CN106931600A - A kind of method for determining building air-conditioning pump energy saving operating scheme - Google Patents

A kind of method for determining building air-conditioning pump energy saving operating scheme Download PDF

Info

Publication number
CN106931600A
CN106931600A CN201710161675.8A CN201710161675A CN106931600A CN 106931600 A CN106931600 A CN 106931600A CN 201710161675 A CN201710161675 A CN 201710161675A CN 106931600 A CN106931600 A CN 106931600A
Authority
CN
China
Prior art keywords
air
conditioning
water pump
cold
annual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710161675.8A
Other languages
Chinese (zh)
Other versions
CN106931600B (en
Inventor
吴延奎
朱树园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Cloud Design Consulting Service Co Ltd
Original Assignee
Shenzhen Cloud Design Consulting Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Cloud Design Consulting Service Co Ltd filed Critical Shenzhen Cloud Design Consulting Service Co Ltd
Priority to CN201710161675.8A priority Critical patent/CN106931600B/en
Publication of CN106931600A publication Critical patent/CN106931600A/en
Application granted granted Critical
Publication of CN106931600B publication Critical patent/CN106931600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/85Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using variable-flow pumps

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides a kind of method for determining building air-conditioning pump energy saving operating scheme, comprise the following steps:Air-conditioning whole year load is calculated, feature and residing geographical position according to building determine that computation model and boundary condition obtain the relevant parameter of computation model, annual air-conditioning refrigeration duty is calculated in computation model;Determine that refrigeration host computer equipment is in the duration of operation at part load, the annual air-conditioning cold load Analysis according to computation model determine that refrigeration host computer equipment is in the duration of operation at part load;Determine water pump of air conditioner operating scheme, according to refrigeration host computer equipment operation at part load hourage, determine fractional energy savings in air-conditioning system it is maximum newly establish water pump of air conditioner operating scheme.The present invention proposes a kind of method for newly establishing water pump of air conditioner operating scheme, is easy to as the different building types of different cities select different water pump of air conditioner equipment and air-conditioning system and operational mode are improved so that its is energy-saving, and design of air conditioning is more reasonable.

Description

A kind of method for determining building air-conditioning pump energy saving operating scheme
Technical field
It is more particularly to a kind of for determining building air-conditioning water pump section the present invention relates to computer aided calculation technical field The method of energy operating scheme.
Background technology
Water system conveying energy consumption is one of mostly important part of air-conditioning system comprehensive energy consumption, for fan unit piping More than the 20% of the system basic duty adjusting system comprehensive energy consumption of water system conveying energy consumption.Water system conveying energy consumption is reduced for air-conditioning system System energy-conservation just seems relatively important.
It is for reducing the conventional way of water system conveying energy consumption at present, for two stage pump variable flow system, can be to two grades Pump uses VFC, and for primary pump and one-level pump variable flow system, because water pump and refrigeration host computer are corresponded, in order to Ensure the water-carrying capacity of refrigeration host computer, VFC is not often used, if VFC, water pump and refrigeration host computer must be used Be required to set frequency converter, do so one side input cost compare it is larger, in addition refrigeration host computer allow changes in flow rate It is relatively limited, and the refrigeration host computer of various brands differs.
Cannot ensure that water pump of air conditioner most energy-conservation, particularly primary pump and primary pump in whole year operation become by current method Flow system.
The content of the invention
The present invention is directed to above-mentioned defect of the prior art, it is proposed that following technical scheme.
The present invention provides a kind of method for determining building air-conditioning pump energy saving operating scheme, and it includes following step Suddenly:
S1, calculating air-conditioning whole year load, it specifically includes following steps:
S11, longitude and latitude according to where building, determine the meteorologic parameter of building region;
S12, room general layout parameter and floor information parameter are determined according to the general layout and floor information of building;
S13, determine building enclosure parameter:The building enclosure parameter includes Shape Coefficient, window-wall ratio, the heat transfer system of aspect Number, the heat transfer system of the heat transfer coefficient of exterior wall, the heat transfer coefficient of floor, the heat transfer coefficient of interior wall, the heat transfer coefficient of exterior window, external door The heat transfer coefficient of number, the heat transfer coefficient of inside door and interior window;
S14, the room parameter for determining building:The room parameter includes building type, indoor design temperature, relative Humidity, density of personnel, illumination density, plant capacity density and resh air requirement;
The total refrigeration duty Q of S15, air-conditioning system when determining any iI is cold,QI is cold=f (A+B+C), wherein A represents building Feature and B represent residing geographical position, and C represents boundary condition;
S2, determine that refrigeration host computer equipment is in the duration of operation at part load, air-conditioning system during according to any i it is total cold Load QI is coldDetermine that refrigeration host computer equipment is in the duration of operation at part load;
S21, the annual air-conditioning maximum cold load value Q of determinationThe cold max of i
S22, determination need to open the annual air-conditioning part refrigeration duty Q of refrigeration host computerI is coldDuration;
S23, determination need the annual air-conditioning part refrigeration duty Q at each moment for opening refrigeration host computerI is coldWith maximum cold load value QThe cold max of iRatio 0~10%, 10%~20%, 20%~30%, 30%~40%, 40%~50%, 50%~60%, The corresponding annual air-conditioning part refrigeration duty of 60%~70%, 70%~80%, 80%~90%, 90%~100% each ratio section QI is coldDuration and each ratio section annual air-conditioning part refrigeration duty QI is coldDuration shared by annual air-conditioning using the ratio of duration, obtain Obtain the annual air-conditioning refrigeration duty statistical form at each moment.
S3, determine water pump of air conditioner operating scheme, according to refrigeration host computer equipment operation at part load hourage, it is determined that empty What fractional energy savings was maximum in adjusting system newly establishes water pump of air conditioner operating scheme,
Determine that the water pump of air conditioner progress control method step of newly establishing of air-conditioning system most energy-conservation is specifically included in S3:
S31, the annual air-conditioning refrigeration duty statistical form according to each moment, determine various to newly establish water pump of air conditioner operating scheme;
S32, various water pump of air conditioner operating schemes of newly establishing are verified, determine fractional energy savings it is maximum newly establish air conditioner water Pump operation scheme.
Preferably, the annual air-conditioning refrigeration duty statistical form at each moment includes the annual air-conditioning part refrigeration duty at each moment QI is coldWith maximum cold load value QThe cold max of iRatio, the annual air-conditioning part refrigeration duty Q of each ratio sectionI is coldDuration and each ratio section Annual air-conditioning part refrigeration duty QI is coldDuration shared by annual air-conditioning using duration ratio.
Preferably, water pump of air conditioner operating scheme is newly established to be specially:
Newly-increased water pump and raw water pump parallel running, and switched over by the motor-driven valve being arranged on pipeline, when detecting System water supply flow when being less than certain setting value, operation water pump is switched to by raw water pump and newly establishes water pump, be when what is detected System water supply flow then switches back into raw water pump when being higher than certain setting value.
Preferably, S32 specifically includes following steps:
According to pipe system performance curve formula, pipe network hinders a under air-conditioning system part load conditions under the various operating schemes of calculating Power,
Wherein, pipe system performance curve formula is H=SQ2, wherein H be resistance of pipe system Pa, S be it is related to pipe network composition because Son, Q is air-conditioning system water-carrying capacity m3/ h, for same pipe network, S values are fixed, H and Q2It is directly proportional, when load becomes hour, Resistance of pipe system diminishes therewith;
B calculations of air conditioner system pump heads, obtain water pump of air conditioner operating scheme table, the water pump of air conditioner operating scheme table bag Include annual air-conditioning refrigeration duty, air-conditioning system water-carrying capacity, air-conditioning system pump head, the big pump power of air-conditioning system and air-conditioning system Unite small pump power;
C calculates annual non-warm season air-conditioning system comprehensive energy consumption according to water pump of air conditioner operating scheme meter, to each operating scheme Annual non-warm season air-conditioning system comprehensive energy consumption be compared, determine fractional energy savings in air-conditioning system it is maximum newly establish air conditioner water Pump operation scheme.
Preferably, fractional energy savings maximum newly establishing in water pump of air conditioner operating scheme opens system the need for correspondence in air-conditioning system The annual air-conditioning part refrigeration duty Q at each moment of cold main frameI is coldWith maximum cold load value QThe cold max of iRatio be 80%~90%.
Technique effect of the invention is:Propose one kind and newly establish water pump of air conditioner progress control method so that air-conditioning water system In whole year operation, particularly in operation at part load, water pump efficiency is high for the water pump that system design is selected, water system conveying Energy consumption is relatively low, is easy to select different water pump of air conditioner and to air-conditioning system and operational mode for the different building types of different cities It is improved so that its is energy-saving.
Brief description of the drawings
Fig. 1 is a kind of flow chart for newly establishing water pump of air conditioner progress control method of the invention;
Fig. 2 is one of schematic diagram of a computation model of the invention;
Fig. 3 is the two of the schematic diagram of a computation model of the invention;
Fig. 4 is the three of the schematic diagram of a computation model of the invention;
Fig. 5 is the four of the schematic diagram of a computation model of the invention;And
Fig. 6 is water pump adapter schematic diagram of the invention.
Specific embodiment
1-6 and specific embodiment are specifically described to the present invention below in conjunction with the accompanying drawings.
Fig. 1 shows a kind of method for determining building air-conditioning pump energy saving operating scheme of the invention, the method Comprise the following steps:
S1, calculating air-conditioning whole year load, feature and residing geographical position according to building determine computation model and side Boundary's condition obtains the relevant parameter of computation model, and annual air-conditioning refrigeration duty is calculated in computation model;
S2, determine that refrigeration host computer equipment is in the duration of operation at part load, annual air-conditioning cold according to computation model is born Lotus analysis determines that refrigeration host computer equipment is in the duration of operation at part load;
S3, determine water pump of air conditioner operating scheme, according to refrigeration host computer equipment operation at part load hourage, it is determined that empty What fractional energy savings was maximum in adjusting system newly establishes water pump of air conditioner operating scheme.
Further, the relevant parameter of computation model includes out door climatic parameter, room general layout and floor information in S1 Parameter, building enclosure parameter and room parameter.
Further, the whole year carry calculation of air-conditioning described in S1 specifically includes following steps:
S11, the city according to where building, determine out door climatic parameter;The present embodiment is from Chinese Typical Representative meteorology year (CNTMY) meteorological data as air-conditioning system comprehensive energy consumption analytical calculation out door climatic parameter.That is meteorologic parameter setting steps Concrete operations be:Corresponding outdoor weather is selected from Chinese typical meteorological year meteorological data based on the location of air-conditioning system Parameter.At present, annual out door climatic parameter is all using a hour as calculating duration.
S12, room general layout and floor information parameter that computation model is determined according to the general layout and floor information of building;
S13, the building enclosure parameter for determining computation model:The building enclosure parameter includes Shape Coefficient, window-wall ratio, layer The heat transfer coefficient in face, the heat transfer coefficient of exterior wall, the heat transfer coefficient of floor, the heat transfer coefficient of interior wall, the heat transfer coefficient of exterior window, external door Heat transfer coefficient, the heat transfer coefficient of inside door and interior window heat transfer coefficient;
S14, the room parameter for determining computation model:The room parameter includes building type, indoor design temperature, phase To humidity, density of personnel, illumination density, plant capacity density and resh air requirement;
S15, relevant parameter is input into computation model, determines the annual air-conditioning total refrigeration duty of building;And obtain any i When air-conditioning system i when total refrigeration duty Qi it is cold.
Further, determine that duration of the refrigeration host computer equipment in operation at part load specifically includes following step in S2 Suddenly:
S21, the annual air-conditioning maximum cold load value Q of determinationThe cold max of i;Annual air-conditioning total refrigeration duty QIt is coldBy the annual load chosen Software for calculation is directly calculated, while Q when obtaining any iI is cold, QI is coldTotal refrigeration duty during as air-conditioning system i.Whole year is negative Lotus software for calculation directly uses the existing Load Software in market, and the achievements of a ruler that we choose relatively simple practicality herein is complete Year carry calculation and energy consumption analysis software HY-EP4.0.
S22, determination need to open the annual air-conditioning part refrigeration duty Q of refrigeration host computerI is coldDuration;
S23, determination need the annual air-conditioning part refrigeration duty Q at each moment for opening refrigeration host computerI is coldWith maximum cold load value QThe cold max of iRatio 0~10%, 10%~20%, 20%~30%, 30%~40%, 40%~50%, 50%~60%, The corresponding annual air-conditioning part refrigeration duty of 60%~70%, 70%~80%, 80%~90%, 90%~100% each ratio section QI is coldDuration and each ratio section annual air-conditioning part refrigeration duty QI is coldDuration shared by annual air-conditioning using the ratio of duration, obtain Obtain the annual air-conditioning refrigeration duty statistical form at each moment.
Further, determine in S3 air-conditioning system most energy-conservation to newly establish water pump of air conditioner progress control method step specific Including:
S31, the annual air-conditioning refrigeration duty statistical form according to each moment, determine various to newly establish water pump of air conditioner operating scheme;
S32, various water pump of air conditioner operating schemes of newly establishing are verified, determine fractional energy savings it is maximum newly establish air conditioner water Pump operation scheme.
Further, water pump of air conditioner operating scheme is newly established to be specially:
Newly-increased water pump and raw water pump parallel running, and switched over by the motor-driven valve being arranged on pipeline, when detecting System water supply flow when being less than certain setting value, operation water pump is switched to by raw water pump and newly establishes water pump, be when what is detected System water supply flow then switches back into raw water pump when being higher than certain setting value.
Further, S32 specifically includes following steps:
According to pipe system performance curve formula, pipe network hinders a under air-conditioning system part load conditions under the various operating schemes of calculating Power,
Wherein, pipe system performance curve formula is H=SQ2, wherein H be resistance of pipe system Pa, S be it is related to pipe network composition because Son, Q is air-conditioning system water-carrying capacity m3/ h, for same pipe network, S values are fixed, H and Q2It is directly proportional, when load becomes hour, Resistance of pipe system diminishes therewith;
B calculations of air conditioner system pump heads, obtain water pump of air conditioner operating scheme table, the water pump of air conditioner operating scheme table bag Include annual air-conditioning refrigeration duty, air-conditioning system water-carrying capacity, air-conditioning system pump head, the big pump power of air-conditioning system and air-conditioning system Unite small pump power;
C calculates annual non-warm season air-conditioning system comprehensive energy consumption according to water pump of air conditioner operating scheme meter, to each operating scheme Annual non-warm season air-conditioning system comprehensive energy consumption be compared, determine fractional energy savings in air-conditioning system it is maximum newly establish air conditioner water Pump operation scheme.
Further, fractional energy savings maximum newly establishing in water pump of air conditioner operating scheme is opened the need for correspondence in air-conditioning system Open the annual air-conditioning part refrigeration duty Q at each moment of refrigeration host computerI is coldWith maximum cold load value QThe cold max of iRatio for 80%~ 90%.
Specific embodiment one
Fig. 2~Fig. 5 show practical engineering project in an office building (being divided into A, Building B) as computation model, the calculating 1~17 layer of model is divided into 8 unlimited offices and 2 aisle for index bed, and 18 layers are divided into 22 offices and 4 are walked Toilet, equipment room, stair in road, wherein Core Walls Structure etc. are not counted in air conditioning area.The building is located at Guangzhou (hot summer and warm winter zone) Area, air conditioning terminal system uses fan coil+VMC.
Tu2Zhong a areas are the first office, and area is 311.5m2, b areas are the second office, and area is 311.5m2, c areas are Core Walls Structure stair, elevator, d areas are Core Walls Structure stair, and e areas are aisle, and area is 488.41m2, f areas are the first office, area It is 311.5m2, g areas are the second office, and area is 311.5m2
Tu3Zhong a areas are the first office, and area is 311.5m2, b areas are the second office, and area is 311.5m2, c areas are Core Walls Structure stair, elevator, d areas are Core Walls Structure stair, and e areas are aisle, and area is 488.41m2, f areas are the first office, area It is 311.5m2, g areas are the second office, and area is 311.5m2
Tu4Zhong a areas are the first office, and area is 76m2, b areas are the second office, and area is 63.01m2, c areas are the Three offices, area is 129.09m2, d areas are the 4th office, and area is 55.5m2, e areas are the 5th office, and area is 180m2, f areas are the 6th office, and area is 116.15m2, g areas are the 7th office, and area is 124.02m2, h areas are the 8th Office, area is 45m2, i areas are the 9th office, and area is 142.58m2, j areas are the tenth office, and area is 111.1m2, k areas are the 11st office, and area is 77.77m2, l areas are the first passageway, and area is 171.44m2, m areas are first Passageway, area is 190.78m2, n areas are Core Walls Structure stair, elevator, and o areas are Core Walls Structure stair.
Tu5Zhong a areas are the first office, and area is 55.5m2, b areas are the second office, and area is 116.15m2, c areas are 3rd office, area is 77.77m2, d areas are the 4th office, and area is 111.1m2, e areas are the 5th office, and area is 129.09m2, f areas are the 6th office, and area is 63.01m2, g areas are the 7th office, and area is 124.02m2, h areas are the Eight offices, area is 45m2, i areas are the 9th office, and area is 142.58m2, j areas are the tenth office, and area is 76m2, K areas are the 11st office, and area is 180m2, l areas are the first passageway, and area is 171.44m2, m areas are the first passageway, area It is 190.78m2, n areas are Core Walls Structure stair, elevator, and o areas are Core Walls Structure stair.
The calculating time of office is defined by the work hours of general clerical workforce, and specially 8:00~18:00, all minor details are false Day does not calculate.Building enclosure parameter takes building energy conservation calculated value, specifically refers to table 1.Indoor meteorologic parameter, density of personnel, equipment The value of power, illumination density and utilization rate is defined by design load, is specifically shown in Table 2.For the sake of simple, it is assumed here that room parameter Whole year does not change.
Table 1:Enclosed structure parameter list
The room parameter table of table 2
Then, annual load is carried out to computation model from achievements of a ruler whole year carry calculation and energy consumption analysis software HY-EP4.0 Calculate, its maximum cold load value QThe cold max of iIt is 6609kw.The Air-conditioner design of former computation model by when item by item refrigeration duty value be 9789.7kw。
The annual refrigeration duty that will be calculated deducts the hourage (duration) that need not open refrigeration host computer, that is, deduct nature room Temperature is less than 22 DEG C and only opens the time of waste heat in decontamination chamber by new blower fan, and will need each moment of unlatching refrigeration host computer Annual each moment air-conditioning refrigeration duty QI is coldCorresponding to maximum refrigeration duty QThe cold max of iThe ratio of value is 0~10%, 10%~20%, 20% ~30%, 30%~40%, 40%~50%, 50%~60%, 60%~70%, 70%~80%, 80%~90%, 90% The ratio that the duration and the corresponding duration of~100% each ratio section account for total duration does corresponding statistics, obtains the whole year at each moment Air-conditioning refrigeration duty statistical form, specifically refers to table 3.
The annual dynamic refrigeration duty Data-Statistics table of table 3
QI is cold/QThe cold max of iRatio The corresponding refrigeration duty of different proportion Hourage Hourage proportion
0~10% 0~660.96 4.00 0.22%
10%~20% 660.96~1321.92 85.00 4.68%
20%~30% 1321.92~1982.88 232.00 12.77%
30%~40% 1982.88~2643.84 278.00 15.30%
40~50% 2643.84~3304.80 273.00 15.02%
50%~60% 3304.80~3965.76 290.00 15.96%
60%~70% 3965.76~4626.72 315.00 17.34%
70%~80% 4626.72~5287.69 237.00 13.04%
80%~90% 5287.69~5948.65 92.00 5.06%
90%~100% 5948.65~6609.61 10.00 0.55%
The water pump of air conditioner scheme (scheme 1) that former operating scheme is selected is 1 242m3The small pump of/h and 2 727m3/ h's is big Pump.And according to the dynamic cooling load distribution rule of table 3, for annual water pump of air conditioner Effec-tive Function, water system conveying is reduced as far as possible The principle of energy consumption, increases 3 of water pump of air conditioner newly, and 2 big one is small, is corresponded with main frame, increases water pump of air conditioner newly with former water pump of air conditioner It is connected in parallel, electrically operated valve is set on branch pipe, connection diagram refers to Fig. 6, in figure, two groups of refrigeration units (big) 1 and one group of system Cold group (small) 2 is connected by water pump of air conditioner 3 with return pipe 4 respectively, and multiple water pump of air conditioner are connected in parallel.In order to obtain most energy-conservation Water pump of air conditioner operation method, 11 kinds of operation methods are listed here and are compared.Scheme 1, is the water pump of air conditioner of former design selection Scheme.2~scheme of scheme 11, be air conditioner load corresponding table 3 in different proportion, by formula H=SQ2Calculate corresponding water Pump lift.Specific data refer to table 4, table 5.
The resistance of pipe system of the computation model of table 4 constitutes table
Main frame pressure drop (m) Computer room pipe resistance (m) End pressure drop (m) Fixed resistance (m) Variable resistance of pipe system (m) System drag overall (pump head) (m)
7.2 2 4 13.2 27.8 41
The water pump of air conditioner operation method table of table 5
Scheme Load (kw) Flow (m3/h) Lift (m) Big pump power (KW) Small pump power (KW)
Scheme 1 (former scheme) 9846 1696 41 132 55
Scheme 2 (100%) 6609.61 1136.65 25.69 90 30
Scheme 3 (90%) 5948.65 1022.98 23.31 75 22
Scheme 4 (80%) 5287.69 909.32 21.19 55 22
Scheme 5 (70%) 4626.72 795.65 19.32 55 22
Scheme 6 (60%) 3965.76 681.99 17.70 55 18.5
Scheme 7 (50%) 3304.80 568.32 16.32 45 18.5
Scheme 8 (40%) 2643.84 454.66 15.20 45 18.5
Scheme 9 (30%) 1982.88 340.99 14.32 45 18.5
Scheme 10 (20%) 1321.92 227.33 13.70 37 15
Scheme 11 (10%) 660.96 113.66 13.32 37 15
It is by the patent name that applicant applies by above-mentioned 11 kinds of schemes:A kind of non-warm season air-conditioning system comprehensive energy consumption Analysis method, the patent of invention of Application No. 2016109743028 carry out annual non-warm season air-conditioning system comprehensive energy consumption and calculate, Circular is as follows:
According to formula WAlways=WIt is cold+WGas+WWaterThe comprehensive energy consumption of calculations of air conditioner system, wherein, WAlwaysIt is air-conditioning system comprehensive energy consumption, WIt is coldIt is energy consumption for cooling, WGasIt is air system conveying energy consumption, WWaterIt is water system conveying energy consumption.
Wherein, COP is coefficient of performance of refrigerating, and total refrigeration duty during the cold i for air-conditioning system of Qi, t is cold It is the low-temperature receiver available machine time;
Air system conveying energy consumption WGasComputational methods be:
Wherein, NI endsIt is end-equipment power, tEndIt is the available machine time of end-equipment.
Water system conveying energy consumption WWaterComputational methods be:
Wherein, COP is coefficient of performance of refrigerating, QI is coldTotal refrigeration duty during for air-conditioning system i, tIt is coldIt is low-temperature receiver available machine time, NI is cold To run the plant capacity of handpiece Water Chilling Units, NI waterTo run the plant capacity of water pump, NI towersTo run the plant capacity of cooling tower.Its Middle refrigeration host computer, end-equipment, pipe-line system are calculated according to the design of former air-conditioning system.It is the results detailed in Table 6.
The air-conditioning system comprehensive energy consumption comparison sheet of 6 11 kinds of schemes of table
It can be seen from Table 6 that, select scheme 4, i.e. QI is cold/QThe cold max of iRatio be 80% when, air-conditioning system most energy-conservation, relatively In water system conveying energy consumption, 53.54% energy consumption can be saved, relative to air-conditioning system comprehensive energy consumption, 5.7% energy can be saved Consumption.If calculated by the 0.88 yuan/KWh of electricity price in current Guangzhou, most I saves 124988 yuan every year.
The present invention can be different regions difference Building Design suitable water pump of air conditioner scheme, and more for energy consumption System propose corrective measure, with energy-saving and emission-reduction, so as to save the substantial amounts of energy.
Method of the present invention, can be realized by computer program, it is also possible to by computer program storage in storage On medium, processor reads computer program from storage medium, and performs corresponding method, completes the work of series compensation device Make the monitoring of state, it is ensured that its work safety.
It should be noted last that:Above example only illustrates and not to limit technical scheme, although reference Above-described embodiment has been described in detail to the present invention, it will be understood by those within the art that:Still can be to this hair It is bright to modify or equivalent, any modification or partial replacement without departing from the spirit and scope of the present invention, it all should Cover in the middle of scope of the presently claimed invention.

Claims (5)

1. a kind of method for determining building air-conditioning pump energy saving operating scheme, it is characterised in that:It is comprised the following steps:
S1, the calculating air-conditioning whole year load, it specifically includes following steps:
S11, longitude and latitude according to where building, determine the meteorologic parameter of building region;
S12, room general layout parameter and floor information parameter are determined according to the general layout and floor information of building;
S13, determine building enclosure parameter:The building enclosure parameter include Shape Coefficient, window-wall ratio, the heat transfer coefficient of aspect, It is the heat transfer coefficient of exterior wall, the heat transfer coefficient of floor, the heat transfer coefficient of interior wall, the heat transfer coefficient of exterior window, the heat transfer coefficient of external door, interior The heat transfer coefficient of door and the heat transfer coefficient of interior window;
S14, the room parameter for determining building:The room parameter includes building type, indoor design temperature, relatively wet Degree, density of personnel, illumination density, plant capacity density and resh air requirement;
The total refrigeration duty Q of S15, air-conditioning system when determining any iI is cold,QI is cold=f (A+B+C), wherein A represent the feature of building Residing geographical position is represented with B, C represents boundary condition;
S2, determine refrigeration host computer equipment be in operation at part load duration, the theoretical load of air-conditioning system during according to any i Amount determines that refrigeration host computer equipment is in the duration of operation at part load;
S21, the annual air-conditioning maximum cold load value Q of determinationThe cold max of i
S22, determination need to open the annual air-conditioning part refrigeration duty Q of refrigeration host computerI is coldDuration;
S23, determination need the annual air-conditioning part refrigeration duty Q at each moment for opening refrigeration host computerI is coldWith maximum cold load value QThe cold max of i Ratio 0~10%, 10%~20%, 20%~30%, 30%~40%, 40%~50%, 50%~60%, 60%~ 70%th, 70%~80%, 80%~90%, the corresponding annual air-conditioning part refrigeration duty Q of 90%~100% each ratio sectionI is coldWhen The annual air-conditioning part refrigeration duty Q of long and each ratio sectionI is coldDuration shared by annual air-conditioning using duration ratio, when obtaining each The annual air-conditioning refrigeration duty statistical form at quarter.
S3, determine water pump of air conditioner operating scheme, according to refrigeration host computer equipment in the hourage of operation at part load, determine air-conditioning system What fractional energy savings was maximum in system newly establishes water pump of air conditioner operating scheme.
Determine that the water pump of air conditioner progress control method step of newly establishing of air-conditioning system most energy-conservation is specifically included in S3:
S31, the annual air-conditioning refrigeration duty statistical form according to each moment, determine various to newly establish water pump of air conditioner operating scheme;
S32, various water pump of air conditioner operating schemes of newly establishing are verified, determine fractional energy savings it is maximum newly establish water pump of air conditioner fortune Row scheme.
2. the method for determining building air-conditioning pump energy saving operating scheme according to claim 1, it is characterised in that: The annual air-conditioning refrigeration duty statistical form at each moment includes the annual air-conditioning part refrigeration duty Q at each momentI is coldWith maximum refrigeration duty Value QThe cold max of iRatio, each ratio section annual air-conditioning part refrigeration duty QI is coldDuration and each ratio section annual air-conditioning part Refrigeration duty QI is coldDuration shared by annual air-conditioning using duration ratio.
3. the method for determining building air-conditioning pump energy saving operating scheme according to claim 1, it is characterised in that: Water pump of air conditioner operating scheme is newly established to be specially:
Newly-increased water pump and raw water pump parallel running, and switched over by the motor-driven valve being arranged on pipeline, it is when what is detected When system water supply flow is less than certain setting value, operation water pump is switched to by raw water pump and newly establishes water pump, when the system for detecting is supplied Water-carrying capacity then switches back into raw water pump when being higher than certain setting value.
4. the method for determining building air-conditioning pump energy saving operating scheme according to claim 3, it is characterised in that: S32 specifically includes following steps:
A calculates under various operating schemes resistance of pipe system under air-conditioning system part load conditions according to pipe system performance curve formula,
Wherein, pipe system performance curve formula is H=SQ2, wherein H is the factor related to pipe network composition, Q for resistance of pipe system Pa, S It is air-conditioning system water-carrying capacity m3/ h, for same pipe network, S values are fixed, H and Q2It is directly proportional, when load becomes hour, pipe network Resistance diminishes therewith;
B calculations of air conditioner system pump heads, obtain water pump of air conditioner operating scheme table, and the water pump of air conditioner operating scheme table includes complete Year air-conditioning refrigeration duty, air-conditioning system water-carrying capacity, air-conditioning system pump head, the big pump power of air-conditioning system and air-conditioning system are small Pump power;
C calculates annual non-warm season air-conditioning system comprehensive energy consumption according to water pump of air conditioner operating scheme meter, to the complete of each operating scheme Year, non-warm season air-conditioning system comprehensive energy consumption was compared, and determined that the water pump of air conditioner of newly establishing of fractional energy savings maximum in air-conditioning system is transported Row scheme.
5. the method for determining building air-conditioning pump energy saving operating scheme according to claim 4, it is characterised in that: Each moment of refrigeration host computer is opened in what fractional energy savings was maximum in air-conditioning system newly establish water pump of air conditioner operating scheme the need for correspondence Annual air-conditioning part refrigeration duty QI is coldWith maximum cold load value QThe cold max of iRatio be 80%~90%.
CN201710161675.8A 2017-03-17 2017-03-17 A method of for determining building air-conditioning pump energy saving operating scheme Active CN106931600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710161675.8A CN106931600B (en) 2017-03-17 2017-03-17 A method of for determining building air-conditioning pump energy saving operating scheme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710161675.8A CN106931600B (en) 2017-03-17 2017-03-17 A method of for determining building air-conditioning pump energy saving operating scheme

Publications (2)

Publication Number Publication Date
CN106931600A true CN106931600A (en) 2017-07-07
CN106931600B CN106931600B (en) 2019-06-21

Family

ID=59433736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710161675.8A Active CN106931600B (en) 2017-03-17 2017-03-17 A method of for determining building air-conditioning pump energy saving operating scheme

Country Status (1)

Country Link
CN (1) CN106931600B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109829635A (en) * 2019-01-21 2019-05-31 上海理工大学 Cold source equipment capacity dynamic matching method based on operation year limited load evolution Feature
CN111306694A (en) * 2017-11-10 2020-06-19 珠海格力电器股份有限公司 Air conditioning system and control method thereof
CN111706962A (en) * 2020-05-25 2020-09-25 珠海格力电器股份有限公司 Control device and method of multi-air-conditioning system and multi-air-conditioning system
CN112484128A (en) * 2020-11-26 2021-03-12 华能聊城热电有限公司 Heat exchange station water pump adaptation method
CN117332613A (en) * 2023-10-27 2024-01-02 南京长江都市建筑设计股份有限公司 An efficient refrigeration machine room performance optimization method, device, equipment and medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101240949A (en) * 2008-03-13 2008-08-13 上海交通大学 Household Energy System with Adjustable Capacity for Cascade Energy Utilization
CN201348319Y (en) * 2008-12-17 2009-11-18 广州市设计院 Loop primary pump conveying system of chilled water central air conditioner
CN103277863A (en) * 2013-06-24 2013-09-04 机械工业第三设计研究院 Air conditioner cold water variable-flow system and control method thereof
CN103383121A (en) * 2012-05-03 2013-11-06 南京市建筑设计研究院有限责任公司 District air-conditioner distributed secondary pump system
CN103453623A (en) * 2013-09-13 2013-12-18 天津大学建筑设计研究院 Water source heat pump air-conditioning system operating parameter optimization control method
CN205402987U (en) * 2016-03-15 2016-07-27 苏州医电神空调设备工程有限公司 Novel energy -conserving air conditioning unit prevents frostbite
JP2016194386A (en) * 2015-03-31 2016-11-17 三機工業株式会社 Heat source control system
CN106529167A (en) * 2016-10-28 2017-03-22 深圳市云科设计咨询服务有限公司 Analysis method for comprehensive energy consumption of air conditioning system in non-heating season

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101240949A (en) * 2008-03-13 2008-08-13 上海交通大学 Household Energy System with Adjustable Capacity for Cascade Energy Utilization
CN201348319Y (en) * 2008-12-17 2009-11-18 广州市设计院 Loop primary pump conveying system of chilled water central air conditioner
CN103383121A (en) * 2012-05-03 2013-11-06 南京市建筑设计研究院有限责任公司 District air-conditioner distributed secondary pump system
CN103277863A (en) * 2013-06-24 2013-09-04 机械工业第三设计研究院 Air conditioner cold water variable-flow system and control method thereof
CN103453623A (en) * 2013-09-13 2013-12-18 天津大学建筑设计研究院 Water source heat pump air-conditioning system operating parameter optimization control method
JP2016194386A (en) * 2015-03-31 2016-11-17 三機工業株式会社 Heat source control system
CN205402987U (en) * 2016-03-15 2016-07-27 苏州医电神空调设备工程有限公司 Novel energy -conserving air conditioning unit prevents frostbite
CN106529167A (en) * 2016-10-28 2017-03-22 深圳市云科设计咨询服务有限公司 Analysis method for comprehensive energy consumption of air conditioning system in non-heating season

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程桃桃: "基于EnergyPlus平台的办公建筑动态能耗模拟分析", 《中国优秀硕士学位论文全文数据库》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306694A (en) * 2017-11-10 2020-06-19 珠海格力电器股份有限公司 Air conditioning system and control method thereof
CN109829635A (en) * 2019-01-21 2019-05-31 上海理工大学 Cold source equipment capacity dynamic matching method based on operation year limited load evolution Feature
CN111706962A (en) * 2020-05-25 2020-09-25 珠海格力电器股份有限公司 Control device and method of multi-air-conditioning system and multi-air-conditioning system
CN111706962B (en) * 2020-05-25 2021-05-18 珠海格力电器股份有限公司 Control device and method of multi-air-conditioning system and multi-air-conditioning system
CN112484128A (en) * 2020-11-26 2021-03-12 华能聊城热电有限公司 Heat exchange station water pump adaptation method
CN117332613A (en) * 2023-10-27 2024-01-02 南京长江都市建筑设计股份有限公司 An efficient refrigeration machine room performance optimization method, device, equipment and medium

Also Published As

Publication number Publication date
CN106931600B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN105973626B (en) The assessment of central air conditioner system host operational energy efficiency and prediction technique and device
US20210123625A1 (en) Low-cost commissioning method for the air-conditioning systems in existing large public buildings
CN102043907B (en) Real-time cold load determination method of air-conditioner room
Xie et al. Collaborative optimization of ground source heat pump-radiant ceiling air conditioning system based on response surface method and NSGA-II
CN106951630A (en) A kind of refrigeration host computer device selection method being applied in air-conditioning system
CN106529167B (en) A kind of analysis method of non-warm season air-conditioning system comprehensive energy consumption
CN106931600B (en) A method of for determining building air-conditioning pump energy saving operating scheme
CN104121666B (en) For central air-conditioning wind system by time frequency conversion air feed system and control method
Zhu et al. Modelling and applications of annual energy-using simulation module of separated heat pipe heat exchanger
Niu et al. Adaptability of a temperature and humidity independent control air-conditioning system in green office buildings
CN111723533B (en) Energy-saving calculation method for variable-frequency water pump of ground source heat pump system
CN105004002A (en) Energy saving control system and energy saving control method used for central air conditioner cooling water system
CN202613835U (en) Simultaneous cold and heat supply energy-saving system
CN102410597B (en) Ground source heat pump air-conditioning system device based on peak regulation and energy storage as well as control and operation method thereof
CN103486693A (en) Energy-saving control method for central air-conditioning chilled water system
CN108895633A (en) Central air-conditioning system control method using building structure as cold accumulation medium
Shao et al. A practical application-oriented model predictive control algorithm for direct expansion (DX) air-conditioning (A/C) systems that balances thermal comfort and energy consumption
Liu et al. A case study of ground source direct cooling system integrated with water storage tank system
CN105180310A (en) Water source VRF air conditioning cold and heat source system
CN104279692A (en) Energy-saving control method and energy-saving control system for energy consumption track of central air conditioner
CN105115113B (en) A kind of central air conditioner room efficiency optimization system
CN117556690A (en) Energy efficiency evaluation method for building central air conditioner room
CN105546768A (en) Energy-saving method and system of central air conditioner
Li et al. Energy consumption analysis and operating characteristics research on small time scale of variable refrigerant flow air conditioning systems in public buildings
CN110910017B (en) Method and device for evaluating cooling/heating condition of building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant