CN106836016A - Steel truss girder bridge repairs linear control method - Google Patents

Steel truss girder bridge repairs linear control method Download PDF

Info

Publication number
CN106836016A
CN106836016A CN201510990675.XA CN201510990675A CN106836016A CN 106836016 A CN106836016 A CN 106836016A CN 201510990675 A CN201510990675 A CN 201510990675A CN 106836016 A CN106836016 A CN 106836016A
Authority
CN
China
Prior art keywords
steel
bridge
main truss
truss
truss girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510990675.XA
Other languages
Chinese (zh)
Other versions
CN106836016B (en
Inventor
刘治国
侯勇
朱新华
李军平
刘志刚
袁俊
马增岗
董向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Group Co Ltd
Original Assignee
China Railway Baoji Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Group Co Ltd filed Critical China Railway Baoji Bridge Group Co Ltd
Priority to CN201510990675.XA priority Critical patent/CN106836016B/en
Publication of CN106836016A publication Critical patent/CN106836016A/en
Application granted granted Critical
Publication of CN106836016B publication Critical patent/CN106836016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

The present invention relates to a kind of reparation for super life-span riveted truss girder bridge, develop a kind of steel truss girder bridge maintenance linear control method, because all kinds of super all kinds of light maintenances of life-span steel truss girder bridge are continuous, but with the growth of service life, bridge steel structure bearing capacity gradually weakens, corrosion and degree of fatigue are more serious, so more need to thoroughly be repaired to such bridge, formulated " Steel Bridge temporary support → trussed steel beam linear adjustment → main truss rod member replacings → main truss temporarily fixed → bridge deck in length and breadth beam dismounting → main truss it is traversing → bridge deck installation " recovery scenario.To control the reparation of steel truss girder linear, after steel truss girder bridge is moved on into reparation position, the stress of steel main truss is adjusted using many synchronous hydra-ulic jacks, the rod member of steel main truss is substantially at unstress state, to the stressing influence of original component in reduction repair process.

Description

Steel truss girder bridge repairs linear control method
Technical field
The present invention relates to a kind of reparation for super life-span riveted truss girder bridge, develop a kind of steel truss girder bridge and repair linear control Method processed, with ensure steel truss girder bridge reparation it is linear do not change, the repairing quality so as to ensure riveted truss girder bridge.
Background technology
China has built some steel truss girder bridges in 20 beginnings of the century, and the service life of some bridges has exceeded a century, many at present Number has turned into historical relic's protection bridge.Since recent decades, old all kinds of light maintenances of steel truss girder bridge constantly, but with using the longevity The growth of life, bridge steel structure bearing capacity gradually weakens, and corrosion and degree of fatigue are more serious, so the bridge need to be carried out more Thoroughly repair.Used as historical relic's protection bridge, repair process need to ensure the features such as original agent structure, the bridge linear of bridge, Because these bridges are most in urban district prosperity location, should not be repaired in former Bridge position.Therefore, bridge main need to ensured Body it is linear it is constant in the state of, changed using the advanced Steel Bridge recovery technique component serious to disease in factory building or Repair, reach " restoring the old as the old " and repair theory.Because Steel Bridge is by prolonged operation, and in super life-span use state, The force status of all kinds of components of steel truss girder is there occurs great variety, all kinds of components can not have been calculated using finite element analysis Stressing conditions, so it is particularly critical to keep linear and stress not change during bridge maintaining.The steel of exploitation Truss bridge repairs linear control technology can then ensure that the linear state of bridge does not change, remediation efficiency is high, good economy performance Feature.
The content of the invention
Purpose of design:The weak point in background technology is avoided, a kind of steel truss girder bridge maintenance linear control method is designed, with Ensure steel truss girder bridge reparation it is linear do not change, the repairing quality so as to ensure steel truss girder bridge.
Design:In order to realize above-mentioned purpose of design.The present invention is adopted in design, Steel Bridge movement to after repairing factory building With temporarily " the serious rod member replacing → main truss of Steel Bridge temporary support → trussed steel beam linear adjustment → main truss corrosion fixes → bridge deck In length and breadth beam dismounting → main truss it is traversing → bridge deck installs " scheme, concrete scheme is:(1) after steel truss girder bridge moves on to maintenance place, According to the theory support counter-force numerical value for calculating(See theory support counter-force computation model Fig. 7), it is very heavy using many synchronous hydraulics Push up and the stress of steel main truss be adjusted, manufacture linear closest so as to reach the linear of bridge repair process and its, The rod member of steel main truss is set to be substantially at unstress state, to the stressing influence of original component in reduction repair process.(2) it is to avoid Bridge reparation causes nodal shift or the disengaging of main truss, when main truss rod member is changed, using the outer of first dismounting side steel main truss rod member Side part, then installs the part of brand-new, then the method for changeing the inner side part of main truss rod member.
Compared with background technology, one is the stress that ensure that original component in disease bridge repair process to the present invention, The technological sciences rationally, by multi-point support force bearing adjustment, ensure that the linear and stress of Steel Bridge repair process, enter And improve the repairing quality of riveted truss girder;Two is the scheme that steel girder member bar replaces side using dismounting side, it is ensured that steel The integrated connection of the agent structure of bridge, it is possible to decrease the potential safety hazard of work progress.
Brief description of the drawings
Fig. 1 is that steel truss girder bridge repairs linear control technology implementation total figure.
Fig. 2 is the specific steps that steel truss girder bridge repairs linear control technology;State 1 is steel truss girder maintenance in wherein Fig. 2-1 The schematic diagram of support, state 2-2a is the schematic diagram of steel truss girder temporary support, and state 2-2b is what steel truss girder temporary support was reinforced Schematic diagram, the schematic diagram that state 2-3 is changed for steel girder member bar, Fig. 2-4 be in Fig. 2-3 A-A to cross section structure diagram.
Fig. 3 and Fig. 4 are to change sequential schematic.
Fig. 5-Figure 10 is that truss bridge repairs linear control technology picture schematic diagram.
Specific embodiment
Embodiment 1:Referring to the drawings 2-1 to Fig. 5.State 1 is the schematic diagram of steel truss girder maintaining support, state 2- in Fig. 2-1 2a is the schematic diagram of steel truss girder temporary support, and state 2-2b is the schematic diagram that steel truss girder temporary support is reinforced, and state 2-3 is steel truss The schematic diagram that beam column part is changed.Steel truss girder bridge repairs linear control method:
1st step:After steel truss girder bridge moves on to maintenance place, the ground sample of steel truss girder bridge is released in factory building, then in main truss node position Install multiple support piers.
2nd step:It is linear linear consistent with real bridge like state after Steel Bridge temporary support to make, arrange synchronous on support pier Hydraulic jack, for adjusting the linear of main truss, is shown in Fig. 5.
3rd step:After steel truss girder bridge is moved into factory building, slowly it is placed on support pier, sees Fig. 6.
4th step:Adjustment hydraulic jack, makes the stress size of each strong point identical with the theoretical stress of the point, it is ensured that main Boom part is substantially at unstress state, sees Fig. 7 and Fig. 8.
5th step:When main truss rod member is changed, the outside part of side steel main truss rod member is first removed, then install the zero of brand-new Part, then the inner side part of main truss rod member is changed, see Fig. 9.
6th step:Steel main truss temporary support is installed, monolithic steel main truss is formed rock-steady structure.
7th step:Steel truss girder lateral, stull and bridge deck are removed, the two panels steel main truss of steel truss girder is kept completely separate.
8th step:Monolithic steel main truss is traversing to carry out pushing tow using 5 synchronous hydra-ulic jacks, and main truss is laterally moved to setting position Afterwards, its holding state is adjusted, then fixed support and support pier is welded, Figure 10 is seen.
9th step:The strong point stressing conditions of two panels steel main truss are adjusted, then the spacing to top-bottom chord is measured.
10th step:Crossbeam unit and bridge floor Slab element are installed successively in the middle of from bridge to two ends, the reparation of steel truss girder is completed Work.
It is to be understood that:Although above-described embodiment is contrasted to mentality of designing of the invention, detailed word is retouched State, but these word descriptions, simply to the simple text description of mentality of designing of the present invention, rather than to mentality of designing of the present invention Limitation, any combination without departing from mentality of designing of the present invention, increase or change, each fall within protection scope of the present invention.

Claims (2)

1. a kind of steel truss girder bridge repairs linear control method, it is characterized in that:(1) after steel truss girder bridge moves on to maintenance place, according to meter The theory support counter-force numerical value for calculating, is adjusted using many synchronous hydra-ulic jacks to the stress of steel main truss, so that Reach the linear of bridge repair process and manufacture linear closest with it, the rod member of steel main truss is substantially at unstress state, To the stressing influence of original component in reduction repair process;(2) to avoid bridge reparation from causing nodal shift or the disengaging of main truss, When main truss rod member is changed, using the outside part for first removing side steel main truss rod member, then the part of brand-new is installed, then change master The method of the inner side part of boom part.
2. steel truss girder bridge according to claim 1 repairs linear control method, it is characterized in that:
1st step:After steel truss girder bridge moves on to maintenance place, the ground sample of steel truss girder bridge is released in factory building, then in main truss node position Install multiple support piers;
2nd step:It is linear linear consistent with real bridge like state after Steel Bridge temporary support to make, synchronous hydraulic is arranged on support pier Jack, for adjusting the linear of main truss;
3rd step:After steel truss girder bridge is moved into factory building, slowly it is placed on support pier;
4th step:Adjustment hydraulic jack, makes the stress size of each strong point identical with the theoretical stress of the point, it is ensured that main truss bar Part is substantially at unstress state;
5th step:When main truss rod member is changed, the outside part of side steel main truss rod member is first removed, then the part of brand-new is installed, then Change the inner side part of main truss rod member;
6th step:Steel main truss temporary support is installed, monolithic steel main truss is formed rock-steady structure;
7th step:Steel truss girder lateral, stull and bridge deck are removed, the two panels steel main truss of steel truss girder is kept completely separate;
8th step:Monolithic steel main truss is traversing to carry out pushing tow using multiple synchronous hydra-ulic jacks, after main truss is laterally moved to setting position, Its holding state is adjusted, then fixed support and support pier is welded;
9th step:The strong point stressing conditions of two panels steel main truss are adjusted, then the spacing to top-bottom chord is measured;
10th step:Crossbeam unit and bridge floor Slab element are installed successively in the middle of from bridge to two ends, the repair of steel truss girder is completed.
CN201510990675.XA 2015-12-24 2015-12-24 Steel truss girder bridge repairs linear control method Active CN106836016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510990675.XA CN106836016B (en) 2015-12-24 2015-12-24 Steel truss girder bridge repairs linear control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510990675.XA CN106836016B (en) 2015-12-24 2015-12-24 Steel truss girder bridge repairs linear control method

Publications (2)

Publication Number Publication Date
CN106836016A true CN106836016A (en) 2017-06-13
CN106836016B CN106836016B (en) 2018-10-09

Family

ID=59150868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510990675.XA Active CN106836016B (en) 2015-12-24 2015-12-24 Steel truss girder bridge repairs linear control method

Country Status (1)

Country Link
CN (1) CN106836016B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107391811A (en) * 2017-06-30 2017-11-24 北方工业大学 A kind of steel truss girder bridge rod member checking method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913315A (en) * 1995-06-30 1997-01-14 Mamoru Tsuchie Steel bridge
RU2304656C1 (en) * 2006-02-03 2007-08-20 Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") Method for lattice span structure disassembling by span structure division into three-dimensional blocks
CN101122118A (en) * 2007-08-31 2008-02-13 西南交通大学 Method for reinforcing and modifying through steel truss bridge
CN101935987A (en) * 2010-08-27 2011-01-05 中交一公局桥隧工程有限公司 Construction method for integrally sliding large-span steel pipe arch of curved bridge
CN104818666A (en) * 2015-04-29 2015-08-05 镇江长城重工科技有限公司 Large-span steel temporary bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913315A (en) * 1995-06-30 1997-01-14 Mamoru Tsuchie Steel bridge
RU2304656C1 (en) * 2006-02-03 2007-08-20 Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") Method for lattice span structure disassembling by span structure division into three-dimensional blocks
CN101122118A (en) * 2007-08-31 2008-02-13 西南交通大学 Method for reinforcing and modifying through steel truss bridge
CN101935987A (en) * 2010-08-27 2011-01-05 中交一公局桥隧工程有限公司 Construction method for integrally sliding large-span steel pipe arch of curved bridge
CN104818666A (en) * 2015-04-29 2015-08-05 镇江长城重工科技有限公司 Large-span steel temporary bridge

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李金锁: "既有罗湖铁路钢桥整桥移梁施工", 《国防交通工程与技术》 *
王伟祖: "广州市海珠桥中跨钢梁整节制作技术", 《山西建筑》 *
王倩: "具有历史文物价值的铆接钢桁架桥大修探讨", 《城市道桥与防洪》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107391811A (en) * 2017-06-30 2017-11-24 北方工业大学 A kind of steel truss girder bridge rod member checking method and system

Also Published As

Publication number Publication date
CN106836016B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN108824193B (en) Method for quickly dismantling and installing bridge superstructure and replacing system thereof
CN102505866A (en) Displacement method of defective concrete of column body
CN101736909A (en) Method for restoring building construction with bottom frame posts damaged by vibration
CN111733712B (en) Construction method for replacing beam part structure of bridge
CN102587689A (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN110700100A (en) Bailey beam bundle construction method for cast-in-situ platform of high-pier small-radius curve ramp bridge
Hanna et al. Adjacent box girders without internal diaphragms or posttensioned joints.
CN105155431A (en) Rapid repair method for three-stand-column structure bridge with damaged lateral stand columns and undamaged beam and slab structure
CN104947604A (en) Rapid beam-replacing construction method for high speed railway 900 t concrete box beam
CN106836016B (en) Steel truss girder bridge repairs linear control method
Zhao et al. Fatigue behavior and retrofit investigation of distortion-induced web gap cracking
Zhao et al. Integral lifting project of the qifeng bridge
JP6632157B2 (en) Replacement method of truss structure members
CN210105373U (en) Replacement, reinforcement and support device for concrete building shear wall
CN103774560B (en) The curved bridge construction engineering method of suspension type cast-in-situ template
Gasii Production of full-scale experimental modular specimens of the steel and concrete composite cable space frame
JP6905556B2 (en) Truss bridge member replacement method and replacement method
CN104989120A (en) Space structure key rod piece reinforcing method
CN113622703A (en) Method for reforming and reinforcing prestressed reinforced concrete beam
Ghannam et al. Effect of post tensioning on strengthening different types of steel frames
JP3739046B2 (en) Construction method of steel PC composite bridge
CN110130234B (en) Novel bridge reinforcing system and construction method thereof
CN105970838A (en) Deck type arch bridge vault padding unloading and reinforcing construction method and application
CN101550684B (en) Two-stage unsupported construction method used for repairing damaged hydraulic concrete beams

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant