CN106836474A - Prefabricated post composite beam top of column joints connection method in assembled RC frame-shear structures - Google Patents
Prefabricated post composite beam top of column joints connection method in assembled RC frame-shear structures Download PDFInfo
- Publication number
- CN106836474A CN106836474A CN201710035753.XA CN201710035753A CN106836474A CN 106836474 A CN106836474 A CN 106836474A CN 201710035753 A CN201710035753 A CN 201710035753A CN 106836474 A CN106836474 A CN 106836474A
- Authority
- CN
- China
- Prior art keywords
- prefabricated post
- composite beam
- sides
- grout sleeve
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
- E04B1/1903—Connecting nodes specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses prefabricated post composite beam top of column joints connection method in a kind of assembled RC frame-shear structures, during formal assembling, first assemble lower floor's wall of prefabricated post top layer both sides, the Column border node of assembling prefabricated post both sides lower floor, after the completion of support, stirrup on full grout sleeve and beam is loaded onto on beam steel at the Column border node of both sides, afterwards, both sides lift the lower floor's composite beam for being coated with upper longitudinal bar again, composite beam is carried out into leveling, support, screw the pre- full grout sleeve put, connected upper longitudinal bar is set to be evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;Prefabricated post top layer is closed by the connected position that full grout sleeve is formed with cement mortar, joint face is formed closed cavity;Sitting slurry carries out cementing operations after 1 day, mix grouting material is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting.Integral construction of the present invention is easy, and anti-seismic performance is good, construction cost saving, short construction period.
Description
Technical field
The invention belongs to building structure connection area, and in particular to prefabricated post-overlapping in a kind of assembled RC frame shear structures
Beam top of column joints connection method.
Background technology
Traditional cast-in-place building refers to carry out the construction such as reinforcing bar colligation, formwork supporting plate, casting concrete at the construction field (site) to form
Building.The past for quite a long time, cast-in-place building solves personnel's employment etc. to receiving surplus rural labor force of China
Serve positive, current cast-in-place mode still occupies absolute main flow in China's construction.But, it is cast-in-place for a long time to build
Build and be widely present in constructing situ wet operation amount greatly, labour's input amount is big, and labor strength is high, poor working environment, mould
The input amounts such as plate, scaffold are big, turnover utilization rate is low, mechanized construction low degree, construction safety hidden danger and Frequent Accidents, relatively
The thorny problem such as work efficiency is not high and job site largely produces airborne dust, noise pollution, building waste many.These cast-in-place buildings
Congenital drawback is incompatible with the trend of the current construction industry development of China.
Assembled architecture is, in plant produced, to be assembled building subassembly and component and fitting at the construction field (site) and be formed by connecting
Building.It with modern science and technology is support that the construction of assembled architecture is, with industrialized production as means, with engineering
Mesh management innovation is core, and building products production overall process is coupled integral by extensive utilization information technology, intelligent environment protection technology
Change the structural system of industrial chain, assembled architecture can economize on resources and be polluted with the energy, reduction, effectively improves labor productivity,
Improve construction quality etc..The house for meeting China " 13 " national development stage " energy and land saving " and " structure industrial system " is produced
Industry guiding theory, with significant economic benefit and social benefit.The current desalination along with China human mortality bonus, it is of the right age to build
The reduction of industry number of employees is built, development assembled architecture is brought into schedule in good time.
Assembled architecture presses structural system, is broadly divided into assembled frame-shear structure, fabricated shear wall structure, assembled frame
Frame-shear wall structure etc..Wherein first two structural system is relatively more in the research of China, and both at home and abroad to assembling frame-
The research of shear wall structure is also relatively fewer, and existing research is concentrated mainly on theoretical and numerical simulation aspect, wherein H. A.
D. Samith Buddika etc. have carried out theoretical research based on Opensees softwares to assembled frame shear structure.Dionysios
Bournas etc. has carried out pseudo to 1 three layers of assembled frame shear structure model, have studied structural model different parts,
Damaged situation of the node of multi-form under geological process.Majid Divana etc. with nonlinear static force method to difference across number and
The assembled frame shear structure of floor height has carried out theoretical research.Current developing rapidly in China, assembled with building industrialization
The application of frame shear wall structure is increasing, therefore is necessary to further investigate it.
At present, the common practice to shear wall position in assembled RC frame shear structures is using traditional complete cast-in-place mode
Shear wall is built, this is mainly based upon in frame shear wall structure, shear wall as main lateral resistant member, in earthquake
In undertake most horizontal force, while shear wall is destroyed at first as the first line of defence in earthquake, thus shear wall from
The anti-seismic performance quality of body is most important.For the requirement of shear wall aspect of performance, the present patent application scheme proposes a kind of dress
With prefabricated post in formula RC frame shear structures-composite beam top of column joints connection method.
The content of the invention
Goal of the invention:In order to solve the deficiencies in the prior art, the invention provides pre- in a kind of assembled RC frame shear structures
Post processed-composite beam top of column joints connection method.
Technical scheme:Prefabricated post-composite beam top of column joints connection method in a kind of assembled RC frame shear structures, including
Following steps:
1)During formal assembling, lower floor's wall of prefabricated post top layer both sides, the Column border node of assembling prefabricated post both sides lower floor, branch are first assembled
After the completion of support, stirrup on full grout sleeve and beam is loaded onto on the beam steel at the Column border node of both sides, afterwards, both sides lift install again
There is lower floor's composite beam of upper longitudinal bar, composite beam is carried out into leveling, support, screw the pre- full grout sleeve put, make connected
Upper longitudinal bar is evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;
2)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by prefabricated post top layer by being connected that full grout sleeve is formed
Position is closed, and joint face is formed closed cavity;
3)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting
Grouting material.
As optimization:Before formal assembling, first dabbing treatment will be carried out at rear pouring concrete faying face, water under high pressure is used after dabbing
Floating dust is rinsed well.
Beneficial effect:Integral construction of the present invention is easy, and anti-seismic performance is good, construction cost saving, short construction period.
Brief description of the drawings
Fig. 1 is structural representation of the invention;In figure:1 prefabricated post, 2 composite beams, 3 beam steels, 4 full grout sleeves, 5 beams
Pouring concrete behind upper stirrup, 6 upper longitudinal bars, 7.
Specific embodiment
With reference to specific embodiment, the invention will be further described.
Embodiment
As shown in figure 1, prefabricated post-composite beam top of column joints connection method in a kind of assembled RC frame shear structures, including
Following steps:
1)Before formal assembling, first dabbing treatment will be carried out at the faying face of rear pouring concrete 7, rinsed floating dust with water under high pressure after dabbing
Totally.
2)During formal assembling, lower floor's wall of the top layer both sides of prefabricated post 1, the post of assembling prefabricated post 1 both sides lower floor are first assembled
Node, after the completion of support, loads onto stirrup 5 on full grout sleeve 4 and beam, afterwards, both sides on the beam steel 3 at the Column border node of both sides
The lower floor's composite beam 2 for being coated with upper longitudinal bar is lifted again, composite beam 2 is carried out into leveling, support, screw the pre- full grout sleeve put
4, connected upper longitudinal bar 6 is evenly distributed on inside full grout sleeve 4, then the stirrup at colligation post-cast strip;
3)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by the top layer of prefabricated post 1 by being connected that full grout sleeve 4 is formed
Socket part position is closed, and joint face is formed closed cavity;
4)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting
Grouting material.
The present invention is not limited to above-mentioned preferred forms, and anyone can show that other are various under enlightenment of the invention
The product of form, however, make any change in its shape or structure, it is every with skill identical or similar to the present application
Art scheme, is within the scope of the present invention.
Claims (2)
1. prefabricated post-composite beam top of column joints connection method in a kind of assembled RC frame shear structures, it is characterised in that:Including
Following steps:
1)During formal assembling, lower floor's wall of prefabricated post top layer both sides, the Column border node of assembling prefabricated post both sides lower floor, branch are first assembled
After the completion of support, stirrup on full grout sleeve and beam is loaded onto on the beam steel at the Column border node of both sides, afterwards, both sides lift install again
There is lower floor's composite beam of upper longitudinal bar, composite beam is carried out into leveling, support, screw the pre- full grout sleeve put, make connected
Upper longitudinal bar is evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;
2)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by prefabricated post top layer by being connected that full grout sleeve is formed
Position is closed, and joint face is formed closed cavity;
3)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting
Grouting material.
2. prefabricated post-composite beam top of column joints connection method in assembled RC frame shear structures according to claim 1,
It is characterized in that:Before formal assembling, first dabbing treatment will be carried out at rear pouring concrete faying face, with water under high pressure by floating dust after dabbing
Rinse well.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710035753.XA CN106836474A (en) | 2017-01-18 | 2017-01-18 | Prefabricated post composite beam top of column joints connection method in assembled RC frame-shear structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710035753.XA CN106836474A (en) | 2017-01-18 | 2017-01-18 | Prefabricated post composite beam top of column joints connection method in assembled RC frame-shear structures |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836474A true CN106836474A (en) | 2017-06-13 |
Family
ID=59125012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710035753.XA Pending CN106836474A (en) | 2017-01-18 | 2017-01-18 | Prefabricated post composite beam top of column joints connection method in assembled RC frame-shear structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836474A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8413396B2 (en) * | 2009-08-11 | 2013-04-09 | Wisconsin Alumni Research Foundation | Splice system for connecting rebars in concrete assemblies |
CN103452246A (en) * | 2013-07-09 | 2013-12-18 | 东南大学 | Grouted deformed steel tube sleeve abutted and connected by steel bar grouting anchor |
CN104453015A (en) * | 2014-11-19 | 2015-03-25 | 沈阳建筑大学 | Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars |
CN104727439A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Assembly concrete new type pillar and beam structure and assembly connecting method |
CN105756191A (en) * | 2016-04-22 | 2016-07-13 | 河北省建筑科学研究院 | Assembling-type beam-column joint connection structure for concrete special-shaped column frame |
CN106284654A (en) * | 2016-08-17 | 2017-01-04 | 沈阳建筑大学 | Novel fabricated beam column node connection device |
-
2017
- 2017-01-18 CN CN201710035753.XA patent/CN106836474A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8413396B2 (en) * | 2009-08-11 | 2013-04-09 | Wisconsin Alumni Research Foundation | Splice system for connecting rebars in concrete assemblies |
CN103452246A (en) * | 2013-07-09 | 2013-12-18 | 东南大学 | Grouted deformed steel tube sleeve abutted and connected by steel bar grouting anchor |
CN104453015A (en) * | 2014-11-19 | 2015-03-25 | 沈阳建筑大学 | Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars |
CN104727439A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Assembly concrete new type pillar and beam structure and assembly connecting method |
CN105756191A (en) * | 2016-04-22 | 2016-07-13 | 河北省建筑科学研究院 | Assembling-type beam-column joint connection structure for concrete special-shaped column frame |
CN106284654A (en) * | 2016-08-17 | 2017-01-04 | 沈阳建筑大学 | Novel fabricated beam column node connection device |
Non-Patent Citations (1)
Title |
---|
刘梦然: "《建设工程绿色施工及技术应用》", 30 September 2016 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203049832U (en) | Assembling type shear wall structure | |
CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
CN101769008B (en) | Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams | |
CN106436893A (en) | Fully-prefabricated structure and construction method thereof | |
CN203213346U (en) | Connecting structure for assembling integral concrete frame and shear wall | |
CN204252269U (en) | A kind of Prefabricated steel construction integration assembling green building Component composition assembly unit | |
CN106149937B (en) | Assembly concrete beam and its dry type connection method | |
CN205242773U (en) | Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection | |
CN104727476B (en) | The light body 3D steel bar girders floor plates of assembled and its manufacture method | |
CN206368422U (en) | A kind of assembled beam-column connecting node | |
CN104612246A (en) | Assembled monolithic concrete large-span frame structure system and assembling method thereof | |
CN106760228A (en) | The method of precast shear wall wall Vertical bar connection | |
CN106759933A (en) | Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN111236416A (en) | Prefabricated reinforced concrete structure house and installation method thereof | |
CN103362307B (en) | Construction method for modularizing insulation wall boards and pouring integrated house building | |
CN207919737U (en) | A kind of assembled steel-Combined concrete frame structure | |
CN106759882A (en) | Prefabricated post composite beam top story exterior joints connection method in assembled RC frame-shear structures | |
CN106836473A (en) | Prefabricated post composite beam intermediate layer mid-side node connection method in assembled RC frame-shear structures | |
CN106869331A (en) | The connection method of precast shear wall composite beam in assembled RC frame-shear structures | |
CN205875520U (en) | Precast beam steel reinforcement cage component and reinforced concrete roof beam | |
CN104878837A (en) | Concrete frame structure system and assembly method thereof | |
CN104594560A (en) | Prefabricated frame column | |
CN204609121U (en) | A kind of precast truss frame beam | |
CN208899692U (en) | Beam rigid connection node outside assembly concrete shear wall and face |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |
|
RJ01 | Rejection of invention patent application after publication |