CN106931630B - Novel intelligence hot and cold water mixing constant temperature heat supply device - Google Patents

Novel intelligence hot and cold water mixing constant temperature heat supply device Download PDF

Info

Publication number
CN106931630B
CN106931630B CN201710328538.9A CN201710328538A CN106931630B CN 106931630 B CN106931630 B CN 106931630B CN 201710328538 A CN201710328538 A CN 201710328538A CN 106931630 B CN106931630 B CN 106931630B
Authority
CN
China
Prior art keywords
water
valve
pipe
tank
cooling water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710328538.9A
Other languages
Chinese (zh)
Other versions
CN106931630A (en
Inventor
秦宇
于洋
郑丽伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Hengjiu Antai Environmental Protection And Energy Saving Technology Co ltd
Original Assignee
Shenyang Hengjiu Antai Environmental Protection And Energy Saving Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Hengjiu Antai Environmental Protection And Energy Saving Technology Co ltd filed Critical Shenyang Hengjiu Antai Environmental Protection And Energy Saving Technology Co ltd
Priority to CN201710328538.9A priority Critical patent/CN106931630B/en
Publication of CN106931630A publication Critical patent/CN106931630A/en
Application granted granted Critical
Publication of CN106931630B publication Critical patent/CN106931630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18—Water-storage heaters
    • F24H1/185—Water-storage heaters using electric energy supply
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18—Water-storage heaters
    • F24H1/181—Construction of the tank
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00—Details
    • F24H9/0005—Details for water heaters
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00—Details
    • F24H9/18—Arrangement or mounting of grates or heating means
    • F24H9/1809—Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1818—Arrangement or mounting of electric heating means
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00—Details
    • F24H9/20—Arrangement or mounting of control or safety devices
    • F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014—Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021—Storage heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention discloses a novel intelligent cold-hot water mixing constant-temperature heating device, and relates to the technical field of electric heat storage boilers; through moisturizing union coupling between moisturizing case and the coolant tank, install the fifth water pump on the moisturizing pipe, coolant pipe and heat accumulation device are connected through coolant pipe in coolant tank's bottom, and heat accumulation device's bottom is passed through the wet return and is connected with muddy water jar and coolant tank's middle part, install the third valve on the wet return of being connected with coolant tank's middle part, and mix water jar and pass through water piping connection with heat accumulation device's top, and install the second valve on the delivery pipe, outlet pipe and drain pipe connection are passed through to heat accumulation device's bottom, and install the fifth valve on the outlet pipe. The heat accumulator in the device does not have water to flow through the heat accumulator in the heat accumulation period, and the cooling water tank is used for replacing the traditional heat accumulation water tank, so that the internal defects of the two traditional electric heat accumulation heating modes are overcome, the efficiency of the electric heat accumulation boiler is improved compared with the traditional boiler, and the occupied area is reduced by 50%.

Description

一种新型智能冷热水混合恒温供热装置A new type of intelligent hot and cold water mixed constant temperature heating device

技术领域technical field

本发明涉及一种新型智能冷热水混合恒温供热装置,属于电蓄热锅炉技术领域。The invention relates to a novel intelligent cold and hot water mixed constant temperature heating device, which belongs to the technical field of electric heat storage boilers.

背景技术Background technique

对谷电蓄热锅炉的研发应用,已成为节能环保领域各国研发的焦点和热点。目前,谷电蓄热锅炉技术实现的技术方法分为两种:第一种是利用夜间廉价的谷电加热蓄热体,把热量储存在蓄热体中,在白天峰电时段,用风机把锅炉内的热量通过管道吹送到风水换热器中,通过风水换热器加热采暖管道内的循环水为建筑供暖;第二种是在利用夜间谷电加热蓄热体的同时,使水通过管道在蓄热体内流动,水吸收蓄热体的热量后温度升高,并将温度升高后的高温水储存在蓄水箱中,在白天,利用蓄水箱中的高温水通过水-水换热器加热采暖管道内的循环水为建筑供暖。然而,在实际操作中,这两种方法存在很多的局限性。The R&D and application of Gudian thermal storage boilers has become the focus and hotspot of R&D in various countries in the field of energy conservation and environmental protection. At present, the technical methods of valley electricity thermal storage boiler technology are divided into two types: the first is to use cheap valley electricity at night to heat the thermal storage body, and store the heat in the thermal storage body. The heat in the boiler is blown into the wind-water heat exchanger through the pipeline, and the circulating water in the heating pipeline is heated by the wind-water heat exchanger to heat the building; the second is to use the valley electricity at night to heat the heat storage body, and make the water pass through the pipeline. Flowing in the heat storage body, the water absorbs the heat of the heat storage body and the temperature rises, and the high temperature water after the temperature rise is stored in the water storage tank. During the day, the high temperature water in the water storage tank is used to exchange water-water The heater heats the circulating water in the heating pipe to heat the building. However, in practice, these two methods have many limitations.

对于第一种方法:由于空气-水换热器的换热效率低,空气的比热小,导致空气-水换热器体积庞大,风管管径大,占地面积大,这种缺点随着采暖面积的增加会更加明显,甚至无法实施。而且,空气-水换热器的制造工艺复杂,价格昂贵,吊装安装困难,给电蓄热锅炉技术的推广应用带来了不便之处。For the first method: due to the low heat exchange efficiency of the air-water heat exchanger and the small specific heat of the air, the air-water heat exchanger is bulky, the diameter of the air duct is large, and the floor area is large. With the increase of heating area will be more obvious, or even impossible to implement. Moreover, the manufacturing process of the air-water heat exchanger is complicated, the price is high, and the hoisting and installation are difficult, which brings inconvenience to the popularization and application of the electric thermal storage boiler technology.

对于第二种方法:在解决上述第一种方法存在的各种缺点方面有了一定的改进,取消了第一种方法中的空气-水换热器,但是增加了蓄水箱,虽然蓄水箱的制作工艺简单,但蓄水箱的体积仍然庞大,占地面积大。此外,由于夜间谷电蓄热时间段水流不断的从蓄热体内吸收热量,导致蓄热体温度难以升高,降低了蓄热体的利用率。For the second method: some improvements have been made in solving the various shortcomings of the first method above, the air-water heat exchanger in the first method is cancelled, but a water storage tank is added, although the water storage The production process of the tank is simple, but the volume of the water storage tank is still huge and covers a large area. In addition, because the water flow continuously absorbs heat from the heat storage body during the night valley electricity heat storage period, it is difficult to increase the temperature of the heat storage body, which reduces the utilization rate of the heat storage body.

针对现有谷电蓄热锅炉技术方案的上述缺点,通过对蓄热锅炉产品结构与工艺技术创新,提供一种经济高效的谷电蓄热锅炉产品。Aiming at the above-mentioned shortcomings of the existing technical solutions of the valley electricity heat storage boiler, an economical and efficient valley electricity heat storage boiler product is provided by innovating the product structure and process technology of the heat storage boiler.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明要解决的技术问题是提供一种新型智能冷热水混合恒温供热装置。In view of the above problems, the technical problem to be solved by the present invention is to provide a new type of intelligent hot and cold mixed constant temperature heating device.

本发明的智能冷热水混合恒温供热装置,它包含第一阀门1-1、第二阀门1-2、第三阀门1-3、第四阀门1-4、第五阀门1-5、第一水泵2-1、第二水泵2-2、第三水泵2-3、第四水泵2-4、第五水泵2-5、补水箱3、喷头4、冷却水箱5、冷却水管6、蒸汽管7、回水管8、供水管9、混水罐10、蓄热装置11和排水管12, 补水箱3与冷却水箱5之间通过补水管3-1连接,补水管3-1上安装有第五水泵2-5, 冷却水箱5的上部设置有填料5-1,填料5-1的上部通过蒸汽管7与蓄热装置11连接,且冷却水箱5的顶部设置有喷头4,且喷头4的底部喷水管4-1与冷却水箱5的底部连通,且喷水管4-1上安装有第三水泵2-3,冷却水箱5的底部通过冷却水管6与蓄热装置11连接,且蓄热装置11的底部通过回水管8与混水罐10和冷却水箱5的中部连接,且与混水罐10连接的回水管8上设置有第四阀门1-4,与冷却水箱5的中部连接的回水管8上安装有第三阀门1-3,且混水罐10与蓄热装置11的顶部通过供水管9连接,且供水管9上安装有第二阀门1-2, 蓄热装置11的底部通过出水管11-1与排水管12连接,且出水管11-1上安装有第五阀门1-5。The intelligent hot and cold mixed thermostatic heating device of the present invention comprises a first valve 1-1, a second valve 1-2, a third valve 1-3, a fourth valve 1-4, a fifth valve 1-5, The first water pump 2-1, the second water pump 2-2, the third water pump 2-3, the fourth water pump 2-4, the fifth water pump 2-5, the replenishment tank 3, the nozzle 4, the cooling water tank 5, the cooling water pipe 6, The steam pipe 7, the water return pipe 8, the water supply pipe 9, the mixing tank 10, the heat storage device 11 and the drain pipe 12 are connected between the replenishment tank 3 and the cooling water tank 5 through the replenishment pipe 3-1, which is installed on the replenishment pipe 3-1 There is a fifth water pump 2-5, the upper part of the cooling water tank 5 is provided with a filler 5-1, the upper part of the filler 5-1 is connected with the heat storage device 11 through the steam pipe 7, and the top of the cooling water tank 5 is provided with a spray head 4, and the spray head The bottom water spray pipe 4-1 of 4 communicates with the bottom of the cooling water tank 5, and a third water pump 2-3 is installed on the water spray pipe 4-1, and the bottom of the cooling water tank 5 is connected with the heat storage device 11 through the cooling water pipe 6, And the bottom of the heat storage device 11 is connected with the middle of the mixing tank 10 and the cooling water tank 5 through the return pipe 8, and the return pipe 8 connected with the mixing tank 10 is provided with a fourth valve 1-4, which is connected with the cooling water tank 5. A third valve 1-3 is installed on the return pipe 8 connected in the middle, and the top of the mixing tank 10 and the heat storage device 11 is connected through a water supply pipe 9, and a second valve 1-2 is installed on the water supply pipe 9 to store heat. The bottom of the device 11 is connected to the drain pipe 12 through a water outlet pipe 11-1, and a fifth valve 1-5 is installed on the water outlet pipe 11-1.

本发明的有益效果:本装置中的蓄热体在蓄热时段没有水流过蓄热体,使蓄热体的蓄热温度比传统蓄热锅炉的蓄热温度高,提供了蓄热体的使用效率;使用冷却水箱取代了传统的蓄热水箱,并且不使用传统的风-水换热器,克服了传统电蓄热供暖两种方式的内在缺点,使得电蓄热锅炉的效率比传统有所提高,占地面积比传统蓄热锅炉至少减少50%。The beneficial effects of the present invention: the heat storage body in the device has no water flowing through the heat storage body during the heat storage period, so that the heat storage temperature of the heat storage body is higher than that of the traditional heat storage boiler, and the use of the heat storage body is provided. Efficiency; using a cooling water tank to replace the traditional hot water storage tank, and does not use the traditional air-water heat exchanger, overcomes the inherent shortcomings of the two traditional electric thermal storage heating methods, making the electric thermal storage boiler more efficient than the traditional one. The improvement, the floor space is reduced by at least 50% compared with the traditional regenerative boiler.

附图说明:Description of drawings:

为了易于说明,本发明由下述的具体实施及附图作以详细描述。For ease of description, the present invention is described in detail by the following specific implementations and accompanying drawings.

图1为本发明结构示意图。Figure 1 is a schematic structural diagram of the present invention.

附图标记:第一阀门1-1、第二阀门1-2、第三阀门1-3、第四阀门1-4、第五阀门1-5、第一水泵2-1、第二水泵2-2、第三水泵2-3、第四水泵2-4、第五水泵2-5、补水箱3、喷头4、冷却水箱5、冷却水管6、蒸汽管7、回水管8、供水管9、混水罐10、蓄热装置11、排水管12。Reference numerals: first valve 1-1, second valve 1-2, third valve 1-3, fourth valve 1-4, fifth valve 1-5, first water pump 2-1, second water pump 2 -2, the third water pump 2-3, the fourth water pump 2-4, the fifth water pump 2-5, the replenishment tank 3, the nozzle 4, the cooling water tank 5, the cooling water pipe 6, the steam pipe 7, the return water pipe 8, the water supply pipe 9 , Mixing tank 10 , heat storage device 11 , drain pipe 12 .

具体实施方式:Detailed ways:

如图1所示,本具体实施方式采用以下技术方案:它包含第一阀门1-1、第二阀门1-2、第三阀门1-3、第四阀门1-4、第五阀门1-5、第一水泵2-1、第二水泵2-2、第三水泵2-3、第四水泵2-4、第五水泵2-5、补水箱3、喷头4、冷却水箱5、冷却水管6、蒸汽管7、回水管8、供水管9、混水罐10、蓄热装置11和排水管12, 补水箱3与冷却水箱5之间通过补水管3-1连接,补水管3-1上安装有第五水泵2-5, 冷却水箱5的上部设置有填料5-1,填料5-1的上部通过蒸汽管7与蓄热装置11连接,且冷却水箱5的顶部设置有喷头4,且喷头4的底部喷水管4-1与冷却水箱5的底部连通,且喷水管4-1上安装有第三水泵2-3,冷却水箱5的底部通过冷却水管6与蓄热装置11连接,且蓄热装置11的底部通过回水管8与混水罐10和冷却水箱5的中部连接,且与混水罐10连接的回水管8上设置有第四阀门1-4,与冷却水箱5的中部连接的回水管8上安装有第三阀门1-3,且混水罐10与蓄热装置11的顶部通过供水管9连接,且供水管9上安装有第二阀门1-2, 蓄热装置11的底部通过出水管11-1与排水管12连接,且出水管11-1上安装有第五阀门1-5。As shown in FIG. 1, this specific embodiment adopts the following technical solutions: it includes a first valve 1-1, a second valve 1-2, a third valve 1-3, a fourth valve 1-4, and a fifth valve 1- 5. The first water pump 2-1, the second water pump 2-2, the third water pump 2-3, the fourth water pump 2-4, the fifth water pump 2-5, the water supply tank 3, the nozzle 4, the cooling water tank 5, the cooling water pipe 6. The steam pipe 7, the return pipe 8, the water supply pipe 9, the mixing tank 10, the heat storage device 11 and the drain pipe 12, the replenishment tank 3 and the cooling water tank 5 are connected through the replenishment pipe 3-1, and the replenishment pipe 3-1 A fifth water pump 2-5 is installed thereon, a filler 5-1 is arranged on the upper part of the cooling water tank 5, the upper part of the filler 5-1 is connected with the heat storage device 11 through the steam pipe 7, and the top of the cooling water tank 5 is provided with a spray head 4, And the bottom water spray pipe 4-1 of the spray head 4 is communicated with the bottom of the cooling water tank 5, and a third water pump 2-3 is installed on the spray pipe 4-1, and the bottom of the cooling water tank 5 is connected to the heat storage device 11 through the cooling water pipe 6. connected, and the bottom of the heat storage device 11 is connected to the middle of the mixing tank 10 and the cooling water tank 5 through the return pipe 8, and the return pipe 8 connected to the mixing tank 10 is provided with a fourth valve 1-4, which is connected to the cooling water tank. The third valve 1-3 is installed on the return pipe 8 connected in the middle of 5, and the top of the mixing tank 10 and the heat storage device 11 is connected through the water supply pipe 9, and the second valve 1-2 is installed on the water supply pipe 9, The bottom of the heat storage device 11 is connected to the drain pipe 12 through a water outlet pipe 11-1, and a fifth valve 1-5 is installed on the water outlet pipe 11-1.

本具体实施方式的工作原理为:夜间蓄热时段,第一阀门1-1与第二阀门1-2关闭,第五阀门1-5开启,当蓄热装置11中管道内的水排放后,电加热装置启动对蓄热装置11进行加热,当夜间谷电时段结束时,电加热结束,进入蓄热装置11释热时段,在释热时段,第五阀门1-5关闭,第二水泵2-2从冷却水箱5抽取冷却水缓慢注入蓄热装置11中炽热的钢管中对钢管进行冷却,冷却过程产生的蒸汽通过蒸汽管7进入冷却水箱5,第三水泵2-3从冷却水箱5中抽取冷却水通过喷头4喷洒到冷却水箱5中的填料5-1上,蒸汽与冷却水在填料5-1表面进行传热使蒸汽冷凝为高温冷凝水储存在冷却水箱5中,当冷却水箱5中的水温达到50℃时,第三阀门1-3与第四水泵2-4同时开启,建筑采暖管道系统中的25℃回水经过第三阀门1-3回到冷却水箱5中,冷却水箱5中的热水通过第四水泵2-4输送到建筑采暖管道中,当冷却水箱5中的水温降到30℃时,第三阀门1-3与第二水泵2-4同时关闭,上述过程一直持续到蓄热装置11中的钢管温度降低到注入钢管中的冷却水不再产生蒸汽为止,此时,第二水泵2-2、第三水泵2-3、第四水泵2-4、第三阀门1-3关闭,第一阀门1-1、第二阀门1-2开启,采暖系统中的25℃回水直接进入蓄热装置11的钢管中,当从钢管中流出的水温高于85℃时,第四阀门1-4开启,将系统25℃回水按比例引入混水罐10与高于85℃的高温水进行混合,使混合后的水温低于85℃,在任何时段,只要冷却水箱5中的水位低于设定水位,第五水泵2-5从补水箱3中抽取经软化后的软化水注入冷却水箱5中,直到到达设定的水位时,第五水泵2-5停止运行。The working principle of this specific embodiment is as follows: during the heat storage period at night, the first valve 1-1 and the second valve 1-2 are closed, and the fifth valve 1-5 is opened. The electric heating device starts to heat the heat storage device 11. When the valley electricity period at night ends, the electric heating ends, and the heat storage device 11 enters the heat release period. During the heat release period, the fifth valve 1-5 is closed, and the second water pump 2 -2 The cooling water is drawn from the cooling water tank 5 and slowly injected into the hot steel pipe in the heat storage device 11 to cool the steel pipe. The steam generated during the cooling process enters the cooling water tank 5 through the steam pipe 7, and the third water pump 2-3 from the cooling water tank 5. The cooling water is extracted and sprayed on the filler 5-1 in the cooling water tank 5 through the nozzle 4, and the steam and the cooling water conduct heat transfer on the surface of the filler 5-1 to condense the steam into high-temperature condensed water and store it in the cooling water tank 5. When the cooling water tank 5 When the water temperature reaches 50°C, the third valve 1-3 and the fourth water pump 2-4 are turned on at the same time, and the 25°C return water in the building heating pipeline system returns to the cooling water tank 5 through the third valve 1-3, and the cooling water tank The hot water in 5 is delivered to the building heating pipeline through the fourth water pump 2-4. When the water temperature in the cooling water tank 5 drops to 30°C, the third valve 1-3 and the second water pump 2-4 are closed at the same time. The above process It continues until the temperature of the steel pipe in the heat storage device 11 is reduced to the point where the cooling water injected into the steel pipe no longer generates steam. At this time, the second water pump 2-2, the third water pump 2-3, the fourth water pump 2-4, the The three valves 1-3 are closed, the first valve 1-1 and the second valve 1-2 are opened, and the 25°C return water in the heating system directly enters the steel pipe of the heat storage device 11. When the temperature of the water flowing out of the steel pipe is higher than 85°C At ℃, the fourth valve 1-4 is opened, and the 25 ℃ return water of the system is proportionally introduced into the mixing tank 10 to be mixed with high-temperature water higher than 85 ℃, so that the mixed water temperature is lower than 85 ℃. The water level in the cooling water tank 5 is lower than the set water level, the fifth water pump 2-5 extracts softened water from the replenishment tank 3 and injects it into the cooling water tank 5 until it reaches the set water level, the fifth water pump 2-5 Stop running.

以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Various changes and modifications fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (1)

1.一种新型智能冷热水混合恒温供热装置,其特征在于:它包含第一阀门(1-1)、第二阀门(1-2)、第三阀门(1-3)、第四阀门(1-4)、第五阀门(1-5)、第一水泵(2-1)、第二水泵(2-2)、第三水泵(2-3)、第四水泵(2-4)、第五水泵(2-5)、补水箱(3)、喷头(4)、冷却水箱(5)、冷却水管(6)、蒸汽管(7)、回水管(8)、供水管(9)、混水罐(10)、蓄热装置(11)和排水管(12),补水箱(3)与冷却水箱(5)之间通过补水管(3-1)连接,补水管(3-1)上安装有第五水泵(2-5), 冷却水箱(5)的上部设置有填料(5-1),填料(5-1)的上部通过蒸汽管(7)与蓄热装置(11)连接,且冷却水箱(5)的顶部设置有喷头(4),且喷头(4)的底部喷水管(4-1)与冷却水箱(5)的底部连通,且喷水管(4-1)上安装有第三水泵(2-3),冷却水箱(5)的底部通过冷却水管(6)与蓄热装置(11)连接,且蓄热装置(11)的底部通过回水管(8)与混水罐(10)和冷却水箱(5)的中部连接,且与混水罐(10)连接的回水管(8)上设置有第四阀门(1-4),与冷却水箱(5)的中部连接的回水管(8)上安装有第三阀门(1-3),且混水罐(10)与蓄热装置(11)的顶部通过供水管(9)连接,且供水管(9)上安装有第二阀门(1-2), 蓄热装置(11)的底部通过出水管(11-1)与排水管(12)连接,且出水管(11-1)上安装有第五阀门(1-5),所述的智能冷热水混合恒温供热装置的工作原理为:夜间蓄热时段,第一阀门(1-1)与第二阀门(1-2)关闭,第五阀门(1-5)开启,当蓄热装置(11)中管道内的水排放后,电加热装置启动对蓄热装置(11)进行加热,当夜间谷电时段结束时,电加热结束,进入蓄热装置(11)释热时段,在释热时段,第五阀门(1-5)关闭,第二水泵(2-2)从冷却水箱(5)抽取冷却水缓慢注入蓄热装置(11)中炽热的钢管中对钢管进行冷却,冷却过程产生的蒸汽通过蒸汽管(7)进入冷却水箱(5),第三水泵(2-3)从冷却水箱(5)中抽取冷却水通过喷头(4)喷洒到冷却水箱(5)中的填料(5-1)上,蒸汽与冷却水在填料(5-1)表面进行传热使蒸汽冷凝为高温冷凝水储存在冷却水箱(5)中,当冷却水箱(5)中的水温达到50℃时,第三阀门(1-3)与第四水泵(2-4)同时开启,建筑采暖管道系统中的25℃回水经过第三阀门(1-3)回到冷却水箱(5)中,冷却水箱(5)中的热水通过第四水泵(2-4)输送到建筑采暖管道中,当冷却水箱(5)中的水温降到30℃时,第三阀门(1-3)与第二水泵(2-4)同时关闭,上述过程一直持续到蓄热装置(11)中的钢管温度降低到注入钢管中的冷却水不再产生蒸汽为止,此时,第二水泵(2-2)、第三水泵(2-3)、第四水泵(2-4)、第三阀门(1-3)关闭,第一阀门(1-1)、第二阀门(1-2)开启,采暖系统中的25℃回水直接进入蓄热装置(11)的钢管中,当从钢管中流出的水温高于85℃时,第四阀门(1-4)开启,将系统25℃回水按比例引入混水罐(10)与高于85℃的高温水进行混合,使混合后的水温低于85℃,在任何时段,只要冷却水箱(5) 中的水位低于设定水位,第五水泵(2-5)从补水箱(3) 中抽取经软化后的软化水注入冷却水箱(5)中,直到到达设定的水位时,第五水泵(2-5)停止运行。1. A novel intelligent cold and hot water mixing thermostatic heating device, characterized in that: it comprises a first valve (1-1), a second valve (1-2), a third valve (1-3), a fourth valve (1-3), a Valve (1-4), fifth valve (1-5), first water pump (2-1), second water pump (2-2), third water pump (2-3), fourth water pump (2-4) ), fifth water pump (2-5), water supply tank (3), nozzle (4), cooling water tank (5), cooling water pipe (6), steam pipe (7), return water pipe (8), water supply pipe (9) ), the mixing tank (10), the heat storage device (11) and the drain pipe (12), the water supply tank (3) and the cooling water tank (5) are connected by a water supply pipe (3-1), and the water supply pipe (3- 1) The fifth water pump (2-5) is installed on it, the upper part of the cooling water tank (5) is provided with a filler (5-1), and the upper part of the filler (5-1) passes through the steam pipe (7) and the heat storage device (11). ) is connected, and the top of the cooling water tank (5) is provided with a spray head (4), and the bottom spray pipe (4-1) of the spray head (4) is communicated with the bottom of the cooling water tank (5), and the spray pipe (4- 1) A third water pump (2-3) is installed on it, the bottom of the cooling water tank (5) is connected to the heat storage device (11) through the cooling water pipe (6), and the bottom of the heat storage device (11) is connected through the return pipe (8) ) is connected with the middle of the mixing tank (10) and the cooling water tank (5), and the return pipe (8) connected with the mixing tank (10) is provided with a fourth valve (1-4), which is connected with the cooling water tank (5). A third valve (1-3) is installed on the return pipe (8) connected in the middle of the 9) A second valve (1-2) is installed on it, the bottom of the heat storage device (11) is connected to the drain pipe (12) through the water outlet pipe (11-1), and the water outlet pipe (11-1) is installed with a second valve (1-2). Five valves (1-5), the working principle of the intelligent hot and cold mixed constant temperature heating device is: during the night heat storage period, the first valve (1-1) and the second valve (1-2) are closed, and the first valve (1-1) and the second valve (1-2) are closed. The five valves (1-5) are opened. When the water in the pipeline in the heat storage device (11) is discharged, the electric heating device starts to heat the heat storage device (11). Entering the heat release period of the heat storage device (11), during the heat release period, the fifth valve (1-5) is closed, and the second water pump (2-2) draws cooling water from the cooling water tank (5) and slowly injects it into the heat storage device (11) The steel pipe is cooled in the hot steel pipe in ), the steam generated during the cooling process enters the cooling water tank (5) through the steam pipe (7), and the third water pump (2-3) extracts the cooling water from the cooling water tank (5) through the nozzle ( 4) sprayed onto the packing (5-1) in the cooling water tank (5), the steam and the cooling water conduct heat transfer on the surface of the packing (5-1) to condense the steam into high-temperature condensed water and store it in the cooling water tank (5), When the water temperature in the cooling water tank (5) reaches 50°C, the third valve (1-3) and the fourth water pump (2-4) are opened at the same time, and the building adopts The 25°C return water in the heating pipe system is returned to the cooling water tank (5) through the third valve (1-3), and the hot water in the cooling water tank (5) is transported to the building heating pipeline through the fourth water pump (2-4). , when the water temperature in the cooling water tank (5) drops to 30°C, the third valve (1-3) and the second water pump (2-4) are closed at the same time, and the above process continues until the heat storage device (11). The temperature of the steel pipe is lowered until the cooling water injected into the steel pipe no longer produces steam. At this time, the second water pump (2-2), the third water pump (2-3), the fourth water pump (2-4), the third valve ( 1-3) is closed, the first valve (1-1) and the second valve (1-2) are opened, the 25°C return water in the heating system directly enters the steel pipe of the heat storage device (11), and when it flows out of the steel pipe When the water temperature is higher than 85°C, the fourth valve (1-4) is opened, and the 25°C return water of the system is introduced into the mixing tank (10) in proportion to mix with the high-temperature water higher than 85°C, so that the mixed water temperature is low At 85°C, at any time, as long as the water level in the cooling water tank (5) is lower than the set water level, the fifth water pump (2-5) draws softened water from the replenishing water tank (3) and injects it into the cooling water tank (5). ) until reaching the set water level, the fifth water pump (2-5) stops running.
CN201710328538.9A 2017-05-11 2017-05-11 Novel intelligence hot and cold water mixing constant temperature heat supply device Active CN106931630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710328538.9A CN106931630B (en) 2017-05-11 2017-05-11 Novel intelligence hot and cold water mixing constant temperature heat supply device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710328538.9A CN106931630B (en) 2017-05-11 2017-05-11 Novel intelligence hot and cold water mixing constant temperature heat supply device

Publications (2)

Publication Number Publication Date
CN106931630A CN106931630A (en) 2017-07-07
CN106931630B true CN106931630B (en) 2022-04-12

Family

ID=59430073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710328538.9A Active CN106931630B (en) 2017-05-11 2017-05-11 Novel intelligence hot and cold water mixing constant temperature heat supply device

Country Status (1)

Country Link
CN (1) CN106931630B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108592007B (en) * 2018-06-25 2024-05-03 江苏天楹环保能源成套设备有限公司 Circulating cooling water supplementing system of fire tube boiler
CN110173749B (en) * 2019-04-02 2023-09-26 北京工业大学 A low-valley electric heat storage household heating system
CN111255534B (en) * 2020-03-31 2024-06-11 西安西热节能技术有限公司 Steam storage peak regulation system and method applied to industrial steam supply system of coal-fired unit

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1042771A (en) * 1988-11-05 1990-06-06 利夫·雅各森 Steam condensation method and equipment thereof
CN202048564U (en) * 2011-05-09 2011-11-23 山东济矿民生热能有限公司 Heat accumulating type boiler steam condenser
CN202403323U (en) * 2012-01-05 2012-08-29 寿光泰达空调设备有限公司 Heat storing and supplying system using sewage source heat pump
CN102679441A (en) * 2011-12-24 2012-09-19 河南科技大学 Low-temperature hot-water warming system
JP2013108630A (en) * 2011-11-17 2013-06-06 Corona Corp Hot-water storage type hot-water supply apparatus
CN105352023A (en) * 2015-12-02 2016-02-24 宋世海 Secondary heat exchange and heat supply system having low-valley electrical heating energy storage
KR20170029959A (en) * 2015-09-08 2017-03-16 백진순 Combined hot water heating systems using thermal oil as heat accumulation substance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1042771A (en) * 1988-11-05 1990-06-06 利夫·雅各森 Steam condensation method and equipment thereof
CN202048564U (en) * 2011-05-09 2011-11-23 山东济矿民生热能有限公司 Heat accumulating type boiler steam condenser
JP2013108630A (en) * 2011-11-17 2013-06-06 Corona Corp Hot-water storage type hot-water supply apparatus
CN102679441A (en) * 2011-12-24 2012-09-19 河南科技大学 Low-temperature hot-water warming system
CN202403323U (en) * 2012-01-05 2012-08-29 寿光泰达空调设备有限公司 Heat storing and supplying system using sewage source heat pump
KR20170029959A (en) * 2015-09-08 2017-03-16 백진순 Combined hot water heating systems using thermal oil as heat accumulation substance
CN105352023A (en) * 2015-12-02 2016-02-24 宋世海 Secondary heat exchange and heat supply system having low-valley electrical heating energy storage

Also Published As

Publication number Publication date
CN106931630A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN205299702U (en) Central heating system provides multiple forms of energy to complement each other
CN106440397B (en) It is a kind of seasonally to descend composite heat storage system
CN204555414U (en) A kind of degression type steam condensate (SC) reclaiming system
CN208983651U (en) A solar collector water supply system
CN201310986Y (en) Solar energy integrated system for household heating and heat supply
CN106931630A (en) A kind of novel intelligent hot and cold water mixing constant temperature heating plant
CN201396836Y (en) Household solar central heating device
CN2926914Y (en) Waste heat recovery heat pump water heater
CN205783215U (en) The energy-conservation heat-exchange unit of high-effect, lower resistance
CN204593568U (en) A kind of transformer station's house heating system based on power transformer loss
CN202734236U (en) Fully automatic energy storage instant electric water heater
CN207299103U (en) A kind of central heating heat distribution pipe network is every pressure heat-exchange system
CN205825425U (en) A kind of energy-efficiency Type Hot Water Heating System
CN214581875U (en) Deep and shallow combined EHT coupled heat exchange well system
CN103256716A (en) Method and device for recovering retention heat of gas heating water heater
CN109357302A (en) Pneumoelectric composite heating water heater
CN204313478U (en) A kind of once-through cycle formula air-source water heater
CN108916978A (en) A kind of solar energy central water supply system of good antiscale property
CN206875694U (en) A kind of novel intelligent hot and cold water mixing constant temperature heating plant
CN201885297U (en) Solar floor heating and hot water supply system
CN209386397U (en) A kind of graphene electric heating system based on solar energy auxiliary heating
CN208871902U (en) A kind of green energy conservation moving energy station provided multiple forms of energy to complement each other
CN207112994U (en) Storing energy and supplying hot system
CN207365150U (en) A kind of family's heat supply network active heat-exchange system in central heating system
CN206291511U (en) A kind of novel solar water heating system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A new type of intelligent mixed hot and cold water constant temperature heating device

Granted publication date: 20220412

Pledgee: Bank of Communications Ltd. Liaoning branch

Pledgor: SHENYANG HENGJIU ANTAI ENVIRONMENTAL PROTECTION AND ENERGY SAVING TECHNOLOGY CO.,LTD.

Registration number: Y2024980051190

PE01 Entry into force of the registration of the contract for pledge of patent right