CN1069163A - The method of prevention flood - Google Patents
The method of prevention flood Download PDFInfo
- Publication number
- CN1069163A CN1069163A CN 91107263 CN91107263A CN1069163A CN 1069163 A CN1069163 A CN 1069163A CN 91107263 CN91107263 CN 91107263 CN 91107263 A CN91107263 A CN 91107263A CN 1069163 A CN1069163 A CN 1069163A
- Authority
- CN
- China
- Prior art keywords
- rainfall
- unit interval
- disaster
- prevention
- floods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 230000002265 prevention Effects 0.000 title abstract description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000006424 Flood reaction Methods 0.000 abstract description 4
- 238000009825 accumulation Methods 0.000 description 1
- 238000010010 raising Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The present invention is a kind of method of preventing flood.This method might form the heavy rain cloud cluster of disaster, its build up as yet finish before, utilize the method for artificial rainfall that it is shot down, thereby can avoid the rainfall in the unit interval to rush down magnanimity, and then reach the purpose of prevention floods greater than the unit interval of river basin.
Description
The present invention is a kind of method of preventing floods, can be used for the frequent area of most of floods.
Traditional floods precautionary measures are confined to raisings such as dredging river more and rush down on the simple thinking of big vast ability.
The objective of the invention is to utilize existing artificial rainfall technology, might form the rainfall cloud cluster of disaster, just make its landing step by step at its accumulation initial stage, thereby can avoid the flooding of rivers that magnanimity causes less than the rainfall of unit interval of rushing down because of the river basin unit interval.In other words, promptly the heavy rain of landing or the heavy rain moderate rain or the light rain that become long-time landing suddenly in the short time.Thereby rush down for the row of river basin and to gain time.
If large-area cloud cluster is built up, then the artificial rainfall order should be earlier from the downstream in basin, and upstream the basin advances gradually, and blanking time and the dispensing dosage of implementing artificial rainfall should be no more than the big vast ability degree of being of rushing down of rivers with its rainfall at every turn.
Claims (1)
- A kind of method of preventing flood is characterized in that:-with the means of artificial rainfall, may cause the heavy rain of disaster to be decomposed into the rain landing ahead of time of unlikely formation disaster.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 91107263 CN1069163A (en) | 1991-08-02 | 1991-08-02 | The method of prevention flood |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 91107263 CN1069163A (en) | 1991-08-02 | 1991-08-02 | The method of prevention flood |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN1069163A true CN1069163A (en) | 1993-02-24 |
Family
ID=4908618
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 91107263 Pending CN1069163A (en) | 1991-08-02 | 1991-08-02 | The method of prevention flood |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1069163A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107278732A (en) * | 2016-04-11 | 2017-10-24 | 国家电网公司 | The overhead potential energy ejecting rain making method and system of mountain shape are relied on based on intelligent grid |
| CN107278734A (en) * | 2016-04-11 | 2017-10-24 | 国家电网公司 | Jacking column foot ejection rain making method and system based on intelligent grid |
-
1991
- 1991-08-02 CN CN 91107263 patent/CN1069163A/en active Pending
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107278732A (en) * | 2016-04-11 | 2017-10-24 | 国家电网公司 | The overhead potential energy ejecting rain making method and system of mountain shape are relied on based on intelligent grid |
| CN107278734A (en) * | 2016-04-11 | 2017-10-24 | 国家电网公司 | Jacking column foot ejection rain making method and system based on intelligent grid |
| CN107278734B (en) * | 2016-04-11 | 2020-07-17 | 国家电网公司 | Artificial rainfall method and system based on smart grid |
| CN107278732B (en) * | 2016-04-11 | 2020-07-31 | 国家电网公司 | Method and system for artificial rainfall by overhead potential energy ejection based on the mountain situation based on smart grid |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2499353B1 (en) | Shaft power plant | |
| EP2464858B1 (en) | Shaft power plant | |
| AU1313697A (en) | A flashboard for a hydraulic structure such as a weir, or a spillway on a dam or on a protective embankment | |
| CN1103691A (en) | Method for hydraulically branching open flow and hydraulically operated branching channel | |
| CN1069163A (en) | The method of prevention flood | |
| Legendre et al. | Aperiodic changes of water column stability and phytoplankton in an Arctic coastal embayment, Manitounuk Sound, Hudson Bay. | |
| Johnson et al. | Conflicts over flood control and wetland preservation in the Taylor Slough and eastern panhandle basins of Everglades National Park | |
| EP2888413A1 (en) | Method for preventing floods using a pipe/pump system | |
| Simas et al. | Lag time characteristics for small watersheds in the U. S. | |
| KR20230033276A (en) | hydroelectric power generation without dam | |
| CN206607652U (en) | The first unconspicuous separate system of rain feature handles exhaust system online | |
| CN218831511U (en) | Irrigation equipment suitable for rural domestic sewage treatment system | |
| Mungur et al. | An assessment of highway runoff treatment by a natural wetland | |
| CN208137014U (en) | A kind of novel water storage module | |
| Martinson | Channel adjustments after passage of a lahar | |
| Grant | A hydrologist's contribution to the debate on wild animal management | |
| SU1714020A1 (en) | Hydraulic filling method | |
| Gray et al. | Effects of water use diversion regulation and conservation on sediment transport in China’s Yellow River with comparisons from the United States | |
| Gietz | Stormwater Runoff Treatment by Impoundment: Barrhaven Pilot Study | |
| Harvey et al. | Predicting Channel Adjustment to Channelization | |
| SU1006587A1 (en) | Method for controlling hydraulic jump in water discharge structure having end tip | |
| Smith | Storm-water discharge and its effects on beaches | |
| DE3300489A1 (en) | Float-controlled screen | |
| RU2633773C1 (en) | Device for discharging cleaned livestock wastes to channel water courses | |
| JPS57124076A (en) | Hydroelectric power generator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |