Urban construction high-efficiency sewage Boosting pumping station
Technical field
The present invention relates to supply equipment technical field, specifically urban construction high-efficiency sewage Boosting pumping station.
Background technology
Today's society, for large- and-medium size cities, because the sewage area for processing is very big, so having built sewage disposal
Factory realizes the treatment of sewage in the way of focusing on.Focusing on for sewage needs the large area sewage that will be discharged to concentrate defeated
Sewage treatment plant is sent to, during sewage transport, sewage conduct buries very deep in underground due to road farther out, in order to reduce
The buried depth of subsequent delivery pipeline, pumping plant is set in the midway of sewage transport, is transported to by sewage conduct again after sewage is boosted
Farther place, this pumping plant is sewage lift stations.Sewage lift stations act as the sewage lifting of distant place to sewage disposal
Factory is focused on.
Limited by the current basement region for building house, the discharge of basement sewage can not be expelled directly out by gravity
Sewage, so just having built sewage lift stations.The sewage lifting pump station of China's prior art, is generally entered by the way of catch pit
Row sewage discharge, the sewage lifting pump station mainly includes:Catch pit, dredge pump, fluid level controller and electric cabinet, dredge pump and liquid
Catch pit is located in level controller, and both agree to access electric cabinet by respective cable, wherein dredge pump is filled by coupling
Put and be fixed in catch pit.Run under the adverse circumstances of contact sewage because dredge pump is long-term, reduce the use of dredge pump
In the life-span, simultaneously because it passes through coupling device being fixed in catch pit, install cumbersome, later maintenance cost is high, maintenance is inconvenient.
Existing sewage lifting pump station is generally relatively simple for structure, and function is relatively simple, and the gas that sewage is produced is general all
It is to take encapsulation process, in maintenance and repair procedures, during gas with foreign flavor enters to manual maintenance, considerably increases work
Make difficulty, once while system blackout, it is impossible in the case of providing work about electric power, the foreign matter in sewage cannot crush cutting, be
Water in system cannot be discharged, and existing technology cannot carry out pump termination of pumping operation, intelligence degree according to liquid level well in addition
Than relatively low, while in the case of winter, weather is terribly cold, sewage freezes, and greatly reduces the operating efficiency of sewage pumping station.
The content of the invention
The technical problems to be solved by the invention are to provide urban construction high-efficiency sewage Boosting pumping station, in order to solve the above-mentioned back of the body
The problem existed in prior art in scape technology, the present invention provides a kind of urban construction high-efficiency sewage Boosting pumping station, by setting
Many places liquid level alarms monitors the level condition of sewage, feeds back to switch board, and in the case that liquid level is very low, liquid is worked as in termination of pumping retaining
Position has reached pump liquid position, and main pump is started working, and when liquid level is very high, starts stand-by pump and cooperates, and realizes the efficient row of sewage
Put, while there is provided bamboo charcoal Sound-proof material, on the one hand absorbs the noise that motor work is produced, and absorb the peculiar smell not being collected
Gas, and by biogas carried out collect generated electricity, can be carried out in system cut-off and powered again, saved the energy, in addition
In the case that temperature is relatively low in the winter time, or cold district throughout the year, inside the thermal source reduction pumping plant that can be produced by generating electricity
Temperature, it is to avoid the situation of icing, although while summer internal system temperature is higher, the gas that thermal source can also allow in sewage
Body is evaporated, and improves the collection efficiency of biogas, and the system not only solves the problems, such as sewage smells, while for the system is carried
The standby energy high.
To achieve the above object, the present invention provides following technical scheme:
Urban construction high-efficiency sewage Boosting pumping station, it is characterised in that including main body, the first underground wall body, water inlet pipe, first electronic
Valve, cutting pump, the first liquid level alarm, the second liquid level alarm, the 3rd liquid level alarm, main pump, stand-by pump, the second underground
Wall, main pump coupling device, stand-by pump coupling device, the second electrically operated valve, drainpipe, switch board, biogas generator, biogas are received
Collection tank, the first warehouse, the second warehouse and ground;The main body is arranged at underground, respectively with the first underground wall body and the second underground
Wall is fixedly connected, and the main body is connected with water inlet pipe and drainpipe respectively, and the water inlet pipe is connected with the first electrically operated valve, institute
State the sealing of the first electrically operated valve to be applied in main body and be connected with cutting pump, the main body centre position installs support platform additional by inside
Space is divided into the first warehouse and the second warehouse, and first warehouse is provided with magnetite, first storehouse below cutting pump delivery port
Body bottom is installed with main pump by two first support bars, and the first warehouse bottom is fixed by two second support bars
Stand-by pump is installed, the main pump is provided with main pump coupling device, the stand-by pump is provided with stand-by pump coupling device, the main pump according to
Secondary the first pipeline, the first valve of passing through is connected with three-way pipe, and the stand-by pump passes sequentially through second pipe, the second valve and threeway
Pipe is connected, and the three-way pipe is described by being connected with check-valves, flexible coupling, butterfly valve and the second electrically operated valve communicating pipe in turn
Second electrically operated valve is connected with drainpipe, and the second warehouse warehouse top-side is provided with the first bamboo charcoal Sound-proof material, the second bamboo charcoal
Sound-proof material, the 3rd bamboo charcoal Sound-proof material, stair, the stair bottom are installed with the second warehouse storehouse wall by stair base
Portion is fixed in support platform, be installed with the support platform thermal source outlet, biogas generator, biogas plucker,
The biogas plucker is connected with small pressurized pump, and the small pressurized pump is connected with collecting methane tank, the collecting methane
Tank is connected with biogas generator, and the marsh gas power generation motor spindle is provided with thermal source outlet, is fixedly mounted on the second warehouse wall
Have a switch board, the switch board is provided with control button and instrument board, the second warehouse top be provided with exhaust outlet, rotary shaft,
Lid and locking bar, the second warehouse top are above the ground level, and the second fill stratum and first are provided with around the second warehouse top
Fill stratum.
As further scheme of the invention:The electrically operated valve of switch board centralized Control first, cutting pump, the first liquid level
Alarm, the second liquid level alarm, the 3rd liquid level alarm, main pump, stand-by pump, small pressurized pump, the second electrically operated valve, biogas
Generator, collecting methane tank and pressure monitoring device.
As further scheme of the invention:The lid and locking bar are engaged, and locking bar can seal lid.
As further scheme of the invention:First liquid level alarm, the second liquid level alarm and the 3rd liquid level report
Alert device is identical liquid level alarm device.
As further scheme of the invention:The first bamboo charcoal Sound-proof material, the second bamboo charcoal Sound-proof material and the 3rd bamboo charcoal every
Sound cotton is identical bamboo charcoal Sound-proof material, and bamboo charcoal can adsorb peculiar smell, and Sound-proof material can absorb the noise of motor generation, sound insulation
Cotton inner side is enclosed with bamboo-carbon layer.
The beneficial effects of the invention are as follows:
The present invention provides a kind of urban construction high-efficiency sewage Boosting pumping station, and the liquid of sewage is monitored by setting many places liquid level alarm
Position situation, feeds back to switch board, in the case that liquid level is very low, termination of pumping retaining, and when liquid level has reached pump liquid, main pump starts work
Make, when liquid level is very high, starts stand-by pump and cooperate, the efficient discharge of sewage is realized, while there is provided bamboo charcoal Sound-proof material, one
Aspect absorbs the noise that motor work is produced, and absorbs the gas with foreign flavor not being collected, and biogas is collected
Generated electricity, can be carried out in system cut-off and powered again, saved the energy, in the case that temperature is relatively low in the winter time in addition, or
The long-term cold district of person, the temperature inside thermal source reduction pumping plant that can be produced by generating electricity, it is to avoid the situation of icing, while the summer
Although season, internal system temperature was higher, the gaseous volatilization that thermal source can also allow in sewage out, improves the receipts of biogas
Collection efficiency, the system not only solves the problems, such as sewage smells, while for the system improves the standby energy.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is control planning schematic diagram of the present invention;
1st, the first underground wall body, the 2, first bamboo charcoal Sound-proof material, 3, stair base, the 4, first electrically operated valve, 5, water inlet pipe, 6, cutting
Pump, the 7, first liquid level alarm, 8, magnetite, the 9, second liquid level alarm, the 10, the 3rd liquid level alarm, 11, main pump coupling dress
Put, 12, first support bar, 13, main pump, the 14, first pipeline, the 15, first valve, 16, stand-by pump coupling device, 17, second
Strut, 18, stand-by pump, 19, second pipe, the 20, first warehouse, the 21, second valve, 22, three-way pipe, the 23, second underground wall body,
24th, biogas plucker, 25, support platform, 26, communicating pipe, 27, small pressurized pump, 28, check-valves, 29, flexible coupling, 30,
Butterfly valve, 31, thermal source outlet, 32, biogas generator, 33, control button, the 34, first fill stratum, the 35, second bamboo charcoal Sound-proof material,
36th, the second warehouse, 37, collecting methane tank, the 38, the 3rd bamboo charcoal Sound-proof material, 39, pressure monitoring device, 40, switch board, 41, instrument
Disk, 42, rotary shaft, 43, lid, 44, locking bar, the 45, second fill stratum, 46, ground, 47, exhaust outlet, 48, stair, 49, second
Electrically operated valve, 50, drainpipe, 51, main body, 52, plant-grid connection mouthful.
Specific embodiment
Technical scheme is described in more detail with reference to specific embodiment.
Urban construction high-efficiency sewage Boosting pumping station, it is characterised in that including main body 51, the first underground wall body 1, water inlet pipe 5,
First electrically operated valve 4, cutting pump 6, the first liquid level alarm 7, the second liquid level alarm 9, the 3rd liquid level alarm 10, main pump
13rd, stand-by pump 18, the second underground wall body 23, main pump coupling device 11, stand-by pump coupling device 16, the second electrically operated valve 29, row
Water pipe 50, switch board 40, biogas generator 32, collecting methane tank 37, the first warehouse 20, the second warehouse 36 and ground 46;It is described
Main body 51 is arranged at underground, is fixedly connected with the first underground wall body 1 and the second underground wall body 23 respectively, the main body 51 respectively with
Water inlet pipe 5 and drainpipe 50 are connected, and the water inlet pipe 5 is connected with the first electrically operated valve 4, and the sealing of the first electrically operated valve 4 is passed through
Wear and be connected with cutting pump 6 on the body 51, the centre position of the main body 51 installs support platform 25 additional and inner space is divided into first
The warehouse 36 of warehouse 20 and second, first warehouse 20 is provided with magnetite 8, first warehouse 20 below the delivery port of cutting pump 6
Bottom is installed with main pump 13 by two first support bars 12, and the bottom of the first warehouse 20 passes through two second support bars
17 are installed with stand-by pump 18, and the main pump 13 is provided with main pump coupling device 11, and the stand-by pump 18 is provided with stand-by pump coupling
Device 16, the main pump 13 passes sequentially through the first pipeline 14, the first valve 15 and is connected with three-way pipe 22,
The stand-by pump 18 passes sequentially through second pipe 19, the second valve 21 and is connected with three-way pipe 22, and the three-way pipe 22 passes through
It is connected with check-valves 28, flexible coupling 29, the electrically operated valve 49 of butterfly valve 30 and second, second electrically operated valve communicating pipe 26 in turn
49 are connected with drainpipe 50, and the warehouse top-side of second warehouse 36 is provided with the first bamboo charcoal Sound-proof material 2, the second bamboo charcoal Sound-proof material
35th, the 3rd bamboo charcoal Sound-proof material 38, stair 48, the building are installed with the storehouse wall of second warehouse 36 by stair base 3
Terraced 48 bottoms are fixed in support platform 25, be installed with the support platform 25 thermal source outlet 31, biogas generator 32,
Biogas plucker 24, the biogas plucker 24 are connected with small pressurized pump 27, and the small pressurized pump 27 is received with biogas
Collection tank 37 is connected, and the collecting methane tank 37 is connected with biogas generator 32, and the bottom of the biogas generator 32 is provided with thermal source and goes out
Mouth 31, switch board 40 is installed with the wall of the second warehouse 36, and the switch board 40 is provided with control button 33 and instrument
Dial plate 41, the top of the second warehouse 36 is provided with exhaust outlet 47, rotary shaft 42, lid 43 and locking bar 44, second warehouse 36
Top is above the ground level 46, and the second fill stratum 45 and the first fill stratum 34 are provided with around the top of the second warehouse 36.
Preferably, the first electrically operated valve of centralized Control 4, cutting pump 6 of switch board 40, the first liquid level alarm 7, the second liquid
Level alarm 9, the 3rd liquid level alarm 10, main pump 13, stand-by pump 18, small pressurized pump 27, the second electrically operated valve 49, biogas hair
Motor 32, collecting methane tank 37 and pressure monitoring device 39;Preferably, lid 43 and locking bar 44 are engaged, locking bar 44 can be with
Lid 43 is sealed;Preferably, the first liquid level alarm 7, the second liquid level alarm 9 and the 3rd liquid level alarm 10 are complete
Identical liquid level alarm device;Preferably, the first bamboo charcoal Sound-proof material 2, the second bamboo charcoal Sound-proof material 35 and the 3rd bamboo charcoal Sound-proof material
38 is identical bamboo charcoal Sound-proof material, and bamboo charcoal can adsorb peculiar smell, and Sound-proof material can absorb the noise of motor generation, Sound-proof material
Inner side is enclosed with bamboo-carbon layer.
Operation principle of the invention is:Urban construction high-efficiency sewage Boosting pumping station of the present invention, by water inlet pipe 5
The sewage that will be discharged enters cutting pump 6 by the first electrically operated valve 4, and cutting pump 6 arranges the foreign matter cutting and grinding in sewage
Enter sewage lifting system, some metallic residues after crushing can be adsorbed by magnetite 8, sewage passes through main pump 13 and stand-by pump 18
Three-way pipe 22, check-valves 28, flexible coupling 29, butterfly valve 30 are sequentially passed through, then by the second electrically operated valve 49 and the row of drainpipe 50
Enter municipal sewage drainage system;The system sets the first liquid level alarm 7, the and of the second liquid level alarm 9 in the first warehouse 20
3rd liquid level alarm 10, under normal operation, switch board 40 starts the single pump work of main pump 13, when liquid level is less than the 3rd liquid level
During 10 position of alarm, the 3rd liquid level alarm 10 sends alarm signal and feeds back to switch board 40, and switch board 40 stops main pump 13
Work, water inlet pipe 5 persistently supplies water, when liquid level reaches the second liquid level alarm 9 higher than the position of the 3rd liquid level alarm 10, the
Two liquid level alarms 9 send a signal to switch board 40, and switch board 40 starts main pump 12 and works, when liquid level reaches the first liquid level warning
During device 7, the first liquid level alarm 7 sends a signal to switch board 40, and switch board 40 starts stand-by pump 18 and is operated, main pump
12 and stand-by pump 18 cooperate, sewage is entered into municipal drainage system;The meeting during blowdown of biogas plucker 24 simultaneously
The collecting methane that will be produced is stored in collecting methane tank 37 again, when equipment has a power failure, and plant-grid connection mouthful 52 cannot power, Ke Yitong
Cross biogas generator 32 to be generated electricity with the biogas of storage, the thermal source of generation enters the first warehouse 20 by thermal source outlet again
It is interior, anti-defrosting effect can be played to equipment in winter, on the one hand the system can monitor sewage level situation, take switch board
Based Intelligent Control is carried out, while the biogas generator for setting, in the case where other peculiar smell are solved, additionally it is possible to profit again is carried out to waste gas
With reducing energy resource consumption.
It is described in detail above in association with urban construction high-efficiency sewage Boosting pumping station specific embodiment of the invention, but simultaneously
Non- is limitation of the present invention, every any simple modification made for any of the above embodiments is belonged to according to technical spirit of the invention
In technical scope of the invention, in addition it is also necessary to explanation, according to urban construction high-efficiency sewage Boosting pumping station technical side of the invention
The category of case includes any combination between each part mentioned above.