CN106869300A - Urban construction high-efficiency sewage Boosting pumping station - Google Patents

Urban construction high-efficiency sewage Boosting pumping station Download PDF

Info

Publication number
CN106869300A
CN106869300A CN201710224903.1A CN201710224903A CN106869300A CN 106869300 A CN106869300 A CN 106869300A CN 201710224903 A CN201710224903 A CN 201710224903A CN 106869300 A CN106869300 A CN 106869300A
Authority
CN
China
Prior art keywords
pump
liquid level
warehouse
level alarm
electrically operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710224903.1A
Other languages
Chinese (zh)
Inventor
熊兴智
陆刊勤
熊荣安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Machinery Equipment Co Ltd
Original Assignee
Shanghai Foundation Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Machinery Equipment Co Ltd filed Critical Shanghai Foundation Machinery Equipment Co Ltd
Priority to CN201710224903.1A priority Critical patent/CN106869300A/en
Publication of CN106869300A publication Critical patent/CN106869300A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B23/00Pumping installations or systems
    • F04B23/04Combinations of two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/06Control using electricity
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/20Measuring flow in sewer systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention relates to urban construction high-efficiency sewage Boosting pumping station, including main body, the first underground wall body, water inlet pipe, the first electrically operated valve, cutting pump, the first liquid level alarm, the second liquid level alarm, the 3rd liquid level alarm, main pump, stand-by pump, the second underground wall body, main pump coupling device, stand-by pump coupling device, the second electrically operated valve, drainpipe, switch board, biogas generator, collecting methane tank, the first warehouse, the second warehouse and ground.The present invention sets the level condition that liquid level alarm monitors sewage, feed back to switch board, in the case that liquid level is very low, termination of pumping retaining, when liquid level has reached pump liquid position, main pump is started working, when liquid level is very high, starts stand-by pump and cooperate, realize the efficient discharge of sewage, bamboo charcoal Sound-proof material is provided with simultaneously, on the one hand the noise that motor work is produced is absorbed, and absorbs the gas with foreign flavor not being collected, and utilized well, can be carried out in system cut-off and powered again, be that the system improves the standby energy.

Description

Urban construction high-efficiency sewage Boosting pumping station
Technical field
The present invention relates to supply equipment technical field, specifically urban construction high-efficiency sewage Boosting pumping station.
Background technology
Today's society, for large- and-medium size cities, because the sewage area for processing is very big, so having built sewage disposal Factory realizes the treatment of sewage in the way of focusing on.Focusing on for sewage needs the large area sewage that will be discharged to concentrate defeated Sewage treatment plant is sent to, during sewage transport, sewage conduct buries very deep in underground due to road farther out, in order to reduce The buried depth of subsequent delivery pipeline, pumping plant is set in the midway of sewage transport, is transported to by sewage conduct again after sewage is boosted Farther place, this pumping plant is sewage lift stations.Sewage lift stations act as the sewage lifting of distant place to sewage disposal Factory is focused on.
Limited by the current basement region for building house, the discharge of basement sewage can not be expelled directly out by gravity Sewage, so just having built sewage lift stations.The sewage lifting pump station of China's prior art, is generally entered by the way of catch pit Row sewage discharge, the sewage lifting pump station mainly includes:Catch pit, dredge pump, fluid level controller and electric cabinet, dredge pump and liquid Catch pit is located in level controller, and both agree to access electric cabinet by respective cable, wherein dredge pump is filled by coupling Put and be fixed in catch pit.Run under the adverse circumstances of contact sewage because dredge pump is long-term, reduce the use of dredge pump In the life-span, simultaneously because it passes through coupling device being fixed in catch pit, install cumbersome, later maintenance cost is high, maintenance is inconvenient.
Existing sewage lifting pump station is generally relatively simple for structure, and function is relatively simple, and the gas that sewage is produced is general all It is to take encapsulation process, in maintenance and repair procedures, during gas with foreign flavor enters to manual maintenance, considerably increases work Make difficulty, once while system blackout, it is impossible in the case of providing work about electric power, the foreign matter in sewage cannot crush cutting, be Water in system cannot be discharged, and existing technology cannot carry out pump termination of pumping operation, intelligence degree according to liquid level well in addition Than relatively low, while in the case of winter, weather is terribly cold, sewage freezes, and greatly reduces the operating efficiency of sewage pumping station.
The content of the invention
The technical problems to be solved by the invention are to provide urban construction high-efficiency sewage Boosting pumping station, in order to solve the above-mentioned back of the body The problem existed in prior art in scape technology, the present invention provides a kind of urban construction high-efficiency sewage Boosting pumping station, by setting Many places liquid level alarms monitors the level condition of sewage, feeds back to switch board, and in the case that liquid level is very low, liquid is worked as in termination of pumping retaining Position has reached pump liquid position, and main pump is started working, and when liquid level is very high, starts stand-by pump and cooperates, and realizes the efficient row of sewage Put, while there is provided bamboo charcoal Sound-proof material, on the one hand absorbs the noise that motor work is produced, and absorb the peculiar smell not being collected Gas, and by biogas carried out collect generated electricity, can be carried out in system cut-off and powered again, saved the energy, in addition In the case that temperature is relatively low in the winter time, or cold district throughout the year, inside the thermal source reduction pumping plant that can be produced by generating electricity Temperature, it is to avoid the situation of icing, although while summer internal system temperature is higher, the gas that thermal source can also allow in sewage Body is evaporated, and improves the collection efficiency of biogas, and the system not only solves the problems, such as sewage smells, while for the system is carried The standby energy high.
To achieve the above object, the present invention provides following technical scheme:
Urban construction high-efficiency sewage Boosting pumping station, it is characterised in that including main body, the first underground wall body, water inlet pipe, first electronic Valve, cutting pump, the first liquid level alarm, the second liquid level alarm, the 3rd liquid level alarm, main pump, stand-by pump, the second underground Wall, main pump coupling device, stand-by pump coupling device, the second electrically operated valve, drainpipe, switch board, biogas generator, biogas are received Collection tank, the first warehouse, the second warehouse and ground;The main body is arranged at underground, respectively with the first underground wall body and the second underground Wall is fixedly connected, and the main body is connected with water inlet pipe and drainpipe respectively, and the water inlet pipe is connected with the first electrically operated valve, institute State the sealing of the first electrically operated valve to be applied in main body and be connected with cutting pump, the main body centre position installs support platform additional by inside Space is divided into the first warehouse and the second warehouse, and first warehouse is provided with magnetite, first storehouse below cutting pump delivery port Body bottom is installed with main pump by two first support bars, and the first warehouse bottom is fixed by two second support bars Stand-by pump is installed, the main pump is provided with main pump coupling device, the stand-by pump is provided with stand-by pump coupling device, the main pump according to Secondary the first pipeline, the first valve of passing through is connected with three-way pipe, and the stand-by pump passes sequentially through second pipe, the second valve and threeway Pipe is connected, and the three-way pipe is described by being connected with check-valves, flexible coupling, butterfly valve and the second electrically operated valve communicating pipe in turn Second electrically operated valve is connected with drainpipe, and the second warehouse warehouse top-side is provided with the first bamboo charcoal Sound-proof material, the second bamboo charcoal Sound-proof material, the 3rd bamboo charcoal Sound-proof material, stair, the stair bottom are installed with the second warehouse storehouse wall by stair base Portion is fixed in support platform, be installed with the support platform thermal source outlet, biogas generator, biogas plucker, The biogas plucker is connected with small pressurized pump, and the small pressurized pump is connected with collecting methane tank, the collecting methane Tank is connected with biogas generator, and the marsh gas power generation motor spindle is provided with thermal source outlet, is fixedly mounted on the second warehouse wall Have a switch board, the switch board is provided with control button and instrument board, the second warehouse top be provided with exhaust outlet, rotary shaft, Lid and locking bar, the second warehouse top are above the ground level, and the second fill stratum and first are provided with around the second warehouse top Fill stratum.
As further scheme of the invention:The electrically operated valve of switch board centralized Control first, cutting pump, the first liquid level Alarm, the second liquid level alarm, the 3rd liquid level alarm, main pump, stand-by pump, small pressurized pump, the second electrically operated valve, biogas Generator, collecting methane tank and pressure monitoring device.
As further scheme of the invention:The lid and locking bar are engaged, and locking bar can seal lid.
As further scheme of the invention:First liquid level alarm, the second liquid level alarm and the 3rd liquid level report Alert device is identical liquid level alarm device.
As further scheme of the invention:The first bamboo charcoal Sound-proof material, the second bamboo charcoal Sound-proof material and the 3rd bamboo charcoal every Sound cotton is identical bamboo charcoal Sound-proof material, and bamboo charcoal can adsorb peculiar smell, and Sound-proof material can absorb the noise of motor generation, sound insulation Cotton inner side is enclosed with bamboo-carbon layer.
The beneficial effects of the invention are as follows:
The present invention provides a kind of urban construction high-efficiency sewage Boosting pumping station, and the liquid of sewage is monitored by setting many places liquid level alarm Position situation, feeds back to switch board, in the case that liquid level is very low, termination of pumping retaining, and when liquid level has reached pump liquid, main pump starts work Make, when liquid level is very high, starts stand-by pump and cooperate, the efficient discharge of sewage is realized, while there is provided bamboo charcoal Sound-proof material, one Aspect absorbs the noise that motor work is produced, and absorbs the gas with foreign flavor not being collected, and biogas is collected Generated electricity, can be carried out in system cut-off and powered again, saved the energy, in the case that temperature is relatively low in the winter time in addition, or The long-term cold district of person, the temperature inside thermal source reduction pumping plant that can be produced by generating electricity, it is to avoid the situation of icing, while the summer Although season, internal system temperature was higher, the gaseous volatilization that thermal source can also allow in sewage out, improves the receipts of biogas Collection efficiency, the system not only solves the problems, such as sewage smells, while for the system improves the standby energy.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is control planning schematic diagram of the present invention;
1st, the first underground wall body, the 2, first bamboo charcoal Sound-proof material, 3, stair base, the 4, first electrically operated valve, 5, water inlet pipe, 6, cutting Pump, the 7, first liquid level alarm, 8, magnetite, the 9, second liquid level alarm, the 10, the 3rd liquid level alarm, 11, main pump coupling dress Put, 12, first support bar, 13, main pump, the 14, first pipeline, the 15, first valve, 16, stand-by pump coupling device, 17, second Strut, 18, stand-by pump, 19, second pipe, the 20, first warehouse, the 21, second valve, 22, three-way pipe, the 23, second underground wall body, 24th, biogas plucker, 25, support platform, 26, communicating pipe, 27, small pressurized pump, 28, check-valves, 29, flexible coupling, 30, Butterfly valve, 31, thermal source outlet, 32, biogas generator, 33, control button, the 34, first fill stratum, the 35, second bamboo charcoal Sound-proof material, 36th, the second warehouse, 37, collecting methane tank, the 38, the 3rd bamboo charcoal Sound-proof material, 39, pressure monitoring device, 40, switch board, 41, instrument Disk, 42, rotary shaft, 43, lid, 44, locking bar, the 45, second fill stratum, 46, ground, 47, exhaust outlet, 48, stair, 49, second Electrically operated valve, 50, drainpipe, 51, main body, 52, plant-grid connection mouthful.
Specific embodiment
Technical scheme is described in more detail with reference to specific embodiment.
Urban construction high-efficiency sewage Boosting pumping station, it is characterised in that including main body 51, the first underground wall body 1, water inlet pipe 5, First electrically operated valve 4, cutting pump 6, the first liquid level alarm 7, the second liquid level alarm 9, the 3rd liquid level alarm 10, main pump 13rd, stand-by pump 18, the second underground wall body 23, main pump coupling device 11, stand-by pump coupling device 16, the second electrically operated valve 29, row Water pipe 50, switch board 40, biogas generator 32, collecting methane tank 37, the first warehouse 20, the second warehouse 36 and ground 46;It is described Main body 51 is arranged at underground, is fixedly connected with the first underground wall body 1 and the second underground wall body 23 respectively, the main body 51 respectively with Water inlet pipe 5 and drainpipe 50 are connected, and the water inlet pipe 5 is connected with the first electrically operated valve 4, and the sealing of the first electrically operated valve 4 is passed through Wear and be connected with cutting pump 6 on the body 51, the centre position of the main body 51 installs support platform 25 additional and inner space is divided into first The warehouse 36 of warehouse 20 and second, first warehouse 20 is provided with magnetite 8, first warehouse 20 below the delivery port of cutting pump 6 Bottom is installed with main pump 13 by two first support bars 12, and the bottom of the first warehouse 20 passes through two second support bars 17 are installed with stand-by pump 18, and the main pump 13 is provided with main pump coupling device 11, and the stand-by pump 18 is provided with stand-by pump coupling Device 16, the main pump 13 passes sequentially through the first pipeline 14, the first valve 15 and is connected with three-way pipe 22,
The stand-by pump 18 passes sequentially through second pipe 19, the second valve 21 and is connected with three-way pipe 22, and the three-way pipe 22 passes through It is connected with check-valves 28, flexible coupling 29, the electrically operated valve 49 of butterfly valve 30 and second, second electrically operated valve communicating pipe 26 in turn 49 are connected with drainpipe 50, and the warehouse top-side of second warehouse 36 is provided with the first bamboo charcoal Sound-proof material 2, the second bamboo charcoal Sound-proof material 35th, the 3rd bamboo charcoal Sound-proof material 38, stair 48, the building are installed with the storehouse wall of second warehouse 36 by stair base 3 Terraced 48 bottoms are fixed in support platform 25, be installed with the support platform 25 thermal source outlet 31, biogas generator 32, Biogas plucker 24, the biogas plucker 24 are connected with small pressurized pump 27, and the small pressurized pump 27 is received with biogas Collection tank 37 is connected, and the collecting methane tank 37 is connected with biogas generator 32, and the bottom of the biogas generator 32 is provided with thermal source and goes out Mouth 31, switch board 40 is installed with the wall of the second warehouse 36, and the switch board 40 is provided with control button 33 and instrument Dial plate 41, the top of the second warehouse 36 is provided with exhaust outlet 47, rotary shaft 42, lid 43 and locking bar 44, second warehouse 36 Top is above the ground level 46, and the second fill stratum 45 and the first fill stratum 34 are provided with around the top of the second warehouse 36.
Preferably, the first electrically operated valve of centralized Control 4, cutting pump 6 of switch board 40, the first liquid level alarm 7, the second liquid Level alarm 9, the 3rd liquid level alarm 10, main pump 13, stand-by pump 18, small pressurized pump 27, the second electrically operated valve 49, biogas hair Motor 32, collecting methane tank 37 and pressure monitoring device 39;Preferably, lid 43 and locking bar 44 are engaged, locking bar 44 can be with Lid 43 is sealed;Preferably, the first liquid level alarm 7, the second liquid level alarm 9 and the 3rd liquid level alarm 10 are complete Identical liquid level alarm device;Preferably, the first bamboo charcoal Sound-proof material 2, the second bamboo charcoal Sound-proof material 35 and the 3rd bamboo charcoal Sound-proof material 38 is identical bamboo charcoal Sound-proof material, and bamboo charcoal can adsorb peculiar smell, and Sound-proof material can absorb the noise of motor generation, Sound-proof material Inner side is enclosed with bamboo-carbon layer.
Operation principle of the invention is:Urban construction high-efficiency sewage Boosting pumping station of the present invention, by water inlet pipe 5
The sewage that will be discharged enters cutting pump 6 by the first electrically operated valve 4, and cutting pump 6 arranges the foreign matter cutting and grinding in sewage Enter sewage lifting system, some metallic residues after crushing can be adsorbed by magnetite 8, sewage passes through main pump 13 and stand-by pump 18 Three-way pipe 22, check-valves 28, flexible coupling 29, butterfly valve 30 are sequentially passed through, then by the second electrically operated valve 49 and the row of drainpipe 50 Enter municipal sewage drainage system;The system sets the first liquid level alarm 7, the and of the second liquid level alarm 9 in the first warehouse 20 3rd liquid level alarm 10, under normal operation, switch board 40 starts the single pump work of main pump 13, when liquid level is less than the 3rd liquid level During 10 position of alarm, the 3rd liquid level alarm 10 sends alarm signal and feeds back to switch board 40, and switch board 40 stops main pump 13 Work, water inlet pipe 5 persistently supplies water, when liquid level reaches the second liquid level alarm 9 higher than the position of the 3rd liquid level alarm 10, the Two liquid level alarms 9 send a signal to switch board 40, and switch board 40 starts main pump 12 and works, when liquid level reaches the first liquid level warning During device 7, the first liquid level alarm 7 sends a signal to switch board 40, and switch board 40 starts stand-by pump 18 and is operated, main pump 12 and stand-by pump 18 cooperate, sewage is entered into municipal drainage system;The meeting during blowdown of biogas plucker 24 simultaneously The collecting methane that will be produced is stored in collecting methane tank 37 again, when equipment has a power failure, and plant-grid connection mouthful 52 cannot power, Ke Yitong Cross biogas generator 32 to be generated electricity with the biogas of storage, the thermal source of generation enters the first warehouse 20 by thermal source outlet again It is interior, anti-defrosting effect can be played to equipment in winter, on the one hand the system can monitor sewage level situation, take switch board Based Intelligent Control is carried out, while the biogas generator for setting, in the case where other peculiar smell are solved, additionally it is possible to profit again is carried out to waste gas With reducing energy resource consumption.
It is described in detail above in association with urban construction high-efficiency sewage Boosting pumping station specific embodiment of the invention, but simultaneously Non- is limitation of the present invention, every any simple modification made for any of the above embodiments is belonged to according to technical spirit of the invention In technical scope of the invention, in addition it is also necessary to explanation, according to urban construction high-efficiency sewage Boosting pumping station technical side of the invention The category of case includes any combination between each part mentioned above.

Claims (5)

1. urban construction high-efficiency sewage Boosting pumping station, it is characterised in that including main body(51), the first underground wall body(1), water inlet pipe (5), the first electrically operated valve(4), cutting pump(6), the first liquid level alarm(7), the second liquid level alarm(9), the 3rd liquid level report Alert device(10), main pump(13), stand-by pump(18), the second underground wall body(23), main pump coupling device(11), stand-by pump coupling device (16), the second electrically operated valve(29), drainpipe(50), switch board(40), biogas generator(32), collecting methane tank(37), One warehouse(20), the second warehouse(36)And ground(46);The main body(51)Underground is arranged at, respectively with the first underground wall body (1)With the second underground wall body(23)It is fixedly connected, the main body(51)Respectively with water inlet pipe(5)And drainpipe(50)Connection, institute State water inlet pipe(5)With the first electrically operated valve(4)Connection, first electrically operated valve(4)Sealing is applied in main body(51)Go up and cut Cut pump(6)Connection, the main body(51)Centre position installs support platform additional(25)Inner space is divided into the first warehouse(20)With Second warehouse(36), first warehouse(20)In cutting pump(6)Delivery port lower section is provided with magnetite(8), first warehouse (20)Bottom passes through two first support bars(12)It is installed with main pump(13), first warehouse(20)Bottom passes through two Second support bar(17)It is installed with stand-by pump(18), the main pump(13)It is provided with main pump coupling device(11), it is described standby Pump(18)It is provided with stand-by pump coupling device(16), the main pump(13)Pass sequentially through the first pipeline(14), the first valve(15)With Three-way pipe(22)Connection,
The stand-by pump(18)Pass sequentially through second pipe(19), the second valve(21)With three-way pipe(22)Connection, the threeway Pipe(22)By communicating pipe(26)It is connected with check-valves in turn(28), flexible coupling(29), butterfly valve(30)With the second electrically operated valve (49), second electrically operated valve(49)With drainpipe(50)Connection, second warehouse(36)Warehouse top-side is provided with One bamboo charcoal Sound-proof material(2), the second bamboo charcoal Sound-proof material(35), the 3rd bamboo charcoal Sound-proof material(38), second warehouse(36)On the wall of storehouse By stair base(3)It is installed with stair(48), the stair(48)Bottom is fixed on support platform(25)On, the branch Support platform(25)On be installed with thermal source outlet(31), biogas generator(32), biogas plucker(24), the biogas adopts Acquisition means(24)It is connected with small pressurized pump(27), the small pressurized pump(27)With collecting methane tank(37)Connection, the natural pond Gas collecting tank(37)With biogas generator(32)Connection, the biogas generator(32)Bottom is provided with thermal source outlet(31), it is described Second warehouse(36)Switch board is installed with wall(40), the switch board(40)It is provided with control button(33)And instrument Disk(41), second warehouse(36)Top is provided with exhaust outlet(47), rotary shaft(42), lid(43)And locking bar(44), it is described Second warehouse(36)Top is above the ground level(46), second warehouse(36)The second fill stratum is provided with around top(45)With first Fill stratum(34).
2. urban construction high-efficiency sewage Boosting pumping station according to claim 1, it is characterised in that the switch board(40)Collection The first electrically operated valve of middle control(4), cutting pump(6), the first liquid level alarm(7), the second liquid level alarm(9), the 3rd liquid level Alarm(10), main pump(13), stand-by pump(18), small pressurized pump(27), the second electrically operated valve(49), biogas generator (32), collecting methane tank(37)And pressure monitoring device(39).
3. urban construction high-efficiency sewage Boosting pumping station according to claim 1, it is characterised in that the lid(43)And lock Bar(44)It is engaged, locking bar(44)Can be by lid(43)Seal.
4. urban construction high-efficiency sewage Boosting pumping station according to claim 1, it is characterised in that first liquid level warning Device(7), the second liquid level alarm(9)With the 3rd liquid level alarm(10)It is identical liquid level alarm device.
5. urban construction high-efficiency sewage Boosting pumping station according to claim 1, it is characterised in that the first bamboo charcoal sound insulation Cotton(2), the second bamboo charcoal Sound-proof material(35)With the 3rd bamboo charcoal Sound-proof material(38)It is identical bamboo charcoal Sound-proof material, bamboo charcoal can be inhaled Attached peculiar smell, Sound-proof material can absorb the noise of motor generation, and Sound-proof material inner side is enclosed with bamboo-carbon layer.
CN201710224903.1A 2017-04-07 2017-04-07 Urban construction high-efficiency sewage Boosting pumping station Pending CN106869300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710224903.1A CN106869300A (en) 2017-04-07 2017-04-07 Urban construction high-efficiency sewage Boosting pumping station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710224903.1A CN106869300A (en) 2017-04-07 2017-04-07 Urban construction high-efficiency sewage Boosting pumping station

Publications (1)

Publication Number Publication Date
CN106869300A true CN106869300A (en) 2017-06-20

Family

ID=59160317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710224903.1A Pending CN106869300A (en) 2017-04-07 2017-04-07 Urban construction high-efficiency sewage Boosting pumping station

Country Status (1)

Country Link
CN (1) CN106869300A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576590A (en) * 2020-06-03 2020-08-25 上海绿地建设(集团)有限公司 Structure and method for repairing damaged and blocked sewage pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500751A (en) * 2002-11-13 2004-06-02 王晓川 Decentralizing treating and utilizing technology for zero discharging sewage
CN203215963U (en) * 2012-12-14 2013-09-25 内蒙古伊利实业集团股份有限公司 Sewage biogas reutilization system
CN104294908A (en) * 2013-07-19 2015-01-21 盐城开仕比环保设备有限公司 Intelligent type integrated airtight sewage lifting pump station
CN206037068U (en) * 2016-07-28 2017-03-22 东莞顺裕纸业有限公司 Combustion system is retrieved to dirty water station marsh gas
CN206693378U (en) * 2017-04-07 2017-12-01 上海克础机械设备有限公司 Urban construction high-efficiency sewage Boosting pumping station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500751A (en) * 2002-11-13 2004-06-02 王晓川 Decentralizing treating and utilizing technology for zero discharging sewage
CN203215963U (en) * 2012-12-14 2013-09-25 内蒙古伊利实业集团股份有限公司 Sewage biogas reutilization system
CN104294908A (en) * 2013-07-19 2015-01-21 盐城开仕比环保设备有限公司 Intelligent type integrated airtight sewage lifting pump station
CN206037068U (en) * 2016-07-28 2017-03-22 东莞顺裕纸业有限公司 Combustion system is retrieved to dirty water station marsh gas
CN206693378U (en) * 2017-04-07 2017-12-01 上海克础机械设备有限公司 Urban construction high-efficiency sewage Boosting pumping station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576590A (en) * 2020-06-03 2020-08-25 上海绿地建设(集团)有限公司 Structure and method for repairing damaged and blocked sewage pipeline

Similar Documents

Publication Publication Date Title
CN109970152B (en) Saline-alkali soil distributed salty-extraction-to-light-drainage-irrigation coupling improvement system and use method
CN105234166B (en) A kind of system of solar energy home position strengthening gas phase extracting rehabilitating soil organic pollution
JP4871080B2 (en) Vacuum station, vacuum sewer system
CN109500043A (en) A kind of quasi- aerobic ecological restoring method of refuse landfill and system
CN204059567U (en) A kind of energy-conservation prefabricated pumping plant
CN206693378U (en) Urban construction high-efficiency sewage Boosting pumping station
CN106869300A (en) Urban construction high-efficiency sewage Boosting pumping station
CN205742768U (en) A kind of new energy source energy-saving environment protection architecture thing
CN109654581B (en) Season-crossing heat storage composite heating system based on confined aquifer
CN205165341U (en) System for solar energy normal position is reinforceed gaseous phase and is extracted restoration soil organic pollutant
CN109306674A (en) A kind of Ecological Retaining Wall and construction method with solar water pump automatic irrigation system
CN112878423A (en) Water resource utilization system in rainy and hilly areas
CN118292516A (en) Air conditioner energy storage system and method based on purified rainwater for supplying groundwater
CN117905524A (en) Subway interval drainage system and drainage method
CN116556490A (en) Partition type vacuum pressure drainage system and drainage method
CN206069524U (en) Integrate vacuum sewage and collect the energy-conservation pollution treatment system with artificial wetland treatment
CN206815526U (en) A kind of container mobile field camp
CN214614320U (en) Water resource utilization system in rainy and hilly areas
CN109441149A (en) The water-saving decanter type Toilet system of new energy and installation method
CN205777667U (en) Assembled self-loopa bio-toilet
CN209853804U (en) Saline and alkaline land distributed saline pumping-to-fresh water draining-irrigating coupling improvement system
CN107724526A (en) A kind of energy saving building
CN208733795U (en) One kind can remote monitoring intelligent pumping plant
CN208949850U (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system
CN207597574U (en) A kind of prefabricated pumping plant of constant temperature for severe cold area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 201406 workshop 2 and office building, 628 Ningfu Road, Fengxian District, Shanghai

Applicant after: Shanghai Kechu Machinery Equipment Group Co.,Ltd.

Address before: 201406 workshop 2 and office building, 628 Ningfu Road, Fengxian District, Shanghai

Applicant before: SHANGHAI KECHU MACHINERY EQUIPMENT CO.,LTD.

Address after: 201406 workshop 2 and office building, 628 Ningfu Road, Fengxian District, Shanghai

Applicant after: Shanghai Kechu machinery (Group) Co.,Ltd.

Address before: 201406 workshop 2 and office building, 628 Ningfu Road, Fengxian District, Shanghai

Applicant before: Shanghai Kechu Machinery Equipment Group Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620