CN106956016B - A kind of equidistant perforating device of building board - Google Patents

A kind of equidistant perforating device of building board Download PDF

Info

Publication number
CN106956016B
CN106956016B CN201710386149.1A CN201710386149A CN106956016B CN 106956016 B CN106956016 B CN 106956016B CN 201710386149 A CN201710386149 A CN 201710386149A CN 106956016 B CN106956016 B CN 106956016B
Authority
CN
China
Prior art keywords
chamber
conduction
wall
face
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710386149.1A
Other languages
Chinese (zh)
Other versions
CN106956016A (en
Inventor
陈海龙
谭海丽
鲁方慧
胡承斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Changxin Huasen Construction Technology Co.,Ltd.
Original Assignee
Hunan Xinhua Sen Green Building Aluminum Mold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xinhua Sen Green Building Aluminum Mold Co Ltd filed Critical Hunan Xinhua Sen Green Building Aluminum Mold Co Ltd
Priority to CN201710386149.1A priority Critical patent/CN106956016B/en
Publication of CN106956016A publication Critical patent/CN106956016A/en
Application granted granted Critical
Publication of CN106956016B publication Critical patent/CN106956016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B39/00General-purpose boring or drilling machines or devices; Sets of boring and/or drilling machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses a kind of equidistant perforating device of building board, including main pedestal, balladeur train and the perforation structure being arranged in balladeur train, internal equity up and down is provided with conduction chamber on the left of perforation structure, cavity is provided with inside perforation structure between two groups of conduction chambers, first set of extending downwards is provided with inside perforation structure on the right side of the conduction chamber of upside and slides chamber, second set of extending upwards is provided with inside perforation structure on the right side of the conduction chamber of downside and slides chamber, the 3rd, which is provided with, inside the perforation structure that second cunning chamber extends on the right side of section upwards slides chamber, cavity inside is provided with the first punching and implements device, the conduction intracavitary of upper and lower both sides is equipped with conduction and implements device, first cunning intracavitary portion is provided with the first mobile device, second cunning intracavitary portion is provided with the second mobile device, 3rd, which slides intracavitary portion, is provided with the second punching execution device;The present invention is simple in construction, can realize the equidistant automatic punching work of high-frequency.

Description

A kind of equidistant perforating device of building board
Technical field
The present invention relates to architectural engineering construction technique field, specifically a kind of equidistant perforating device of building board.
Background technology
Need largely to use sheet material in architectural engineering, need to carry out punch operation in advance when processing, allow sheet material side Just install, building board needs to carry out drilling operation installing and using often, and then factory passes through when processing building board Punch operation is carried out away from perforating device, facilitates the later stage to be mounted directly work, improves efficiency of construction, traditional equidistant perforating device holds Skew is easily caused, wastes sheet material, when especially needing equidistantly to punch, spacing is difficult to control, and there is larger safety is hidden Suffer from, efficiency is low, and the accuracy of punching is poor, is not suitable for existing needs.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of equidistant perforating device of building board, and it can solve the problem that above-mentioned Now in the art the problem of.
The present invention is achieved through the following technical solutions:A kind of equidistant perforating device of building board of the present invention, bag Main pedestal, balladeur train and the perforation structure being arranged in the balladeur train are included, internal equity up and down is provided with the left of the perforation structure Chamber is conducted, is conducted described in two groups and cavity is provided with inside the perforation structure between chamber, the institute on the right side of the conduction chamber of upside State and first set of extending downwards is provided with inside perforation structure slides chamber, in the perforation structure on the right side of the conduction chamber of downside Portion is provided with second set of extending upwards and slides chamber, and the first cunning chamber, which extends downwards, to be slided chamber with described second on the right side of section and extend upwards Section gets through settings between left side, and the 3rd cunning chamber is provided with inside the perforation structure that the second cunning chamber extends on the right side of section upwards, First is provided between the 3rd cunning chamber and the second cunning chamber and connects groove, the conduction chamber right wall of upside and the described first cunning chamber Second is provided between left wall and connects groove, the conduction chamber right wall of downside and described second are provided with the 3rd company's groove between sliding chamber left wall, The cavity inside is provided with the first punching and implements device, and the conduction intracavitary of upper and lower both sides is equipped with conduction and implements device, institute State the first cunning intracavitary portion and be provided with the first mobile device, the second cunning intracavitary portion is provided with the second mobile device, and the described 3rd slides chamber Inside is provided with the second punching and implements device, and the main pedestal right hand top is provided with sheet material support slot, in the sheet material support slot Left and right equity is fixedly installed clamping bullet on portion's cell wall.
Preferably technical scheme, the main pedestal bottom are provided with the base frame for setting of extending to the left, and the base frame is right The first chute is provided with inside side roof part end face, the first screw rod that left and right extension is set is provided with inside first chute, it is described First screw rod left-hand end is transferred with the first chute left wall, and the first screw rod right-hand end and the first power set coordinate Connection, the first power set outer surface are arranged in the first chute right wall and are fixedly connected, first screw rod Inside spin line is connected with the first sliding block, and the first slider top end face is fixedly connected with the balladeur train bottom end, described The second chute is provided with inside balladeur train its right end face, the second screw rod for extending set up and down, institute are provided with inside second chute State and transferred at the top of the second screw rod with the second chute inner roof wall, the second screw rod bottom coordinates with the second power set Connection, the second power set outer surface are arranged in the second chute bottom end face and are fixedly connected, second spiral shell Swing arm inside spin line is connected with the second sliding block, and the second sliding block its right end face is fixedly connected with the perforation structure.
Preferably technical scheme, it is described first punching implement device include conduction flute profile wheel and with the conduction tooth The main flute profile wheel of ratcheting connection on the left of type wheel, first rotating shaft of the main flute profile wheel provided with setting of extending up and down, described first Extension end pin in rotating shaft bottom is transferred with the cavity inner bottom wall, and extension end pin is matched somebody with somebody with the 3rd power set at the top of the first rotating shaft Connection is closed, the 3rd power set outer surface is arranged in the cavity inner roof wall and is fixedly connected, the conduction flute profile wheel The second rotating shaft extended set up and down is provided with, second rotating shaft is led to upside extension section wears the cavity top inwall and turn Connect, end pin puts in the conduction intracavitary of upside at the top of second rotating shaft, and second rotating shaft wears institute to extension section in downside is logical Cavity bottom inwall and switching are stated, the second rotating shaft bottom end pin puts in the conduction intracavitary of downside.
Preferably technical scheme, device is implemented in the conduction of upside includes bottom and tail at the top of second rotating shaft The first raised wheel and the first pushed section with connecting on the right side of first raised wheel that the tip is fixedly connected;The conduction of downside is applied Luggage put the second raised wheel for being fixedly connected including top with the second rotating shaft bottom end pin and with second raised wheel The second pushed section that right side connects, first raised wheel are equipped with convex portion with the opposite side of the second raised wheel horizontal direction, The first push shaft of setting of extending to the right is fixed with the right side of first pushed section, extension section puts in institute on the right side of first push shaft State in second company's groove and end pin puts in described first and slides intracavitary, be fixed with the right side of second pushed section and extend what is set to the right Second push shaft, the second push shaft right side extension section is put in the 3rd company groove and end pin puts in described second and slides intracavitary, institute State between the first push shaft and the conduction chamber right wall of upside and the conduction chamber right wall of second push shaft and downside it Between outer surface be equipped with reduction spring part.
Preferably technical scheme, first mobile device include the first sliding block and are fixed on described first and push away Sliding block its right end face and the sliding bar for setting of extending to the right;Second mobile device includes the second sliding block and is fixed on The second sliding block its right end face and the sliding sleeve pipe for setting of extending to the right, sliding sleeve pipe right side extension section put in institute State in first company's groove and slide fit connects, extension section is put in the sliding sleeve pipe on the right side of the sliding bar and slide fit connects, described End pin is fixedly connected on the right side of first sliding block left end face and first push shaft, the second sliding block left end face with it is described End pin is fixedly connected on the right side of second push shaft.
Preferably technical scheme, device is implemented in second punching to be included slider guide and is fixed on the slider guide The punching pushed section of the setting of extending to the right of its right end face, the punching pushed section right side extension section is logical to wear the 3rd cunning chamber right wall And slide fit connects, extension end pin is extended outside the perforation structure its right end face on the right side of the punching pushed section, and described first connects on groove The 3rd cunning chamber left wall equity of lower both sides is provided with inside groove, and spring is provided between the inside groove and the slider guide left end face Part.
The beneficial effects of the invention are as follows:
1. setting conduction chamber by internal equity up and down on the left of perforation structure, set inside the perforation structure between two groups of conduction chambers Cavity, first set of extending downwards is set inside the perforation structure on the right side of the conduction chamber of upside and slides chamber, on the right side of the conduction chamber of downside Perforation structure inside set second set of extending upwards and slide chamber, the first cunning chamber, which extends downwards, to be slided chamber with second on the right side of section and prolongs upwards Settings is got through between on the left of exhibition section, and being provided with the 3rd inside the perforation structure that the second cunning chamber extends on the right side of section upwards slides chamber, the 3rd cunning First company's groove is set between chamber and the second cunning chamber, second company's groove, downside are set between the conduction chamber right wall of upside and the first cunning chamber left wall Conduction chamber right wall and second cunning chamber left wall between set the 3rd company groove, cavity inside set the first punching implement device, upper and lower both sides Conduction intracavitary be all provided with conduction and implement device, the first cunning intracavitary portion sets the first mobile device, and the second cunning intracavitary portion sets the second movement Device, the 3rd cunning intracavitary portion set the second punching and implement device, so as to realize that sliding bar and sliding sleeve pipe interval promote punching pushed section Flexible punching work, improve operating efficiency and punching frequency.
2. setting the base frame for setting of extending to the left by main pedestal bottom, base frame right hand top sets the first cunning inside end face Groove, left and right being set inside the first chute and is extended the first screw rod set, the first screw rod left-hand end is transferred with the first chute left wall, First screw rod right-hand end and the first power set are connected, and the first power set outer surface is arranged in the first chute right wall And be fixedly connected, the first screw rod inside spin line the first sliding block of mating connection, the first slider top end face is consolidated with balladeur train bottom end Fixed connection, the second chute is set inside balladeur train its right end face, set the second screw rod for extending set up and down inside the second chute, second Transferred at the top of screw rod with the second chute inner roof wall, the second screw rod bottom is connected with the second power set, the second power Outside of deivce face is arranged in the second chute bottom end face and is fixedly connected, and the second screw rod inside spin line mating connection second is slided Block, the second sliding block its right end face are fixedly connected with perforation structure, are beaten so as to realize that the left and right of balladeur train is slided work and automatically controlled The upper downslide regulation punch position of pore structure
3. master of the device including conduction flute profile wheel and with ratcheting connection on the left of conduction flute profile wheel is implemented by the first punching Flute profile wheel, the first rotating shaft for extending set up and down is set on main flute profile wheel, and extension end pin in first rotating shaft bottom turns with cavity inner bottom wall Connect, extension end pin and the 3rd power set are connected at the top of first rotating shaft, and the 3rd power set outer surface is arranged in cavity In roof and it is fixedly connected, conducts the second rotating shaft for being set on flute profile wheel and extending set up and down, the second rotating shaft is led to upside extension section Wear cavity top inwall and switching, end pin puts in the conduction intracavitary of upside at the top of the second rotating shaft, and the second rotating shaft is to downside extension section Logical to wear cavity bottom inwall and switching, the second rotating shaft bottom end pin puts in the conduction intracavitary of downside, and the is automatically controlled so as to realize The flexible work of device connection is implemented in one punching.
4. the present invention is simple in construction, easy to operate, manufacturing cost and maintenance cost are low, can realize that high-frequency is equidistantly beaten automatically Hole works.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of equidistant perforating device overall structure diagram of building board of the present invention;
Fig. 2 is the perforation structure external structure schematic diagram of the present invention;
Fig. 3 is the perforation structure internal structure schematic diagram of the present invention;
Fig. 4 is located at the front position of the first raised wheel, the second raised wheel for the convex portion on the first raised wheel of the present invention On the raised wheel of convex portion second dead astern position when structural representation;
Fig. 5 is located at the directly to the right position of the first raised wheel, the second raised wheel for the convex portion on the first raised wheel of the present invention On structural representation of convex portion when being located at the directly to the left position of the second raised wheel;
Fig. 6 is the internal structure enlarged diagram of the support slot of the present invention.
Embodiment
As shown in figs 1 to 6, the equidistant perforating device of a kind of building board of the invention, including main pedestal 7, balladeur train 8 and The perforation structure 6 being arranged in the balladeur train 8, the internal equity up and down in the left side of perforation structure 6 are provided with conduction chamber 61, two groups of institutes State the inside of the perforation structure 6 between conduction chamber 61 and be provided with cavity 62, the punching on the right side of the conduction chamber 61 of upside The inside of structure 6 is provided with first set of extending downwards and slides chamber 63, in the perforation structure 6 on the right side of the conduction chamber 61 of downside Portion is provided with second set of extending upwards and slides chamber 64, described first slide chamber 63 slided with described second on the right side of extension section downwards chamber 64 to Setting is got through between on the left of upper extension section, described second slides the 3rd cunning in the perforation structure 6 on the right side of extension section upwards of chamber 64 Chamber 65, the described 3rd slides between chamber 65 and the second cunning chamber 64 provided with first company's groove 651, the right wall of conduction chamber 61 of upside Second is provided between the described first cunning left wall of chamber 63 and connects groove 631, and the right wall of conduction chamber 61 of downside slides chamber with described second The 3rd is provided between 64 left walls and connects groove 641, the inside of cavity 62 is provided with the first punching and implements device, the biography of upper and lower both sides Conduction is equipped with guide cavity 61 and implements device, the inside of the first cunning chamber 63 is provided with the first mobile device, and described second slides chamber 64 Inside is provided with the second mobile device, and the described 3rd slides the inside of chamber 65 implements device provided with the second punching, and the main right side of pedestal 7 is pushed up Portion is provided with sheet material support slot 76, and left and right equity is fixedly installed clamping bullet 761 on the inside cell wall of sheet material support slot 76.
Wherein, the bottom of main pedestal 7 is provided with the base frame 71 for setting of extending to the left, the right hand top end face of base frame 71 Inside is provided with the first chute 72, and extend the first screw rod 74 set provided with left and right for the inside of the first chute 72, and described first The left-hand end of screw rod 74 is transferred with the left wall of the first chute 72, the right-hand end of the first screw rod 74 and the first power set 75 It is connected, the outer surface of the first power set 75 is arranged in the right wall of the first chute 72 and is fixedly connected, and described the The inside spin line of one screw rod 74 is connected with the first sliding block 73, the top end face of the first sliding block 73 and the bottom of balladeur train 8 End is fixedly connected, and the second chute 81 is provided with inside its right end face of balladeur train 8, and the inside of the second chute 81 is provided with extends up and down The second screw rod 82 set, the top of the second screw rod 82 are transferred with the inner roof wall of the second chute 81, second spiral shell The bottom of swing arm 82 is connected with the second power set 84, and the outer surface of the second power set 84 is arranged at second chute In 81 bottom end faces and it is fixedly connected, the inside spin line of the second screw rod 82 is connected with the second sliding block 83, and described second Its right end face of sliding block 83 is fixedly connected with the perforation structure 6, is beaten so as to realize that the left and right of balladeur train 8 is slided work and automatically controlled The upper downslide regulation punch position of pore structure 6.
Wherein, first punching implements device and includes conduction flute profile wheel 621 and conduct the left side of flute profile wheel 621 with described The main flute profile wheel 622 of ratcheting connection, first rotating shaft 624 of the main flute profile wheel 622 provided with setting of extending up and down, described first The bottom extension end pin of rotating shaft 624 is transferred with the inner bottom wall of cavity 62, and the top extension end pin of first rotating shaft 624 and the 3rd moves Power apparatus 623 is connected, and the outer surface of the 3rd power set 623 is arranged in the inner roof wall of cavity 62 and fixed company Connect, the conduction flute profile wheel 621 is provided with the second rotating shaft 6211 extended set up and down, and second rotating shaft 6211 is prolonged to upside Exhibition section is logical to wear the top inner wall of cavity 62 and switching, and the top end pin of the second rotating shaft 6211 puts in the conduction chamber of upside In 61, second rotating shaft 6211 wears the bottom interior wall of cavity 62 and switching, second rotating shaft to extension section in downside is logical 6211 bottom end pins are put in the conduction chamber 61 of downside, are stretched so as to realize to automatically control the first punching and implement device and connect Work.
Wherein, the conduction of upside is implemented device and is fixedly connected including bottom with the top end pin of the second rotating shaft 6211 The first raised wheel 611 and the first pushed section 614 for connecting with the right side of first raised wheel 611;The conduction of downside is applied Luggage puts the second raised wheel 612 for being fixedly connected including top with the bottom end pin of the second rotating shaft 6211 and with described second The second pushed section 613 that the right side of raised wheel 612 connects, first raised wheel 611 and the horizontal direction of the second raised wheel 612 Opposite side is equipped with convex portion 6111, and the right side of the first pushed section 614 is fixed with the first push shaft 6311 of setting of extending to the right, The right side extension section of first push shaft 6311 is put in second company groove 631 and end pin puts in described first and slided in chamber 63, institute The second push shaft 6411 that the right side of the second pushed section 613 is fixed with setting of extending to the right is stated, the right side of the second push shaft 6411 is prolonged Exhibition section is put in the 3rd company groove 641 and end pin puts in described second and slided in chamber 64, first push shaft 6311 and upside Between the conduction right wall of the chamber 61 and outer surface between second push shaft 6411 and the right wall of conduction chamber 61 of downside Reduction spring part 6131 is equipped with, so as to realize that the conducting operations between device and the second punching execution device are implemented in the first punching.
Wherein, first mobile device includes the first sliding block 632 and is fixed on the right side of the first sliding block 632 End face and the sliding bar 633 for setting of extending to the right;Second mobile device includes the second sliding block 642 and is fixed on institute State its right end face of the second sliding block 642 and the sliding sleeve pipe 643 for setting of extending to the right, the right side of sliding sleeve pipe 643 are extended First company's groove 651 is interior described in Duan Shenjin and slide fit connects, and the right side extension section of sliding bar 633 puts in the sliding sleeve pipe 643 Interior and slide fit is connected, and the left end face of the first sliding block 632 is fixedly connected with the right side end pin of the first push shaft 6311, described The left end face of second sliding block 642 is fixedly connected with the right side end pin of the second push shaft 6411.
Wherein, second punching implements device and includes slider guide 652 and be fixed on its right end face of slider guide 652 Setting of extending to the right punching pushed section 6521, the punching right side extension section of pushed section 6521 is logical to wear the described 3rd to slide chamber 65 right Wall and slide fit connection, the punching right side extension end pin of pushed section 6521 are extended outside its right end face of perforation structure 6, and described first Even the 3rd cunning chamber 65 left wall of groove both sides about 651 is reciprocity is provided with inside groove 653, the inside groove 653 and the slider guide 652 Spring part 654 is provided between left end face, so as to realize the punching automatic telescopic of pushed section 6521 work.
During original state, the first sliding block 73 is located at the left-most position in the first chute 72, makes the top of the first sliding block 73 Balladeur train 8 at utmost away from the main left side outer wall of pedestal 7, meanwhile, the second sliding block 83 drive perforation structure 6 be located in the second chute 81 Top position, now, the convex portion 6111 on the first raised wheel 611 in the conduction chamber 61 of upside is located at the first raised wheel 611 directly to the left position, while the convex portion 6111 on the second raised wheel 612 in the conduction chamber 61 of downside is located at the second raised wheel 612 directly to the right position, now, the first pushed section 614 are made the first pushed section 614 left by the pressure on top surface of reduction spring part 6131 on right side Side connects with the first raised wheel 611 away from the side of convex portion 6111 on the first raised wheel 611, meanwhile, the second pushed section 613 by The pressure on top surface of reduction spring part 6131 on right side, make the left-hand end of the second pushed section 613 and the side phase of convex portion 6111 on the second raised wheel 612 Connect, now, make left-most position of the first sliding block 632 in the first cunning chamber 63, meanwhile, it is located at the second sliding block 642 Second slides the right-most position in chamber 64, and now, the second sliding block 642 drives sliding sleeve pipe 643 at utmost to connect through first Groove 651 is simultaneously at utmost put in the 3rd cunning chamber 65, the right side end pin of sliding sleeve pipe 643 is offseted with the left-hand end of slider guide 652, together When, the right side end pin of sliding bar 633 is located in the left side section of sliding sleeve pipe 643 and at utmost away from slider guide 652, now, makes to lead Sliding block 652 overcomes the tensile force of spring part 654 to connect with the 3rd cunning right wall of chamber 65, meanwhile, slider guide 652 drives punching pushed section 6521 At utmost extend outside its right end face of perforation structure 6.
When needing punching in use, sheet material is fixed in support slot 76 first, then pass through the band of the first power set 75 Dynamic 74 turns of first screw rod, the first sliding block 73 and the balladeur train 8 at the top of the first sliding block 73 are driven towards right side by the first screw rod 74 It is sliding, until the right side of perforation structure 6 offsets with sheet material, now control the first power set 75 to stop turning, then pass through the second power Device 84 drives the rotating of the second screw rod 82, is driven by the second screw rod 82 on the right side of the second sliding block 83 and the second sliding block 83 Perforation structure 6 glides along the direction of the second chute 81, meanwhile, drive first rotating shaft 624 and master by the 3rd power set 623 622 turns of flute profile wheel, 6211 turns of conduction flute profile wheel 621 and the second rotating shaft are driven by main flute profile wheel 622, by the band of the second rotating shaft 6211 612 turns of the second raised wheel in 611 turns of the first raised wheel and downside conduction chamber 61 in dynamic upside conduction chamber 61, until first When the raised wheel 612 of raised wheel 611 and second is gone to such as Fig. 4 states, now, convex portion 6111 on the first raised wheel 611 is positioned at the The front position of one raised wheel 611, meanwhile, the dead astern position of the raised wheel 612 of convex portion 6,111 second on the second raised wheel 612 Put, now, the left-hand end of the first pushed section 614 is connected with the left side lateral wall of the first raised wheel 611, meanwhile, make the second pushed section 613 left Side connects with the left side lateral wall of the second raised wheel 612, and now, the first pushed section 614 and the second pushed section 613 are by reduction spring part 6131 active force, the first pushed section 614 is set to drive the first sliding block 632 of the right side end pin of the first push shaft 6311 to keep raw bits Put, the second pushed section 613 is driven the second sliding block 642 of the right side end pin of the second push shaft 6411 positioned at second leftmost side for sliding chamber 64 Position, now, the second sliding block 642 drive sliding sleeve pipe 643 at utmost away from slider guide 652, meanwhile, slider guide 652 by To the tensile force of spring part 654, make left-most position of the slider guide 652 in the 3rd cunning chamber 65, now, slider guide 652 drives Punching pushed section 6521 is put in the left end face of perforation structure 6 completely, is continued through the 3rd power set 623 and is driven upside to conduct 612 turns of the second raised wheel in 611 turns of the first raised wheel and downside conduction chamber 61 in chamber 61, until upside as shown in Figure 5 Conduction chamber 61 in the first raised wheel 611 on convex portion 6111 be located at the directly to the right position of the first raised wheel 611, while downside Conduction chamber 61 in the second raised wheel 612 on convex portion 6111 be located at the directly to the left position of the second raised wheel 612, now, One pushed section 614 is made on the left-hand end of the first pushed section 614 and the first raised wheel 611 by the pressure on top surface of reduction spring part 6131 on right side The side of convex portion 6111 connects, meanwhile, the second pushed section 613 is made the second pushed section 613 left by the pressure on top surface of reduction spring part 6131 on right side Side connects with the second raised wheel 612 away from the side outer wall of convex portion 6111 on the second raised wheel 612, now, makes the first sliding Right-most position of the block 632 in the first cunning chamber 63, meanwhile, the second sliding block 642 is slided positioned at second most left in chamber 64 Side position, now, the right side end pin of sliding bar 633 offset with slider guide 652, slider guide 652 is overcome the tensile force position of spring part 654 The right-most position in chamber 65 is slided in the 3rd, now slider guide 652, which drives, punches the left side that pushed section 6521 puts in perforation structure 6 completely In side end face, meanwhile, the right side end pin of sliding sleeve pipe 643 is at utmost away from slider guide 652.
The beneficial effects of the invention are as follows:
1. setting conduction chamber by internal equity up and down on the left of perforation structure, set inside the perforation structure between two groups of conduction chambers Cavity, first set of extending downwards is set inside the perforation structure on the right side of the conduction chamber of upside and slides chamber, on the right side of the conduction chamber of downside Perforation structure inside set second set of extending upwards and slide chamber, the first cunning chamber, which extends downwards, to be slided chamber with second on the right side of section and prolongs upwards Settings is got through between on the left of exhibition section, and being provided with the 3rd inside the perforation structure that the second cunning chamber extends on the right side of section upwards slides chamber, the 3rd cunning First company's groove is set between chamber and the second cunning chamber, second company's groove, downside are set between the conduction chamber right wall of upside and the first cunning chamber left wall Conduction chamber right wall and second cunning chamber left wall between set the 3rd company groove, cavity inside set the first punching implement device, upper and lower both sides Conduction intracavitary be all provided with conduction and implement device, the first cunning intracavitary portion sets the first mobile device, and the second cunning intracavitary portion sets the second movement Device, the 3rd cunning intracavitary portion set the second punching and implement device, so as to realize that sliding bar and sliding sleeve pipe interval promote punching pushed section Flexible punching work, improve operating efficiency and punching frequency.
2. setting the base frame for setting of extending to the left by main pedestal bottom, base frame right hand top sets the first cunning inside end face Groove, left and right being set inside the first chute and is extended the first screw rod set, the first screw rod left-hand end is transferred with the first chute left wall, First screw rod right-hand end and the first power set are connected, and the first power set outer surface is arranged in the first chute right wall And be fixedly connected, the first screw rod inside spin line the first sliding block of mating connection, the first slider top end face is consolidated with balladeur train bottom end Fixed connection, the second chute is set inside balladeur train its right end face, set the second screw rod for extending set up and down inside the second chute, second Transferred at the top of screw rod with the second chute inner roof wall, the second screw rod bottom is connected with the second power set, the second power Outside of deivce face is arranged in the second chute bottom end face and is fixedly connected, and the second screw rod inside spin line mating connection second is slided Block, the second sliding block its right end face are fixedly connected with perforation structure, are beaten so as to realize that the left and right of balladeur train is slided work and automatically controlled The upper downslide regulation punch position of pore structure
3. master of the device including conduction flute profile wheel and with ratcheting connection on the left of conduction flute profile wheel is implemented by the first punching Flute profile wheel, the first rotating shaft for extending set up and down is set on main flute profile wheel, and extension end pin in first rotating shaft bottom turns with cavity inner bottom wall Connect, extension end pin and the 3rd power set are connected at the top of first rotating shaft, and the 3rd power set outer surface is arranged in cavity In roof and it is fixedly connected, conducts the second rotating shaft for being set on flute profile wheel and extending set up and down, the second rotating shaft is led to upside extension section Wear cavity top inwall and switching, end pin puts in the conduction intracavitary of upside at the top of the second rotating shaft, and the second rotating shaft is to downside extension section Logical to wear cavity bottom inwall and switching, the second rotating shaft bottom end pin puts in the conduction intracavitary of downside, and the is automatically controlled so as to realize The flexible work of device connection is implemented in one punching.
4. the present invention is simple in construction, easy to operate, manufacturing cost and maintenance cost are low, can realize that high-frequency is equidistantly beaten automatically Hole works.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (6)

1. a kind of equidistant perforating device of building board, including main pedestal, balladeur train and the perforation structure being arranged in balladeur train, it is special Sign is:The internal equity up and down in perforation structure left side, which is provided with, conducts chamber, and sky is provided with inside the perforation structure between two groups of conduction chambers Chamber, first cunning chamber of the perforation structure inside conducted on the right side of chamber provided with setting of extending downwards of upside, the conduction chamber right side of downside Perforation structure inside be provided with second set of extending upwards and slide chamber, the first cunning chamber extends downwards upward with the second cunning chamber on the right side of section Get through settings between on the left of extension section, be provided with the 3rd cunning chamber inside the perforation structure that the second cunning chamber extends on the right side of section upwards, the 3rd First is provided between sliding chamber and the second cunning chamber and connects groove, the conduction chamber right wall of upside and first are provided with the second company between sliding chamber left wall Groove, the 3rd is provided between the conduction chamber right wall of downside and the second cunning chamber left wall and connects groove, cavity inside is provided with the first punching execution dress Put, the conduction intracavitary of upper and lower both sides is equipped with conduction and implements device, and the first cunning intracavitary portion is provided with the first mobile device, and second slides chamber Inside is provided with the second mobile device, and the 3rd, which slides intracavitary portion, is provided with the second punching execution device, and the main pedestal right hand top is set There is a sheet material support slot, left and right equity is fixedly installed clamping bullet on cell wall inside the sheet material support slot.
A kind of 2. equidistant perforating device of building board according to claim 1, it is characterised in that:The main pedestal bottom is set There is a base frame for setting of extending to the left, be provided with the first chute inside the base frame right hand top end face, inside first chute Extend the first screw rod set provided with left and right, and the first screw rod left-hand end is transferred with the first chute left wall, described First screw rod right-hand end and the first power set are connected, and the first power set outer surface is arranged at described first and slided In groove right wall and it is fixedly connected, the first screw rod inside spin line is connected with the first sliding block, first slider top End face is fixedly connected with the balladeur train bottom end, is provided with the second chute inside the balladeur train its right end face, in second chute Portion is provided with the second screw rod for extending set up and down, is transferred at the top of second screw rod with the second chute inner roof wall, institute State the second screw rod bottom to be connected with the second power set, the second power set outer surface is arranged at described second and slided In bottom land end surface and it is fixedly connected, the second screw rod inside spin line is connected with the second sliding block, second sliding block Its right end face is fixedly connected with the perforation structure.
A kind of 3. equidistant perforating device of building board according to claim 1, it is characterised in that:First punching is implemented Device includes conduction flute profile wheel and the main flute profile wheel with ratcheting connection on the left of the conduction flute profile wheel, is set on the main flute profile wheel There is the first rotating shaft for extending set up and down, the first rotating shaft bottom extension end pin and the cavity inner bottom wall are transferred, and described the Extension end pin and the 3rd power set are connected at the top of one rotating shaft, and the 3rd power set outer surface is arranged at the cavity In inner roof wall and be fixedly connected, the conduction flute profile wheel is provided with the second rotating shaft extended set up and down, second rotating shaft to Extension section in upside is logical to wear the cavity top inwall and is transferred with the cavity top inwall, and end pin is stretched at the top of second rotating shaft Enter the conduction intracavitary of upside, second rotating shaft to downside extension section it is logical wear the cavity bottom inwall and with the cavity Bottom interior wall is transferred, and the second rotating shaft bottom end pin puts in the conduction intracavitary of downside.
A kind of 4. equidistant perforating device of building board according to claim 3, it is characterised in that:The conduction of upside is applied Luggage put the first raised wheel for being fixedly connected including end pin at the top of bottom and second rotating shaft and with first raised wheel The first pushed section that right side connects;Device is implemented in the conduction of downside includes top and the second rotating shaft bottom end pin fixation company The second raised wheel connect and the second pushed section with connecting on the right side of second raised wheel, first raised wheel and described second The opposite side of raised wheel horizontal direction is equipped with convex portion, and the first of setting of extending to the right is fixed with the right side of first pushed section Push shaft, extension section is put in second company groove on the right side of first push shaft and end pin puts in described first and slides intracavitary, and described the The second push shaft of setting of extending to the right is fixed with the right side of two pushed sections, extension section puts in the described 3rd on the right side of second push shaft Even groove is interior and end pin puts in described second and slides intracavitary, between first push shaft and the conduction chamber right wall of upside and described Outer surface between second push shaft and the conduction chamber right wall of downside is equipped with reduction spring part.
A kind of 5. equidistant perforating device of building board according to claim 4, it is characterised in that:First mobile device Including the first sliding block and it is fixed on the sliding bar of the first sliding block its right end face and setting of extending to the right;Described Two mobile devices include the second sliding block and be fixed on the second sliding block its right end face and to the right extend set push away Sliding sleeve pipe, sliding sleeve pipe right side extension section puts in first company groove and is connected with described first company's groove slide fit, described Extension section puts in the sliding sleeve pipe and is connected with the sliding sleeve pipe slide fit on the right side of sliding bar, on the left of the first sliding block End face is fixedly connected with end pin on the right side of first push shaft, the second sliding block left end face and tail on the right side of second push shaft The tip is fixedly connected.
A kind of 6. equidistant perforating device of building board according to claim 1, it is characterised in that:Second punching is implemented Device includes slider guide and is fixed on the punching pushed section of the setting of extending to the right of the slider guide its right end face, the punching Extension section is logical on the right side of pushed section wears the 3rd cunning chamber right wall and is connected with the described 3rd cunning chamber right wall slide fit, and the punching pushed section is right Side extension end pin is extended outside the perforation structure its right end face, and described first connects the 3rd cunning chamber left wall pair of both sides above and below groove Deng inside groove is provided with, spring part is provided between the inside groove and the slider guide left end face.
CN201710386149.1A 2017-05-26 2017-05-26 A kind of equidistant perforating device of building board Active CN106956016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710386149.1A CN106956016B (en) 2017-05-26 2017-05-26 A kind of equidistant perforating device of building board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710386149.1A CN106956016B (en) 2017-05-26 2017-05-26 A kind of equidistant perforating device of building board

Publications (2)

Publication Number Publication Date
CN106956016A CN106956016A (en) 2017-07-18
CN106956016B true CN106956016B (en) 2018-02-23

Family

ID=59483095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710386149.1A Active CN106956016B (en) 2017-05-26 2017-05-26 A kind of equidistant perforating device of building board

Country Status (1)

Country Link
CN (1) CN106956016B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107840404A (en) * 2017-08-21 2018-03-27 广西圣洁环境工程有限公司 A kind of effluent treatment plant
CN107840405A (en) * 2017-08-21 2018-03-27 广西圣洁环境工程有限公司 A kind of sewage purifying and treating device
CN107840406A (en) * 2017-08-21 2018-03-27 广西圣洁环境工程有限公司 A kind of sewage quick treatment device
CN107756545B (en) * 2017-11-06 2018-07-31 江西林强家具有限公司 A kind of novel environment-friendly sheet processing unit (plant)
CN107803891B (en) * 2017-11-08 2018-09-11 贵港市鸿盛隆木业有限公司 One kind being used for environment-friendly sheet processing unit (plant)
CN108214739A (en) * 2017-11-08 2018-06-29 广州巨茗自控技术有限公司 It is a kind of novel to be used for environment-friendly sheet processing unit (plant)
CN108214720A (en) * 2017-11-08 2018-06-29 广州巨茗自控技术有限公司 It is a kind of follow-on for environment-friendly sheet processing unit (plant)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4162908B2 (en) * 2002-04-01 2008-10-08 大同工業株式会社 Drilling device
CN202715700U (en) * 2012-04-23 2013-02-06 陈永明 Hole punching machine
CN204018786U (en) * 2014-08-04 2014-12-17 繁昌县天和机械有限公司 A kind of equidistant porous casting perforating device with one heart
US8936189B2 (en) * 2012-07-20 2015-01-20 Officemate International Corporation Switchable hole punch apparatus
CN205704519U (en) * 2016-06-03 2016-11-23 铜仁学院 A kind of perforating device being applicable to Furniture panel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4162908B2 (en) * 2002-04-01 2008-10-08 大同工業株式会社 Drilling device
CN202715700U (en) * 2012-04-23 2013-02-06 陈永明 Hole punching machine
US8936189B2 (en) * 2012-07-20 2015-01-20 Officemate International Corporation Switchable hole punch apparatus
CN204018786U (en) * 2014-08-04 2014-12-17 繁昌县天和机械有限公司 A kind of equidistant porous casting perforating device with one heart
CN205704519U (en) * 2016-06-03 2016-11-23 铜仁学院 A kind of perforating device being applicable to Furniture panel

Also Published As

Publication number Publication date
CN106956016A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN106956016B (en) A kind of equidistant perforating device of building board
CN106976131B (en) A kind of plate drilling device for the drill bit that can automatically switch
CN107097302B (en) A kind of building decorative plates perforating device
CN107100542B (en) A kind of building wall punch device
CN107584158A (en) A kind of letter box arrangement
CN107097301B (en) A kind of plate drilling device of automatic switchover drill bit
CN107803528A (en) A kind of new letter box arrangement
CN107127821A (en) A kind of double mode puncher of hydraulic control
CN203151305U (en) Motor pushrod apparatus with adjustable stroke
CN107584574A (en) A kind of decorative panel for building perforating device
CN107685171A (en) A kind of building board perforating device
CN107031250B (en) A kind of engraving machine
CN107685358A (en) A kind of equidistant perforating device of construction sheet material
CN107775038A (en) A kind of letter box arrangement
CN106994524B (en) A kind of bridge construction device
CN107756042A (en) A kind of new letter box arrangement
CN107598580A (en) A kind of follow-on letter box arrangement
CN108146127B (en) A kind of engraving machine
CN107020663A (en) A kind of double mode hydraulic pressure puncher
CN108189600B (en) A kind of modified engraving machine
CN107584573A (en) A kind of building board perforating device
CN107595085A (en) A kind of letter box arrangement
CN106994477A (en) A kind of architectural engineering iron plate cutter device
CN108068524A (en) A kind of two-sided engraving machine of practicality
CN104120562B (en) For the electronic hand wheel of SERVO CONTROL sewing machine auxiliary operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Hailong

Inventor after: Tan Haili

Inventor after: Lu Fanghui

Inventor after: Hu Chengbin

Inventor before: Fan Su

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180123

Address after: 423000 Chenzhou city of Hunan province Chang Chong lake Hunan Village Economic Development Zone, high tech Park 101

Applicant after: Hunan Xinhua Sen green building aluminum mold Co. Ltd.

Address before: No. 97, Seven Star Street tower mountain village, Xinchang County, Shaoxing, Zhejiang

Applicant before: XINCHANG QIPENG AUTOMATION EQUIPMENT CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 423000 Xiangnan Gaoxin Park 101, changchong Village Economic Development Zone, Beihu District, Chenzhou City, Hunan Province

Patentee after: Hunan Changxin Huasen Construction Technology Co.,Ltd.

Address before: 423000 Xiangnan Gaoxin Park 101, changchong Village Economic Development Zone, Beihu District, Chenzhou City, Hunan Province

Patentee before: Hunan Xinhua Sen green building aluminum mold Co.,Ltd.

CP01 Change in the name or title of a patent holder