CN106957017A CN201710331836.3A CN201710331836A CN106957017A CN 106957017 A CN106957017 A CN 106957017A CN 201710331836 A CN201710331836 A CN 201710331836A CN 106957017 A CN106957017 A CN 106957017A
Authority
CN
China
Prior art keywords
amplitude variation
variation trolley
pulley
multiplying power
big
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710331836.3A
Other languages
Chinese (zh)
Inventor
王永新
李鹏举
庞继勇
尚勇
任卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201710331836.3A priority Critical patent/CN106957017A/en
Publication of CN106957017A publication Critical patent/CN106957017A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley
    • B66D3/08Arrangements of sheaves

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system, it is related to a kind of derrick crane, including the first amplitude variation trolley and the first big assembly pulley, the first truckle group is additionally provided between first amplitude variation trolley and the first big assembly pulley, the truckle group can be connected with each other or separate from the first amplitude variation trolley, the first big assembly pulley and realize that multiplying power changes by different wirings, the present invention is using dual drive, middle part truckle group design, collocation amplitude variation trolley and big assembly pulley, according to different combinations, the conversion of a variety of multiplying powers can be carried out.Flat arm tower crane amplitude variation trolley construction complexity large-scale at present is solved, pattern is various, is difficult general and exchanges.The pulley quantity that hoisting mechanism steel wire rope is bypassed is more, and efficiency is low, the problem of winding method is complicated cumbersome, and wiring principle of the present invention is simple, and construction is clear and definite, compact conformation.

Description

A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
Technical field
The present invention relates to a kind of derrick crane, the specifically flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system.
Background technology
Maximization, large-tonnage are one of developing direction of derrick crane, and (rated load weight exceedes the flat arm tower crane of ultra-large type 300 tons) there is presently no correlation technique or product.Flat arm tower crane is run using drive mechanism trailer wagon along before and after arm track To realize luffing, flat arm tower crane amplitude variation trolley construction large-scale at present is complicated, and pattern is various, is difficult general and exchanges.Lifting mechanism The pulley quantity that steel wire rope is bypassed is more, and efficiency is low, and winding method complexity is cumbersome.
Chinese patent CN204661178U discloses a kind of big amplitude variation trolley for becoming multiplying power, base of the dolly in traditional dolly On plinth, single crab is combined with double trolley and realizes the adjustment of changeable multiplying power.But as shown in Figure 12 and Figure 14 in the patent, It is 8 times of luffings, but single-sheaved block group but realizes identical technique effect in different height, is to realize from theory analysis , even so, even if being that by, this amplitude variation trolley is substantially to be set on the basis of traditional single crab added with one The dolly of many assembly pulleys is equipped with, is being used in series for two dollies in fact.When being used in series, first is unstable hidden in the presence of safety Suffer from, when by weight in many pulley assembly pulleys, single-sheaved block group certainly will be risen in the presence of weight vertex abrasion pulley and around Rope, single wiring is if there is fracture, and falling object from high altitude consequence is hardly imaginable;Second to become multiplying power inconvenient, can be with from application documents Find out, the replacing of multiplying power needs constantly to change many assembly pulleys, for work high above the ground, treat the danger for just having one second in one second more Danger, designs extremely unreasonable, replacing construction is long in this respect.
The content of the invention
Excessive for potential safety hazard present in existing design, replacing construction is long, becomes the problems such as multiplying power is inconvenient, the present invention A kind of flat arm tower crane lifting of ultra-large type is provided and becomes multiplying power wiring system, the generation of above mentioned problem can be avoided.
The technical scheme adopted by the invention to solve the technical problem is that:
A kind of flat arm tower crane lifting of ultra-large type, which becomes on multiplying power wiring system, including a mounting bracket, the mounting bracket, installs the One amplitude variation trolley, first amplitude variation trolley includes one-level equalizer bar and two grades of equalizer bars, and BOGEY WHEEL group is arranged on by bearing pin On one-level equalizer bar, horizontal guide wheel bond pads are on the one-level equalizer bar on the outside of dolly, and two adjacent one-level equalizer bars pass through Two grades of equalizer bar connections, two grades of equalizer bars are fixed on the vehicle frame of the first amplitude variation trolley by bearing pin respectively, in two grades of equalizer bars The unthreaded hole for installing locating rod is provided with the web at two ends, vehicle frame left and right ends are provided with two pulley spindles, the pulley Leading block is housed on axle, the first big assembly pulley, first amplitude variation trolley and first are lifted with below the first amplitude variation trolley The first truckle group is additionally provided between big assembly pulley, the truckle group can be mutual with the first amplitude variation trolley, the first big assembly pulley Connection or separation simultaneously realize that multiplying power changes by different wirings.
Further, the second amplitude variation trolley, the first amplitude variation trolley and the second amplitude variation trolley are also equipped with the mounting bracket It is connected, the second truckle group, second largest assembly pulley is connected with the second amplitude variation trolley.
Further, first amplitude variation trolley is connected with the second amplitude variation trolley using a connecting plate, in the first luffing Dolly is provided with variable amplitude rope tugboat, is fixed on the second amplitude variation trolley provided with luffing end.
Further, the first truckle group includes truckle, pulley connecting plate, lifting cylinder, spacing rod and truckle Rotary shaft, pulley connecting plate top is provided with lifting cylinder, the lifting cylinder and the pulley spindle phase being arranged in the middle part of the first amplitude variation trolley Coordinate, be provided with the middle part of the pulley connecting plate in truckle rotary shaft, truckle rotary shaft and truckle is installed, in pulley connection Plate is provided with some spacing rods.
Further, the described first big assembly pulley include upper boatswain chair, U-type groove, lower engaging lug, big pulley, limiting plate and under Big pulley is provided with by rotary shaft on boatswain chair, the lower boatswain chair, limiting plate is provided with the outside of big pulley, the limiting plate is with Boatswain chair is connected, and boatswain chair on rotatable is provided with the rotary shaft of lower boatswain chair, and the upper boatswain chair is provided with U-type groove.
Further, hanger is provided with the vehicle frame of the first amplitude variation trolley, is set on the upper boatswain chair of the first big assembly pulley There is lower engaging lug, the lower engaging lug is connected with hanger by drag-line.
Further, when the multiplying power such as the first amplitude variation trolley and the second amplitude variation trolley, the first big assembly pulley and second largest cunning Wheel group is fixed on lift beam two ends by bearing pin, and suspension hook group is arranged in the middle part of lift beam by bearing pin.
Further, two two grades of equalizer bars of the vehicle frame left and right sides are fixed by locating rod and location nut, and two Each web of level equalizer bar one end respectively has two location nuts, and location nut compresses web by locating rod.
Further, two sets of reels side by side on the mounting bracket, steel cable is laid out from a set of reel, bypasses two Leading block, around the leading block for entering the first amplitude variation trolley side, is downwardly into the first big pulley of the first big assembly pulley, to On around the first truckle group is entered, the second big pulley for being downwardly into the first big assembly pulley is laid out from truckle, upwards about entering The leading block of one amplitude variation trolley opposite side, subsequently into the second amplitude variation trolley, winding of the steel wire rope on the second amplitude variation trolley It is identical with the winding on the first amplitude variation trolley, finally it is fastened on bascule.
The beneficial effects of the invention are as follows:
The present invention ensure that the security of system by the way of dual drive, even if another of fracture steel cable is still It can work, using middle part truckle group design, collocation amplitude variation trolley and big assembly pulley, can according to different combinations Carry out the conversion of a variety of multiplying powers.Solve that large-scale flat arm tower crane amplitude variation trolley construction at present is complicated, pattern is various, be difficult it is general and Exchange.The pulley quantity that hoisting mechanism steel wire rope is bypassed is more, and efficiency is low, the problem of winding method is complicated cumbersome, wiring of the present invention Principle is simple, and construction is clear and definite, compact conformation.
Brief description of the drawings
Assembly pulley and amplitude variation trolley combination diagram when Fig. 1 is 8 multiplying power;
Fig. 2 is 8 multiplying power rope-winding method schematic diagrames;
Fig. 3 is amplitude variation trolley combination diagram;
Fig. 4 is large and small assembly pulley combination diagram;
Fig. 5 is big assembly pulley schematic diagram;
Fig. 6 is truckle group schematic diagram;
Assembly pulley and amplitude variation trolley combination diagram when Fig. 7 is 4 multiplying power;
Fig. 8 is 4 multiplying power rope-winding method schematic diagrames;
Assembly pulley and amplitude variation trolley combination diagram when Fig. 9 is 2 multiplying power;
Figure 10 is 2 multiplying power rope-winding method schematic diagrames;
Figure 11 is 12 multiplying power rope-winding method schematic diagrames;
Figure 12 is 6 multiplying power rope-winding method schematic diagrames.
In figure:1 reel, 2 steel wire ropes, 3 leading blocks, 4 first amplitude variation trolleys, 401 BOGEY WHEEL groups, 402 horizontal guide wheel groups, 403 one-level equalizer bars, 404 2 grades of equalizer bars, 405 vehicle frames, 406 pulley spindles, 407 connecting plates, 408 luffing ends are fixed, 409 become Width rope tugboat, 410 hangers, 5 first big assembly pulleys, boatswain chair on 501,502U type grooves, 503 times engaging lugs, 504 big pulleys, 505 limits Position plate, 506 times boatswain chairs, 6 first truckle groups, 601 truckles, 602 pulley connecting plates, 603 lifting cylinders, 604 spacing rods, 605 Truckle rotary shaft, 7 second amplitude variation trolleys, 8 second largest assembly pulleys, 9 second truckle groups, 10 bascules, 11 lift beams, 12 are hung Hook group.
Embodiment
The flat arm tower crane lifting of the ultra-large type, which becomes multiplying power wiring system, includes a mounting bracket, and the mounting bracket is provided with two luffings Dolly, two amplitude variation trolleys can be connected with each other or separate.
A truckle group is provided with amplitude variation trolley, the truckle group can be connected or separated with amplitude variation trolley, be used for The change of multiplying power.Big assembly pulley is lifted with by wirerope-winding below the amplitude variation trolley, passes through the guiding on amplitude variation trolley Pulley, truckle group and big assembly pulley realize luffing.The truckle group can be connected with each other or separate with big assembly pulley.
The present invention is further analysed below in conjunction with the accompanying drawings, as shown in Figure 1 to Figure 3.The flat arm tower crane lifting of the ultra-large type When becoming multiplying power wiring system into 8 multiplying power, for the stability and security performance of strengthening system, the wiring system uses dual drive machine Structure, two sets of reels 1 side by side on mounting bracket, steel cable 2 is laid out from a set of reel 1, bypasses two leading blocks 3, around Enter the leading block 3 of the side of the first amplitude variation trolley 4, be downwardly into the first big pulley 504 of the first big assembly pulley 5, upwards about Enter the first truckle group 6, the second big pulley 504 for being downwardly into the first big assembly pulley 5 is laid out from truckle 601, upwards about Enter the leading block 3 of the opposite side of the first amplitude variation trolley 4, subsequently into the second amplitude variation trolley 9, steel wire rope 2 is in the second amplitude variation trolley 9 On winding it is identical with the winding on the first amplitude variation trolley 4, be finally fastened on bascule 10.The bascule 10 using the bascule on existing equipment, not excessive to introduce.
Another steel cable 2 is laid out from another set of reel 1, and winding method is identical with steel cable.
Now analyzed by taking the first amplitude variation trolley, the first truckle group and the first big assembly pulley as an example, first luffing Dolly includes one-level equalizer bar 403 and two grades of equalizer bars 404, and BOGEY WHEEL group 401 is arranged on one-level equalizer bar 403 by bearing pin On, horizontal guide wheel group 402 is welded on the one-level equalizer bar 403 on the outside of dolly.
Two adjacent one-level equalizer bars 403 are connected by two grades of equalizer bars 404, and two grades of equalizer bars 404 pass through pin respectively Axle is fixed on the vehicle frame 405 of the first amplitude variation trolley, and two grades of equalizer bars 404 are fish belly form, and cross section uses box beam construction, Small, the large carrying capacity of deadweight.
To ensure that two one-level equalizer bars 403 that two grades of equalizer bars 404 are connected rotate and displacement, in two grades of balances Unthreaded hole is provided with the web at the two ends of beam 404, for installing locating rod.
Two two grades of equalizer bars 404 of the left and right sides of vehicle frame 405 are fixed by locating rod and location nut.Two grades of equalizer bars Each web of 404 one end respectively has two location nuts, and location nut compresses web by locating rod, it is ensured that two two grades are put down Heng Liang's is rigidly connected.One end of the two grades of equalizer bars in the left and right sides of vehicle frame 405 respectively has one group of locating rod and location nut to fix, and protects The synchronization action of two grades of equalizer bars is demonstrate,proved.
The left and right ends of vehicle frame 405 and middle part, which are provided with three pulley spindles 406, the pulley spindle of left and right ends, is respectively equipped with two Leading block.The pulley spindle 406 at middle part is used to install the first truckle group 6.
First amplitude variation trolley is identical with the second amplitude variation trolley structure, and both are connected using a connecting plate 407, described Connected mode can using being hinged or other modes, be hinged be advantageous in that convenient in carrying, it is lightweight, while can adjust well again The distance between two dollies are saved, only the length of connecting plate need to be changed.It is small in the first luffing in order to ensure the winding of steel wire rope Car is provided with variable amplitude rope tugboat 409, and with this cooperation, 408 are fixed provided with luffing end on the second amplitude variation trolley 7.Ensure Steel wire rope is wound on the second amplitude variation trolley from the first amplitude variation trolley.
It is the three dimensional structure diagram of the first big truckle group 6 of assembly pulley 5 and first as shown in Figures 4 to 6.Described first Truckle group can link together with the first big assembly pulley, and the first truckle group includes truckle 601, pulley connecting plate 602nd, lifting cylinder 603, spacing rod 604 and truckle rotary shaft 605,
The top of pulley connecting plate 602 is provided with lifting cylinder 603, the pulley lifted in the middle part of the amplitude variation trolley of cylinder 603 and first Axle 406 is engaged.The middle part of pulley connecting plate 602, which is provided with truckle rotary shaft 605, truckle rotary shaft 605, to be provided with Truckle 601, in order to improve the stability and security of truckle group, is provided with some spacing rods on pulley connecting plate 602 604。
The first big assembly pulley includes upper boatswain chair 501, U-type groove 502, lower engaging lug 503, big pulley 504, limiting plate 505 and lower boatswain chair 506, big pulley 504 is provided with by rotary shaft on the lower boatswain chair 506, provided with spacing on the outside of big pulley Plate 505, the limiting plate 505 is connected with lower boatswain chair 506, and boatswain chair on rotatable is also equipped with the rotary shaft of lower boatswain chair 501, the upper boatswain chair 501 is provided with U-type groove 502, to match the first truckle group 6, facilitates the first truckle group 6 to be fixed on On upper boatswain chair.For the ease of the fixation of the first big assembly pulley and the first amplitude variation trolley, set on the vehicle frame 405 of the first amplitude variation trolley There is hanger 410, lower engaging lug 503, the lower engaging lug 503 and hanger are provided with the upper boatswain chair 501 of the first big assembly pulley 410 are connected by drag-line.
As shown in figure 1, when 8 multiplying power, the first big assembly pulley and second largest assembly pulley are fixed on 11 liang of beam of lift by bearing pin End, suspension hook group 12 is arranged on the middle part of lift beam 11 by bearing pin.
Second amplitude variation trolley 7, the second truckle group 9 and the structure of second largest assembly pulley 8 are identical, not with excessive introduction.
The multiplying power use and transform method for now becoming multiplying power wiring to the flat arm tower crane lifting of ultra-large type are analyzed:
During 8 multiplying power, as shown in Figure 1, 2.Two amplitude variation trolleys are applied in combination, and are fixed using connecting plate 407 and bolt connection, Ensure synchronization action.Luffing end is provided with the vehicle frame of second amplitude variation trolley 7 and fixes 408, for fixing two ropes of variable amplitude rope Head.Variable amplitude rope tugboat 409 is provided with the vehicle frame 405 of first amplitude variation trolley 4, prevents that luffing rope sag friction is small to the first luffing Car 4.The amplitude variation trolley of luffing wire saws second is acted, and the second amplitude variation trolley drives the first amplitude variation trolley to act by connecting plate.
During 4 multiplying power, as shown in Figure 7,8.Connecting plate 407 is removed, the first amplitude variation trolley is fixed on arm root, only second Amplitude variation trolley is acted.The pulley spindle of first truckle group falls in the U-type groove 502 of the first big assembly pulley, as shown in Figure 4.First Truckle group is fixed on vehicle frame by bearing pin, and there is lower engaging lug 503 the first big assembly pulley left and right sides, the first amplitude variation trolley There is hanger 410 the vehicle frame left and right sides, and the first big assembly pulley is fixed on vehicle frame by two groups of drag-line connections.Work as hoist rope When tightening up, the vehicle frame of the pulley yoke and the first amplitude variation trolley of the first big assembly pulley is held out against;When hoist rope puts rope, drag-line is protected Assembly pulley has been demonstrate,proved to be coupled to each other with the first amplitude variation trolley.Second truckle group is fixed on vehicle frame by bearing pin.
During 2 multiplying power, as shown in Fig. 9,10.Connecting plate is removed, the first amplitude variation trolley is fixed on arm root, and only second becomes Width dolly is acted.First amplitude variation trolley, the first truckle group, the connection of the first big assembly pulley are identical when being used with 4 multiplying powers, and second Truckle group is fixed on second largest assembly pulley.
During 12 multiplying power, as shown in figure 11, this application method and similar 8 multiplying power of baudrier, difference are to change Pulley number in truckle group and big assembly pulley, such as in 8 multiplying power, during using dual drive, big assembly pulley top sheave is 4, And in 12 multiplying power, during using dual drive, big assembly pulley top sheave is 6.
During 6 multiplying power, as shown in figure 12, this application method and similar 4 multiplying power of baudrier, it is more that difference, which is also, The pulley number changed on truckle group and big assembly pulley.
Therefore it can theoretically analogize, when pulley quantity side by side is more, it is possible to achieve the luffing of more multiples, even The amplitude variation trolley connect is more, realizes the luffing of more multiples.The rope-winding method, amplitude variation trolley and suspender are not limited only to be used in tower crane On, it can be used on the handling equipment based on flat orbit arm.
In addition to the technical characteristic described in specification, the known technology of those skilled in the art is.

Claims (9)

1. a kind of flat arm tower crane lifting of ultra-large type, which becomes on multiplying power wiring system, including a mounting bracket, the mounting bracket, installs first Amplitude variation trolley, first amplitude variation trolley includes one-level equalizer bar and two grades of equalizer bars, and BOGEY WHEEL group is arranged on one by bearing pin On level equalizer bar, horizontal guide wheel bond pads are on the one-level equalizer bar on the outside of dolly, and two adjacent one-level equalizer bars pass through two Level equalizer bar connection, two grades of equalizer bars are fixed on the vehicle frame of the first amplitude variation trolley by bearing pin respectively, in two grades of equalizer bars two The unthreaded hole for installing locating rod is provided with the web at end, vehicle frame left and right ends are provided with two pulley spindles, the pulley spindle It is upper that leading block is housed, the first big assembly pulley is lifted with below the first amplitude variation trolley, it is characterized in that, first amplitude variation trolley The first truckle group is additionally provided between the first big assembly pulley, the truckle group can be with the first amplitude variation trolley, the first big pulley Group is connected with each other or separated and realizes that multiplying power changes by different wirings.
2. the flat arm tower crane lifting of a kind of ultra-large type according to claim 1 becomes multiplying power wiring system, it is characterized in that, the peace Shelve and be also equipped with the second amplitude variation trolley, the first amplitude variation trolley is connected with the second amplitude variation trolley, connects on the second amplitude variation trolley It is connected to the second truckle group, second largest assembly pulley.
3. a kind of flat arm tower crane lifting of ultra-large type according to claim 2 becomes multiplying power wiring system, it is characterized in that, described the One amplitude variation trolley is connected with the second amplitude variation trolley using a connecting plate, and variable amplitude rope tugboat is provided with the first amplitude variation trolley, Second amplitude variation trolley is fixed provided with luffing end.
4. the flat arm tower crane lifting of a kind of ultra-large type according to any one of claim 1 to 3 becomes multiplying power wiring system, it is special Levying is, the first truckle group includes truckle, pulley connecting plate, lifting cylinder, spacing rod and truckle rotary shaft, and pulley connects Fishplate bar top is engaged provided with lifting cylinder, the lifting cylinder and the pulley spindle being arranged in the middle part of the first amplitude variation trolley, the pulley It is provided with the middle part of connecting plate in truckle rotary shaft, truckle rotary shaft and truckle is installed, provided with some on pulley connecting plate Spacing rod.
5. a kind of flat arm tower crane lifting of ultra-large type according to claim 4 becomes multiplying power wiring system, it is characterized in that, described the One big assembly pulley is included on upper boatswain chair, U-type groove, lower engaging lug, big pulley, limiting plate and lower boatswain chair, the lower boatswain chair by turning Moving axis is provided with big pulley, and limiting plate is provided with the outside of big pulley, and the limiting plate is connected with lower boatswain chair, in turning for lower boatswain chair Rotatably upper boatswain chair is installed, the upper boatswain chair is provided with U-type groove on moving axis.
6. the flat arm tower crane lifting of a kind of ultra-large type according to claim 5 becomes multiplying power wiring system, it is characterized in that, first The vehicle frame of amplitude variation trolley is provided with hanger, and lower engaging lug, the lower engaging lug are provided with the upper boatswain chair of the first big assembly pulley It is connected with hanger by drag-line.
7. the flat arm tower crane lifting of a kind of ultra-large type according to claim 6 becomes multiplying power wiring system, it is characterized in that, when first During the multiplying power such as amplitude variation trolley and the second amplitude variation trolley, the first big assembly pulley and second largest assembly pulley are fixed on lift beam two by bearing pin End, suspension hook group is arranged in the middle part of lift beam by bearing pin.
8. the flat arm tower crane lifting of a kind of ultra-large type according to claim 1 becomes multiplying power wiring system, it is characterized in that, the car Two two grades of equalizer bars of the frame left and right sides are fixed by locating rod and location nut, and each web of two grades of equalizer bar one end is each There are two location nuts, location nut compresses web by locating rod.
9. the flat arm tower crane lifting of a kind of ultra-large type according to claim 7 becomes multiplying power wiring system, it is characterized in that, the peace Two sets of reels side by side are shelved, steel cable is laid out from a set of reel, bypass two leading blocks, the first luffing is small around entering The leading block of car side, is downwardly into the first big pulley of the first big assembly pulley, upwards about entering the first truckle group, from small Pulley lays out the second big pulley for being downwardly into the first big assembly pulley, is slided upwards about the guiding for entering the first amplitude variation trolley opposite side Wheel, subsequently into the second amplitude variation trolley, winding of the steel wire rope on the second amplitude variation trolley and the winding on the first amplitude variation trolley It is identical, finally it is fastened on bascule.
CN201710331836.3A 2017-05-12 2017-05-12 A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system Pending CN106957017A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710331836.3A CN106957017A (en) 2017-05-12 2017-05-12 A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710331836.3A CN106957017A (en) 2017-05-12 2017-05-12 A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system

Publications (1)

Publication Number Publication Date
CN106957017A true CN106957017A (en) 2017-07-18

Family

ID=59482400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710331836.3A Pending CN106957017A (en) 2017-05-12 2017-05-12 A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system

Country Status (1)

Country Link
CN (1) CN106957017A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111278762A (en) * 2017-11-16 2020-06-12 株式会社日立产机系统 Chain winding device
CN112607642A (en) * 2019-11-05 2021-04-06 杭州富阳鸿祥技术服务有限公司 Multi-wire pulley equipment
CN114084809A (en) * 2021-11-19 2022-02-25 徐州建机工程机械有限公司 Double-arm tower crane and multiplying power conversion method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Loading trolley-based converting rope winding system with variable multiplying power
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable-magnification conversion rope winding system based on load trolley
CN204079293U (en) * 2014-09-17 2015-01-07 抚顺永茂建筑机械有限公司 Tower machine luffing mechanism, amplitude variation trolley, suspension hook group comprehensive experimental device
CN204661178U (en) * 2015-05-29 2015-09-23 郑州科润机电工程有限公司 A kind of amplitude variation trolley of large zoom rate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Loading trolley-based converting rope winding system with variable multiplying power
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable-magnification conversion rope winding system based on load trolley
CN204079293U (en) * 2014-09-17 2015-01-07 抚顺永茂建筑机械有限公司 Tower machine luffing mechanism, amplitude variation trolley, suspension hook group comprehensive experimental device
CN204661178U (en) * 2015-05-29 2015-09-23 郑州科润机电工程有限公司 A kind of amplitude variation trolley of large zoom rate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张新春等: "超大型平臂塔机起升绕绳系统及变幅小车结构的研究", 《建筑机械》 *
李鹏举: "平臂塔机多倍率变换的单轨变幅小车", 《建筑机械化》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111278762A (en) * 2017-11-16 2020-06-12 株式会社日立产机系统 Chain winding device
CN111278762B (en) * 2017-11-16 2021-07-27 株式会社日立产机系统 Chain winding device
CN112607642A (en) * 2019-11-05 2021-04-06 杭州富阳鸿祥技术服务有限公司 Multi-wire pulley equipment
CN112607642B (en) * 2019-11-05 2024-05-24 南京溧星晨电子科技有限公司 Multi-wire pulley equipment
CN114084809A (en) * 2021-11-19 2022-02-25 徐州建机工程机械有限公司 Double-arm tower crane and multiplying power conversion method

Similar Documents

Publication Publication Date Title
CN101670982B (en) Maintenance gantry crane
CN201495044U (en) Maintaining gantry crane
CN106957017A (en) A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
CN201040690Y (en) Shaking-proof plate blank soaking pit crane
CN207061702U (en) A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
CN107265296A (en) Guy device
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN202864746U (en) Telescopic boom crane
CN202148155U (en) Novel variable-amplitude mast and crane with same
CN203667839U (en) Four-suspension-centre automatic offset balanced large-scale hoist assembly equipment
CN109279499A (en) It is a kind of to suffer from one's own actions balance hanging beam and crane for the dedicated of long materials lifting
CN108016986A (en) A kind of swing arm underhung crane
CN107416694A (en) A kind of single girder portal crane
CN201191731Y (en) Electric tackle
CN2855992Y (en) Towing rope bogie of tower crane
CN107311048A (en) Cable crane
CN101920913A (en) Self-propelled wide-span tower crane
CN205328482U (en) Multi -purpose gantry container crane of two hoisting points
CN203213018U (en) Lifting device for rigid hinges and large components
CN204434122U (en) The two loading trolley of tower crane
CN204111203U (en) A kind of connection structure of passing through formula double trolley
CN102815629B (en) Telescopic arm crane
CN201614230U (en) Hoisting device for replacing torch heads
CN207645641U (en) A kind of swing arm underhung crane
CN202022677U (en) Wheeled crane and variable amplitude assistant arm thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination