CN106930445A - A kind of concrete wall direct-burried switch box construction technique - Google Patents

A kind of concrete wall direct-burried switch box construction technique Download PDF

Info

Publication number
CN106930445A
CN106930445A CN201710328403.2A CN201710328403A CN106930445A CN 106930445 A CN106930445 A CN 106930445A CN 201710328403 A CN201710328403 A CN 201710328403A CN 106930445 A CN106930445 A CN 106930445A
Authority
CN
China
Prior art keywords
switch box
casing
wall
hole
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710328403.2A
Other languages
Chinese (zh)
Other versions
CN106930445B (en
Inventor
徐东峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG WATER & ELECTRICITY EQUIPMENT INSTALLATION CO., LTD.
Original Assignee
徐东峰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐东峰 filed Critical 徐东峰
Priority to CN201710328403.2A priority Critical patent/CN106930445B/en
Publication of CN106930445A publication Critical patent/CN106930445A/en
Application granted granted Critical
Publication of CN106930445B publication Critical patent/CN106930445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ

Abstract

The invention provides a kind of concrete wall direct-burried switch box construction technique, including 11 steps such as the processing of concealed installation panel switches box body, wall steel bar colligation, the line of setting structure 50, casing positioning, adjustment reinforcing bar, trimming bar reinforcings, trimming bar cutting, casing cable-through hole pipe arrangement, casing are fixedly mounted, shuttering casting concrete and switch box are assembled.The present invention can greatly reduce civil engineering structure hole to be provided, reduce hole form removal construction, and effectively overcome the easy outlet inanition phenomenon of conventional electrical distribution switch-box periphery wall, reduce civil engineering stifled hole workload and wall crackle, so as on the one hand simplify construction technology, are favorably improved and the installation alignment quality and electrical equipment of the casing of switch box are installed and operation stability and raising electrical safety, the opposing party can effectively improve efficiency of construction, and reduce labour intensity and material loss in construction, so as to effective cost-effective, greatly reduce construction costs.

Description

A kind of concrete wall direct-burried switch box construction technique
Technical field
The present invention relates to a kind of concrete wall direct-burried switch box construction technique, dependent territory builds construction technology technology Field.
Background technology
At present in constructure construction procedure is carried out, for convenience in later stage building supply line arrangement, often need The switch box of distribution system is installed on wall in advance when building wall body construction is carried out, in traditional construction During, often according to the architectural feature of the switch box installed, wall construction is carried out first, and will match somebody with somebody in construction Hole is installed at the reserved place of the installation site of electric switch case, treats to carry out the installation of switch box, this side after the completion of wall construction again Although the need for method can meet construction, always being found in practice of construction, the construction technology of this form of construction work is complex, applies Work operating efficiency is low, and material loss is larger, and needs to carry out multiple reserving hole masterplate installing/dismountings, reserving hole later stage The operation such as fill up, so as to significantly increase labour intensity and material loss, and be also easily caused after switch box installation it Periphery is poor with being tightly combined property of wall, so as to cause wall outlet inanition to come off or seminess, on the one hand has a strong impact on and matches somebody with somebody The stability and security of electric switch case operation, structural strength and aesthetic property of the another aspect also to wall cause serious harm, Therefore this present situation is directed to, in the urgent need to developing a kind of brand-new concrete wall direct-burried switch box construction technique, With meet it is actually used the need for.
The content of the invention
A kind of concrete wall direct-burried switch box construction technique is provided it is an object of the invention to provide the present invention.
In order to achieve the above object, the present invention provides following technical scheme:
A kind of concrete wall direct-burried switch box construction technique, comprises the following steps:
The first step, concealed installation panel switches box body processing, dimension is selected according to layout design pipeline specification model Switch box, and cable-through hole of being slotted on the wall of switch box side, are then sealed cable-through hole with elastic packing plug, and Reinforcing bearing rib is set in switch box, each side surface of switch box is supported calmly by strengthening bearing rib Position, after completing reinforcing bearing rib installation positioning, separately in one layer of machine oil of switch box inner surface brushing, and in switch box Interior filling such as sawdust, is then shut off switch box chamber door and switch box chamber door is sealed with corresponding template, and Template sealing part is another by rubber belt sealing;
Second step, wall steel bar colligation is tied up according to the requirement of civil engineering wall inclination to the arrangement of reinforcement in wall;
3rd step, the line of setting structure 50 on the good shear force wall reinforcing steel bar of basic colligation, determines that the line of structure 50 is identified, then use Level meter, guides at the indoor case of concealed installation, carries out the mark of 50 lines, and determine switch box with 50 lines from 50 line positions of fixed point Corresponding position location;
4th step, casing positioning, according to construction requirement and switch box self structure size, the line of integrated structure 50 Home position, is determined, and determine casing accurate plan-position on wall to the height that casing is installed;
5th step, adjusts reinforcing bar, the line of integrated structure 50 and installation site determined by casing of opening the light, to the reinforcing bar in wall Position is adjusted, and constitutes switch box installation hole, when reinforcing bar adjustment is carried out, makes reinforced steel bar ring around panel switches box body Installation site be distributed, and reinforced steel bar ring around panel switches casing installation site be distributed when, reinforcing bar use detour and must not cut;
6th step, trimming bar is reinforced, in the inner side of the panel switches casing installation hole for determining, using reinforced concrete-bar Hole was reinforced at least one week around hole;
7th step, trimming bar cutting, according to switch box physical dimension, will use cutting equipment for reinforcing Hole height eminence panel switches box body up to lacks 5mm after cutting rest and reorganization, and rest and reorganization are carried out to reinforcing bar;
8th step, casing cable-through hole pipe arrangement, according to building supply line layout requirements, by penetration pipe and switch box Cable-through hole is attached;
9th step, casing fixed installation, panel switches box body is installed to according to design height reserved with establishing by cable Case is closed to install in hole, and after switch box casing is rectified, surrounding steel bar clamping, must not be with steel bar welding in wall Connect, simultaneously, the spacer bar of welding one and wall uniform thickness at least three jiaos of panel switches box body, spacer bar is welded It is connected on casing fixture, and spacer bar one end will flush and absolute upright with casing vertical plane, then will be with distribution box The penetration pipe of casing connection is connected and fastens with casing, and penetration pipe enters straight at carton and crate, and exposed length is small in carton and crate In 5mm;
Tenth step, shuttering casting concrete after switch box installation, mould is set at switch box panel Plate, and template is offseted with switch box panel, concreting operation is then carried out to wall, and carry out concreting During operation, concrete is poured from panel switches box body both sides, and not handy vibrating head is to week around distribution box body and casing While carrying out directly vibrating operation.
11st step, switch box assembling pours operation, and after after concrete setting, incite somebody to action walls concrete is completed The form removable of switch box, and the sawdust in switch box and reinforcing bearing rib are removed, then electrically set It is standby to install.
Further, cable-through hole hole back gauge casing Edge Distance is not more than 10mm in the described first step.
Further, if the reinforced concrete-bar in reinforcing bearing rib and the 6th step in the described first step has cross-distribution During situation, then it is attached with metal binding silk at its position of intersecting point.
Further, thickness of wall body is not less than 180mm.
The more traditional construction technology of construction technology of the present invention, can greatly reduce civil engineering structure hole to be provided, reduction hole and tear open Mould is constructed, and effectively overcomes the easy outlet inanition phenomenon of conventional electrical distribution switch-box periphery wall, is reduced the stifled hole of civil engineering and is made Industry amount and wall seminess, so as on the one hand simplify construction technology, are favorably improved the peace to the casing of switch box Dress alignment quality and electrical equipment are installed and operation stability, are favorably improved electrical safety, improve wall impression quality, separately One side can effectively improve efficiency of construction, and reduce labour intensity and material loss in construction, thus it is effective cost-effective, Greatly reduce construction costs.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is manufacturing process flow diagram of the present invention.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing of the invention, it is clear that retouched The embodiment stated is only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to the present invention The scope of protection.
Embodiment 1
A kind of concrete wall direct-burried switch box construction technique as shown in Figure 1, comprises the following steps:
The first step, concealed installation panel switches box body processing, dimension is selected according to layout design pipeline specification model Switch box, and cable-through hole of being slotted on the wall of switch box side, and cable-through hole hole back gauge casing Edge Distance is 10mm, so Cable-through hole is sealed with elastic packing plug afterwards, and reinforcing bearing rib is set in switch box, by strengthening brace rod Plate is supported positioning to each side surface of switch box, after completing reinforcing bearing rib installation positioning, separately in switch box One layer of machine oil of inner surface brushing, and the filling such as sawdust in switch box, are then shut off switch box chamber door and with accordingly Template switch box chamber door is sealed, and template sealing part is another by rubber belt sealing;
Second step, wall steel bar colligation is tied up according to the requirement of civil engineering wall inclination to the arrangement of reinforcement in wall;
3rd step, the line of setting structure 50 on the good shear force wall reinforcing steel bar of basic colligation, determines that the line of structure 50 is identified, then use Level meter, guides at the indoor case of concealed installation, carries out the mark of 50 lines from 50 line positions of fixed point, and on the basis of 50 lines upwards 1300mm as be panel switches box body base away from altitude, and carry out scale marker;
4th step, casing positioning, according to construction requirement and switch box self structure size, the line of integrated structure 50 Home position, is determined, and determine casing accurate plan-position on wall to the height that casing is installed;
5th step, adjusts reinforcing bar, the line of integrated structure 50 and installation site determined by casing of opening the light, to the reinforcing bar in wall Position is adjusted, and constitutes switch box installation hole, when reinforcing bar adjustment is carried out, makes reinforced steel bar ring around panel switches box body Installation site be distributed, and reinforced steel bar ring around panel switches casing installation site be distributed when, reinforcing bar use detour and must not cut;
6th step, trimming bar reinforce, it is determined that casing adjust mouth position line perimeter reinforcement, with a length below hole 50cm reinforcing bars long, it is concordant to be fixed on panel switches box body base mouth under altitude line, with two 40cm reinforcing bars Vertical colligation is greater than box sizes 8cm, firm with tied silk colligation at hole or so.
7th step, trimming bar cutting, according to switch box physical dimension, will use cutting equipment for reinforcing Hole height eminence panel switches box body up to lacks 5mm after cutting rest and reorganization, and rest and reorganization are carried out to reinforcing bar;
8th step, casing cable-through hole pipe arrangement, according to building supply line layout requirements, by penetration pipe and switch box Cable-through hole is attached;
9th step, casing fixed installation, panel switches box body is installed to according to design height reserved with establishing by cable Case is closed to install in hole, and after switch box casing is rectified, surrounding steel bar clamping, must not be with steel bar welding in wall Connect, simultaneously, the spacer bar of welding one and wall uniform thickness at least three jiaos of panel switches box body, spacer bar is welded It is connected on casing fixture, and spacer bar one end will flush and absolute upright with casing vertical plane, then will be with distribution box The penetration pipe of casing connection is connected and fastens with casing, and penetration pipe enters straight at carton and crate, and exposed length is in carton and crate 4mm;
Tenth step, shuttering casting concrete after switch box installation, mould is set at switch box panel Plate, and template is offseted with switch box panel, concreting operation is then carried out to wall, thickness of wall body is 190mm, When carrying out concreting operation, concrete is poured from panel switches box body both sides, and not handy vibrating head is to distribution box case Body and casing perimeter carry out directly vibrating operation.
11st step, switch box assembling pours operation, and after after concrete setting, incite somebody to action walls concrete is completed The form removable of switch box, and the sawdust in switch box and reinforcing bearing rib are removed, then electrically set It is standby to install.
Embodiment 2
A kind of concrete wall direct-burried switch box construction technique as shown in Figure 1, comprises the following steps:
The first step, concealed installation panel switches box body processing, dimension is selected according to layout design pipeline specification model Switch box, and cable-through hole of being slotted on the wall of switch box side, and cable-through hole hole back gauge casing Edge Distance is 5mm, so Cable-through hole is sealed with elastic packing plug afterwards, and reinforcing bearing rib is set in switch box, by strengthening brace rod Plate is supported positioning to each side surface of switch box, after completing reinforcing bearing rib installation positioning, separately in switch box One layer of machine oil of inner surface brushing, and the filling such as sawdust in switch box, are then shut off switch box chamber door and with accordingly Template switch box chamber door is sealed, and template sealing part is another by rubber belt sealing;
Second step, wall steel bar colligation is tied up according to the requirement of civil engineering wall inclination to the arrangement of reinforcement in wall;
3rd step, the line of setting structure 50 on the good shear force wall reinforcing steel bar of basic colligation, determines that the line of structure 50 is identified, then use Level meter, guides at the indoor case of concealed installation, carries out the mark of 50 lines from 50 line positions of fixed point, and on the basis of 50 lines upwards 1400mm as be panel switches box body base away from altitude, and carry out scale marker;
4th step, casing positioning, according to construction requirement and switch box self structure size, the line of integrated structure 50 Home position, is determined, and determine casing accurate plan-position on wall to the height that casing is installed;
5th step, adjusts reinforcing bar, the line of integrated structure 50 and installation site determined by casing of opening the light, to the reinforcing bar in wall Position is adjusted, and constitutes switch box installation hole, when reinforcing bar adjustment is carried out, makes reinforced steel bar ring around panel switches box body Installation site be distributed, and reinforced steel bar ring around panel switches casing installation site be distributed when, reinforcing bar use detour and must not cut;
6th step, trimming bar reinforce, it is determined that casing adjust mouth position line perimeter reinforcement, with a length below hole 50cm reinforcing bars long, it is concordant to be fixed on panel switches box body base mouth under altitude line, with two 40cm reinforcing bars Vertical colligation is greater than box sizes 10cm, firm with tied silk colligation at hole or so.
7th step, trimming bar cutting, according to switch box physical dimension, will use cutting equipment for reinforcing Hole height eminence panel switches box body up to lacks 10mm after cutting rest and reorganization, and rest and reorganization are carried out to reinforcing bar;
8th step, casing cable-through hole pipe arrangement, according to building supply line layout requirements, by penetration pipe and switch box Cable-through hole is attached;
9th step, casing fixed installation, panel switches box body is installed to according to design height reserved with establishing by cable Case is closed to install in hole, and after switch box casing is rectified, surrounding steel bar clamping, must not be with steel bar welding in wall Connect, simultaneously, the spacer bar of welding one and wall uniform thickness at least three jiaos of panel switches box body, spacer bar is welded It is connected on casing fixture, and spacer bar one end will flush and absolute upright with casing vertical plane, then will be with distribution box The penetration pipe of casing connection is connected and fastens with casing, and penetration pipe enters straight at carton and crate, and exposed length is in carton and crate 4mm;
Tenth step, shuttering casting concrete after switch box installation, mould is set at switch box panel Plate, and template is offseted with switch box panel, concreting operation is then carried out to wall, thickness of wall body is 200mm, When carrying out concreting operation, concrete is poured from panel switches box body both sides, and not handy vibrating head is to distribution box case Body and casing perimeter carry out directly vibrating operation.
11st step, switch box assembling pours operation, and after after concrete setting, incite somebody to action walls concrete is completed The form removable of switch box, and the sawdust in switch box and reinforcing bearing rib are removed, then electrically set It is standby to install.
The more traditional construction technology of construction technology of the present invention, can greatly reduce civil engineering structure hole to be provided, reduction hole and tear open Mould is constructed, and effectively overcomes the easy outlet inanition phenomenon of conventional electrical distribution switch-box periphery wall, is reduced the stifled hole of civil engineering and is made Industry amount and wall seminess, so as on the one hand simplify construction technology, are favorably improved the peace to the casing of switch box Dress alignment quality and electrical equipment are installed and operation stability, are favorably improved electrical safety, improve wall impression quality, separately One side can effectively improve efficiency of construction, and reduce labour intensity and material loss in construction, thus it is effective cost-effective, Greatly reduce construction costs.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (4)

1. a kind of concrete wall direct-burried switch box construction technique, it is characterised in that:Described concrete wall is straight Switch box construction technique is buried to comprise the following steps:
The first step, concealed installation panel switches box body processing, the distribution of dimension is selected according to layout design pipeline specification model Switch-box, and cable-through hole of being slotted on the wall of switch box side, are then sealed cable-through hole with elastic packing plug, and in distribution Reinforcing bearing rib is set in switch-box, positioning is supported to each side surface of switch box by strengthening bearing rib, it is complete After positioning is installed into reinforcing bearing rib, separately in one layer of machine oil of switch box inner surface brushing, and filled out in switch box Fill such as sawdust, be then shut off switch box chamber door and switch box chamber door is sealed with corresponding template, and template Sealing part is another by rubber belt sealing;
Second step, wall steel bar colligation is tied up according to the requirement of civil engineering wall inclination to the arrangement of reinforcement in wall;
3rd step, the line of setting structure 50 on the good shear force wall reinforcing steel bar of basic colligation, determines that the line of structure 50 is identified, then use level Instrument, guides at the indoor case of concealed installation, carries out the mark of 50 lines, and the phase of switch box is determined with 50 lines from 50 line positions of fixed point Answer position location;
4th step, casing positioning, according to construction requirement and switch box self structure size, the line of integrated structure 50 mark Position, is determined, and determine casing accurate plan-position on wall to the height that casing is installed;
5th step, adjusts reinforcing bar, the line of integrated structure 50 and installation site determined by casing of opening the light, to the reinforcement location in wall It is adjusted, and constitutes switch box and hole is installed, when reinforcing bar adjustment is carried out, reinforced steel bar ring is installed around panel switches box body Position distribution, and reinforced steel bar ring around panel switches casing installation site be distributed when, reinforcing bar is using detouring and must not cut;
6th step, trimming bar is reinforced, and in the inner side of the panel switches casing installation hole for determining, is surround using reinforced concrete-bar Hole is reinforced at least one week to hole;
7th step, trimming bar cutting, according to switch box physical dimension, by for reinforcing with cutting equipment to steel Hole height eminence panel switches box body up to lacks 5mm after muscle carries out cutting rest and reorganization, and rest and reorganization;
Penetration pipe and switch box, according to building supply line layout requirements, are crossed line by the 8th step, casing cable-through hole pipe arrangement Hole is attached;
9th step, casing fixed installation, panel switches box body is installed to the switch box reserved according to design height Install hole in, and switch box casing rectify after, surrounding steel bar clamping, must not with reinforcement welding in wall, Simultaneously, at least three jiaos of panel switches box body welding one and wall uniform thickness spacer bar, spacer bar welds On casing fixture, and spacer bar one end will flush and absolute upright with casing vertical plane, then will be with distribution box case The penetration pipe of body connection is connected and fastens with casing, and penetration pipe enters straight at carton and crate, and exposed length is less than in carton and crate 5mm;
Tenth step, shuttering casting concrete after switch box installation, template is set at switch box panel, And template is offseted with switch box panel, concreting operation is then carried out to wall, and carry out concreting work During industry, concrete is poured from panel switches box body both sides, and not handy vibrating head is to distribution box body and casing perimeter Carry out directly vibrating operation.
11st step, switch box assembling pours operation walls concrete is completed, and after after concrete setting, by distribution The form removable of switch-box, and the sawdust in switch box and reinforcing bearing rib are removed, then carry out electrical equipment peace Dress.
2. a kind of concrete wall direct-burried switch box construction technique according to claim 1, it is characterised in that: Cable-through hole hole back gauge casing Edge Distance is not more than 10mm in the described first step.
3. a kind of concrete wall direct-burried switch box construction technique according to claim 1, it is characterised in that: If the reinforced concrete-bar in reinforcing bearing rib and the 6th step in the described first step has cross-distribution situation, in its intersection point It is attached with metal binding silk at position.
4. a kind of concrete wall direct-burried switch box construction technique according to claim 1, it is characterised in that: Thickness of wall body is not less than 180mm.
CN201710328403.2A 2017-05-11 2017-05-11 A kind of concrete wall direct-burried switch box construction technique Active CN106930445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710328403.2A CN106930445B (en) 2017-05-11 2017-05-11 A kind of concrete wall direct-burried switch box construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710328403.2A CN106930445B (en) 2017-05-11 2017-05-11 A kind of concrete wall direct-burried switch box construction technique

Publications (2)

Publication Number Publication Date
CN106930445A true CN106930445A (en) 2017-07-07
CN106930445B CN106930445B (en) 2019-05-07

Family

ID=59430136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710328403.2A Active CN106930445B (en) 2017-05-11 2017-05-11 A kind of concrete wall direct-burried switch box construction technique

Country Status (1)

Country Link
CN (1) CN106930445B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030040687A (en) * 2001-11-15 2003-05-23 송규열 panel for external underground wall of building, structure and construction method using the same
KR20040034291A (en) * 2002-10-19 2004-04-28 곽양진 Prefabricated ramen panel
CN101392597A (en) * 2008-09-25 2009-03-25 陕西省第三建筑工程公司 Construction electric switch box construction method once and for all
CN103510631A (en) * 2012-06-25 2014-01-15 深圳海外装饰工程有限公司 Indoor sound insulation construction structure and construction method thereof
CN204126213U (en) * 2014-08-20 2015-01-28 江苏扬安集团有限公司 The direct-burried construction system of distributing box in the in-situ concrete wall having decorative layer
CN204732708U (en) * 2015-06-17 2015-10-28 青岛海川建设集团有限公司 A kind of concrete wall direct-burried distribution switchgear cabinet mounting structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030040687A (en) * 2001-11-15 2003-05-23 송규열 panel for external underground wall of building, structure and construction method using the same
KR20040034291A (en) * 2002-10-19 2004-04-28 곽양진 Prefabricated ramen panel
CN101392597A (en) * 2008-09-25 2009-03-25 陕西省第三建筑工程公司 Construction electric switch box construction method once and for all
CN103510631A (en) * 2012-06-25 2014-01-15 深圳海外装饰工程有限公司 Indoor sound insulation construction structure and construction method thereof
CN204126213U (en) * 2014-08-20 2015-01-28 江苏扬安集团有限公司 The direct-burried construction system of distributing box in the in-situ concrete wall having decorative layer
CN204732708U (en) * 2015-06-17 2015-10-28 青岛海川建设集团有限公司 A kind of concrete wall direct-burried distribution switchgear cabinet mounting structure

Also Published As

Publication number Publication date
CN106930445B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN102127968B (en) Method for grouting floor slab bushing hole reservation preembedding die and grouting die
CN103806651B (en) A kind of method utilizing crane span structure installation of embedded parts crane span structure
CN102493648B (en) Pre-embedding construction method for distribution box with rows of pipes, and support device
CN102937027A (en) Construction method of edge top arch and bottom arch of concrete pouring tunnel
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN109680938A (en) A kind of nonstandard layer aluminum wood steel combination template and its construction method, building
CN103672181A (en) Water supply and drainage pipeline sleeve pre-embedding construction method
CN103485537A (en) Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure
CN110924692A (en) Masonry pipeline direct-buried construction method
CN109322505A (en) A kind of roofing reserved opening concrete plugging device and preparation method thereof
CN109610478A (en) A kind of construction method of cable duct
CN103572964B (en) Building engineering structure construction stage prefabricated air channel mounting method
CN109706954A (en) The segmentation of cup-shaped foundation unitary mould pours a monolithic molding structure and manufacturing process
CN202347544U (en) Advance water stop construction structure for post-cast strip of basement outer wall
CN103590841A (en) Supporting method for primary support of underground excavated chamber
CN106245770B (en) Expanded letter variable cross-section annular stiffness beam construction method
CN107237492A (en) The installation method of sizing cylindrical form
CN101392597B (en) Construction electric switch box construction method once and for all
CN107269001A (en) Concealed distribution box is with the whole construction method poured of concrete wall structure
CN110359595A (en) Prefabricated component splices masonry shearwalls and construction method
CN106930445B (en) A kind of concrete wall direct-burried switch box construction technique
CN105155843A (en) Construction method and construction device of constructional columns
CN201908439U (en) Reserved embedded grouting die for floor sleeve holes
CN206001126U (en) A kind of floor sealing hole sizing gasifying device
CN202596173U (en) Embedded part for cable bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190412

Address after: 510115 No. 50 Civilization Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: GUANGDONG WATER & ELECTRICITY EQUIPMENT INSTALLATION CO., LTD.

Address before: 341600 Jiangxi Province Ganzhou Xinfeng County Jiading Town Vegetable Market BS54

Applicant before: Xu Dongfeng

GR01 Patent grant