascending resource.
In the present embodiment, scheduled resource distribution mode by protocol conventions or can perhaps be depended on by network configuration It is realized in terminal.
In the present embodiment, the scheduled resource distribution mode includes any of the following:
Mode one, in carrying or priority of logical channels queue each carrying or logic channel it is successively preferential according to it Change bit rate PBR and carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant also Remaining ascending resource, then again against carrying or priority of logical channels queue in it is each have remaining data need transmit hold It carries or the remaining data of logic channel carries out the second wheel remaining data resource allocation, until the ascending resource of corresponding UL grant is complete Portion is assigned or the data to be transmitted of carrying or all carryings in priority of logical channels queue or logic channel is all distributed Ascending resource;
Mode two, in carrying or priority of logical channels queue each carrying or logic channel successively according to being needed Transmitted data amount carries out resource allocation, until the ascending resource of corresponding UL grant is all assigned or carries or logic channel The data to be transmitted of all carryings or logic channel in priority query is all assigned with ascending resource;
Mode three, to carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR First round PBR resource allocation is carried out, wherein not needing to carry out two-wheeled money for determining in carrying or priority of logical channels queue The carrying of source distribution or logic channel need to distribute ascending resource for its total data then in first round PBR resource allocation; If first round PBR resource allocation terminates corresponding UL grant there are also remaining ascending resource, believe again against carrying or logic It is surplus that the remaining data of each carrying or logic channel for having remaining data to need to transmit in road priority query carries out the second wheel Remainder is according to resource allocation, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels team The data to be transmitted of all carryings or logic channel in column is all assigned with ascending resource;
Above-mentioned two-wheeled resource allocation refers to: first round PBR resource allocation and the second wheel remaining data resource allocation.
Mode four, to carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR Carry out first round PBR resource allocation, wherein do not need to carry out two-wheeled money for determining in carrying or priority of logical channels queue The carrying of source distribution or logic channel do not need to distribute ascending resource for it then in first round PBR resource allocation;If the One wheel PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or bgical channel priority The remaining data of each carrying or logic channel for having remaining data to need to transmit in grade queue carries out the second wheel resource allocation, Until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in all carryings Or the data to be transmitted of logic channel is all assigned with ascending resource.
In the present embodiment, terminal is according to ascending resource allocation result tissue MAC PDU, and specific there are two types of modes:
Mode one, terminal will distribute to it is same carrying or logic channel ascending resource merge, then determine carrying or The data volume of logic channel, and for a carrying or one, logic channel tissue (media access control) MAC (service data list Member) SDU;
Mode two, terminal believe a carrying or a logic channel ascending resource of every distribution for the carrying or logic Road generates a MAC SDU.
In the present embodiment, terminal receives N number of UL grant (N >=1), carries out resource allocation on each UL grant When, the mapping relations based on carrying or logic channel and numerology and/or TTI length, are preferably the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant and has data needs The carrying or logical channel assignment resource of transmission, avoid low priority but the transfer resource of the business more sensitive to time delay is high The problem of business of priority is seized.
Referring to Fig. 3, the process of uplink resource allocating method in another embodiment is shown in figure, the specific steps are as follows:
Step 301, terminal receive one or more UL grant;
Step 302, terminal on each UL grant carry out ascending resource distribution when, based on carrying or logic channel with The mapping relations of numerology and/or TTI length, the maximum numerology and/or TTI length for that can support is equal to should The corresponding numerology and/or TTI length of UL grant, and the carrying or logical channel assignment uplink for thering are data to need to transmit Resource.
It should be noted that above-mentioned steps 301 and step 302 are identical as step 101 shown in FIG. 1 and step 102, step 302 specific implementation process can be found in the introduction to step 102, no longer applies state herein.
If step 303, corresponding UL grant there are also remaining ascending resource, based on carrying or logic channel with The mapping relations of numerology and/or TTI length, the maximum numerology and/or TTI length for that can support is greater than should The corresponding numerology and/or TTI length of UL grant, and the carrying or logical channel assignment uplink for thering are data to need to transmit Resource.
Referring to fig. 4, detailed process is as follows for step 303:
If step 3031, corresponding UL grant there are also remaining ascending resource, according to carrying or logic channel with The corresponding relationship of numerology and/or TTI length selects the maximum numerology and/or TTI length supported to be greater than wait locate The corresponding numerology and/or TTI length of the UL grant of reason and have data need some or all of carrying transmitted or Logic channel;
Step 3032 arranges the carrying or logic channel chosen according to the priority of carrying or logic channel Sequence generates carrying or priority of logical channels queue, to the carrying or logic in the carrying or priority of logical channels queue Channel carries out ascending resource distribution, until ascending resource be all assigned or all carryings being mapped on the UL grant or All data of logic channel are all assigned with ascending resource.
In the present embodiment, terminal is according to ascending resource allocation result tissue MAC PDU, and specific there are two types of modes:
Mode one, terminal will distribute to it is same carrying or logic channel ascending resource merge, then determine carrying or The data volume of logic channel, and for a carrying or one, logic channel tissue (media access control) MAC (service data list Member) SDU;
Mode two, terminal believe a carrying or a logic channel ascending resource of every distribution for the carrying or logic Road generates a MAC SDU.
In the present embodiment, terminal receives N number of UL grant (N >=1), carries out resource allocation on each UL grant When, the mapping relations based on carrying or logic channel and numerology and/or TTI length, are preferably the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant and has data needs The carrying or logical channel assignment resource of transmission;If there are also surplus resources by corresponding UL grant, for the maximum that can be supported Numerology and/or TTI length be greater than the corresponding numerology and/or TTI length of the UL grant and have data need The carrying or logical channel assignment resource to be transmitted, can be avoided low priority but the transmission of the business more sensitive to time delay provides The problem of source is seized by the business of high priority.
Referring to Fig. 5, the process of terminal side ascending resource distribution is shown in figure, the specific steps are as follows:
Step 501 determines UL grant processing priority queue;
Specifically, terminal receives N number of UL grant, determines the processing sequence of N number of UL grant, generates at UL grant Priority query is managed, N is more than or equal to 1.
Optionally, the processing sequence of N number of UL grant can be protocol conventions, such as according to numerology and/or TTI The processing sequence of the sequence of length from small to large, N number of UL grant can also be configured by network side.
Step 502, according to UL grant processing priority queue, selection is in the UL grant of head of the queue, to the UL Grant carries out ascending resource distribution.
Optionally, ascending resource distribution is carried out to the UL grant according to mode shown in fig. 6:
First UL grant to be processed in step 5021, selection UL grant processing priority queue, and determining should The corresponding numerology and/or TTI length of UL grant.
Step 5022, according to carrying or logic channel and numerology and/or TTI length corresponding relationship, selection prop up The maximum numerology and/or TTI length held is equal to the corresponding numerology and/or TTI long of UL grant to be processed It spends and there are data to need the carrying transmitted, then to the carrying or logic channel chosen according to the excellent of carrying or logic channel First grade carries out descending sort from high to low, generates carrying or priority of logical channels queue.
Step 5023, in carrying or priority of logical channels queue carrying or logic channel carry out ascending resource point Match.
Specifically there are several types of modes:
Mode one: to carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR Carry out first round resource allocation.If first round resource allocation terminates to believe there are also surplus resources again against carrying or logic The remaining data of each carrying or logic channel for having remaining data to need to transmit in road priority query carries out the second wheel money Source distribution, until the data to be transmitted of all carryings in resource exhaustion or loading priority queue is all assigned with resource.
Mode two: in carrying or priority of logical channels queue each carrying or logic channel successively according to being needed Transmitted data amount carries out resource allocation.Until in resource exhaustion or carrying or priority of logical channels queue all carryings or The data to be transmitted of logic channel is all assigned with resource.
Mode three: to carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR Carry out first round resource allocation.Wherein, it does not need to carry out two-wheeled resource for determining in carrying or priority of logical channels queue The carrying of distribution or logic channel need to distribute resource for its total data then in first round resource allocation.If the first round Resource allocation terminates there are also surplus resources, then has remaining data again against each in carrying or priority of logical channels queue The remaining data of the carrying or logic channel that need to transmit carries out the second wheel resource allocation, until resource exhaustion or carrying or patrols The data to be transmitted for collecting all carryings or logic channel in channel priority queue is all assigned with resource.
Optionally, it does not need to carry out holding for two-wheeled resource allocation for being configured in carrying or priority of logical channels queue It carries or logic channel its corresponding data is all transmitted in first round resource allocation.
Mode four: to carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR Carry out first round resource allocation.Wherein, it does not need to carry out two-wheeled resource for determining in carrying or priority of logical channels queue The carrying of distribution or logic channel do not need to distribute resource for it then in first round resource allocation.If first round resource point With terminating there are also surplus resources, then there is remaining data to need to pass again against each in carrying or priority of logical channels queue The remaining data of defeated carrying or logic channel carries out the second wheel resource allocation, until resource exhaustion or carrying or logic channel The data to be transmitted of all carryings or logic channel in priority query is all assigned with resource.
For determining the carrying or logic that do not need to carry out two-wheeled resource allocation in carrying or priority of logical channels queue Channel, all data all distribute resource in the second wheel resource allocation.
If after step 5024, step 5023 resource allocation, there are also surplus resources by the UL grant, then according to carrying Or the corresponding relationship of logic channel and numerology and/or TTI length, select the maximum numerology and/or TTI supported Length be greater than the corresponding numerology and/or TTI length of UL grant to be processed and have data need the part transmitted or Person all carries or logic channel.Then to the carrying or logic channel chosen according to carrying or the priority of logic channel Descending sort is carried out from high to low, generates carrying or priority of logical channels queue, and continue to execute step 5023 and 5024, directly To the UL grant resource exhaustion or all carryings that may map on the UL grant or all data of logic channel All it is assigned with resource.
Step 503 updates UL grant priority process queue, and processed UL grant is deleted, is then weighed Multiple step 502, until the resource exhaustion of all UL grant or all carryings or logic channel all at its it is corresponding Ascending resource is assigned on the corresponding UL grant of numerology/TTI.
In the present embodiment, terminal is according to ascending resource allocation result tissue MAC PDU, and specific there are two types of modes:
Mode one: the resource for distributing to the same carrying is merged, the data volume that then determination can carry, and is directed to one A one MAC SDU of carrying tissue.
Mode two: an each pair of carrying or logical channel assignment first resource (distribute resource such as PBR or are directed to Remaining data distribution resource can be regarded as resource allocation twice), then a MAC SDU is generated for the carrying.
In the present embodiment, terminal receives N number of UL grant (N >=1), carries out resource allocation on each UL grant When, the mapping relations based on carrying and numerology/TTI length, are preferably the maximum numerology/TTI that can be supported Length is equal to the corresponding numerology/TTI length of the UL grant and has data to need the carrying transmitted distribution carrying or patrol Collect channel distribution resource;If the maximum numerology/TTI length for that can support is greater than the UL there are also surplus resources The corresponding numerology/TTI length of grant and have data need transmit carrying distribution carrying or logical channel assignment money Source, can be avoided low priority but the transfer resource of the business more sensitive to time delay is asked by what the business of high priority was seized Topic.
Based on the same inventive concept, a kind of ascending resource distributor is additionally provided in the embodiment of the present invention, due on this The principle that row resource allocation device solves the problems, such as is similar to uplink resource allocating method in Fig. 1~5 of the embodiment of the present invention, therefore should The implementation of ascending resource distributor may refer to the implementation of method, no longer applies and states in place of repeating.
Referring to Fig. 7, a kind of structure of ascending resource distributor is shown in figure, which includes:
Receiving module 701, for receiving one or more uplink scheduling authorization UL grant;
First resource distribution module 702, on each UL grant carry out ascending resource distribution when, based on carrying or The mapping relations of logic channel and baseband parameter numerology and/or Transmission Time Interval TTI length, for that can support most Big numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and has data to need The carrying to be transmitted or logical channel assignment ascending resource.
In the present embodiment, optionally, with continued reference to Fig. 7, device 700 further include:
Secondary resource distribution module 703, if for corresponding UL grant there are also remaining ascending resource, based on carrying or patrol The mapping relations of channel and numerology and/or TTI length are collected, for the maximum numerology and/or TTI long that can be supported Degree is greater than the corresponding numerology and/or TTI length of the UL grant, and the carrying for having data to need to transmit or logic channel Distribute ascending resource.
In the present embodiment, optionally, the carrying or the mapping of logic channel and numerology and/or TTI length Relationship is network side configuration or protocol conventions.
In the present embodiment, optionally, the carrying or the mapping of logic channel and numerology and/or TTI length Relationship includes:
All numerology and/or TTI length combinations that carrying or logic channel and the carrying or logic channel use Mapping relations;Or
The maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Mapping relations.
In the present embodiment, optionally, with continued reference to Fig. 7, the first resource distribution mould 702 includes:
First determination unit 7021 generates UL grant processing for determining the processing sequence of the multiple UL grant Priority query;
Second determination unit 7022, it is excellent for the processing according to UL grant in the UL grant processing priority queue The sequence of first grade from high to low successively selects UL grant to be processed, and determines that the UL grant to be processed is corresponding Numerology and/or TTI length;
First queue generation unit 7023, for according to carrying or logic channel and numerology and/or TTI length Corresponding relationship selects the maximum numerology and/or TTI length supported to be equal to UL grant to be processed corresponding Numerology and/or TTI length and the carrying for thering are data to need to transmit or logic channel, carrying or logic to choosing Channel is ranked up according to the priority of carrying or logic channel, generates carrying or priority of logical channels queue;
First resource allocation unit 7024, for excellent to the carrying or logic channel according to scheduled resource distribution mode Carrying or logic channel in first grade queue carry out ascending resource distribution, until all UL in UL grant processing priority queue The corresponding ascending resource of grant is all assigned or the data to be transmitted of all carryings or logic channel is all assigned with uplink money Source.
In the present embodiment, optionally, the processing sequence of the multiple UL grant is by protocol conventions, or by network side Configuration, or depend on terminal and realize.
In the present embodiment, optionally, the scheduled resource distribution mode is by network configuration, or by protocol conventions, Or it depends on terminal and realizes.
In the present embodiment, optionally, the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit Rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also in residue Row resource then has remaining data to need the carrying transmitted or patrol again against each in carrying or priority of logical channels queue The remaining data for collecting channel carries out the second wheel remaining data resource allocation, until the ascending resource of corresponding UL grant is all divided Match or carries or the data to be transmitted of all carryings in priority of logical channels queue or logic channel is all assigned with uplink Resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to institute's available for transmission number Resource allocation is carried out according to measuring, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels The data to be transmitted of all carryings or logic channel in queue is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first PBR resource allocation is taken turns, wherein not needing to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel need to distribute ascending resource for its total data then in first round PBR resource allocation;If first Wheel PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels The remaining data of each carrying or logic channel for having remaining data to need to transmit in queue carries out the second wheel remaining data money Source distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in institute There is the data to be transmitted of carrying or logic channel to be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first Take turns PBR resource allocation, wherein do not need to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel do not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR provides Source distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against in carrying or priority of logical channels queue The remaining data of each carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
In the present embodiment, optionally, with continued reference to Fig. 7, the Secondary resource distribution module 703 includes:
Selecting unit 7031, if there are also remaining ascending resources for corresponding UL grant, according to carrying or logic channel With the corresponding relationship of numerology and/or TTI length, select support maximum numerology and/or TTI length be greater than to The corresponding numerology and/or TTI length of the UL grant of processing, and some or all of carrying for thering are data to need to transmit Or logic channel;
Second queue generation unit 7032, for the carrying or logic channel chosen according to carrying or logic channel Priority be ranked up, generate carrying or priority of logical channels queue;
Secondary resource allocation unit 7033, for the carrying or logic in the carrying or priority of logical channels queue Channel carries out ascending resource distribution, until ascending resource be all assigned or all carryings being mapped on the UL grant or All data of logic channel are all assigned with ascending resource.
In the present embodiment, optionally, with continued reference to Fig. 7, described device 700 further include:
MAC SDU generation module 704, the ascending resource for that will distribute to the same carrying or logic channel merge, so The data volume of carrying or logic channel is determined afterwards, and for a carrying or one media access control MAC of logic channel tissue Service data unit SDU;Or
To a carrying or a logic channel ascending resource of every distribution, one is generated for the carrying or logic channel MAC SDU。
The embodiment of the invention also provides a kind of terminals, comprising: memory, processor and storage are on a memory and can be The computer program run on processor, the processor realize ascending resource as shown in Fig. 1 when executing described program Step in distribution method.
Referring to Fig. 8, a kind of structure of terminal is shown, which includes memory, processor and store on a memory And the computer program that can be run on a processor, the processor perform the steps of reception one when executing described program Or multiple uplink scheduling authorization UL grant;When carrying out ascending resource distribution on each UL grant, based on carrying or logic The mapping relations of channel and baseband parameter numerology and/or Transmission Time Interval TTI length, for the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and has data needs The carrying of transmission or logical channel assignment ascending resource.
In fig. 8, bus architecture (being represented with bus 800), bus 800 may include the bus of any number of interconnection And bridge, the storage that bus 800 will include the one or more processors represented by general processor 801 and memory 804 represents The various circuits of device link together.Bus 800 can also will such as peripheral equipment, voltage-stablizer and management circuit or the like Various other circuits link together, these are all it is known in the art, therefore, is no longer further retouched to it herein It states.Bus interface 803 provides interface between bus 800 and transceiver 802.Transceiver 802 can be an element, can also be with It is multiple element, such as multiple receivers and transmitter, the list for communicating over a transmission medium with various other devices is provided Member.Such as: transceiver 802 receives external data from other equipment.Transceiver 802 is used for treated the data of processor 801 It is sent to other equipment.Depending on the property of computing system, user interface, such as keypad, display, loudspeaking can also be provided Device, microphone, control stick.
Processor 801 is responsible for management bus 800 and common processing, and the general-purpose operating system is run as described in aforementioned.And it deposits Reservoir 704 can be used for the used data when executing operation of storage processor 801.
Optionally, processor 801 can be CPU, ASIC (Application Specific Integrated Circuit, specific integrated circuit), FPGA (Field-Programmable Gate Array, field programmable gate array) or CPLD (Complex Programmable Logic Device, Complex Programmable Logic Devices).
Optionally, processor 801 is also used to: if corresponding UL grant there are also remaining ascending resource, based on carrying or patrol The mapping relations of channel and numerology and/or TTI length are collected, for the maximum numerology and/or TTI long that can be supported Degree is greater than the corresponding numerology and/or TTI length of the UL grant, and the carrying for having data to need to transmit or logic channel Distribute ascending resource.
Optionally, the mapping relations of the carrying or logic channel and numerology and/or TTI length are that network side is matched It sets or protocol conventions.
Optionally, the carrying or logic channel and the mapping relations of numerology and/or TTI length include:
All numerology and/or TTI length combinations that carrying or logic channel and the carrying or logic channel use Mapping relations;Or
The maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Mapping relations.
Optionally, processor 801 is further used for: determining the processing sequence of the multiple UL grant, generates UL Grant processing priority queue;According to the processing priority of UL grant in the UL grant processing priority queue from height UL grant to be processed is successively selected to low sequence, and determines the corresponding numerology of UL grant to be processed And/or TTI length;According to carrying or the corresponding relationship of logic channel and numerology and/or TTI length, support is selected Maximum numerology and/or TTI length be equal to the corresponding numerology and/or TTI length of UL grant to be processed and There are data to need the carrying transmitted or logic channel, to the carrying or logic channel chosen according to carrying or logic channel Priority is ranked up, and generates carrying or priority of logical channels queue;According to scheduled resource distribution mode to the carrying Or carrying or logic channel progress ascending resource distribution in priority of logical channels queue, until UL grant processing priority The corresponding ascending resource of all UL grant is all assigned or the data to be transmitted of all carryings or logic channel in queue All it is assigned with ascending resource.
Optionally, the processing sequence of the multiple UL grant is perhaps configured or is depended on by network side by protocol conventions It is realized in terminal.
Optionally, the scheduled resource distribution mode is by network configuration, perhaps by protocol conventions or depending on terminal It realizes.
Optionally, the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit Rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also in residue Row resource then has remaining data to need the carrying transmitted or patrol again against each in carrying or priority of logical channels queue The remaining data for collecting channel carries out the second wheel remaining data resource allocation, until the ascending resource of corresponding UL grant is all divided Match or carries or the data to be transmitted of all carryings in priority of logical channels queue or logic channel is all assigned with uplink Resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to institute's available for transmission number Resource allocation is carried out according to measuring, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels The data to be transmitted of all carryings or logic channel in queue is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first PBR resource allocation is taken turns, wherein not needing to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel need to distribute ascending resource for its total data then in first round PBR resource allocation;If first Wheel PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels The remaining data of each carrying or logic channel for having remaining data to need to transmit in queue carries out the second wheel remaining data money Source distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in institute There is the data to be transmitted of carrying or logic channel to be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out first Take turns PBR resource allocation, wherein do not need to carry out two-wheeled resource allocation for determining in carrying or priority of logical channels queue Carrying or logic channel do not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR provides Source distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against in carrying or priority of logical channels queue The remaining data of each carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
Optionally, processor 801 is further used for: if there are also remaining ascending resources by corresponding UL grant, according to carrying Or the corresponding relationship of logic channel and numerology and/or TTI length, select the maximum numerology and/or TTI supported Length is greater than the corresponding numerology and/or TTI length of UL grant to be processed, and have data need the part transmitted or Person all carries or logic channel;The carrying or logic channel chosen is carried out according to the priority of carrying or logic channel Sequence generates carrying or priority of logical channels queue;To the carrying in the carrying or priority of logical channels queue or patrol It collects channel and carries out ascending resource distribution, until the whole assigned or all carryings being mapped on the UL grant of ascending resource Or all data of logic channel are all assigned with ascending resource.
Optionally, processor 801 is also used to: the ascending resource for distributing to the same carrying or logic channel being merged, so The data volume of carrying or logic channel is determined afterwards, and for a carrying or one media access control MAC of logic channel tissue Service data unit SDU;Or to a carrying or a logic channel ascending resource of every distribution, believe for the carrying or logic Road generates a MAC SDU.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, special Sign is that the program realizes the step in uplink resource allocating method as shown in Fig. 1 when being executed by processor.
It should be understood that " one embodiment " or " embodiment " that specification is mentioned in the whole text mean it is related with embodiment A particular feature, structure, or characteristic is included at least one embodiment of the present invention.Therefore, occur everywhere in the whole instruction " in one embodiment " or " in one embodiment " not necessarily refer to identical embodiment.In addition, these specific features, knot Structure or characteristic can combine in any suitable manner in one or more embodiments.
In various embodiments of the present invention, it should be appreciated that magnitude of the sequence numbers of the above procedures are not meant to execute suitable Sequence it is successive, the execution of each process sequence should be determined by its function and internal logic, the implementation without coping with the embodiment of the present invention Process constitutes any restriction.
In addition, the terms " system " and " network " are often used interchangeably herein.
It should be understood that the terms "and/or", only a kind of incidence relation for describing affiliated partner, expression can deposit In three kinds of relationships, for example, A and/or B, can indicate: individualism A exists simultaneously A and B, these three situations of individualism B. In addition, character "/" herein, typicallys represent the relationship that forward-backward correlation object is a kind of "or".
In embodiment provided herein, it should be appreciated that " B corresponding with A " indicates that B is associated with A, can be with according to A Determine B.It is also to be understood that determine that B is not meant to determine B only according to A according to A, it can also be according to A and/or other information Determine B.
In several embodiments provided herein, it should be understood that disclosed method and apparatus, it can be by other Mode realize.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only For a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine Or it is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed phase Coupling, direct-coupling or communication connection between mutually can be through some interfaces, the INDIRECT COUPLING or communication of device or unit Connection can be electrical property, mechanical or other forms.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that the independent physics of each unit includes, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can store and computer-readable deposit at one In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or network side equipment etc.) executes transmitting-receiving side described in each embodiment of the present invention The part steps of method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, letter Claim ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Above-described is the preferred embodiment of the present invention, it should be pointed out that the ordinary person of the art is come It says, several improvements and modifications can also be made under the premise of not departing from principle of the present invention, these improvements and modifications also exist In protection scope of the present invention.

Claims (20)

1. a kind of uplink resource allocating method, which is characterized in that the described method includes:
Terminal receives one or more uplink scheduling authorization UL grant;
The terminal is when carrying out ascending resource distribution on each UL grant, based on carrying or logic channel and baseband parameter The mapping relations of numerology and/or Transmission Time Interval TTI length are preferably the maximum numerology that can be supported And/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and the carrying for having data to need to transmit Or logical channel assignment ascending resource.
2. the method according to claim 1, wherein carrying out uplink money on each UL grant in the terminal When source is distributed, the mapping relations based on carrying or logic channel and numerology and/or TTI length, are preferably that can support Maximum numerology and/or TTI length be equal to the corresponding numerology and/or TTI length of the UL grant, and have number After the carrying or logical channel assignment ascending resource for needing to transmit, the method also includes:
If there are also remaining ascending resources by corresponding UL grant, based on carrying or logic channel and numerology and/or TTI long The mapping relations of degree, it is corresponding that the maximum numerology and/or TTI length for that can support is greater than the UL grant Numerology and/or TTI length, and the carrying for thering are data to need to transmit or logical channel assignment ascending resource.
3. method according to claim 1 or 2, which is characterized in that the carrying or logic channel and numerology and/ Or the mapping relations of TTI length are network side configuration or protocol conventions.
4. according to the method described in claim 3, it is characterized in that, the carrying or logic channel and numerology and/or The mapping relations of TTI length include:
All numerology and/or TTI length combinations that carrying or logic channel are used with the carrying or logic channel are reflected Penetrate relationship;Or
The mapping for the maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Relationship.
5. the method according to claim 1, wherein the terminal carries out resource allocation on each UL grant When, the mapping relations based on carrying or logic channel and numerology and/or TTI length, are preferably the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and has data needs The carrying of transmission or logical channel assignment ascending resource, comprising:
It determines the processing sequence of the multiple UL grant, generates UL grant processing priority queue;
It is successively selected according to the processing priority sequence from high to low of UL grant in the UL grant processing priority queue UL grant to be processed is selected, and determines the corresponding numerology and/or TTI length of UL grant to be processed;
According to carrying or the corresponding relationship of logic channel and numerology and/or TTI length, the maximum supported is selected Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of UL grant to be processed and has number According to needing the carrying transmitted or logic channel, to the carrying or logic channel chosen according to the preferential of carrying or logic channel Grade is ranked up, and generates carrying or priority of logical channels queue;
According to scheduled resource distribution mode to it is described carrying or priority of logical channels queue in carrying or logic channel into Row ascending resource distribution, until the corresponding ascending resource of UL grant all in UL grant processing priority queue is all divided Match or all carryings or the data to be transmitted of logic channel are all assigned with ascending resource.
6. according to the method described in claim 5, it is characterized in that, the processing sequence of the multiple UL grant by agreement about It is fixed, terminal is perhaps configured or depended on by network side realizes;Or
The scheduled resource distribution mode is perhaps realized by protocol conventions or depending on terminal by network configuration.
7. according to the method described in claim 5, it is characterized in that, the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also remaining uplink moneys Source then has remaining data that the carrying transmitted or logic is needed to believe again against each in carrying or priority of logical channels queue The remaining data in road carries out the second wheel remaining data resource allocation, be all assigned until the ascending resource of corresponding UL grant or The data to be transmitted of person's carrying or all carryings in priority of logical channels queue or logic channel is all assigned with ascending resource; Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to all data to be transmitted amounts Resource allocation is carried out, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels queue In all carryings or the data to be transmitted of logic channel be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out the first round PBR resource allocation, wherein not needing to carry out holding for two-wheeled resource allocation for determining in carrying or priority of logical channels queue It carries or logic channel needs to distribute ascending resource for its total data then in first round PBR resource allocation;If the first round PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels team The remaining data of each carrying or logic channel for having remaining data to need to transmit in column carries out the second wheel remaining data resource Distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in it is all The data to be transmitted of carrying or logic channel is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out the first round PBR resource allocation, wherein do not need to carry out holding for two-wheeled resource allocation for determining in carrying or priority of logical channels queue It carries or logic channel does not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR resource Distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against each in carrying or priority of logical channels queue The remaining data of a carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
8. if according to the method described in claim 2, the it is characterized in that, also remaining uplink money of the corresponding UL grant Source, the mapping relations based on carrying or logic channel and numerology and/or TTI length, are preferably the maximum that can be supported Numerology and/or TTI length is greater than the corresponding numerology and/or TTI length of the UL grant, and has data needs The carrying or logical channel assignment resource of transmission, comprising:
If there are also remaining ascending resources by corresponding UL grant, according to carrying or logic channel and numerology and/or TTI long The corresponding relationship of degree selects the maximum numerology and/or TTI length supported to be greater than UL grant to be processed corresponding Numerology and/or TTI length, and some or all of carrying for thering are data to need to transmit or logic channel;
The carrying or logic channel chosen is ranked up according to the priority of carrying or logic channel, carrying is generated or patrols Volume channel priority queue, in the carrying or priority of logical channels queue carrying or logic channel carry out ascending resource Distribution, until the whole assigned or all carryings being mapped on the UL grant of ascending resource or all numbers of logic channel According to being all assigned with ascending resource.
9. the method according to claim 1, wherein the method also includes:
The terminal merges the ascending resource for distributing to the same carrying or logic channel, then determines carrying or logic channel Data volume, and for one carrying or one media access control MAC service data unit SDU of logic channel tissue;Or
The terminal generates one to a carrying or a logic channel ascending resource of every distribution, for the carrying or logic channel A MAC SDU.
10. a kind of ascending resource distributor, which is characterized in that described device includes:
Receiving module, for receiving one or more uplink scheduling authorization UL grant;
First resource distribution module, for being believed based on carrying or logic when carrying out ascending resource distribution on each UL grant The mapping relations of road and baseband parameter numerology and/or Transmission Time Interval TTI length, are preferably the maximum that can be supported Numerology and/or TTI length is equal to the corresponding numerology and/or TTI length of the UL grant, and has data needs The carrying of transmission or logical channel assignment ascending resource.
11. device according to claim 10, which is characterized in that described device further include:
Secondary resource distribution module, if there are also remaining ascending resources for corresponding UL grant, based on carrying or logic channel It is preferably the maximum numerology and/or TTI length that can be supported with the mapping relations of numerology and/or TTI length Numerology and/or TTI length corresponding greater than the UL grant, and the carrying for thering are data to need to transmit or logic channel point With ascending resource.
12. device described in 0 or 11 according to claim 1, which is characterized in that the carrying or logic channel and numerology And/or the mapping relations of TTI length are network side configuration or protocol conventions.
13. device according to claim 12, which is characterized in that the carrying or logic channel and numerology and/ Or the mapping relations of TTI length include:
All numerology and/or TTI length combinations that carrying or logic channel are used with the carrying or logic channel are reflected Penetrate relationship;Or
The mapping for the maximum numerology and/or TTI length that carrying or logic channel and the carrying or logic channel use Relationship.
14. device according to claim 10, which is characterized in that the first resource distribution module includes:
First determination unit generates UL grant processing priority team for determining the processing sequence of the multiple UL grant Column;
Second determination unit, for the processing priority according to UL grant in the UL grant processing priority queue from height UL grant to be processed is successively selected to low sequence, and determines the corresponding numerology of UL grant to be processed And/or TTI length;
First queue generation unit, for being closed according to carrying or logic channel are corresponding with numerology and/or TTI length System selects the maximum numerology and/or TTI length supported to be equal to the corresponding numerology of UL grant to be processed And/or TTI length and there are data to need the carrying transmitted or logic channel, to the carrying or logic channel chosen according to holding It carries or the priority of logic channel is ranked up, generate carrying or priority of logical channels queue;
First resource allocation unit is used for according to scheduled resource distribution mode to the carrying or priority of logical channels queue In carrying or logic channel carry out ascending resource distribution, until all UL grant couple in UL grant processing priority queue The ascending resource answered all is assigned or the data to be transmitted of all carryings or logic channel is all assigned with ascending resource.
15. device according to claim 14, which is characterized in that the processing sequence of the multiple UL grant by agreement about It is fixed, terminal is perhaps configured or depended on by network side realizes;Or
The scheduled resource distribution mode is perhaps realized by protocol conventions or depending on terminal by network configuration.
16. device according to claim 14, which is characterized in that the scheduled resource distribution mode includes:
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its be prioritized bit rate PBR carries out first round PBR resource allocation;If first round PBR resource allocation terminates corresponding UL grant, there are also remaining uplink moneys Source then has remaining data that the carrying transmitted or logic is needed to believe again against each in carrying or priority of logical channels queue The remaining data in road carries out the second wheel remaining data resource allocation, be all assigned until the ascending resource of corresponding UL grant or The data to be transmitted of person's carrying or all carryings in priority of logical channels queue or logic channel is all assigned with ascending resource; Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to all data to be transmitted amounts Resource allocation is carried out, until the ascending resource of corresponding UL grant is all assigned or carries or priority of logical channels queue In all carryings or the data to be transmitted of logic channel be all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out the first round PBR resource allocation, wherein not needing to carry out holding for two-wheeled resource allocation for determining in carrying or priority of logical channels queue It carries or logic channel needs to distribute ascending resource for its total data then in first round PBR resource allocation;If the first round PBR resource allocation terminates corresponding UL grant, and there are also remaining ascending resources, then again against carrying or priority of logical channels team The remaining data of each carrying or logic channel for having remaining data to need to transmit in column carries out the second wheel remaining data resource Distribution, until the ascending resource of corresponding UL grant be all assigned or carrying or priority of logical channels queue in it is all The data to be transmitted of carrying or logic channel is all assigned with ascending resource;Or
To carrying or priority of logical channels queue in each carrying or logic channel successively according to its PBR carry out the first round PBR resource allocation, wherein do not need to carry out holding for two-wheeled resource allocation for determining in carrying or priority of logical channels queue It carries or logic channel does not need to distribute ascending resource for it then in first round PBR resource allocation;If first round PBR resource Distribution terminates corresponding UL grant, and there are also remaining ascending resources, then again against each in carrying or priority of logical channels queue The remaining data of a carrying or logic channel for having remaining data to need to transmit carries out the second wheel resource allocation, until corresponding UL The ascending resource of grant is all assigned or carrying or all carryings in priority of logical channels queue or logic channel Data to be transmitted is all assigned with ascending resource.
17. device according to claim 11, which is characterized in that the Secondary resource distribution module includes:
Selecting unit, if for corresponding UL grant there are also remaining ascending resource, according to carrying or logic channel with The corresponding relationship of numerology and/or TTI length selects the maximum numerology and/or TTI length supported to be greater than wait locate The corresponding numerology and/or TTI length of the UL grant of reason, and have data need some or all of carrying transmitted or Logic channel;
Second queue generation unit, for the carrying or logic channel chosen according to carrying or logic channel priority It is ranked up, generates carrying or priority of logical channels queue;
Secondary resource allocation unit, for the carrying or logic channel progress in the carrying or priority of logical channels queue Ascending resource distribution, until the whole assigned or all carryings being mapped on the UL grant of ascending resource or logic channel All data be all assigned with ascending resource.
18. device according to claim 10, which is characterized in that described device further include:
MAC SDU generation module, the ascending resource for that will distribute to the same carrying or logic channel merge, and then determination is held The data volume of load or logic channel, and for a carrying or one media access control MAC service data of logic channel tissue Cell S DU;Or
To a carrying or a logic channel ascending resource of every distribution, a MAC is generated for the carrying or logic channel SDU。
19. a kind of terminal characterized by comprising memory, processor and storage can transport on a memory and on a processor Capable computer program, the processor realize ascending resource as described in any one of claims 1 to 9 when executing described program Step in distribution method.
20. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor The step in uplink resource allocating method as described in any one of claims 1 to 9 is realized when execution.
CN201710308940.0A 2017-05-04 2017-05-04 A kind of uplink resource allocating method and device Active CN106961741B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710308940.0A CN106961741B (en) 2017-05-04 2017-05-04 A kind of uplink resource allocating method and device
PCT/CN2018/081558 WO2018201833A1 (en) 2017-05-04 2018-04-02 Uplink resource allocation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710308940.0A CN106961741B (en) 2017-05-04 2017-05-04 A kind of uplink resource allocating method and device

Publications (2)

Publication Number Publication Date
CN106961741A CN106961741A (en) 2017-07-18
CN106961741B true CN106961741B (en) 2019-11-22

Family

ID=59482146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710308940.0A Active CN106961741B (en) 2017-05-04 2017-05-04 A kind of uplink resource allocating method and device

Country Status (2)

Country Link
CN (1) CN106961741B (en)
WO (1) WO2018201833A1 (en)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018120985A1 (en) * 2016-12-29 2018-07-05 电信科学技术研究院 Method and device for performing resource allocation
CN108282278B (en) * 2017-01-05 2021-02-05 华为技术有限公司 Data transmission method, terminal equipment and network equipment
CN106961741B (en) * 2017-05-04 2019-11-22 电信科学技术研究院 A kind of uplink resource allocating method and device
EP3656169A4 (en) * 2017-07-21 2021-04-07 LG Electronics Inc. Method for performing a lcp procedure in wireless communication system and a device therefor
US11553517B2 (en) * 2017-08-04 2023-01-10 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Resource scheduling method, terminal device, and network device
CN109392148B (en) * 2017-08-11 2021-06-04 电信科学技术研究院 Uplink resource allocation method, terminal and network equipment
US11277828B2 (en) 2017-08-11 2022-03-15 Guangdong Oppo Mobile Method, device and system for resource allocation, and computer-readable storage medium
CN109451855B (en) * 2017-08-18 2023-05-12 北京小米移动软件有限公司 Uplink resource allocation method, device and terminal
WO2019033428A1 (en) * 2017-08-18 2019-02-21 北京小米移动软件有限公司 Uplink resource allocation method, device and terminal
CN109495223B (en) 2017-09-11 2022-06-03 中兴通讯股份有限公司 Resource indication method and device and storage medium
CN109756986B (en) * 2017-11-03 2021-07-13 大唐移动通信设备有限公司 Uplink data packet resource allocation method and user terminal
KR102512086B1 (en) * 2017-11-14 2023-03-17 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 Data transmission method, terminal equipment and network equipment
CN111602347B (en) * 2017-11-20 2022-06-07 上海诺基亚贝尔股份有限公司 Backhaul transport between network devices
EP3716717B1 (en) * 2017-12-27 2023-01-25 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Data sending method and apparatus, computer device and storage medium
CN110139373B (en) * 2018-02-09 2021-08-20 大唐移动通信设备有限公司 Resource selection method and user terminal
CN110167066B (en) * 2018-02-14 2022-09-02 华为技术有限公司 Data transmission method and device
CN110324902B (en) 2018-03-30 2023-06-27 华为技术有限公司 Communication method, communication device and communication system
WO2019191977A1 (en) 2018-04-04 2019-10-10 Zte Corporation Methods, apparatus and systems for preempting uplink transmission resource in a wireless communication
CN110636532B (en) * 2018-06-21 2021-01-08 维沃移动通信有限公司 Power distribution method and terminal
CN110838899B (en) 2018-08-16 2021-12-24 大唐移动通信设备有限公司 Direct communication link resource allocation method and terminal
CN113747596A (en) * 2018-09-21 2021-12-03 华为技术有限公司 Wireless scheduling method and device
CN111132351B (en) * 2018-10-31 2023-04-07 大唐移动通信设备有限公司 Resource allocation method, terminal and node equipment
CN111328138B (en) * 2018-12-13 2023-04-07 大唐移动通信设备有限公司 Method, device and terminal for organizing MAC PDU
CN111385883B (en) * 2018-12-28 2023-01-10 展讯通信(上海)有限公司 Data transmission method and device, storage medium and terminal
CN111294965A (en) 2019-01-11 2020-06-16 展讯通信(上海)有限公司 Uplink transmission resource selection method, terminal and storage medium
CN110602796B (en) * 2019-01-29 2023-06-06 北京中科晶上科技股份有限公司 Resource scheduling method on mobile broadband shared channel and electronic equipment
CN111726865B (en) * 2019-03-21 2023-06-30 大唐移动通信设备有限公司 Medium access control service data unit processing and receiving method, equipment and device
CN113364565B (en) * 2019-03-22 2023-07-21 展讯通信(上海)有限公司 Resource allocation method and device, storage medium and terminal
CN111294964A (en) * 2019-03-28 2020-06-16 展讯通信(上海)有限公司 Resource selection method, resource configuration method, resource selection device, resource configuration device, storage medium, user equipment and base station
CN111836389B (en) * 2019-04-23 2023-07-25 中国移动通信有限公司研究院 Uplink resource scheduling method, terminal and network side equipment
CN111601383A (en) * 2019-06-17 2020-08-28 维沃移动通信有限公司 Resource allocation method, terminal and network equipment
WO2021072688A1 (en) * 2019-10-16 2021-04-22 Oppo广东移动通信有限公司 Data transmission method and apparatus, and device and storage medium
CN113630891B (en) * 2020-05-06 2022-08-19 展讯通信(上海)有限公司 MAC layer priority ordering method and device, storage medium and user equipment
CN113840305A (en) * 2020-06-24 2021-12-24 大唐移动通信设备有限公司 Data transmission method, parameter configuration method, terminal and network side equipment
CN117425223A (en) * 2022-07-08 2024-01-19 大唐移动通信设备有限公司 Resource allocation and information configuration method and device, terminal equipment and network equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104247534A (en) * 2012-01-19 2014-12-24 华为技术有限公司 Systems and method for uplink resource allocation
CN104363663A (en) * 2014-11-17 2015-02-18 电子科技大学 Packet scheduling method based on mixed services in LTE communication system
CN106376050A (en) * 2016-09-30 2017-02-01 宇龙计算机通信科技(深圳)有限公司 Setting/determining method and device of subcarrier spacing of reference numerology, base station and terminal

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105979597B (en) * 2016-06-27 2020-02-21 宇龙计算机通信科技(深圳)有限公司 Communication resource allocation method, allocation device, base station and terminal
CN106961741B (en) * 2017-05-04 2019-11-22 电信科学技术研究院 A kind of uplink resource allocating method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104247534A (en) * 2012-01-19 2014-12-24 华为技术有限公司 Systems and method for uplink resource allocation
CN104363663A (en) * 2014-11-17 2015-02-18 电子科技大学 Packet scheduling method based on mixed services in LTE communication system
CN106376050A (en) * 2016-09-30 2017-02-01 宇龙计算机通信科技(深圳)有限公司 Setting/determining method and device of subcarrier spacing of reference numerology, base station and terminal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Discussion on UL sTTI length and structure;Huawei, HiSilicon;《3GPP TSG RAN WG1 Meeting #87,R1-1611155》;20161118;正文2-4节 *

Also Published As

Publication number Publication date
WO2018201833A1 (en) 2018-11-08
CN106961741A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN106961741B (en) A kind of uplink resource allocating method and device
CN109511169A (en) A kind of acquisition methods, device and system controlling resource collection
US8532030B2 (en) Techniques for initiating communication in a wireless network
EP3840512A1 (en) Sidelink resource allocation method and terminal
CN104468019B (en) The indicating means and equipment of signal resource
CN108966358B (en) A kind of method and user equipment sending buffer status report
CN103931262B (en) A kind of data dispatching method and equipment
CN106954277A (en) A kind of dispatch request treating method and apparatus
CN108270514A (en) The determining method and device of PDSCH resources, terminal, base station
CN110249572A (en) Method and apparatus for short PDCCH operation
CN110225547A (en) A kind of scheduling request sending, receiving method, terminal and network side equipment
CN107276734A (en) Transmission method, equipment and the system of reference signal
CN109788570B (en) Logic channel priority resource scheduling method and device
CN108811154A (en) Data pack transmission method and equipment
CN110139376A (en) Determination method, apparatus, storage medium and the electronic device of carrier set
CN109699076A (en) The transmission of Downlink Control Information, blind Detecting number acquisition methods and device
CN109996338A (en) A kind of method, equipment and the system of determining BWP state
CN108401292A (en) Control transmission method, method of reseptance, device, base station and the terminal of information
CN107231693B (en) Sending, receiving method, the apparatus and system of uplink information
CN109803400A (en) Information uploading method, resource allocation methods, user equipment and base station
CN109391424A (en) A kind of data transmission method for uplink, equipment and system
CN109756297A (en) Downlink PPDU's sends and receives method and device
CN106851667B (en) A kind of data processing method and device for air protocol data surface
CN109756986A (en) A kind of upstream data packet resource allocation methods and user terminal
CN107371267B (en) A kind of data transmission method and terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210608

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right