CN106960584A CN201710364867.9A CN201710364867A CN106960584A CN 106960584 A CN106960584 A CN 106960584A CN 201710364867 A CN201710364867 A CN 201710364867A CN 106960584 A CN106960584 A CN 106960584A
Authority
CN
China
Prior art keywords
phase
current
time
track
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710364867.9A
Other languages
Chinese (zh)
Other versions
CN106960584B (en
Inventor
刘雄飞
刘俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201710364867.9A priority Critical patent/CN106960584B/en
Publication of CN106960584A publication Critical patent/CN106960584A/en
Application granted granted Critical
Publication of CN106960584B publication Critical patent/CN106960584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/08Controlling traffic signals according to detected number or speed of vehicles

Abstract

The invention discloses a kind of traffic control method and device of self adaptation crossroad traffic signal lamp, this method comprises the following steps:Step 1:Vehicle fleet size on each track of real-time reception;Step 2:According to the vehicle fleet size on each track, calculate the current coefficient in each track on current crossing, according to each track current coefficient magnitude and combine phase conflicts principle, it is determined that the current order of current crossing phase;Step 3:According to the vehicle fleet size in the vehicle fleet size track corresponding with next crossing in track in clearance phase, it is determined that the green time of phase where each track, according to the current order of phase, determines the green time of each combinatorial phase, implements traffic control successively;The lasting accumulation of congestion, and the preferentially wagon flow in evacuation congestion direction can be slowed down under supersaturated traffic behavior, the extension of congestion is effectively alleviated, and can also effectively improve green time utilization rate in unsaturated state.

Description

A kind of traffic control method and device of self adaptation crossroad traffic signal lamp
Technical field
The invention belongs to traffic signalization field, more particularly to a kind of traffic control of self adaptation crossroad traffic signal lamp Method and device.
Background technology
The Area Traffic Control System with good operational effect having now been developed in the world at present is seldom, including Including TRANSYT, SCOOT, SCATS, a small number of developed countries such as Britain, the U.S., Australia are concentrated mainly on.These traffic controls System processed can obtain pedestrian in preferable operational effect, but the imperfection of domestic relevant traffic regulation, urban road abroad Vehicle can not be well adapted for the current situation of traffic in China city often in unmanageable hybrid state, external system, The implementation result of the country is simultaneously imperfect.
In recent decades, artificial intelligence, theory of optimal control etc. apply to traffic zone and coordinated in control, obtain certain Achievement in research.But this kind of control method has relatively good applied to ripe perfect road traffic system in theory Effect, but for the actual road conditions in most cities, the control facility that these methods are used is more, and systematic parameter input is more, Practice cost is too high, and algorithm complex is high, it is difficult to the change of real-time response traffic flow.Such algorithm is actual in engineering It is excessively complicated in, it is impossible to meet the requirement of engineering of actual traffic optimal control well.
It is many at present by the way of single spot optimization and the green ripple control of main line in the traffic control optimization of intersection, the above Control mode has certain effect to the traffic optimization on some direction on some part or main line, but is difficult to lift road network entirety Traffic efficiency, particularly with the situation of the supersaturated magnitude of traffic flow, only considered local optimization may aggravate the feelings of traffic congestion Condition.
The content of the invention
The invention provides a kind of traffic control method and device of self adaptation crossroad traffic signal lamp, it is intended that Overcome the problem of overall traffic efficiency of road network is not high in the prior art.
A kind of traffic control method of self adaptation crossroad traffic signal lamp, comprises the following steps:
Step 1:Vehicle fleet size on the current crossing of real-time reception and adjacent next crossing Shang Ge tracks;
Step 2:According to the vehicle fleet size on each track, the current coefficient in each track on current crossing is calculated, according to each The current coefficient magnitude in track simultaneously combines phase conflicts principle, it is determined that the current order of current crossing phase;
Step 3:According to the vehicle fleet size in the vehicle fleet size track corresponding with next crossing in track in clearance phase, it is determined that often The green time of phase where individual track, according to the current order of phase, determines the green time of each combinatorial phase, implements to hand over successively Logical control;
Wherein, the current coefficient in current crossing Shang Ge tracks is p:P=N × ((1-o)+e);N represents that current crossing is got on the bus The queuing vehicle quantity in road, o represents the lane occupancy ratio in same sex track on next crossing adjacent with current road junction roadway, e tables Show track green wave band coefficient;
NXVehicle number on expression next crossing adjacent with current road junction roadway on same sex track Amount, d represents the average length of vehicle, and g represents the average spacing between vehicle, and L represents lane length.
Track refers to the connatural track of same direction, if during there are multiple same sexes and runway, with multiple tracks Vehicle fleet size average value is as the vehicle fleet size on current lane, and phase refers to the phase in only one of which clearance direction, track and phase Position is one-to-one, and combinatorial phase is the phase combination that single direction is let pass.
Further, the track green time is t:
T=tSULT+NT×H
Wherein, tSULTRepresent after red light becomes green light, the time that vehicle launch is delayed, when H represents saturation headstock Away from, refer to vehicle under saturation traffic behavior, vehicle by vehicle its length and convoy spacing apart from when required time;
NTRepresent the vehicle fleet size that plan of the corresponding phase of current lane in green time is let pass, NT=min (mque+ marr,macc);
mqueRepresent the queuing vehicle quantity of current lane, marrThe vehicle that may be reached during representing current lane green light, Vehicle arriving amt according to a upper cycle estimated, maccRepresent same sex track corresponding with current lane on next crossing Admissible vehicle fleet size,
Further, the vehicle m that may be reached during the green lightarr
Wherein, t0For initial green light time, t0=tSULT+N0× H, N0For the vehicle number m being likely to be breached during setting green lightarr The initial clearance vehicle fleet size obtained when=0, N0=min (mque,macc);tredFor a red time length before current lane, N represents the vehicle fleet size reached on current lane in a preceding red time.
Further, the determination process of the green time of each current phase is as follows:
Step C0:The current coefficient of all phases is calculated, and is ranked up according to descending order, phase row is obtained Sequence queue;
Step C1, according to the current order of phase, chooses the maximum phase of current coefficient as master phase M, meanwhile, from phase In round-robin queue, two the matched-phases Q1 and Q2 matched with master phase M are selected, combinatorial phase (M, Q1) and (M, Q2) is obtained;
Step C2, using in matched-phase Q1 and Q2 the larger phase of correspondence lane coefficient as secondary phase Q, another As standby phase Q ', master phase M and the track green time where time phase difference (T are calculatedM-TQ), if (TM-TQ) small In defined minimum green time, then into step C2.1, otherwise into step C2.2;
Step C2.1, makes combinatorial phase green light let pass time T equal to TM, phase M and phase Q let pass the time for T jointly, and Phase M and phase Q are removed into out sequencing queue, into step C3;
Step C2.2, makes combinatorial phase green light let pass time T equal to TQ, phase M and phase Q let pass the time for T, entered jointly Enter step C2.3;
Step C2.3, calculates alternative phase Q ' green time TQ', by TMWith the difference (T of T in C2.2M- T) and TQ’ Compare, take higher value max ((TM- T), TQ') as combinatorial phase green light clearance time T ', phase M is put jointly with phase Q ' Row T ' time span, and by M, Q, Q ' phase sequencing queue is removed, into step C3;
Step C3:Whether be empty, if it is empty, return to step C0 restarts entirely to follow if judging track phase sequencing queue Ring;If not empty, then the current coefficient of all phases is recalculated, and the phase in current phase sequencing queue is carried out again Sequence, returns again to step C1.
A kind of traffic control device of self adaptation crossroad traffic signal lamp, including:
Receiver module, for traffic data of the real-time reception from car-mounted terminal and crossing traffic signal pickup assembly;
Processing module, the current coefficient for calculating each track corresponding phase, and current phase principle is combined, determine traffic The current order of signal lamp and time;
Self-adaptive control module, for the current order of traffic lights obtained according to the processing module and time life Traffic lights are controlled into the auto-adaptive controling signal of traffic lights, and based on the auto-adaptive controling signal.
Further, the processing module includes data capture unit, computing unit and allocation unit;
The data capture unit, for obtaining each track in current phase in the traffic data that is gathered from receiver module On vehicle fleet size;
The computing unit, for the vehicle data according to each track, obtains the current coefficient of each track corresponding phase;
The allocation unit, in unit period, being led to according to the current coefficient of each phase in track to each phase The distribution of row order and transit time.
Beneficial effect
The invention provides a kind of traffic control method and device of self adaptation crossroad traffic signal lamp, this method include with Lower step:Step 1:Vehicle fleet size on the current crossing of real-time reception and adjacent next crossing Shang Ge tracks;Step 2:Foundation Vehicle fleet size on each track, calculates the current coefficient in each track on current crossing, the current coefficient magnitude according to each track And phase conflicts principle is combined, it is determined that the current order of current crossing phase;Step 3:Vehicle number according to track in clearance phase The vehicle fleet size in amount track corresponding with next crossing, it is determined that the green time of phase where each track, passes through suitable according to phase Sequence, determines the green time of each combinatorial phase successively, implements traffic control;Using the vehicle fleet size on track, and calculate each car The current coefficient of road corresponding phase, generates the traffic control scheme at current crossing, can slow down under supersaturated traffic behavior and gather around Stifled lasting accumulation, and the preferentially wagon flow in evacuation congestion direction, effectively alleviate the extension of congestion.Also can in unsaturated state Enough effectively improve green time utilization rate.
Brief description of the drawings
Fig. 1 is phase twin nuclei schematic diagram;
Fig. 2 is the schematic flow sheet of the method for the invention;
Fig. 3 is the topological structure schematic diagram of emulation road network;
Fig. 4 is the lower maximum queue length contrast schematic diagram of supersaturation;
Fig. 5 is the lower averagely queue length schematic diagram of supersaturation;
Fig. 6 is journey time schematic diagram.
Embodiment
Below in conjunction with accompanying drawing and example, the present invention is described further.
As shown in Fig. 2 a kind of traffic control method of self adaptation crossroad traffic signal lamp, comprises the following steps:
Step 1:Vehicle fleet size on the current crossing of real-time reception and adjacent next crossing Shang Ge tracks;
Step 2:According to the vehicle fleet size on each track, the current coefficient in each track on current crossing is calculated, according to each The current coefficient magnitude in track simultaneously combines phase conflicts principle, it is determined that the current order of current crossing phase;
Phase conflicts principle is obtained from the phase twin nuclei schematic diagram in Fig. 1.
Step 3:According to the vehicle fleet size in the vehicle fleet size track corresponding with next crossing in track in clearance phase, it is determined that often The green time of phase where individual track, according to the current order of phase, determines the green time of each combinatorial phase, implements to hand over successively Logical control;
Wherein, the current coefficient in current crossing Shang Ge tracks is p:P=N × ((1-o)+e);N represents that current crossing is got on the bus The queuing vehicle quantity in road, o represents the lane occupancy ratio in same sex track on next crossing adjacent with current road junction roadway, e tables Show track green wave band coefficient;
NXVehicle number on expression next crossing adjacent with current road junction roadway on same sex track Amount, d represents the average length of vehicle, and g represents the average spacing between vehicle, and L represents lane length.
Track refers to the connatural track of same direction, if during there are multiple same sexes and runway, with multiple tracks Vehicle fleet size average value is as the vehicle fleet size on current lane, and phase refers to the phase in only one of which clearance direction, track and phase Position is one-to-one, and combinatorial phase is the phase combination that single direction is let pass.
The track green time is t:
T=tSULT+NT×H
Wherein, tSULTRepresent after red light becomes green light, the time that vehicle launch is delayed, when H represents saturation headstock Away from, refer to vehicle under saturation traffic behavior, vehicle by vehicle its length and convoy spacing apart from when required time;
NTRepresent the vehicle fleet size that plan of the corresponding phase of current lane in green time is let pass, NT=min (mque+ marr,macc);
mqueRepresent the queuing vehicle quantity of current lane, marrThe vehicle that may be reached during representing current lane green light, Vehicle arriving amt according to a upper cycle estimated, maccRepresent same sex track corresponding with current lane on next crossing Admissible vehicle fleet size,
Further, the vehicle m that may be reached during the green lightarr
Wherein, t0For initial green light time, t0=tSULT+N0× H, N0For the vehicle number m being likely to be breached during setting green lightarr The initial clearance vehicle fleet size obtained when=0, N0=min (mque,macc);tredFor a red time length before current lane, N represents the vehicle fleet size reached on current lane in a preceding red time.
The determination process of the green time of each current phase is as follows:
Step C0:The current coefficient of all phases is calculated, and is ranked up according to descending order, phase row is obtained Sequence queue;
Step C1, according to the current order of phase, chooses the maximum phase of current coefficient as master phase M, meanwhile, from phase In round-robin queue, two the matched-phases Q1 and Q2 matched with master phase M are selected, combinatorial phase (M, Q1) and (M, Q2) is obtained;
Step C2, using in matched-phase Q1 and Q2 the larger phase of correspondence lane coefficient as secondary phase Q, another As standby phase Q ', master phase M and the track green time where time phase difference (T are calculatedM-TQ), if (TM-TQ) small In defined minimum green time, then into step C2.1, otherwise into step C2.2;
Step C2.1, makes combinatorial phase green light let pass time T equal to TM, phase M and phase Q let pass the time for T jointly, and Phase M and phase Q are removed into out sequencing queue, into step C3;
Step C2.2, makes combinatorial phase green light let pass time T equal to TQ, phase M and phase Q let pass the time for T, entered jointly Enter step C2.3;
Step C2.3, calculates alternative phase Q ' green time TQ', by TMWith the difference (T of T in C2.2M- T) and TQ’ Compare, take higher value max ((TM- T), TQ') as combinatorial phase green light clearance time T ', phase M is put jointly with phase Q ' Row T ' time span, and by M, Q, Q ' phase sequencing queue is removed, into step C3;
Step C3:Whether be empty, if it is empty, return to step C0 restarts entirely to follow if judging track phase sequencing queue Ring;If not empty, then the current coefficient of all phases is recalculated, and the phase in current phase sequencing queue is carried out again Sequence, returns again to step C1.
A kind of traffic control device of self adaptation crossroad traffic signal lamp, including:
Receiver module, for traffic data of the real-time reception from car-mounted terminal and crossing traffic signal pickup assembly;
Processing module, the current coefficient for calculating each track corresponding phase, and current phase principle is combined, determine traffic The current order of signal lamp and time;
Self-adaptive control module, for the current order of traffic lights obtained according to the processing module and time life Traffic lights are controlled into the auto-adaptive controling signal of traffic lights, and based on the auto-adaptive controling signal.
Further, the processing module includes data capture unit, computing unit and allocation unit;
The data capture unit, for obtaining each track in current phase in the traffic data that is gathered from receiver module On vehicle fleet size;
The computing unit, for the vehicle data according to each track, obtains the current coefficient of each track corresponding phase;
The allocation unit, in unit period, being led to according to the current coefficient of each phase in track to each phase The distribution of row order and transit time.
Example one
With road network shown in Fig. 3 for example, provided with crossing A, crossing is B downstream, and A to B is straight trip.Between AB away from From being 200 meters, it is currently to have 10 cars, the crossing B cars on 20, A to B Through Lane to wait the vehicle number from A to B The current corresponding signal lamp in road is green, and remaining time is 30 seconds (tgreen=30s).If average speed is 10 meters during normally travel (v per secondavg=10m/s), average length of car is 4.5 meters (d=4.5m), and average traffic queuing spacing is 2 meters (g=2m).
The green wave band coefficient that A crossings are kept straight on to B crossings is calculated first, by formulaMeter Calculate,
A crossings are calculated to the lane occupancy ratio of the Through Lane at B crossings, by formulaCalculate,
The key coefficient of crossing A to crossing B straight trip phases is calculated, is calculated by formula p=N × ((1-o)+e),
P=20 × ((1-0.325)+0.5)=23.5.That is the key coefficient of crossing A to crossing B straight trip phases.
The key coefficient computational methods of other phases duplicate.
The phase let pass according to the sequence of the key coefficient of all phases and previous cycle, determines next stage Two phases let pass.Clearance phase is determined according to algorithm flow.
It is determined that after clearance phase, calculating clearance green time.
Illustrate the computational methods of green time below.
If the signal lamp red light duration in A crossings to B crossings straight trip direction is 40 seconds (tred=40s), enter during red light Entering vehicle of the A crossings wait straight trip to B crossings has 5, if saturation headway is 2.2 seconds each cars (H=2.2s/veh), opens Dynamic delay is 5 seconds (tSULT=5s)
Estimate the open ended vehicle fleet size of Through Lane at A crossings to B crossings, be by formulaCalculate,Initial clearance vehicle fleet size is by formula N=min (mque+marr,macc) calculate, now If the vehicle fleet size that may be reached during green light is 0 (marr=0), and N0=min (20+0,20.77)=20, car of initially letting pass Number is 20.
Initial clearance green time is by formula t0=tSULT+N0× H is calculated, t0=5s+20 × 2.2s=49s.
The vehicle fleet size that may be reached during estimating green lightThen according to public affairs Formula N=min (mque+marr,macc) calculate the vehicle fleet size to be let pass of determination, N=min (20+6.125,20.77)=20.77.
Finally by formula t=tSULTThe green time t=5s+20.77 that+N × H calculating is determined × 2.2s=50.694s, four House five enter green time be 51 seconds.
The method that explanation distributes clearance phase green time as an example below.If minimum green time is 15 seconds (Tmin= 15s)。
In step C1, being located at the phase that in sequencing queue and key coefficient ranked first is【Kept straight on to north in south】, then with The secondary phase of matching be【Turned left to west in south】With【Kept straight on to south in north】.If the two time phase is all located in sequencing queue, and 【Turned left to west in south】Key coefficient ratio【Kept straight on to south in north】Key coefficient it is big.Then master phase M is【Kept straight on to north in south】, secondary phase Position Q be【Turned left to west in south】, another time phase Q ' is【Kept straight on to south in north】.
By step C2, for example, the 50 seconds (T of master phase M green times calculatedM=50s), secondary phase Q green times are 30 seconds (TQ=30s), TM-TQ=50s-30s=20s<Tmin=15s show that next step should carry out step C2.2, master phase M Clearance green time is 30 seconds (T=T jointly with secondary phase QQ=30s), step C2.3 is arrived after 30 seconds, clearance phase is principal phase Position M and another phase Q ', if the Q ' now calculated according to green time computational methods clearance green time is 25 seconds (TQ' =25s), by the formula T'=max (T in step C2.3M-T,TQ') T'=max (50s-30s, 25s)=25s is calculated, will M, Q, Q ' sequencing queue is removed out, and master phase M is let pass 15 seconds with another phase Q '.Step C3 is carried out after 15 seconds, is sentenced Whether disconnected sequencing queue is empty, and if sky, new round circulation is restarted to step C0, if being not sky, to step C1.
Emulation testing is carried out using the VISSIM traffic simulation softwares of German PTV companies, and programmed by VISSIM COM Interface connection Microsoft .net development platforms are controlled algorithm design and development.
To take into full account the interaction of intersection group, the emulation road network of design one, Fig. 3 merely illustrates emulation road network Topological structure, the road of actual emulation road network sets and does not have such high symmetry.Wagon flow is driven into from road network surrounding, root Different vehicle flowrates are designed according to different traffic to be emulated.Flow design includes supersaturation, and low saturation and in short-term peak are flowed Three kinds of amount.It is 5 seconds to set the start-up lost time time, and saturation headway is 2.2s/veh (veh:), minimum green time is set For 15 seconds, maximum green time was 60 seconds, and other parameters use VISSIM default settings.
When evaluating crossing, choose 1,2,3, the evaluating data at No. 4 four crossings.Simulation time is 0-4200 seconds, Vehicle needs a period of time to enter road network when VISSIM emulation starts, it is difficult to accurate simulation actual conditions, so 0-600 seconds are commenting Do not consider during valency, with 600 seconds for statistics time interval.Emulation basic parameter is VISSIM default settings.
Queue length detector is provided with when emulating herein at each crossing, and it is detection starting point to choose upper left corner S points, at random It is detection terminal to choose A, B, C, D tetra- points, for detect the vehicle from S points when arriving separately at four terminals it is required Journey time.Herein using queue length as main evaluation index, control effect of the adaptive algorithm to congestion is evaluated with this, and join According to lifting effect of the journey time parser to overall road network operational efficiency.
Traffic Evaluation in the case of supersaturation
It is 800 to set the link entry flow in the case of supersaturation, the following is maximum under fixed timing and Self Adaptive Control Queue length, the contrast of average queue length, respectively as shown in Figure 4 and Figure 5.In queuing situation map, abscissa is simulation time Section, has 1 in each period, a data queued at 2,3,4 four crossings respectively, similarly hereinafter.
The effect of optimization of adaptive algorithm is investigated according to emulation period and crossing respectively, period effect of optimization refers to specific time period Under, the queue length effect of optimization average value at four crossings, the effect of optimization that crossing effect of optimization refers to the crossing all periods is put down Average.
The supersaturated effect of optimization of lower queue length period (%) of table 1
The lower queuing queue crossing effect of optimization (%) of the supersaturation of table 2
Maximum queue length can reflect the order of severity of congestion peak time vehicle accumulation when the magnitude of traffic flow is supersaturated, put down Equal queue length reflects the overall congestion of traffic in a period of time.From maximum queue length and the number of average queue length According to chart as can be seen that under supersaturated traffic behavior, set forth herein self-adaptation control method effectively control gathering around for vehicle Stifled, particularly with the 3rd crossing, fixed timing according to actual conditions due to that can not make the adjustment of signal lamp, irrational shunting Cause to queue up and accumulate, form serious traffic congestion, and adaptive algorithm is then preferably suppressed and evacuated to congestion.
Low saturation and the Traffic Evaluation in the case of peak flow in short-term
Link entry flow is 200 under low saturated conditions, and the flow input in the case of peak flow is random by program in short-term Generation, flow is stepped up to 800, then gradually reduced again on a time period from average 400.Optimization effect obtained by simulation result Fruit is as shown in Table 3 and Table 4.
The low saturation of table 3 and average queue length period effect of optimization under peak flow in short-term
The low saturation of table 4 and average queue length crossing effect of optimization under peak flow in short-term
From table 3 and table 4 as can be seen that self adaptation traffic control algorithm not only can effectively suppress to gather around in the case of supersaturation Stifled, in the case of low saturation and in short-term peak flow, improvement of the adaptive algorithm to vehicle queue equally has positive effect, Effect of optimization is general more than 30%.The generation of the phenomenons such as sky is avoided under low flow condition, it is gradually increased in vehicle flowrate During, the flexible allocation that can be also let pass by each crossing to vehicle flowrate reduces road network and the possibility of heavy congestion occurs.
Overall road grid traffic status evaluation
Queue length can effectively reflect the situation of traffic congestion, but for driver and conductor, journey time is actual Most concerned data during trip, the emulation data of circuit are counted the following is four journey times, and these circuits contain emulation road Most intersection in net, can reflect the traffic of overall road network.
The journey time effect of optimization of table 5
Transverse axis represents each measurement circuit in Fig. 6, and the bar chart of every circuit from left to right represents supersaturated flow respectively, short When peak flow, the travel time data under low saturation volume.The simulation experiment result shows, each bar circuit under Self Adaptive Control Journey time has shortened, and journey time averagely reduces 32%, and part circuit reduces more than 50%, i.e. journey time only There is half during timing controlled.It can thus be seen that self-adaptation control method is effectively improved while traffic congestion is controlled The effective rate of utilization of road network entirety traffic traffic efficiency and green time.
The above embodiments are merely illustrative of the technical solutions of the present invention rather than its limitations, although with reference to above-described embodiment pair The present invention is described in detail, and those of ordinary skill in the art should be understood:Still can be to the specific of the present invention Embodiment is modified or equivalent, and any modification or equivalent without departing from spirit and scope of the invention, It all should cover among scope of the presently claimed invention.

Claims (6)

1. a kind of traffic control method of self adaptation crossroad traffic signal lamp, it is characterised in that comprise the following steps:
Step 1:Vehicle fleet size on the current crossing of real-time reception and adjacent next crossing Shang Ge tracks;
Step 2:According to the vehicle fleet size on each track, the current coefficient in each track on current crossing is calculated, according to each track Current coefficient magnitude and combine phase conflicts principle, it is determined that the current order of current crossing phase;
Step 3:According to the vehicle fleet size in the vehicle fleet size track corresponding with next crossing in track in clearance phase, it is determined that each car The green time of phase where road, according to the current order of phase, determines the green time of each combinatorial phase, implements traffic control successively System;
Wherein, the current coefficient in current crossing Shang Ge tracks is p:P=N × ((1-o)+e);N represents track on current crossing Queuing vehicle quantity, o represents the lane occupancy ratio in same sex track on next crossing adjacent with current road junction roadway, and e represents car Road green wave band coefficient;
NXVehicle fleet size on expression next crossing adjacent with current road junction roadway on same sex track, d The average length of vehicle is represented, g represents the average spacing between vehicle, and L represents lane length.
2. according to the method described in claim 1, it is characterised in that the track green time is t:
T=tSULT+NT×H
Wherein, tSULTRepresent after red light becomes green light, the time that vehicle launch is delayed, H represents saturation headway, is Refer to vehicle under saturation traffic behavior, vehicle by vehicle its length and convoy spacing apart from when required time;
NTRepresent the vehicle fleet size that plan of the corresponding phase of current lane in green time is let pass, NT=min (mque+marr, macc);
mqueRepresent the queuing vehicle quantity of current lane, marrThe vehicle that may be reached during representing current lane green light, foundation The vehicle arriving amt in a upper cycle estimated, maccRepresent that same sex track corresponding with current lane can connect on next crossing The vehicle fleet size received,
3. method according to claim 2, it is characterised in that the vehicle m that may be reached during the green lightarr
m a r r = n t r e d &times; t 0
Wherein, t0For initial green light time, t0=tSULT+N0× H, N0For the vehicle number m being likely to be breached during setting green lightarrWhen=0 Obtained initial clearance vehicle fleet size, N0=min (mque,macc);tredFor a red time length before current lane, n is represented The vehicle fleet size reached on current lane in a preceding red time.
4. according to the method in claim 2 or 3, its feature is in the determination process of the green time of each current phase is as follows:
Step C0:The current coefficient of all phases is calculated, and is ranked up according to descending order, phase sequence team is obtained Row;
Step C1, according to the current order of phase, chooses the maximum phase of current coefficient as master phase M, meanwhile, from phase loop In queue, two the matched-phases Q1 and Q2 matched with master phase M are selected, combinatorial phase (M, Q1) and (M, Q2) is obtained;
Step C2, the larger phase of correspondence lane coefficient is used as secondary phase Q, another conduct using in matched-phase Q1 and Q2 Standby phase Q ', calculates master phase M and the track green time where time phase difference (TM-TQ), if (TM-TQ) it is less than rule Fixed minimum green time, then into step C2.1, otherwise into step C2.2;
Step C2.1, makes combinatorial phase green light let pass time T equal to TM, phase M and phase Q let pass the time for T jointly, and by phase Position M and phase Q removes out sequencing queue, into step C3;
Step C2.2, makes combinatorial phase green light let pass time T equal to TQ, phase M and phase Q lets pass the time for T jointly, into step Rapid C2.3;
Step C2.3, calculates alternative phase Q ' green time TQ', by TMWith the difference (T of T in C2.2M- T) and TQ' do ratio Compared with taking higher value max ((TM- T), TQ') let pass time T ' as combinatorial phase green light, phase M and phase Q ' are let pass T ' jointly Time span, and by M, Q, Q ' remove phase sequencing queue, into step C3;
Step C3:Whether be empty, if it is empty, return to step C0 restarts whole circulation if judging track phase sequencing queue;If It is not sky, then recalculates the current coefficient of all phases, and the phase in current phase sequencing queue is resequenced, Return again to step C1.
5. a kind of traffic control device of self adaptation crossroad traffic signal lamp, it is characterised in that including:
Receiver module, for traffic data of the real-time reception from car-mounted terminal and crossing traffic signal pickup assembly;
Processing module, the current coefficient for calculating each track corresponding phase, and current phase principle is combined, determine traffic signals The current order of lamp and time;
Self-adaptive control module, is handed over for the current order of traffic lights obtained according to the processing module and time generation The auto-adaptive controling signal of ventilating signal lamp, and traffic lights are controlled based on the auto-adaptive controling signal.
6. device according to claim 5, it is characterised in that the processing module includes data capture unit, calculates single Member and allocation unit;
The data capture unit, for obtaining each track in the traffic data that is gathered from receiver module in current phase Vehicle fleet size;
The computing unit, for the vehicle data according to each track, obtains the current coefficient of each track corresponding phase;
The allocation unit, in unit period, being carried out according to the current coefficient of each phase in track to each phase current suitable The distribution of sequence and transit time.
CN201710364867.9A 2017-05-22 2017-05-22 A kind of traffic control method and device of adaptive crossroad traffic signal lamp Active CN106960584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710364867.9A CN106960584B (en) 2017-05-22 2017-05-22 A kind of traffic control method and device of adaptive crossroad traffic signal lamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710364867.9A CN106960584B (en) 2017-05-22 2017-05-22 A kind of traffic control method and device of adaptive crossroad traffic signal lamp

Publications (2)

Publication Number Publication Date
CN106960584A true CN106960584A (en) 2017-07-18
CN106960584B CN106960584B (en) 2019-09-20

Family

ID=59482900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710364867.9A Active CN106960584B (en) 2017-05-22 2017-05-22 A kind of traffic control method and device of adaptive crossroad traffic signal lamp

Country Status (1)

Country Link
CN (1) CN106960584B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109003452A (en) * 2018-08-29 2018-12-14 广东工业大学 A kind of optimal control method of regional traffic
CN109003444A (en) * 2018-07-02 2018-12-14 北方工业大学 Urban intersection overflow control method based on wide area radar microwave detector
CN109285362A (en) * 2018-12-07 2019-01-29 北京工业大学 The anti-overflow dynamic control method in intersection based on priority rule
CN109636005A (en) * 2018-11-16 2019-04-16 北京交通大学 A kind of city road network Evacuation Strategies optimization method based on microscopic simulation
CN109754617A (en) * 2017-11-01 2019-05-14 张云超 A kind of high pass line efficiency method for controlling traffic signal lights, apparatus and system
CN110085038A (en) * 2019-04-26 2019-08-02 同济大学 A kind of crossing self-adapting signal control method based on real-time queueing message
CN110111588A (en) * 2019-04-18 2019-08-09 佛山职业技术学院 A kind of traffic lamp control method and control system
CN110379180A (en) * 2019-07-05 2019-10-25 平安国际智慧城市科技股份有限公司 A kind of traffic signal control method, traffic-control unit and terminal device
CN110728840A (en) * 2019-10-22 2020-01-24 宋海南 Traffic control method and intelligent navigation system
CN110766958A (en) * 2019-12-04 2020-02-07 上海新微技术研发中心有限公司 Intelligent control system for traffic signal lamp
CN111369812A (en) * 2019-06-12 2020-07-03 杭州海康威视系统技术有限公司 Traffic signal control method and device
CN113870584A (en) * 2021-09-28 2021-12-31 中国科学技术大学先进技术研究院 Game theory-based traffic intersection passing method and system
CN114299729A (en) * 2021-12-06 2022-04-08 江苏航天大为科技股份有限公司 Signal control method, system and computer storage medium based on intelligent traffic
CN114446066A (en) * 2021-12-30 2022-05-06 银江技术股份有限公司 Road signal control method and device
CN114613158A (en) * 2022-02-09 2022-06-10 阿里云计算有限公司 Traffic control method, system and equipment
CN114973708A (en) * 2022-06-28 2022-08-30 杭州海康威视数字技术股份有限公司 Traffic signal lamp control method and device and storage medium
WO2022199442A1 (en) * 2021-03-25 2022-09-29 江苏航天大为科技股份有限公司 Multi-intersection coordination adaptive control method based on checkpoint police system and video detector
CN115273499A (en) * 2022-06-30 2022-11-01 华东师范大学 Traffic flow-based signal lamp dynamic timing method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103280114A (en) * 2013-06-24 2013-09-04 电子科技大学 Signal lamp intelligent control method based on BP-PSO fuzzy neural network
CN103337178A (en) * 2013-06-28 2013-10-02 大连理工大学 Traffic signal self-adaptive control method based on dynamic priority
CN104794908A (en) * 2015-04-08 2015-07-22 安徽师范大学 Traffic jam coordinated control method and traffic jam coordinated control system
CN105513377A (en) * 2015-12-18 2016-04-20 天津通翔智能交通系统有限公司 Multi-mode mutual feedback traffic signal control method
US9349288B2 (en) * 2014-07-28 2016-05-24 Econolite Group, Inc. Self-configuring traffic signal controller
DE102015202434A1 (en) * 2015-02-11 2016-08-11 Deutsches Zentrum für Luft- und Raumfahrt e.V. Method and device for the dynamic control of a signaling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103280114A (en) * 2013-06-24 2013-09-04 电子科技大学 Signal lamp intelligent control method based on BP-PSO fuzzy neural network
CN103337178A (en) * 2013-06-28 2013-10-02 大连理工大学 Traffic signal self-adaptive control method based on dynamic priority
US9349288B2 (en) * 2014-07-28 2016-05-24 Econolite Group, Inc. Self-configuring traffic signal controller
DE102015202434A1 (en) * 2015-02-11 2016-08-11 Deutsches Zentrum für Luft- und Raumfahrt e.V. Method and device for the dynamic control of a signaling system
CN104794908A (en) * 2015-04-08 2015-07-22 安徽师范大学 Traffic jam coordinated control method and traffic jam coordinated control system
CN105513377A (en) * 2015-12-18 2016-04-20 天津通翔智能交通系统有限公司 Multi-mode mutual feedback traffic signal control method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李瑞敏 等: "过饱和交叉口交通信号控制动态规划优化模型", 《交通运输工程学报》 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109754617A (en) * 2017-11-01 2019-05-14 张云超 A kind of high pass line efficiency method for controlling traffic signal lights, apparatus and system
CN109754617B (en) * 2017-11-01 2021-07-13 张云超 High-traffic-efficiency traffic signal lamp control system
CN109003444B (en) * 2018-07-02 2020-09-18 北方工业大学 Urban intersection overflow control method based on wide area radar microwave detector
CN109003444A (en) * 2018-07-02 2018-12-14 北方工业大学 Urban intersection overflow control method based on wide area radar microwave detector
CN109003452A (en) * 2018-08-29 2018-12-14 广东工业大学 A kind of optimal control method of regional traffic
CN109636005A (en) * 2018-11-16 2019-04-16 北京交通大学 A kind of city road network Evacuation Strategies optimization method based on microscopic simulation
CN109285362A (en) * 2018-12-07 2019-01-29 北京工业大学 The anti-overflow dynamic control method in intersection based on priority rule
CN110111588A (en) * 2019-04-18 2019-08-09 佛山职业技术学院 A kind of traffic lamp control method and control system
CN110085038B (en) * 2019-04-26 2020-11-27 同济大学 Intersection self-adaptive signal control method based on real-time queuing information
CN110085038A (en) * 2019-04-26 2019-08-02 同济大学 A kind of crossing self-adapting signal control method based on real-time queueing message
CN111369812A (en) * 2019-06-12 2020-07-03 杭州海康威视系统技术有限公司 Traffic signal control method and device
CN111369812B (en) * 2019-06-12 2021-01-15 杭州海康威视系统技术有限公司 Traffic signal control method and device
CN110379180A (en) * 2019-07-05 2019-10-25 平安国际智慧城市科技股份有限公司 A kind of traffic signal control method, traffic-control unit and terminal device
CN110379180B (en) * 2019-07-05 2021-08-13 平安国际智慧城市科技股份有限公司 Traffic signal control method, traffic signal control device and terminal equipment
CN110728840A (en) * 2019-10-22 2020-01-24 宋海南 Traffic control method and intelligent navigation system
CN110766958A (en) * 2019-12-04 2020-02-07 上海新微技术研发中心有限公司 Intelligent control system for traffic signal lamp
CN110766958B (en) * 2019-12-04 2023-05-02 上海新微技术研发中心有限公司 Intelligent control system for traffic signal lamp
WO2022199442A1 (en) * 2021-03-25 2022-09-29 江苏航天大为科技股份有限公司 Multi-intersection coordination adaptive control method based on checkpoint police system and video detector
CN113870584A (en) * 2021-09-28 2021-12-31 中国科学技术大学先进技术研究院 Game theory-based traffic intersection passing method and system
CN114299729A (en) * 2021-12-06 2022-04-08 江苏航天大为科技股份有限公司 Signal control method, system and computer storage medium based on intelligent traffic
CN114446066A (en) * 2021-12-30 2022-05-06 银江技术股份有限公司 Road signal control method and device
CN114613158A (en) * 2022-02-09 2022-06-10 阿里云计算有限公司 Traffic control method, system and equipment
CN114613158B (en) * 2022-02-09 2023-09-22 阿里云计算有限公司 Traffic control method, system and equipment
CN114973708A (en) * 2022-06-28 2022-08-30 杭州海康威视数字技术股份有限公司 Traffic signal lamp control method and device and storage medium
CN115273499A (en) * 2022-06-30 2022-11-01 华东师范大学 Traffic flow-based signal lamp dynamic timing method and system
CN115273499B (en) * 2022-06-30 2023-11-10 华东师范大学 Traffic flow-based signal lamp dynamic timing method and system

Also Published As

Publication number Publication date
CN106960584B (en) 2019-09-20

Similar Documents

Publication Publication Date Title
CN106960584A (en) A kind of traffic control method and device of self adaptation crossroad traffic signal lamp
CN109767630B (en) A kind of traffic signal control system based on bus or train route collaboration
CN103280113B (en) Self-adaptive intersection signal control method
CN105118312B (en) The many public transit vehicle method for controlling priority of signalized intersections multi-line
CN104966405B (en) Bus signal priority control system and method based on real-time information interaction
CN104282162B (en) A kind of crossing self-adapting signal control method based on real-time vehicle track
CN107730922B (en) Unidirectional trunk line green wave coordination control self-adaptive adjustment method
CN111951549B (en) Self-adaptive traffic signal lamp control method and system in networked vehicle environment
CN101593419B (en) Intelligent coordination control method for traffic flow of urban road network with public traffic priority
CN109410609A (en) Public transport priority signal control method under car networking environment based on multi-request
CN109887289A (en) A kind of network vehicle flowrate maximization approach of urban traffic network model
CN110136455A (en) A kind of traffic lights timing method
CN104835335A (en) Road network traffic optimization control system and method
CN104408948B (en) Vehicle-mounted-GPS-based public transport priority signal control method of urban road traffic
CN104332058A (en) Intelligent traffic light controlling method and system
CN103236164B (en) Vehicle controlling method for guaranteeing public transport vehicle prior passing
CN103927892A (en) Establishing method and working method for traffic overflowing coordinate control optimization model
CN107507430A (en) A kind of urban road crossing traffic control method and system
CN106920403A (en) A kind of single-point self-adaptation control method based on array radar
CN111047884A (en) Traffic light control method based on fog calculation and reinforcement learning
Li et al. Traffic signal timing optimization in connected vehicles environment
CN106846842A (en) Urban arterial road coordinate control optimization method based on multi-period control program
CN104916142A (en) Adaptive intersection traffic signal control method of trunk road priority
Guerrero-Ibanez et al. A policy-based multi-agent management approach for intelligent traffic-light control
Yun et al. Comparison of emergency vehicle preemption methods using a hardware-in-the-loop simulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant