CN106871479A - A kind of cold recovery formula varying capacity air source heat pump system - Google Patents

A kind of cold recovery formula varying capacity air source heat pump system Download PDF

Info

Publication number
CN106871479A
CN106871479A CN201710245733.5A CN201710245733A CN106871479A CN 106871479 A CN106871479 A CN 106871479A CN 201710245733 A CN201710245733 A CN 201710245733A CN 106871479 A CN106871479 A CN 106871479A
Authority
CN
China
Prior art keywords
heat exchanger
refrigerant
compressor
valve
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710245733.5A
Other languages
Chinese (zh)
Other versions
CN106871479B (en
Inventor
吴运运
王玉军
王颖
李俊红
杨奕
王天舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianshu Electric Appliance Co Ltd
Original Assignee
Jiangsu Tianshu Electric Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianshu Electric Appliance Co Ltd filed Critical Jiangsu Tianshu Electric Appliance Co Ltd
Priority to CN201710245733.5A priority Critical patent/CN106871479B/en
Publication of CN106871479A publication Critical patent/CN106871479A/en
Priority to PCT/CN2017/102002 priority patent/WO2018188269A1/en
Priority to US16/604,943 priority patent/US11137178B2/en
Application granted granted Critical
Publication of CN106871479B publication Critical patent/CN106871479B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B29/00Combined heating and refrigeration systems, e.g. operating alternately or simultaneously
    • F25B29/003Combined heating and refrigeration systems, e.g. operating alternately or simultaneously of the compression type system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/06Heat pumps characterised by the source of low potential heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B43/00Arrangements for separating or purifying gases or liquids; Arrangements for vaporising the residuum of liquid refrigerant, e.g. by heat
    • F25B43/006Accumulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Power Engineering (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

一种冷量回收式变容量空气源热泵系统,涉及交替或同时运转的加热和制冷组合系统,第一子系统和第二子系统共用双通道可变容量换热器;换热器主体包括两个互相独立的制冷剂管程通道,两个通道的制冷剂同时与壳程通道的热媒水进行热交换;壳程通道通过热水循环管路和热水循环泵建立水媒供热循环;第一子系统和第二子系统通过控制阀组连接到两个制冷剂管程通道,建立动态可控的制冷剂循环回路;热泵系统通过控制双通道可变容量换热器之控制阀组的开关状态,通过双通道可变容量换热器实现双通道变容模式,能够有效利用壳管式换热器的换热面积,因而能够满足大负荷工况稳定出力的要求,机组整体运行效率大大提升,从而实现热泵系统的高能效运行。

A cooling capacity recovery type variable capacity air source heat pump system, involving a combined heating and cooling system operating alternately or simultaneously, the first subsystem and the second subsystem share a dual-channel variable capacity heat exchanger; the main body of the heat exchanger includes two Two independent refrigerant tube-side channels, the refrigerant in the two channels exchanges heat with the heat medium water in the shell-side channel at the same time; the shell-side channel establishes a water-medium heating cycle through the hot water circulation pipeline and the hot water circulation pump; The first subsystem and the second subsystem are connected to the two refrigerant tube channels through the control valve group to establish a dynamically controllable refrigerant circulation loop; the heat pump system controls the control valve group of the dual-channel variable-capacity heat exchanger. In the on-off state, the dual-channel variable-capacity mode is realized through the dual-channel variable-capacity heat exchanger, which can effectively use the heat exchange area of the shell-and-tube heat exchanger, so it can meet the requirements of stable output under heavy load conditions, and the overall operating efficiency of the unit is greatly improved. to achieve energy-efficient operation of the heat pump system.

Description

一种冷量回收式变容量空气源热泵系统A cold recovery type variable capacity air source heat pump system

技术领域technical field

本发明涉及交替或同时运转的加热和制冷组合系统,尤其涉及一种以供热为主,同时兼顾冷量供给的热泵式冷热联供系统。The invention relates to a combined heating and cooling system that operates alternately or simultaneously, and in particular to a heat pump combined cooling and heating system that mainly supplies heat while taking into account the supply of cold.

背景技术Background technique

集约型社会建设口号的提出,促使建筑物本体内功能集成化程度更高,做到最大化能源利用已经成为当今议题。如今,商业和商务场所要求越来越高:空气侧要求控制适宜的温湿度和空气洁净度;用水侧水温度要求全年适宜。而传统的冷热源单独供给的方式在不同季节中显然造成了资源的错置,与此同时设备初投资成本亦大大提升。如图1所示的巧克力加工工艺,巧克力产品经过原料混合融化、精磨、精炼、过筛、保温、调温、浇模成型和冷却硬化最后包装成产品,不仅需要大量的热量和冷量供应,而且各个工艺环节对温度有着严格的要求。传统的温度控制一般通过电加热、蒸汽加热或是燃烧锅炉供给热量,而对不同温度要求得工艺往往是通过不同的供热方式来实现,这就增加了企业的运营成本且降低了工作效率,同时不能实现智能控制,需要大量人力投入。因此,需要对原有的耗能生产工艺流程进行改造,研发能够满足食品加工工艺要求的加热和制冷的联合系统。中国发明专利“饭店后厨热泵系统多模式运行控制方法及其控制装置”(发明专利号:201410478406.0,授权公告号:CN104197584B)公开了一种饭店后厨热泵系统多模式运行控制方法及其控制装置,涉及加热和制冷的联合系统的控制,尤其涉及一种适用于饭店后厨的热水供应、降温除湿和冷藏保鲜的热泵综合系统的控制方法及设备,控制装置通过检测和比较运行模式参数的实测值和设定值,控制多模式制冷剂循环回路切换机构改变制冷剂的循环路径,控制饭店后厨热泵系统按照预设的运行模式运行,实现自动多模式运行。The introduction of the slogan of intensive society construction promotes a higher degree of integration of the internal functions of the building itself, and the maximization of energy utilization has become a current topic. Today, commercial and commercial places have higher and higher requirements: the air side requires control of suitable temperature and humidity and air cleanliness; the water side water temperature requires suitable year-round. However, the traditional method of separate supply of cold and heat sources has obviously caused the misplacement of resources in different seasons, and at the same time, the initial investment cost of equipment has also been greatly increased. The chocolate processing technology shown in Figure 1, chocolate products are packaged into products after mixing and melting raw materials, fine grinding, refining, sieving, heat preservation, temperature adjustment, casting, cooling and hardening, which not only require a large amount of heat and cold supply , and each process link has strict requirements on temperature. Traditional temperature control generally supplies heat through electric heating, steam heating or combustion boilers, and processes that require different temperatures are often realized through different heating methods, which increases the operating cost of the enterprise and reduces work efficiency. At the same time, intelligent control cannot be realized, and a large amount of manpower is required. Therefore, it is necessary to transform the original energy-consuming production process and develop a combined heating and cooling system that can meet the requirements of food processing technology. Chinese invention patent "Multi-mode operation control method and control device for restaurant kitchen heat pump system" (invention patent number: 201410478406.0, authorized announcement number: CN104197584B) discloses a multi-mode operation control method and control device for restaurant kitchen heat pump system , relating to the control of the combined system of heating and cooling, and in particular to a control method and equipment for a heat pump integrated system suitable for hot water supply, cooling and dehumidification, and refrigeration and preservation in the back kitchen of a restaurant. The control device detects and compares the parameters of the operating mode Measured values and set values, control the multi-mode refrigerant cycle switching mechanism to change the refrigerant circulation path, control the hotel kitchen heat pump system to operate according to the preset operation mode, and realize automatic multi-mode operation.

另一方面,现有具有热回收功能的热泵系统通常采用一个独立的冷凝器和一个独立热回收器连接组成制热换热器,不仅占用空间大而且成本高。中国实用新型专利“壳管换热器及空调”(实用新型专利号:201420417296.2,授权公告号:CN204084963U)公开了一种壳管换热器及包括该壳管换热器的空调,该壳管换热器包括冷凝器和热回收器,冷凝器一端设有冷却进水口与冷却出水口,另一端密封设置;热回收器一端设有热水进口与热水出口,另一端与冷凝器密封的一端固定连接:通过将冷凝器与热回收器各自的密封端固定连接,并通过连接管将热回收器与冷凝器的冷媒通道连接起来,既能保证壳管换热器正常的冷凝功能及热回收功能,还能使壳管换热器的结构紧凑,节省安装空间,降低成本。但是,该现有技术方案实质上只是把两个独立的功能部件机械上设计为一体,其各自的功能仍然是互相独立的,并不能提高换热器的整体换热效率。On the other hand, the existing heat pump system with heat recovery function usually uses an independent condenser connected with an independent heat recovery unit to form a heating heat exchanger, which not only takes up a lot of space but also costs a lot. Chinese utility model patent "shell and tube heat exchanger and air conditioner" (utility model patent number: 201420417296.2, authorized announcement number: CN204084963U) discloses a shell and tube heat exchanger and an air conditioner including the shell and tube heat exchanger, the shell and tube The heat exchanger includes a condenser and a heat recovery device. One end of the condenser is provided with a cooling water inlet and a cooling water outlet, and the other end is sealed; one end of the heat recovery device is provided with a hot water inlet and a hot water outlet, and the other end is sealed with the condenser. Fixed connection at one end: By connecting the sealed ends of the condenser and the heat recovery unit fixedly, and connecting the heat recovery unit with the refrigerant channel of the condenser through the connecting pipe, the normal condensation function and heat dissipation of the shell-and-tube heat exchanger can be guaranteed. The recovery function can also make the structure of the shell and tube heat exchanger compact, save installation space and reduce costs. However, this prior art solution essentially only integrates two independent functional parts mechanically, and their respective functions are still independent of each other, which cannot improve the overall heat exchange efficiency of the heat exchanger.

发明内容Contents of the invention

本发明的目的是要提供一种冷量回收式变容量空气源热泵系统,用于解决热泵冷热联供系统取代传统加热方式过程中缩减设备尺度、节约设备投入和运行成本,提高换热效率和机组能效的技术问题。The purpose of the present invention is to provide a cold recovery type variable capacity air source heat pump system, which is used to solve the problem of reducing equipment scale, saving equipment investment and operating costs, and improving heat exchange efficiency in the process of replacing traditional heating methods with heat pump combined cooling and heating systems and technical issues of unit energy efficiency.

本发明解决上述技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve the problems of the technologies described above is:

一种冷量回收式变容量空气源热泵系统,包括第一压缩机和冷量回收换热器组成的第一子系统,第二压缩机和翅片式换热器组成的第二子系统,其特征在于;A cold recovery type variable capacity air source heat pump system, including a first subsystem composed of a first compressor and a cold recovery heat exchanger, a second subsystem composed of a second compressor and a finned heat exchanger, It is characterized in that;

所述的第一子系统和第二子系统共同使用一个双通道可变容量换热器作为水冷冷凝器;所述的双通道可变容量换热器包括换热器主体和一组由电磁阀与单向阀组成的控制阀组;换热器主体包括置于同一壳程通道的两个互相独立的制冷剂管程通道,两个制冷剂管程通道内的制冷剂同时与壳程通道中的水进行热交换;换热器主体的壳程通道通过热水循环管路和热水循环泵建立水媒供热循环;The first subsystem and the second subsystem use a dual-channel variable-capacity heat exchanger as a water-cooled condenser; the dual-channel variable-capacity heat exchanger includes a heat exchanger body and a set of solenoid valves A control valve group composed of a one-way valve; the main body of the heat exchanger includes two mutually independent refrigerant tube-side channels placed in the same shell-side channel, and the refrigerant in the two refrigerant tube-side channels is simultaneously connected to the shell-side channel The water is used for heat exchange; the shell-side channel of the heat exchanger main body establishes a water-medium heating cycle through the hot water circulation pipeline and the hot water circulation pump;

第一子系统和第二子系统通过所述的控制阀组连接到两个制冷剂管程通道,建立动态可控的制冷剂循环回路;热泵系统通过控制双通道可变容量换热器之控制阀组的开关状态,实现热泵系统的动态多模式运行。The first subsystem and the second subsystem are connected to the two refrigerant tube channels through the control valve group to establish a dynamically controllable refrigerant circulation loop; the heat pump system is controlled by controlling the dual-channel variable-capacity heat exchanger The switch state of the valve group realizes the dynamic multi-mode operation of the heat pump system.

本发明的冷量回收式变容量空气源热泵系统的一种较佳的技术方案,其特征在于所述的双通道可变容量换热器包括作为换热器主体的壳管式换热器和连接到壳管换热器之制冷剂管程通道的控制阀组;所述的换热器主体内设有两个互相独立的第一制冷剂通道和第二制冷剂通道,两个制冷剂管程通道置于一个共用的壳程通道内;所述的控制阀组包括连接在制冷剂管程通道的三个电磁阀和两个单向阀;所述的电磁阀包括连接在第一制冷剂通道出口的第一电磁阀,连接在第一制冷剂通道出口和第二制冷剂通道入口之间的第二电磁阀,以及连接在第二制冷剂通道出口的第三电磁阀;所述的单向阀包括连接在第二制冷剂通道入口的第一单向阀,以及并联连接在第二制冷剂通道出口和第一电磁阀出口之间的第二单向阀;第一压缩机的排气口通过第一四通阀连接到第一制冷剂通道的入口;第一电磁阀的出口和第二单向阀的出口并联连接后,通过第一膨胀阀连接到冷量回收换热器的制冷剂通道,再通过第一四通阀连接到第一压缩机的进气口;第二压缩机的排气口通过第二四通阀连接到第一单向阀的入口;第三电磁阀的出口通过第二膨胀阀连接到翅片式换热器的制冷剂通道,再通过第二四通阀连接到第二压缩机的进气口。A preferred technical solution of the cold recovery type variable capacity air source heat pump system of the present invention is characterized in that the double-channel variable capacity heat exchanger includes a shell and tube heat exchanger as the main body of the heat exchanger and The control valve group connected to the refrigerant tube channel of the shell-and-tube heat exchanger; the main body of the heat exchanger is provided with two mutually independent first refrigerant channels and second refrigerant channels, and the two refrigerant tubes The side channel is placed in a shared shell side channel; the control valve group includes three solenoid valves and two check valves connected to the refrigerant tube side channel; the solenoid valve includes a valve connected to the first refrigerant tube The first solenoid valve at the outlet of the passage, the second solenoid valve connected between the outlet of the first refrigerant passage and the inlet of the second refrigerant passage, and the third solenoid valve connected at the outlet of the second refrigerant passage; the single The directional valve includes a first one-way valve connected to the inlet of the second refrigerant passage, and a second one-way valve connected in parallel between the outlet of the second refrigerant passage and the outlet of the first solenoid valve; the exhaust of the first compressor The port is connected to the inlet of the first refrigerant passage through the first four-way valve; after the outlet of the first solenoid valve is connected in parallel with the outlet of the second one-way valve, it is connected to the refrigerant of the cold recovery heat exchanger through the first expansion valve. agent channel, and then connected to the inlet of the first compressor through the first four-way valve; the exhaust port of the second compressor is connected to the inlet of the first one-way valve through the second four-way valve; the third solenoid valve The outlet is connected to the refrigerant channel of the fin heat exchanger through the second expansion valve, and then connected to the air inlet of the second compressor through the second four-way valve.

本发明的双通道可变容量换热器的一种优选的技术方案,其特征在于所述的换热器主体采用壳程通道上下连通的立式结构,第一制冷剂通道置于壳程通道的上部,第二制冷剂通道置于壳程通道的下部;制冷剂的高温显热在第一制冷剂通道中传递给壳程通道上部的水,形成高温显热换热区;制冷剂的冷凝潜热在第二制冷剂通道中传递给壳程通道下部的水,形成冷凝潜热换热区。A preferred technical solution of the double-channel variable-capacity heat exchanger of the present invention is characterized in that the main body of the heat exchanger adopts a vertical structure in which the shell-side channel communicates up and down, and the first refrigerant channel is placed in the shell-side channel The upper part of the second refrigerant channel is placed at the lower part of the shell-side channel; the high-temperature sensible heat of the refrigerant is transferred to the water in the upper part of the shell-side channel in the first refrigerant channel, forming a high-temperature sensible heat heat exchange zone; the condensation of the refrigerant The latent heat is transferred to the water in the lower part of the shell-side channel in the second refrigerant channel, forming a condensation latent heat heat exchange area.

本发明的冷量回收式变容量空气源热泵系统的一种更好的技术方案,其特征在于在第一制冷剂通道与第一膨胀阀之间的连接管路上设有第一储液器,在第二制冷剂通道与第二膨胀阀之间的连接管路上设有第二储液器。A better technical solution of the cold recovery type variable capacity air source heat pump system of the present invention is characterized in that a first liquid reservoir is provided on the connecting pipeline between the first refrigerant passage and the first expansion valve, A second liquid accumulator is provided on the connecting pipeline between the second refrigerant channel and the second expansion valve.

本发明的冷量回收式变容量空气源热泵系统的一种改进的技术方案,其特征在于所述的动态多模式运行包括以下四种运行模式:An improved technical solution of the cold recovery type variable capacity air source heat pump system of the present invention is characterized in that the dynamic multi-mode operation includes the following four operation modes:

(1)第一子系统冷热均衡模式:第一压缩机启动,第二压缩机停止,第一电磁阀打开,第二电磁阀关闭,本模式的制冷剂循环路径如下:(1) Cooling and heating balance mode of the first subsystem: the first compressor is started, the second compressor is stopped, the first solenoid valve is opened, and the second solenoid valve is closed. The refrigerant circulation path in this mode is as follows:

第一压缩机-第一四通阀-第一制冷剂通道-第一电磁阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机;The first compressor - the first four-way valve - the first refrigerant passage - the first solenoid valve - the first liquid receiver - the first expansion valve - the cooling recovery heat exchanger - the first four-way valve - the first gas-liquid Separator - first compressor;

(2)第二子系统空气源热水模式:第一压缩机停止,第二压缩机启动,第二电磁阀关闭,第三电磁阀打开,本模式的制冷剂循环路径如下:(2) The air source hot water mode of the second subsystem: the first compressor is stopped, the second compressor is started, the second solenoid valve is closed, and the third solenoid valve is opened. The refrigerant circulation path in this mode is as follows:

第二压缩机-第二四通阀-第一单向阀-第二制冷剂通道-第三电磁阀-第二储液器-第二膨胀阀-翅片式换热器-第二四通阀-第二气液分离器-第二压缩机;The second compressor - the second four-way valve - the first one-way valve - the second refrigerant passage - the third solenoid valve - the second liquid receiver - the second expansion valve - finned heat exchanger - the second four-way valve - the second gas-liquid separator - the second compressor;

(3)双系统定容冷热水模式:第一压缩机和第二压缩机同时启动,第一电磁阀打开,第二电磁阀关闭,第三电磁阀打开,第一子系统的制冷剂循环路径如下:(3) Dual system constant volume cold and hot water mode: the first compressor and the second compressor start at the same time, the first solenoid valve is opened, the second solenoid valve is closed, the third solenoid valve is opened, and the refrigerant cycle of the first subsystem The path is as follows:

第一压缩机-第一四通阀-第一制冷剂通道-第一电磁阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机;The first compressor - the first four-way valve - the first refrigerant passage - the first solenoid valve - the first liquid receiver - the first expansion valve - the cooling recovery heat exchanger - the first four-way valve - the first gas-liquid Separator - first compressor;

第二子系统的制冷剂循环路径如下:The refrigerant circulation path of the second subsystem is as follows:

第二压缩机-第二四通阀-第一单向阀-第二制冷剂通道-第三电磁阀-第二储液器-第二膨胀阀-翅片式换热器-第二四通阀-第二气液分离器-第二压缩机;The second compressor - the second four-way valve - the first one-way valve - the second refrigerant passage - the third solenoid valve - the second liquid receiver - the second expansion valve - finned heat exchanger - the second four-way valve - the second gas-liquid separator - the second compressor;

(4)双通道变容运行模式:第一压缩机启动,第二压缩机停止,第一电磁阀关闭,第二电磁阀打开,第三电磁阀关闭,本模式的制冷剂循环路径如下:(4) Two-channel variable capacity operation mode: the first compressor is started, the second compressor is stopped, the first solenoid valve is closed, the second solenoid valve is opened, and the third solenoid valve is closed. The refrigerant circulation path in this mode is as follows:

第一压缩机-第一四通阀-第一制冷剂通道-第二电磁阀-第二制冷剂通道-第二单向阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机。The first compressor - the first four-way valve - the first refrigerant passage - the second solenoid valve - the second refrigerant passage - the second one-way valve - the first liquid receiver - the first expansion valve - cooling recovery and heat exchange Device - the first four-way valve - the first gas-liquid separator - the first compressor.

本发明的冷量回收式变容量空气源热泵系统的一种进一步改进的技术方案,其特征在于所述的空气源热泵系统根据制冷回收冷量改变翅片式换热器的换热面积,在保证机组制热量的同时缩减热泵系统的整体系统尺寸:A further improved technical solution of the cooling capacity recovery type variable capacity air source heat pump system of the present invention is characterized in that the air source heat pump system changes the heat exchange area of the finned heat exchanger according to the cooling capacity recovered by refrigeration. Reduce the overall system size of the heat pump system while ensuring the heating capacity of the unit:

翅片式换热器之换热面积S的变化范围为0~W2/q,The heat exchange area S of the finned heat exchanger varies from 0 to W 2 /q,

冷量回收换热器之换热面积S1的变化范围为0~(W1-W2)/q1The heat exchange area S 1 of the cold recovery heat exchanger varies from 0 to (W 1 -W 2 )/q 1 ,

其中,机组制热量Q1=W1+Pi,kw;W1为系统制热运行时蒸发器侧的制冷量,kw;Pi为系统制热运行输入功率,kw;W2为制冷回收冷量,kw;S=W2/q为翅片式换热器的换热面积,m2;q为制热工况下蒸发侧单位换热面积制冷量,kw/m2;S1=(W1-W2)/q1为冷量回收换热器的换热面积,m2;q1为冷量回收换热器单位换热面积制冷量,kw/m2Among them, the heating capacity of the unit Q 1 =W 1 +P i , kw; W 1 is the cooling capacity of the evaporator side during the heating operation of the system, kw; P i is the input power of the heating operation of the system, kw; W 2 is the cooling recovery Cooling capacity, kw; S=W 2 /q is the heat transfer area of the finned heat exchanger, m 2 ; q is the cooling capacity per unit heat transfer area of the evaporation side under heating conditions, kw/m 2 ; S 1 = (W 1 -W 2 )/q 1 is the heat transfer area of the cold recovery heat exchanger, m 2 ; q 1 is the cooling capacity per unit heat transfer area of the cold recovery heat exchanger, kw/m 2 .

本发明的有益效果是:The beneficial effects of the present invention are:

1、本发明的冷量回收式变容量空气源热泵系统,通过双通道可变容量换热器实现双通道变容模式,能够有效利用壳管式换热器的换热面积,因而能够满足大负荷工况稳定出力的要求,机组整体运行效率大大提升,从而实现热泵系统的高能效运行。1. The cold recovery type variable capacity air source heat pump system of the present invention realizes the dual channel variable capacity mode through the dual channel variable capacity heat exchanger, which can effectively utilize the heat exchange area of the shell and tube heat exchanger, thus meeting the needs of large To meet the requirements of stable output under load conditions, the overall operating efficiency of the unit is greatly improved, thereby realizing the energy-efficient operation of the heat pump system.

2、本发明的冷量回收式变容量空气源热泵系统,利用变容量模式运行的双通道可变容量换热器和冷量回收换热器实现部分冷量回收,能够大大提升子系统中制冷剂的过冷度,从而提高系统的制冷量。2. The cold recovery type variable capacity air source heat pump system of the present invention uses the dual-channel variable capacity heat exchanger and the cold recovery heat exchanger operating in the variable capacity mode to realize part of the cold recovery, which can greatly improve the cooling capacity of the subsystem. The subcooling degree of the agent, thereby increasing the cooling capacity of the system.

3、本发明的冷量回收式变容量空气源热泵系统,通过两套制冷系统共用一套水冷冷凝器实现耦合运行,利用冷量回收换热器以减小翅片式蒸发器尺寸,从而达到降低系统尺寸的目的,使冷热联供系统在不同冷热负荷下低耗稳定运行,达到高效节能运行的目的。3. The cooling capacity recovery type variable capacity air source heat pump system of the present invention realizes coupled operation through two sets of refrigeration systems sharing a set of water-cooled condensers, and uses the cooling capacity recovery heat exchanger to reduce the size of the finned evaporator, thereby achieving The purpose of reducing the size of the system is to enable the combined cooling and heating system to operate stably with low consumption under different cooling and heating loads, so as to achieve the purpose of high-efficiency and energy-saving operation.

附图说明Description of drawings

图1是巧克力加工工艺流程图;Fig. 1 is a chocolate processing flow chart;

图2是本发明的冷量回收式变容量空气源热泵系统的系统原理图;Fig. 2 is a system schematic diagram of the cold recovery type variable capacity air source heat pump system of the present invention;

图3是本发明的冷量回收式变容量空气源热泵系统的装配结构示意图;Fig. 3 is a schematic diagram of the assembly structure of the cold recovery type variable capacity air source heat pump system of the present invention;

图4是本发明的双通道可变容量换热器的结构示意图;Fig. 4 is a schematic structural view of a double-channel variable-capacity heat exchanger of the present invention;

图5是本发明的冷量回收式变容量空气源热泵系统的运行模式示意图。Fig. 5 is a schematic diagram of the operation mode of the cold recovery type variable capacity air source heat pump system of the present invention.

以上图中各部件的附图标记:1-第一子系统,10-第一压缩机,11-第一四通阀,12-第一膨胀阀,13-冷量回收换热器,14-冷水循环管路,15-第一气液分离器,16-第一感温包,17-第一储液器,18-第一除霜单向电磁阀,2-第二子系统,20-第二压缩机,21-第二四通阀,22-第二膨胀阀,23-翅片式换热器,24-风机,25-第二气液分离器,26-第二感温包,27-第二储液器,28-第二除霜单向电磁阀,3-双通道可变容量换热器,30-换热器主体,31-第一制冷剂通道,32-第二制冷剂通道,33-第一电磁阀,34-第二电磁阀,35-第三电磁阀,36-第一单向阀,37-第二单向阀,38-热水循环管路,39-热水循环泵。The reference signs of the components in the above figure: 1-the first subsystem, 10-the first compressor, 11-the first four-way valve, 12-the first expansion valve, 13-cold recovery heat exchanger, 14- Cold water circulation pipeline, 15-the first gas-liquid separator, 16-the first temperature sensing bulb, 17-the first liquid reservoir, 18-the first defrosting one-way solenoid valve, 2-the second subsystem, 20- The second compressor, 21-the second four-way valve, 22-the second expansion valve, 23-fin heat exchanger, 24-fan, 25-the second gas-liquid separator, 26-the second temperature sensor, 27-Second liquid receiver, 28-Second defrosting one-way solenoid valve, 3-Double-channel variable capacity heat exchanger, 30-Heat exchanger main body, 31-First refrigerant channel, 32-Second refrigeration agent channel, 33-first solenoid valve, 34-second solenoid valve, 35-third solenoid valve, 36-first one-way valve, 37-second one-way valve, 38-hot water circulation pipeline, 39- Hot water circulation pump.

具体实施方式detailed description

为了能更好地理解本发明的上述技术方案,下面结合附图和实施例进行进一步地详细描述。图2和图3是本发明的冷量回收式变容量空气源热泵系统的一个实施例,包括第一压缩机10和冷量回收换热器13组成的第一子系统1,第二压缩机20和翅片式换热器23组成的第二子系统2,如图2所示,所述的第一子系统1和第二子系统2共同使用一个双通道可变容量换热器3作为水冷冷凝器;所述的双通道可变容量换热器3包括换热器主体30和一组由电磁阀与单向阀组成的控制阀组;换热器主体30包括置于同一壳程通道的两个互相独立的制冷剂管程通道,两个制冷剂管程通道内的制冷剂同时与壳程通道中的水进行热交换;换热器主体30的壳程通道通过热水循环管路38和热水循环泵39建立水媒供热循环;第一子系统1和第二子系统2通过所述的控制阀组连接到两个制冷剂管程通道,建立动态可控的制冷剂循环回路;热泵系统通过控制双通道可变容量换热器3之控制阀组的开关状态,实现热泵系统的动态多模式运行。以某巧克力加工产线为例,1T原料从加工至最后包装成产品的生产过程需要稳定100KW热量和50KW冷量需求。在本实施例中,第一子系统1采用套管式蒸发器作为冷量回收换热器13,回收部分冷量用于巧克力加工的浇模成型、冷却硬化和包装等工艺过程中的冷量供应;第二子系统2采用翅片式换热器23从空气源吸取热量,根据冷热量需求的差异增加热泵系统的整体制热能力。In order to better understand the above technical solutions of the present invention, a further detailed description will be given below in conjunction with the drawings and embodiments. Fig. 2 and Fig. 3 are an embodiment of the cooling capacity recovery variable capacity air source heat pump system of the present invention, including the first subsystem 1 composed of the first compressor 10 and the cooling capacity recovery heat exchanger 13, and the second compressor 20 and the second subsystem 2 composed of finned heat exchanger 23, as shown in Figure 2, the first subsystem 1 and the second subsystem 2 share a dual-channel variable capacity heat exchanger 3 as Water-cooled condenser; the dual-channel variable-capacity heat exchanger 3 includes a heat exchanger main body 30 and a set of control valve groups composed of solenoid valves and check valves; the heat exchanger main body 30 includes channels placed on the same shell side There are two mutually independent refrigerant tube-side channels, and the refrigerant in the two refrigerant tube-side channels exchanges heat with the water in the shell-side channel at the same time; the shell-side channel of the heat exchanger main body 30 passes through the hot water circulation pipeline 38 and hot water circulation pump 39 to establish a water-medium heating cycle; the first subsystem 1 and the second subsystem 2 are connected to the two refrigerant tube channels through the control valve group to establish a dynamically controllable refrigerant cycle Circuit: The heat pump system realizes the dynamic multi-mode operation of the heat pump system by controlling the switch state of the control valve group of the dual-channel variable capacity heat exchanger 3 . Taking a chocolate processing line as an example, the production process of 1T of raw materials from processing to final packaging into products requires a stable demand for 100KW of heat and 50KW of cooling. In this embodiment, the first sub-system 1 adopts the sleeve-type evaporator as the cooling capacity recovery heat exchanger 13, and recovers part of the cooling capacity for the cooling capacity in the process of molding, cooling hardening and packaging of chocolate processing. Supply; the second subsystem 2 uses the finned heat exchanger 23 to absorb heat from the air source, and increases the overall heating capacity of the heat pump system according to the difference in cold and heat demand.

在图4所示的实施例中,所述的双通道可变容量换热器3包括作为换热器主体30的壳管式换热器和连接到壳管换热器之制冷剂管程通道的控制阀组;所述的换热器主体30内设有两个互相独立的第一制冷剂通道31和第二制冷剂通道32,两个制冷剂管程通道31和32置于一个共用的壳程通道内;所述的控制阀组包括连接在制冷剂管程通道的三个电磁阀和两个单向阀;所述的电磁阀包括连接在第一制冷剂通道31出口的第一电磁阀33,连接在第一制冷剂通道31出口和第二制冷剂通道32入口之间的第二电磁阀34,以及连接在第二制冷剂通道32出口的第三电磁阀35;所述的单向阀包括连接在第二制冷剂通道32入口的第一单向阀36,以及并联连接在第二制冷剂通道32出口和第一电磁阀33出口之间的第二单向阀37;第一压缩机10的排气口通过第一四通阀11连接到第一制冷剂通道31的入口;第一电磁阀33的出口和第二单向阀37的出口并联连接后,通过第一膨胀阀12连接到冷量回收换热器13的制冷剂通道,再通过第一四通阀11连接到第一压缩机10的进气口;第二压缩机20的排气口通过第二四通阀21连接到第一单向阀36的入口;第三电磁阀35的出口通过第二膨胀阀22连接到翅片式换热器23的制冷剂通道,再通过第二四通阀21连接到第二压缩机20的进气口。In the embodiment shown in FIG. 4, the dual-channel variable-capacity heat exchanger 3 includes a shell-and-tube heat exchanger as the heat exchanger body 30 and a refrigerant tube-side channel connected to the shell-and-tube heat exchanger. control valve group; the heat exchanger main body 30 is provided with two mutually independent first refrigerant passages 31 and second refrigerant passages 32, and the two refrigerant pipe-side passages 31 and 32 are placed in a common In the shell-side passage; the control valve group includes three solenoid valves and two check valves connected to the refrigerant pipe-side passage; the solenoid valve includes a first solenoid valve connected to the outlet of the first refrigerant passage 31 valve 33, the second solenoid valve 34 connected between the outlet of the first refrigerant passage 31 and the inlet of the second refrigerant passage 32, and the third solenoid valve 35 connected at the outlet of the second refrigerant passage 32; the single The one-way valve includes a first one-way valve 36 connected to the inlet of the second refrigerant passage 32, and a second one-way valve 37 connected in parallel between the outlet of the second refrigerant passage 32 and the outlet of the first electromagnetic valve 33; The exhaust port of the compressor 10 is connected to the inlet of the first refrigerant channel 31 through the first four-way valve 11; after the outlet of the first solenoid valve 33 and the outlet of the second one-way valve 37 are connected in parallel, they pass through the first expansion valve. 12 is connected to the refrigerant channel of the cold recovery heat exchanger 13, and then connected to the intake port of the first compressor 10 through the first four-way valve 11; the exhaust port of the second compressor 20 is passed through the second four-way valve 21 is connected to the inlet of the first one-way valve 36; the outlet of the third solenoid valve 35 is connected to the refrigerant channel of the fin heat exchanger 23 through the second expansion valve 22, and then connected to the first four-way valve 21 through the second expansion valve 21. The air inlet of the second compressor 20.

根据本发明的双通道可变容量换热器的一个实施例,所述的换热器主体30采用壳程通道上下连通的立式结构,第一制冷剂通道31置于壳程通道的上部,第二制冷剂通道32置于壳程通道的下部;制冷剂的高温显热在第一制冷剂通道31中传递给壳程通道上部的水,形成高温显热换热区;制冷剂的冷凝潜热在第二制冷剂通道32中传递给壳程通道下部的水,形成冷凝潜热换热区。According to an embodiment of the double-channel variable-capacity heat exchanger of the present invention, the heat exchanger main body 30 adopts a vertical structure in which the shell-side channel communicates up and down, and the first refrigerant channel 31 is placed on the upper part of the shell-side channel. The second refrigerant channel 32 is placed in the lower part of the shell-side channel; the high-temperature sensible heat of the refrigerant is transferred to the water in the upper part of the shell-side channel in the first refrigerant channel 31, forming a high-temperature sensible heat heat exchange zone; the latent heat of condensation of the refrigerant The water transferred to the lower part of the shell-side channel in the second refrigerant channel 32 forms a condensation latent heat heat exchange area.

根据图2所示的本发明的冷量回收式变容量空气源热泵系统的实施例,在第一制冷剂通道31与第一膨胀阀12之间的连接管路上设有第一储液器17,在第二制冷剂通道32与第二膨胀阀22之间的连接管路上设有第二储液器27。According to the embodiment of the cold recovery type variable capacity air source heat pump system of the present invention shown in FIG. , the second liquid accumulator 27 is provided on the connecting pipeline between the second refrigerant channel 32 and the second expansion valve 22 .

根据图5所示的本发明的冷量回收式变容量空气源热泵系统的实施例,所述的动态多模式运行包括以下四种运行模式:According to the embodiment of the cold recovery type variable capacity air source heat pump system of the present invention shown in Fig. 5, the dynamic multi-mode operation includes the following four operation modes:

(1)第一子系统冷热均衡模式:第一压缩机10启动,第二压缩机20停止,第一电磁阀33打开,第二电磁阀34关闭,本模式的制冷剂循环路径如下:(1) The cooling and heating balance mode of the first subsystem: the first compressor 10 is started, the second compressor 20 is stopped, the first solenoid valve 33 is opened, and the second solenoid valve 34 is closed. The refrigerant circulation path in this mode is as follows:

第一压缩机10-第一四通阀11-第一制冷剂通道31-第一电磁阀33-第一储液器17-第一膨胀阀12-冷量回收换热器13-第一四通阀11-第一气液分离器15-第一压缩机10;First compressor 10-first four-way valve 11-first refrigerant channel 31-first solenoid valve 33-first liquid receiver 17-first expansion valve 12-cold recovery heat exchanger 13-first four Through valve 11-the first gas-liquid separator 15-the first compressor 10;

本模式下,第一制冷剂通道31内的制冷剂与壳程通道中的水进行热交换,将第一子系统1制取冷水过程中冷量回收换热器13回收的热能,传递给换热器主体30壳程通道中制取的热水。In this mode, the refrigerant in the first refrigerant channel 31 exchanges heat with the water in the shell-side channel, and transfers the heat energy recovered by the cold recovery heat exchanger 13 in the process of producing cold water by the first subsystem 1 to the heat exchanger. The hot water produced in the shell side channel of the heater main body 30.

(2)第二子系统空气源热水模式:第一压缩机10停止,第二压缩机20启动,第二电磁阀34关闭,第三电磁阀35打开,本模式的制冷剂循环路径如下:(2) The air source hot water mode of the second subsystem: the first compressor 10 is stopped, the second compressor 20 is started, the second solenoid valve 34 is closed, and the third solenoid valve 35 is opened. The refrigerant circulation path in this mode is as follows:

第二压缩机20-第二四通阀21-第一单向阀36-第二制冷剂通道32-第三电磁阀35-第二储液器27-第二膨胀阀22-翅片式换热器23-第二四通阀21-第二气液分离器25-第二压缩机20;The second compressor 20-the second four-way valve 21-the first one-way valve 36-the second refrigerant channel 32-the third solenoid valve 35-the second liquid reservoir 27-the second expansion valve 22-fin type exchange Heater 23-second four-way valve 21-second gas-liquid separator 25-second compressor 20;

本模式下,第二制冷剂通道32内的制冷剂与壳程通道中的水进行热交换,将第二子系统2之翅片式换热器23从空气源吸收的热能,传递给换热器主体30壳程通道中制取的热水。In this mode, the refrigerant in the second refrigerant channel 32 exchanges heat with the water in the shell-side channel, and transfers the heat energy absorbed by the finned heat exchanger 23 of the second subsystem 2 from the air source to the heat exchange The hot water produced in the shell side channel of the device main body 30.

(3)双系统定容冷热水模式:第一压缩机10和第二压缩机20同时启动,第一电磁阀33打开,第二电磁阀34关闭,第三电磁阀35打开,第一子系统1的制冷剂循环路径如下:(3) Dual-system constant-capacity cold and hot water mode: the first compressor 10 and the second compressor 20 are started simultaneously, the first solenoid valve 33 is opened, the second solenoid valve 34 is closed, the third solenoid valve 35 is opened, and the first The refrigerant circulation path of system 1 is as follows:

第一压缩机10-第一四通阀11-第一制冷剂通道31-第一电磁阀33-第一储液器17-第一膨胀阀12-冷量回收换热器13-第一四通阀11-第一气液分离器15-第一压缩机10;First compressor 10-first four-way valve 11-first refrigerant channel 31-first solenoid valve 33-first liquid receiver 17-first expansion valve 12-cold recovery heat exchanger 13-first four Through valve 11-the first gas-liquid separator 15-the first compressor 10;

第二子系统2的制冷剂循环路径如下:The refrigerant circulation path of the second subsystem 2 is as follows:

第二压缩机20-第二四通阀21-第一单向阀36-第二制冷剂通道32-第三电磁阀35-第二储液器27-第二膨胀阀22-翅片式换热器23-第二四通阀21-第二气液分离器25-第二压缩机20;The second compressor 20-the second four-way valve 21-the first one-way valve 36-the second refrigerant channel 32-the third solenoid valve 35-the second liquid reservoir 27-the second expansion valve 22-fin type exchange Heater 23-second four-way valve 21-second gas-liquid separator 25-second compressor 20;

在双系统定容冷热水模式下,第一制冷剂通道31内的制冷剂与壳程通道中的水进行热交换,将第一子系统1冷水制取过程中冷量回收换热器13回收的热能,传递给换热器主体30壳程通道中制取的热水;同时,第二制冷剂通道32内的制冷剂与壳程通道中的水进行热交换,将第二子系统2之翅片式换热器23从空气源吸收的热能,传递给换热器主体30壳程通道中制取的热水。In the dual-system constant-volume cold and hot water mode, the refrigerant in the first refrigerant channel 31 exchanges heat with the water in the shell-side channel, and the cold energy recovery heat exchanger 13 in the cold water production process of the first subsystem 1 The recovered heat energy is transferred to the hot water produced in the shell-side channel of the heat exchanger main body 30; at the same time, the refrigerant in the second refrigerant channel 32 exchanges heat with the water in the shell-side channel, and the second subsystem 2 The heat energy absorbed by the finned heat exchanger 23 from the air source is transferred to the hot water produced in the shell-side channel of the heat exchanger main body 30 .

(4)双通道变容模式:第一压缩机10启动,第二压缩机20停止,第一电磁阀33关闭,第二电磁阀34打开,第三电磁阀35关闭,本模式的制冷剂循环路径如下:(4) Two-channel variable capacity mode: the first compressor 10 is started, the second compressor 20 is stopped, the first solenoid valve 33 is closed, the second solenoid valve 34 is opened, the third solenoid valve 35 is closed, and the refrigerant cycle in this mode The path is as follows:

第一压缩机10-第一四通阀11-第一制冷剂通道31-第二电磁阀34-第二制冷剂通道32-第二单向阀37-第一储液器17-第一膨胀阀12-冷量回收换热器13-第一四通阀11-第一气液分离器15-第一压缩机10。First compressor 10-first four-way valve 11-first refrigerant passage 31-second solenoid valve 34-second refrigerant passage 32-second one-way valve 37-first accumulator 17-first expansion Valve 12—cold recovery heat exchanger 13—first four-way valve 11—first gas-liquid separator 15—first compressor 10.

在双通道变容模式下,本发明的冷量回收式变容量空气源热泵系统之第一压缩机10排气口排出的高温高压制冷剂气体,经第一四通阀11进入双通道可变容量换热器3中,流经第一制冷剂通道31进行第一段换热后,形成制冷剂气液混合物并通过第二电磁阀34回到双通道可变容量换热器3中,在第二制冷剂通道32中再次与换热器主体30的水侧充分换热,冷凝为高压常温的制冷剂液体,流经第二单向阀37后经第一膨胀阀12的节流作用,变为低压制冷剂液体,进入作为冷量回收换热器13的套管式蒸发器,吸热蒸发为低压制冷剂气体通过第一四通阀11进入第一气液分离器15,最终进入第一压缩机10进气口,形成双通道变容模式运行的制冷剂循环路径;在本模式下,制冷剂通过第一制冷剂通道31和第二制冷剂通道32,与壳程通道中的水进行两次热交换,将第一子系统1冷水制取过程中冷量回收换热器13回收的热能,传递给换热器主体30壳程通道中制取的热水。In the dual-channel variable capacity mode, the high-temperature and high-pressure refrigerant gas discharged from the exhaust port of the first compressor 10 of the cooling recovery type variable capacity air source heat pump system of the present invention enters the dual-channel variable capacity through the first four-way valve 11. In the capacity heat exchanger 3, after flowing through the first refrigerant channel 31 for the first stage of heat exchange, the refrigerant gas-liquid mixture is formed and returned to the dual-channel variable capacity heat exchanger 3 through the second solenoid valve 34. The second refrigerant channel 32 fully exchanges heat with the water side of the heat exchanger main body 30 again, condenses into a refrigerant liquid at high pressure and normal temperature, flows through the second check valve 37 and then through the throttling effect of the first expansion valve 12, It becomes a low-pressure refrigerant liquid and enters the jacketed evaporator as the cold recovery heat exchanger 13, absorbs heat and evaporates into a low-pressure refrigerant gas, enters the first gas-liquid separator 15 through the first four-way valve 11, and finally enters the second gas-liquid separator 15. A compressor 10 inlet, forming a refrigerant circulation path for dual-channel variable capacity mode operation; in this mode, the refrigerant passes through the first refrigerant channel 31 and the second refrigerant channel 32, and the water in the shell-side channel Two heat exchanges are performed, and the heat recovered by the cold recovery heat exchanger 13 in the cold water production process of the first subsystem 1 is transferred to the hot water produced in the shell-side channel of the heat exchanger main body 30 .

在双通道变容模式下,本发明的冷量回收式变容量空气源热泵系统之第一压缩机10排气口排出的高温高压制冷剂气体,经第一四通阀11进入双通道可变容量换热器3中,流经第一制冷剂通道31进行第一段换热后,形成制冷剂气液混合物并通过第二电磁阀34回到双通道可变容量换热器3中,在第二制冷剂通道32中再次与换热器主体30的水侧充分换热,冷凝为高压常温的制冷剂液体,流经第二单向阀37后经第一膨胀阀12的节流作用,变为低压制冷剂液体,进入作为冷量回收换热器13的套管式蒸发器,吸热蒸发为低压制冷剂气体通过第一四通阀11进入第一气液分离器15,最终进入第一压缩机10进气口,形成双通道变容模式运行的制冷剂循环路径。In the dual-channel variable capacity mode, the high-temperature and high-pressure refrigerant gas discharged from the exhaust port of the first compressor 10 of the cooling recovery type variable capacity air source heat pump system of the present invention enters the dual-channel variable capacity through the first four-way valve 11. In the capacity heat exchanger 3, after flowing through the first refrigerant channel 31 for the first stage of heat exchange, the refrigerant gas-liquid mixture is formed and returned to the dual-channel variable capacity heat exchanger 3 through the second solenoid valve 34. The second refrigerant channel 32 fully exchanges heat with the water side of the heat exchanger main body 30 again, condenses into a refrigerant liquid at high pressure and normal temperature, flows through the second check valve 37 and then through the throttling effect of the first expansion valve 12, It becomes a low-pressure refrigerant liquid and enters the jacketed evaporator as the cold recovery heat exchanger 13, absorbs heat and evaporates into a low-pressure refrigerant gas, enters the first gas-liquid separator 15 through the first four-way valve 11, and finally enters the second gas-liquid separator 15. An air inlet of the compressor 10 forms a refrigerant circulation path operated in a dual-channel variable capacity mode.

本发明的冷量回收式变容量空气源热泵系统,利用变容量模式运行的双通道可变容量换热器3,能够大大提升第一子系统1中制冷剂的过冷度,从而提高系统的制冷量。在第二子系统2停机时,双通道变容模式能够有效利用壳管式换热器的换热面积,因而能够满足大负荷工况稳定出力的要求,机组整体运行效率大大提升,从而实现热泵系统的高能效运行。The cooling capacity recovery type variable capacity air source heat pump system of the present invention can greatly increase the subcooling degree of the refrigerant in the first subsystem 1 by using the dual-channel variable capacity heat exchanger 3 operating in the variable capacity mode, thereby improving the efficiency of the system. cooling capacity. When the second subsystem 2 is shut down, the dual-channel variable capacity mode can effectively use the heat exchange area of the shell-and-tube heat exchanger, so it can meet the requirements of stable output under heavy load conditions, and the overall operating efficiency of the unit is greatly improved, thereby realizing heat pump Energy-efficient operation of the system.

根据本发明的冷量回收式变容量空气源热泵系统的一个实施例,所述的空气源热泵系统根据制冷回收冷量改变翅片式换热器的换热面积,在保证机组制热量的同时缩减热泵系统的整体系统尺寸:According to an embodiment of the cooling capacity recovery variable capacity air source heat pump system of the present invention, the air source heat pump system changes the heat exchange area of the fin heat exchanger according to the cooling capacity recovered by refrigeration, while ensuring the heating capacity of the unit Reduce the overall system size of the heat pump system:

翅片式换热器23之换热面积S的变化范围为0~W2/q,The heat exchange area S of the finned heat exchanger 23 varies from 0 to W 2 /q,

冷量回收换热器13之换热面积S1的变化范围为0~(W1-W2)/q1The heat exchange area S 1 of the cold recovery heat exchanger 13 varies from 0 to (W 1 -W 2 )/q 1 ,

其中,机组制热量Q1=W1+Pi,kw;W1为系统制热运行时蒸发器侧的制冷量,kw;Pi为系统制热运行输入功率,kw;W2为制冷回收冷量,kw;S=W2/q为翅片式换热器23的换热面积,m2;q为制热工况下蒸发侧单位换热面积制冷量,kw/m2;S1=(W1-W2)/q1为冷量回收换热器13的换热面积,m2;q1为冷量回收换热器13单位换热面积制冷量,kw/m2Among them, the heating capacity of the unit Q 1 =W 1 +P i , kw; W 1 is the cooling capacity of the evaporator side during the heating operation of the system, kw; P i is the input power of the heating operation of the system, kw; W 2 is the cooling recovery Cooling capacity, kw; S=W 2 /q is the heat transfer area of the finned heat exchanger 23, m 2 ; q is the cooling capacity per unit heat transfer area of the evaporation side under heating conditions, kw/m 2 ; S 1 =(W 1 −W 2 )/q 1 is the heat exchange area of the cold recovery heat exchanger 13, m 2 ; q 1 is the cooling capacity per unit heat exchange area of the cold recovery heat exchanger 13, kw/m 2 .

本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明的技术方案,而并非用作为对本发明的限定,任何基于本发明的实质精神对以上所述实施例所作的变化、变型,都将落在本发明的权利要求的保护范围内。Those of ordinary skill in the technical field should recognize that the above embodiments are only used to illustrate the technical solutions of the present invention, and are not used as limitations to the present invention. All changes and modifications will fall within the protection scope of the claims of the present invention.

Claims (6)

1.一种冷量回收式变容量空气源热泵系统,包括第一压缩机和冷量回收换热器组成的第一子系统,第二压缩机和翅片式换热器组成的第二子系统,其特征在于:1. A cooling capacity recovery variable capacity air source heat pump system, including the first sub-system composed of the first compressor and the cooling capacity recovery heat exchanger, the second sub-system composed of the second compressor and the finned heat exchanger system, characterized in that: 所述的第一子系统和第二子系统共同使用一个双通道可变容量换热器作为水冷冷凝器;所述的双通道可变容量换热器包括换热器主体和一组由电磁阀与单向阀组成的控制阀组;换热器主体包括置于同一壳程通道的两个互相独立的制冷剂管程通道,两个制冷剂管程通道内的制冷剂同时与壳程通道中的水进行热交换;换热器主体的壳程通道通过热水循环管路和热水循环泵建立水媒供热循环;The first subsystem and the second subsystem use a dual-channel variable-capacity heat exchanger as a water-cooled condenser; the dual-channel variable-capacity heat exchanger includes a heat exchanger body and a set of solenoid valves A control valve group composed of a one-way valve; the main body of the heat exchanger includes two mutually independent refrigerant tube-side channels placed in the same shell-side channel, and the refrigerant in the two refrigerant tube-side channels is simultaneously connected to the shell-side channel The water is used for heat exchange; the shell-side channel of the heat exchanger main body establishes a water-medium heating cycle through the hot water circulation pipeline and the hot water circulation pump; 第一子系统和第二子系统通过所述的控制阀组连接到两个制冷剂管程通道,建立动态可控的制冷剂循环回路;热泵系统通过控制双通道可变容量换热器之控制阀组的开关状态,实现热泵系统的动态多模式运行。The first subsystem and the second subsystem are connected to the two refrigerant tube channels through the control valve group to establish a dynamically controllable refrigerant circulation loop; the heat pump system is controlled by controlling the dual-channel variable-capacity heat exchanger The switch state of the valve group realizes the dynamic multi-mode operation of the heat pump system. 2.根据权利要求1所述的冷量回收式变容量空气源热泵系统,其特征在于所述的双通道可变容量换热器包括作为换热器主体的壳管式换热器和连接到壳管换热器之制冷剂管程通道的控制阀组;所述的换热器主体内设有两个互相独立的第一制冷剂通道和第二制冷剂通道,两个制冷剂管程通道置于一个共用的壳程通道内;所述的控制阀组包括连接在制冷剂管程通道的三个电磁阀和两个单向阀;所述的电磁阀包括连接在第一制冷剂通道出口的第一电磁阀,连接在第一制冷剂通道出口和第二制冷剂通道入口之间的第二电磁阀,以及连接在第二制冷剂通道出口的第三电磁阀;所述的单向阀包括连接在第二制冷剂通道入口的第一单向阀,以及并联连接在第二制冷剂通道出口和第一电磁阀出口之间的第二单向阀;第一压缩机的排气口通过第一四通阀连接到第一制冷剂通道的入口;第一电磁阀的出口和第二单向阀的出口并联连接后,通过第一膨胀阀连接到冷量回收换热器的制冷剂通道,再通过第一四通阀连接到第一压缩机的进气口;第二压缩机的排气口通过第二四通阀连接到第一单向阀的入口;第三电磁阀的出口通过第二膨胀阀连接到翅片式换热器的制冷剂通道,再通过第二四通阀连接到第二压缩机的进气口。2. The cold recovery type variable capacity air source heat pump system according to claim 1, characterized in that the double-channel variable capacity heat exchanger comprises a shell and tube heat exchanger as the main body of the heat exchanger and connected to The control valve group of the refrigerant tube-side channel of the shell-and-tube heat exchanger; the main body of the heat exchanger is provided with two mutually independent first refrigerant channels and second refrigerant channels, and the two refrigerant tube-side channels Placed in a common shell-side channel; the control valve group includes three solenoid valves and two check valves connected to the refrigerant tube-side channel; the solenoid valve includes a valve connected to the outlet of the first refrigerant channel The first solenoid valve, the second solenoid valve connected between the outlet of the first refrigerant passage and the inlet of the second refrigerant passage, and the third solenoid valve connected at the outlet of the second refrigerant passage; the one-way valve It includes a first one-way valve connected to the inlet of the second refrigerant passage, and a second one-way valve connected in parallel between the outlet of the second refrigerant passage and the outlet of the first electromagnetic valve; the exhaust port of the first compressor passes through The first four-way valve is connected to the inlet of the first refrigerant passage; after the outlet of the first solenoid valve and the outlet of the second one-way valve are connected in parallel, they are connected to the refrigerant passage of the cold recovery heat exchanger through the first expansion valve , and then connected to the intake port of the first compressor through the first four-way valve; the exhaust port of the second compressor is connected to the inlet of the first one-way valve through the second four-way valve; the outlet of the third solenoid valve is connected to the The second expansion valve is connected to the refrigerant channel of the finned heat exchanger, and then connected to the air inlet of the second compressor through the second four-way valve. 3.根据权利要求2所述的冷量回收式变容量空气源热泵系统,其特征在于在第一制冷剂通道与第一膨胀阀之间的连接管路上设有第一储液器,在第二制冷剂通道与第二膨胀阀之间的连接管路上设有第二储液器。3. The cold recovery type variable capacity air source heat pump system according to claim 2, characterized in that a first liquid accumulator is provided on the connecting pipeline between the first refrigerant passage and the first expansion valve, A second liquid accumulator is arranged on the connecting pipeline between the second refrigerant channel and the second expansion valve. 4.根据权利要求2所述的冷量回收式变容量空气源热泵系统,其特征在于所述的换热器主体采用壳程通道上下连通的立式结构,第一制冷剂通道置于壳程通道的上部,第二制冷剂通道置于壳程通道的下部;制冷剂的高温显热在第一制冷剂通道中传递给壳程通道上部的水,形成高温显热换热区;制冷剂的冷凝潜热在第二制冷剂通道中传递给壳程通道下部的水,形成冷凝潜热换热区。4. The cold recovery type variable capacity air source heat pump system according to claim 2, characterized in that the main body of the heat exchanger adopts a vertical structure in which the shell side channel is connected up and down, and the first refrigerant channel is placed on the shell side In the upper part of the channel, the second refrigerant channel is placed in the lower part of the shell-side channel; the high-temperature sensible heat of the refrigerant is transferred to the water in the upper part of the shell-side channel in the first refrigerant channel, forming a high-temperature sensible heat exchange area; The condensation latent heat is transferred to the water in the lower part of the shell side passage in the second refrigerant passage, forming a condensation latent heat heat exchange area. 5.根据权利要求1所述的冷量回收式变容量空气源热泵系统,其特征在于所述的动态多模式运行包括以下四种运行模式:5. The cold recovery type variable capacity air source heat pump system according to claim 1, characterized in that the dynamic multi-mode operation includes the following four operation modes: (1)第一子系统冷热均衡模式:第一压缩机启动,第二压缩机停止,第一电磁阀打开,第二电磁阀关闭,本模式的制冷剂循环路径如下:(1) Cooling and heating balance mode of the first subsystem: the first compressor is started, the second compressor is stopped, the first solenoid valve is opened, and the second solenoid valve is closed. The refrigerant circulation path in this mode is as follows: 第一压缩机-第一四通阀-第一制冷剂通道-第一电磁阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机;The first compressor - the first four-way valve - the first refrigerant passage - the first solenoid valve - the first liquid receiver - the first expansion valve - the cooling recovery heat exchanger - the first four-way valve - the first gas-liquid Separator - first compressor; (2)第二子系统空气源热水模式:第一压缩机停止,第二压缩机启动,第二电磁阀关闭,第三电磁阀打开,本模式的制冷剂循环路径如下:(2) The air source hot water mode of the second subsystem: the first compressor is stopped, the second compressor is started, the second solenoid valve is closed, and the third solenoid valve is opened. The refrigerant circulation path in this mode is as follows: 第二压缩机-第二四通阀-第一单向阀-第二制冷剂通道-第三电磁阀-第二储液器-第二膨胀阀-翅片式换热器-第二四通阀-第二气液分离器-第二压缩机;The second compressor - the second four-way valve - the first one-way valve - the second refrigerant passage - the third solenoid valve - the second liquid receiver - the second expansion valve - finned heat exchanger - the second four-way valve - the second gas-liquid separator - the second compressor; (3)双系统定容冷热水模式:第一压缩机和第二压缩机同时启动,第一电磁阀打开,第二电磁阀关闭,第三电磁阀打开,第一子系统的制冷剂循环路径如下:(3) Dual system constant volume cold and hot water mode: the first compressor and the second compressor start at the same time, the first solenoid valve is opened, the second solenoid valve is closed, the third solenoid valve is opened, and the refrigerant cycle of the first subsystem The path is as follows: 第一压缩机-第一四通阀-第一制冷剂通道-第一电磁阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机;The first compressor - the first four-way valve - the first refrigerant passage - the first solenoid valve - the first liquid receiver - the first expansion valve - the cooling recovery heat exchanger - the first four-way valve - the first gas-liquid Separator - first compressor; 第二子系统的制冷剂循环路径如下:The refrigerant circulation path of the second subsystem is as follows: 第二压缩机-第二四通阀-第一单向阀-第二制冷剂通道-第三电磁阀-第二储液器-第二膨胀阀-翅片式换热器-第二四通阀-第二气液分离器-第二压缩机;The second compressor - the second four-way valve - the first one-way valve - the second refrigerant passage - the third solenoid valve - the second liquid receiver - the second expansion valve - finned heat exchanger - the second four-way valve - the second gas-liquid separator - the second compressor; (4)双通道变容运行模式:第一压缩机启动,第二压缩机停止,第一电磁阀关闭,第二电磁阀打开,第三电磁阀关闭,本模式的制冷剂循环路径如下:(4) Two-channel variable capacity operation mode: the first compressor is started, the second compressor is stopped, the first solenoid valve is closed, the second solenoid valve is opened, and the third solenoid valve is closed. The refrigerant circulation path in this mode is as follows: 第一压缩机-第一四通阀-第一制冷剂通道-第二电磁阀-第二制冷剂通道-第二单向阀-第一储液器-第一膨胀阀-冷量回收换热器-第一四通阀-第一气液分离器-第一压缩机。The first compressor - the first four-way valve - the first refrigerant passage - the second solenoid valve - the second refrigerant passage - the second one-way valve - the first liquid receiver - the first expansion valve - cooling recovery and heat exchange Device - the first four-way valve - the first gas-liquid separator - the first compressor. 6.根据权利要求1所述的冷量回收式变容量空气源热泵系统,其特征在于所述的空气源热泵系统根据制冷回收冷量改变翅片式换热器的换热面积,在保证机组制热量的同时缩减热泵系统的整体系统尺寸:6. The cold recovery type variable capacity air source heat pump system according to claim 1, characterized in that the air source heat pump system changes the heat exchange area of the fin heat exchanger according to the cooling capacity recovered by refrigeration, ensuring that the unit Reduce the overall system size of the heat pump system while heating: 翅片式换热器之换热面积S的变化范围为0~W2/q,The heat exchange area S of the finned heat exchanger varies from 0 to W 2 /q, 冷量回收换热器之换热面积S1的变化范围为0~(W1-W2)/q1The heat exchange area S 1 of the cold recovery heat exchanger varies from 0 to (W 1 -W 2 )/q 1 , 其中,机组制热量Q1=W1+Pi,kw;W1为系统制热运行时蒸发器侧的制冷量,kw;Pi为系统制热运行输入功率,kw;W2为制冷回收冷量,kw;S=W2/q为翅片式换热器的换热面积,m2;q为制热工况下蒸发侧单位换热面积制冷量,kw/m2;S1=(W1-W2)/q1为冷量回收换热器的换热面积,m2;q1为冷量回收换热器单位换热面积制冷量,kw/m2Among them, the heating capacity of the unit Q 1 =W 1 +P i , kw; W 1 is the cooling capacity of the evaporator side during the heating operation of the system, kw; P i is the input power of the heating operation of the system, kw; W 2 is the cooling recovery Cooling capacity, kw; S=W 2 /q is the heat transfer area of the finned heat exchanger, m 2 ; q is the cooling capacity per unit heat transfer area of the evaporation side under heating conditions, kw/m 2 ; S 1 = (W 1 -W 2 )/q 1 is the heat transfer area of the cold recovery heat exchanger, m 2 ; q 1 is the cooling capacity per unit heat transfer area of the cold recovery heat exchanger, kw/m 2 .
CN201710245733.5A 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system Expired - Fee Related CN106871479B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710245733.5A CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system
PCT/CN2017/102002 WO2018188269A1 (en) 2017-04-14 2017-09-18 Cold energy recovery-type variable-capacity air-source heat pump system
US16/604,943 US11137178B2 (en) 2017-04-14 2017-09-18 Cold energy recovery-type variable-capacity air-source heat pump system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710245733.5A CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system

Publications (2)

Publication Number Publication Date
CN106871479A true CN106871479A (en) 2017-06-20
CN106871479B CN106871479B (en) 2020-01-10

Family

ID=59162666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710245733.5A Expired - Fee Related CN106871479B (en) 2017-04-14 2017-04-14 Cold volume recovery type variable-capacity air source heat pump system

Country Status (1)

Country Link
CN (1) CN106871479B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107763887A (en) * 2017-11-03 2018-03-06 广东芬尼能源技术有限公司 The control of Energy Level method and control device of a kind of dual system source pump
CN108534384A (en) * 2018-03-08 2018-09-14 约克广州空调冷冻设备有限公司 A kind of cooling by wind system and operating method
WO2018188269A1 (en) * 2017-04-14 2018-10-18 江苏天舒电器股份有限公司 Cold energy recovery-type variable-capacity air-source heat pump system
CN109357434A (en) * 2018-11-29 2019-02-19 四川长虹空调有限公司 A parallel indoor temperature control system based on dual compressors for air conditioners and heat transfer devices
CN111750525A (en) * 2020-05-28 2020-10-09 河南省中能联建地热工程有限公司 Double-source hot water unit based on air source and water source double heat sources
CN112815429A (en) * 2021-02-22 2021-05-18 北京中科华誉热泵设备制造有限公司 Air source heat pump capable of fully utilizing space to obtain energy
WO2022007739A1 (en) * 2020-07-06 2022-01-13 约克广州空调冷冻设备有限公司 Heat pump system
CN114026373A (en) * 2019-07-03 2022-02-08 三菱电机株式会社 Refrigeration loop device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7062930B2 (en) * 2002-11-08 2006-06-20 York International Corporation System and method for using hot gas re-heat for humidity control
CN2890744Y (en) * 2006-03-31 2007-04-18 孙应真 Double-linkage double-temperature balance type water cooling and heating device
CN101210748A (en) * 2006-12-28 2008-07-02 苏宇贵 Air-conditioner hot-water composite machine
CN104197449A (en) * 2014-09-18 2014-12-10 江苏天舒电器有限公司 Heat pump system for kitchen of restaurant and control method for heat pump system
CN206618147U (en) * 2017-04-14 2017-11-07 江苏天舒电器股份有限公司 A kind of cold recovery formula varying capacity air source heat pump system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7062930B2 (en) * 2002-11-08 2006-06-20 York International Corporation System and method for using hot gas re-heat for humidity control
CN2890744Y (en) * 2006-03-31 2007-04-18 孙应真 Double-linkage double-temperature balance type water cooling and heating device
CN101210748A (en) * 2006-12-28 2008-07-02 苏宇贵 Air-conditioner hot-water composite machine
CN104197449A (en) * 2014-09-18 2014-12-10 江苏天舒电器有限公司 Heat pump system for kitchen of restaurant and control method for heat pump system
CN206618147U (en) * 2017-04-14 2017-11-07 江苏天舒电器股份有限公司 A kind of cold recovery formula varying capacity air source heat pump system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018188269A1 (en) * 2017-04-14 2018-10-18 江苏天舒电器股份有限公司 Cold energy recovery-type variable-capacity air-source heat pump system
CN107763887A (en) * 2017-11-03 2018-03-06 广东芬尼能源技术有限公司 The control of Energy Level method and control device of a kind of dual system source pump
CN107763887B (en) * 2017-11-03 2020-08-04 广东芬尼能源技术有限公司 Energy level control method and control device for dual-system heat pump unit
CN108534384A (en) * 2018-03-08 2018-09-14 约克广州空调冷冻设备有限公司 A kind of cooling by wind system and operating method
CN109357434A (en) * 2018-11-29 2019-02-19 四川长虹空调有限公司 A parallel indoor temperature control system based on dual compressors for air conditioners and heat transfer devices
CN114026373A (en) * 2019-07-03 2022-02-08 三菱电机株式会社 Refrigeration loop device
CN114026373B (en) * 2019-07-03 2023-01-10 三菱电机株式会社 Refrigeration loop device
CN111750525A (en) * 2020-05-28 2020-10-09 河南省中能联建地热工程有限公司 Double-source hot water unit based on air source and water source double heat sources
WO2022007739A1 (en) * 2020-07-06 2022-01-13 约克广州空调冷冻设备有限公司 Heat pump system
CN112815429A (en) * 2021-02-22 2021-05-18 北京中科华誉热泵设备制造有限公司 Air source heat pump capable of fully utilizing space to obtain energy

Also Published As

Publication number Publication date
CN106871479B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
WO2018188269A1 (en) Cold energy recovery-type variable-capacity air-source heat pump system
CN106871479A (en) A kind of cold recovery formula varying capacity air source heat pump system
WO2015158138A1 (en) Refrigeration device
CN200996757Y (en) A dual-source dual-working-condition heat pump energy-saving system
CN109059335A (en) A kind of low-temperature air source heat pump unit
CN210569370U (en) Low-temperature frequency conversion air source heat pump unit
CN109579299A (en) A kind of hot water multi system and its control method
CN102767921B (en) Double-way pre-cooling efficient heat pump device and control method thereof
CN102927718B (en) Novel double-effect dual-temperature high temperature heat pump device
CN209484880U (en) One kind is risen again formula heat pump system
CN209165778U (en) A kind of novel heat pump system
CN201917067U (en) Double-condenser heat pump water heater
CN111412687A (en) Refrigeration and heating integrated heat exchange system
CN206618147U (en) A kind of cold recovery formula varying capacity air source heat pump system
CN101532742A (en) Parallel type thermal differential evaporation cold (hot) water machine
CN201206917Y (en) Multi-stage cycle type cold and hot water equipment
CN112351651B (en) Condenser, air conditioner special for air cooling machine room and control method of air conditioner special for air cooling machine room
CN107062670B (en) Double-channel variable-capacity heat exchanger
CN206890903U (en) A kind of binary channels variable capacity heat exchanger
CN109579300A (en) A kind of hot water multi system and control method with the switching of more four-way valve flow paths
CN212205134U (en) A cooling and heating integrated heat exchange system
CN107883606A (en) A kind of efficient heat source tower heat pump
CN209484871U (en) A kind of superposition type energy-saving refrigerating system
CN203024403U (en) Heat-pump water heater capable of recycling sewage water waste heat
CN207317311U (en) A kind of wind-cooled cold-water refrigeration system with condensation heat recovery device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221600 20 blocks, 1692 Xinghu Avenue, Nantong Development Zone, Nantong City, Jiangsu Province

Applicant after: JIANGSU TENESUN ELECTRICAL APPLIANCE Co.,Ltd.

Address before: 221600 20 blocks, 1692 Xinghu Avenue, Nantong Development Zone, Nantong City, Jiangsu Province

Applicant before: JIANGSU TENESUN ELECTRICAL APPLIANCE Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110