CN106894433A - 装配式预应力节点结构及其施工方法 - Google Patents
装配式预应力节点结构及其施工方法 Download PDFInfo
- Publication number
- CN106894433A CN106894433A CN201710214799.8A CN201710214799A CN106894433A CN 106894433 A CN106894433 A CN 106894433A CN 201710214799 A CN201710214799 A CN 201710214799A CN 106894433 A CN106894433 A CN 106894433A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- pile cover
- precast beam
- prefabricated pile
- preserved pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种装配式预应力节点结构,其由预制桩帽、预制梁、预留管道、预应力钢筋、锚具、灌浆材料和橡胶垫组合而成;所述预制桩帽和所述预制梁中均设有预留管道,所述预留管道的端口设有锚坑,所述预制桩帽和所述预制梁之间设置橡胶垫,所述橡胶垫粘贴在预制桩帽上,所述预应力钢筋穿过所述橡胶垫、所述预制桩帽和所述预制梁,并在所述预制梁的锚坑内与锚具锁死,达到预应力钢筋设计的预应力,再通过灌浆材料封堵锚坑和预留管道,形成预应力节点。本发明还公开了一种预应力节点结构的其施工方法。本发明的优势在于外海施工不需要现场浇筑混凝土,节点连接速度快,装配化程度高,减少外海作业人员数量和防护的措施费用。
Description
技术领域
本发明涉及港口码头工程领域,具体涉及一种预应力节点结构及
其施工方法。
背景技术
装配式结构是交通行业发展不可逆转的趋势,在码头结构的建造上经过多年发展,在高桩梁板码头结构的桩基、梁和板已基本都在预制厂生产完成,现场现浇节点进行装配,装配率已经达到60%。但是随着装配化程度进一步提高,现浇节点已经不能适应高桩码头的建设速度。特别是去外海作业,因当地人工费用高和人工防护措施要求高,且对施工现场的环境要求相对苛刻,因此需要发明新的节点结构,解决现浇节点的问题。结合现代灌浆技术的发展,利用高强灌浆材料和预应力钢筋解决节点连接问题,由此提出装配式预应力节点结构。
发明内容
本发明的目的是提供一种装配式预应力节点结构,其由预制桩帽1、预制梁2、预留管道3、预应力钢筋4、锚具5、灌浆材料6和橡胶垫7组合而成;
所述预制桩帽1和所述预制梁2中均设有预留管道3,所述预留管道3的端口设有锚坑,所述预制桩帽1和所述预制梁2之间设置橡胶垫7,所述橡胶垫7粘贴在预制桩帽1上,所述预应力钢筋4穿过所述橡胶垫7、所述预制桩帽1和所述预制梁2,并在所述预制梁2的锚坑内与锚具5锁死,达到预应力钢筋4设计的预应力,再通过灌浆材料6封堵锚坑和预留管道3,形成预应力节点。
优选的,所述预制梁2中上部的预留管道3和预应力钢筋4设置数量多于下部。因为支座处,上部受拉力大,下部受压力,所以上部配置多,下部少。
优选的,所述锚坑和所述橡胶垫7的上下两端空隙都采用灌浆材料6封堵。
优选的,所述预制桩帽1架设在桩基上。
优选的,所述预留管道3交错预留。
本发明的另一种技术方案:一种预应力节点结构的其施工方法,
步骤一,先在预制厂生产预制桩帽1和预制梁2,在预制桩帽1和预制梁2上预留好预留管道3;
步骤二,将橡胶垫7粘贴在预制桩帽1侧面,预制桩帽1安装在桩基上后,使用起重船吊装预制梁2安放在预制桩帽1上;
步骤三,通过千斤顶微调预制桩帽1和预制梁2相对位置,使预留管道3对齐,再穿预应力钢筋4过橡胶垫7、预制桩帽1和预制梁2,并在预制梁2的锚坑内用锚具5锁死预应力钢筋4,并达到预应力钢筋4设计的预应力,再通过灌浆泵把灌浆材料6灌入锚坑和预留管道3内封堵,形成预应力节点。
优选的,步骤三中所述的预应力钢筋4设计的预应力根据计算得出预应力,不同外力可能是不同值;
优选的,步骤三中所述的预应力钢筋4是软的,通过预留管道3即可穿好。
有益效果:本发明的优势在于外海施工不需要现场浇筑混凝土,节点连接速度快,装配化程度高,减少外海作业人员数量和防护的措施费用。
附图说明
图1为本发明一种装配式预应力节点结构的示意图;
图2为图1的A-A向剖视图;
图3为图1中C处的局部放大图。
具体实施方式
实施例1
参见图1-3,一种装配式预应力节点结构,其由预制桩帽1、预制梁2、预留管道3、预应力钢筋4、锚具5、灌浆材料6和橡胶垫7组合而成;所述预制桩帽1和所述预制梁2中均设有预留管道3,所述预留管道3的端口设有锚坑,所述预制梁2与预制桩帽1之间设置橡胶垫7,所述橡胶垫7粘贴在预制桩帽1上;所述预应力钢筋4穿过所述橡胶垫7、所述预制桩帽1和所述预制梁2,并在所述预制梁2的锚坑内用锚具5锁死,达到预应力钢筋4设计的预应力,再通过灌浆材料6封堵锚坑和预留管道3,形成预应力节点。
实施例2
参见图1-3,根据施工顺序,先在预制厂生产预制桩帽1和预制梁2,在预制桩帽1和预制梁2上预留好预留管道3,将橡胶垫7粘贴在预制桩帽1,预制桩帽1安装在桩基上后,使用起重船吊装预制梁2安放在预制桩帽1上,通过千斤顶微调预制桩帽1和预制梁2相对位置,使预留管道3对齐,再穿预应力钢筋4过橡胶垫7、预制桩帽1和预制梁2,并在预制梁2的锚坑内用锚具5锁死预应力钢筋4,并达到预应力钢筋4设计的预应力,再通过灌浆泵把灌浆材料6灌入封堵锚坑和预留管道3内,形成预应力节点。
Claims (7)
1.一种装配式预应力节点结构,其特征在于:其由预制桩帽、预制梁、预留管道、预应力钢筋、锚具、灌浆材料和橡胶垫组合而成;
所述预制桩帽和所述预制梁中均设有预留管道,所述预留管道的端口设有锚坑,所述预制桩帽和所述预制梁之间设置橡胶垫,所述橡胶垫粘贴在预制桩帽上,所述预应力钢筋穿过所述橡胶垫、所述预制桩帽和所述预制梁,并在所述预制梁的锚坑内与锚具锁死,达到预应力钢筋设计的预应力,再通过灌浆材料封堵锚坑和预留管道,形成预应力节点。
2.如权利要求1所述的一种装配式预应力节点结构,其特征在于:所述预制梁中上部的预留管道和预应力钢筋设置数量多于下部。
3.如权利要求1所述的一种装配式预应力节点结构,其特征在于:所述锚坑和所述橡胶垫的上下两端空隙都采用灌浆材料封堵。
4.如权利要求1所述的一种装配式预应力节点结构,其特征在于:所述预制桩帽架设在桩基上。
5.如权利要求1所述的一种装配式预应力节点结构,其特征在于:所述预留管道交错预留。
6.如权利要求1-5任意一项所述的一种装配式预应力节点结构的施工方法,其特征在于:包括如下步骤:
步骤一,先在预制厂生产预制桩帽和预制梁,在预制桩帽和预制梁上预留好预留管道;
步骤二,将橡胶垫粘贴在预制桩帽侧面,预制桩帽安装在桩基上后,使用起重船吊装预制梁安放在预制桩帽上;
步骤三,通过千斤顶微调预制桩帽和预制梁相对位置,使预留管道对齐,再穿预应力钢筋过橡胶垫、预制桩帽和预制梁,并在预制梁的锚坑内用锚具锁死预应力钢筋,并达到预应力钢筋设计的预应力,再通过灌浆泵把灌浆材料灌入锚坑和预留管道内封堵,形成预应力节点。
7.如权利要求6所述的一种装配式预应力节点结构的施工方法,其特征在于:步骤三中所述的预应力钢筋是软的,通过预留管道即穿好。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710214799.8A CN106894433A (zh) | 2017-04-01 | 2017-04-01 | 装配式预应力节点结构及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710214799.8A CN106894433A (zh) | 2017-04-01 | 2017-04-01 | 装配式预应力节点结构及其施工方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106894433A true CN106894433A (zh) | 2017-06-27 |
Family
ID=59192742
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710214799.8A Pending CN106894433A (zh) | 2017-04-01 | 2017-04-01 | 装配式预应力节点结构及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106894433A (zh) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0468125A (ja) * | 1990-07-09 | 1992-03-03 | Kurosawa Kensetsu Kk | プレキャスト梁を用いた地中梁基礎の構築方法 |
| JPH11181807A (ja) * | 1997-12-22 | 1999-07-06 | Ohbayashi Corp | 地下階の施工方法 |
| JP5023245B1 (ja) * | 2012-02-07 | 2012-09-12 | 黒沢建設株式会社 | 杭頭免震構造物 |
| CN105113389A (zh) * | 2015-09-18 | 2015-12-02 | 河海大学 | 装配式钢-混凝土组合结构桥墩柱构件 |
| CN206655237U (zh) * | 2017-04-01 | 2017-11-21 | 中交第三航务工程勘察设计院有限公司 | 装配式预应力节点结构 |
-
2017
- 2017-04-01 CN CN201710214799.8A patent/CN106894433A/zh active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0468125A (ja) * | 1990-07-09 | 1992-03-03 | Kurosawa Kensetsu Kk | プレキャスト梁を用いた地中梁基礎の構築方法 |
| JPH11181807A (ja) * | 1997-12-22 | 1999-07-06 | Ohbayashi Corp | 地下階の施工方法 |
| JP5023245B1 (ja) * | 2012-02-07 | 2012-09-12 | 黒沢建設株式会社 | 杭頭免震構造物 |
| CN105113389A (zh) * | 2015-09-18 | 2015-12-02 | 河海大学 | 装配式钢-混凝土组合结构桥墩柱构件 |
| CN206655237U (zh) * | 2017-04-01 | 2017-11-21 | 中交第三航务工程勘察设计院有限公司 | 装配式预应力节点结构 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104110039B (zh) | 具有压力分散型布置高强预应力锚杆(索)的风机基础 | |
| CN107975059A (zh) | 一种装配式桩基码头结构及其施工方法 | |
| CN108755738A (zh) | 一种海上高桩承台风机基础及其施工方法 | |
| CN110130367A (zh) | 一种用于边坡加固的预制格构梁及其制作和施工方法 | |
| CN104603367B (zh) | 用于上部结构的带肋基础件以及用于生产该基础件的方法 | |
| CN110055979A (zh) | 用于边坡加固的预制预应力混凝土锚墩及制作和施工方法 | |
| CN106836463A (zh) | 承台及地梁结构的施工装置和施工方法 | |
| CN106436732A (zh) | 一种条形基础置换成筏板基础的加固方法及加固结构 | |
| CN107119699A (zh) | 一种基于等强度梁的抗滑桩及其施工方法 | |
| CN109797759A (zh) | 一种海上岩面仿生套箱围堰及其施工方法 | |
| CN106988333A (zh) | 带有插筋灌芯的预制承台及其施工工艺 | |
| CN207047881U (zh) | 带有插筋灌芯的预制承台 | |
| CN203701125U (zh) | 一种预制桩与承台的连接结构及其送桩器 | |
| CN103410144B (zh) | 预应力钢筋嵌岩灌注桩及施工方法 | |
| CN109914434A (zh) | 一种基坑支护桩顶冠梁施工结构 | |
| CN205742249U (zh) | 一种预应力混凝土封底型承台模板 | |
| CN206655237U (zh) | 装配式预应力节点结构 | |
| US3483707A (en) | Method for reinforcing steel pipe piling in situ and the resultant piling | |
| CN108104135A (zh) | 基坑支护格构柱的施工方法 | |
| CN208472751U (zh) | 海上风力发电机组预应力重力式基础 | |
| CN110067251A (zh) | 用于边坡加固的预制钢筋混凝土锚墩及制作和施工方法 | |
| CN206529881U (zh) | 承台及地梁结构的施工装置 | |
| CN106894433A (zh) | 装配式预应力节点结构及其施工方法 | |
| CN208235562U (zh) | 一种用于加固湿陷性黄土的静压桩结构 | |
| CN203129133U (zh) | 离心浇筑预应力钢筋砼工形截面支护桩 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: No. 831 zhaojiaman Road, Xuhui District, Shanghai Applicant after: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. Address before: 200032 831 Zhaojia Bang Road, Xuhui District, Shanghai Applicant before: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. |
|
| CB02 | Change of applicant information | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170627 |
|