CN106917401A - Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry - Google Patents

Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry Download PDF

Info

Publication number
CN106917401A
CN106917401A CN201710111752.9A CN201710111752A CN106917401A CN 106917401 A CN106917401 A CN 106917401A CN 201710111752 A CN201710111752 A CN 201710111752A CN 106917401 A CN106917401 A CN 106917401A
Authority
CN
China
Prior art keywords
speed
rubble
pressure rotary
drilling rod
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710111752.9A
Other languages
Chinese (zh)
Inventor
王洋
魏宏超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710111752.9A priority Critical patent/CN106917401A/en
Publication of CN106917401A publication Critical patent/CN106917401A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to building lot construction field, specifically a kind of rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry;It is characterized in that:Including understanding rubble, block stone step with difference and thickness;Early strength agent is added during grouting;High-pressure rotary jet grouting pile machinery is drilled down into by carrying drill bit from ground, meanwhile, whitewashed;Rig is crept into the absolute altitude of design stake bottom, drilling rod is carried upwards, while carrying out multiple spray;In multiple spray process, shadoof speed, drilling rod rotary speed are held in deep low gear in metalling, boulder bed, speed of application is then promoted to middling speed or high speed for cohesive soil, sandy soil layer, when drilling rod is promoted to ground absolute altitude again, completes to circulate for the first time;Treat that cement mortar reaches the presetting period, constructed according to second multiple spray circulation is carried out.Treatment method is applied in special geologic conditions such as rubble, cobbles, the cement mortar of high-pressure rotary-spray can be avoided to be flowed away along the gap of rock or block stone such that it is able to from ensureing the construction quality of high-pressure rotary-spray technique.

Description

Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry
Technical field
The present invention relates to building lot construction field, specifically a kind of rubble, pebble layer high-pressure rotary jet grouting pile do not return slurry Processing method.
Background technology
For high-pressure rotary-spray technique, due to its construction machinery and technology characteristics, cause it for different geology soil layers With different applicabilities, generally for the geology such as cohesive soil, sandy soil and grain composition continuity preferable gravelly soil soil Layer has preferable applicability.And the artificial of serious tomography occur for grain composition and fill out the particles such as rubble, severely-weathered hard rock The larger geological stratification in gap, the cement mortar of high-pressure rotary-spray is easy to be walked along rock or block crack of stone clearance flow so that high-pressure rotary-spray work Skill applicability is poor, and rotary churning pile pile quality is difficult to be effectively ensured, or even cannot pile.
The content of the invention
It is an object of the present invention to provide one kind can solve the problem that slurry is not returned in the high-pressure rotary jet grouting pile whitewashing of rubble stratum, it is impossible to have Imitate the construction method of pile.
In order to achieve the above object, the present invention is realized in:
A kind of rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry, including
Step 1, after the completion of drilling, according to geology exploration report understand rubble, block stone step with difference and thickness;
Step 2, grouting, the ratio of mud of the slurry that mixed cement during grouting is 0.45:1~0.55:1, while adding early strength agent, early strength agent Ratio control is 0.5%~2%;
After step 3, high-pressure rotary jet grouting pile machinery are in place, it is drilled down into from ground by carrying drill bit, while drilling, is carried out Whitewashing, rod boring speed is 7cm ~ 9cm/min, and drilling rod rotary speed keeps low-speed running;
Step 4, when rig creep into design stake bottom absolute altitude after, beginning carry drilling rod upwards, while keep original construction parameter answered Spray;
In step 5, multiple spray process, shadoof speed, drilling rod rotary speed deep low gear need to be held in metalling, boulder bed, And speed of application is then promoted to middling speed or high speed for cohesive soil, sandy soil layer, treat that drilling rod is promoted to ground mark again Gao Shi, completes to circulate for the first time;
Step 6, treat that cement mortar reaches the presetting period, second multiple spray circulation construction is carried out according to step 2~step 5.
Treatment method is applied in special geologic conditions such as rubble, cobbles, can avoid the cement mortar edge of high-pressure rotary-spray The gap for rock or block stone flows away such that it is able to ensure that high-pressure rotary-spray technique is applied in special geologic conditions such as rubble, cobbles. Meanwhile, machinery, equipment and material are that job site is existing used by treatment method, therefore with materials, easy to process Advantage, compared to changing technique, take other engineering methods of additional complementary measure, treatment method has low excellent of construction cost Gesture.
Brief description of the drawings
Fig. 1 is the operation schematic diagram for the treatment of method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in figure 1, a kind of rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry, including
Step 1, when drilling 1 after the completion of, according to geology exploration report understand rubble, block stone step with difference and thickness;
Step 2, grouting, the ratio of mud of the slurry that mixed cement during grouting is 0.45:1~0.55:1, while adding early strength agent, early strength agent Ratio control is 0.5%~2%;
After step 3, high-pressure rotary jet grouting pile machinery 2 are in place, it is drilled down into from ground by carrying drill bit 3, while drilling, is entered Row whitewashing, the rate of penetration of drilling rod 4 is 7cm ~ 9cm/min, and the rotary speed of drilling rod 4 keeps low-speed running (12-15r/min);
Step 4, when rig creep into design stake bottom absolute altitude after, beginning carry drilling rod 4 upwards, while keep original construction parameter answered Spray;
In step 5, multiple spray process, shadoof speed, the rotary speed of drilling rod 4 deep low gear need to be held in metalling, boulder bed, And speed of application is then promoted to middling speed for cohesive soil, sandy soil layer(12~15 cm/min)Or at a high speed(15~20 cm/ min), when drilling rod is promoted to ground absolute altitude again, complete to circulate for the first time;
Step 6, treat that cement mortar reaches the presetting period, second multiple spray circulation construction is carried out according to step 2~step 5.
, it is necessary to note when this construction method is used:1st, for high-pressure rotary-spray technique, if adding waterglass as morning Strong agent, then need careful consideration, and waterglass setting time is too short(Determined according to volume, it is most fast up within 1min), it is easy to Cause construction machinery plugging so that a whole set of Grouting Pipe is scrapped;2nd, the parameter such as the cement mortar ratio of mud, admixture dosage is needed in experiment Before, carry out experiment determination according to area, seasonal conditions.
Treatment method is applied in special geologic conditions such as rubble, cobbles, can avoid the cement mortar edge of high-pressure rotary-spray The gap for rock or block stone flows away such that it is able to ensure that high-pressure rotary-spray technique is applied in special geologic conditions such as rubble, cobbles. Meanwhile, machinery, equipment and material are that job site is existing used by treatment method, therefore with materials, easy to process Advantage, compared to changing technique, take other engineering methods of additional complementary measure, treatment method has low excellent of construction cost Gesture.

Claims (1)

1. a kind of rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry, it is characterized in that:Including
Step 1, after the completion of drilling, according to geology exploration report understand rubble, block stone step with difference and thickness;
Step 2, grouting, the ratio of mud of the slurry that mixed cement during grouting is 0.45:1~0.55:1, while adding early strength agent, early strength agent Ratio control is 0.5%~2%;
After step 3, high-pressure rotary jet grouting pile machinery are in place, it is drilled down into from ground by carrying drill bit, while drilling, is carried out Whitewashing, rod boring speed is 7cm ~ 9cm/min, and drilling rod rotary speed keeps low-speed running;
Step 4, when rig creep into design stake bottom absolute altitude after, beginning carry drilling rod upwards, while keep original construction parameter answered Spray;
In step 5, multiple spray process, shadoof speed, drilling rod rotary speed deep low gear need to be held in metalling, boulder bed, And speed of application is then promoted to middling speed or high speed for cohesive soil, sandy soil layer, treat that drilling rod is promoted to ground mark again Gao Shi, completes to circulate for the first time;
Step 6, treat that cement mortar reaches the presetting period, second multiple spray circulation construction is carried out according to step 2~step 5.
CN201710111752.9A 2017-02-28 2017-02-28 Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry Pending CN106917401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710111752.9A CN106917401A (en) 2017-02-28 2017-02-28 Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710111752.9A CN106917401A (en) 2017-02-28 2017-02-28 Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry

Publications (1)

Publication Number Publication Date
CN106917401A true CN106917401A (en) 2017-07-04

Family

ID=59454420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710111752.9A Pending CN106917401A (en) 2017-02-28 2017-02-28 Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry

Country Status (1)

Country Link
CN (1) CN106917401A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108285254A (en) * 2018-04-18 2018-07-17 南京林业大学 A kind of the stabilization processing unit and processing method of heavy metal pollution mud
CN115075226A (en) * 2022-07-01 2022-09-20 中铨建设集团有限公司 Construction method for assembled high-pressure jet grouting reducing telescopic reinforcement cage expansion anchor cable
CN115162340A (en) * 2022-02-22 2022-10-11 中国水利水电建设工程咨询贵阳有限公司 Karst area reservoir curtain grouting construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081770A (en) * 1999-09-16 2001-03-27 Toyo Constr Co Ltd Pile foundation work
CN1487150A (en) * 2003-04-16 2004-04-07 广东省建筑科学研究院 Combined grouting construction process of reinforcing foundation
KR20140062914A (en) * 2012-11-15 2014-05-27 주식회사 삼우기초기술 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same
CN105887886A (en) * 2016-06-16 2016-08-24 中国水利水电第十工程局有限公司 Strong karst development stratum curtain grouting construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081770A (en) * 1999-09-16 2001-03-27 Toyo Constr Co Ltd Pile foundation work
CN1487150A (en) * 2003-04-16 2004-04-07 广东省建筑科学研究院 Combined grouting construction process of reinforcing foundation
KR20140062914A (en) * 2012-11-15 2014-05-27 주식회사 삼우기초기술 Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same
CN105887886A (en) * 2016-06-16 2016-08-24 中国水利水电第十工程局有限公司 Strong karst development stratum curtain grouting construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108285254A (en) * 2018-04-18 2018-07-17 南京林业大学 A kind of the stabilization processing unit and processing method of heavy metal pollution mud
CN115162340A (en) * 2022-02-22 2022-10-11 中国水利水电建设工程咨询贵阳有限公司 Karst area reservoir curtain grouting construction method
CN115075226A (en) * 2022-07-01 2022-09-20 中铨建设集团有限公司 Construction method for assembled high-pressure jet grouting reducing telescopic reinforcement cage expansion anchor cable

Similar Documents

Publication Publication Date Title
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN110043190B (en) Method for building vertical well large-diameter chamber
CN107905728B (en) Rock-fill area drilling construction method
CN114060036B (en) Horizontal positioning grouting reinforcement construction process suitable for municipal construction of muddy soft soil stratum
Burke The state of the practice of jet grouting
CN104033160A (en) Novel support method applicable to shallow-buried subsurface tunnel of soft soil stratum
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN106917401A (en) Rubble, pebble layer high-pressure rotary jet grouting pile do not return the processing method of slurry
CN106014419A (en) Multi-branch-pore ground pre-grouting and water plugging construction method
CN103437340A (en) Method for strengthening soft foundation through high-pressure jet grouting
CN107740434A (en) It is a kind of to be used for sandy gravel, the construction method of dolomite crushed zone dam foundation ditch water protecting curtain
CN110397056A (en) A kind of deep building pit piping method for blocking
CN204551447U (en) Mucky soil cement mixing pile drill bit of drilling machine
CN109577988B (en) Parallel construction method for blind inclined shaft of metal mine
Ibragimov Soil stabilization with cement grouts
Kazemian et al. Assessment of stabilization methods for soft soils by admixtures
CN110318392A (en) A kind of major diameter cement earth pile method of construction
CN110409434A (en) A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN112282638B (en) Construction method for backfilling and grouting of drilling hole with pipe
CN111335903B (en) Construction method for penetrating dense building group downwards in stratum of joint zone
CN110485460B (en) Construction method for sealing water at bottom of underground excavation station
CN114991774A (en) Ground subsection descending type grouting method for crushed andesite basalt stratum
CN103774645A (en) Cemented soil and concrete composite pile and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170704