CN106829739A - A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar - Google Patents

A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar Download PDF

Info

Publication number
CN106829739A
CN106829739A CN201710117905.0A CN201710117905A CN106829739A CN 106829739 A CN106829739 A CN 106829739A CN 201710117905 A CN201710117905 A CN 201710117905A CN 106829739 A CN106829739 A CN 106829739A
Authority
CN
China
Prior art keywords
suspension bridge
platform
tower crane
attached wall
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710117905.0A
Other languages
Chinese (zh)
Other versions
CN106829739B (en
Inventor
顾建华
高银海
陈培培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG PANGYUAN MACHINERY ENGINEERING Co Ltd
Original Assignee
NANTONG PANGYUAN MACHINERY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG PANGYUAN MACHINERY ENGINEERING Co Ltd filed Critical NANTONG PANGYUAN MACHINERY ENGINEERING Co Ltd
Priority to CN201710117905.0A priority Critical patent/CN106829739B/en
Publication of CN106829739A publication Critical patent/CN106829739A/en
Application granted granted Critical
Publication of CN106829739B publication Critical patent/CN106829739B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Method the present invention relates to a kind of utilization suspension bridge dismounting tower crane attached wall pull bar comprises the following steps:A, first making suspension bridge platform, by suspension bridge stage+module to tower crane jacking stock bottom;B, suspension bridge platform is transferred to attached wall frame bottom, one end is connected using 2 M24 high-strength bolts and standard section main string;C, suspension bridge one end is sling, by suspension bridge platform and standard knot into an angle of 90 degrees, locking steel wire rope;D, the platform that will be folded launch, and termination steel wire rope are fixed to the side of stock;E, peace are torn personnel station open and tower crane attached wall pull bar are dismantled on suspension bridge platform;After F, dismounting attached wall, folding platform is packed up, suspension bridge platform is hung and tower body parastate, unclamp suspension bridge platform and tower crane standard knot connecting bolt;Suspension bridge platform declines and lands with tower crane stock.The inventive method is simple, easy to use, is not take up space, security performance advantage high.

Description

A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar
Technical field
The present invention relates to a kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar.
Background technology
Tower crane is widely used in the large-scale construction work of the industries such as water conservancy and hydropower, metallurgy, oil, chemical industry, thermoelectricity, highway, bridge The construction of journey.The operation of tower crane, peace tear open to repair all needs work high above the ground, is high risk industries, and tower crane component weight is heavier, ordinary people Work cannot be moved, particularly column foot attached wall pull bar remove when, workman does not have foothold, there is certain potential safety hazard, it is necessary to Extra operation platform auxiliary of building is completed, very time-consuming laborious.
The content of the invention
In order to overcome the shortcomings of existing process technology, there is provided a kind of method is simple, easy to use, is not take up space, safety The method that performance utilization suspension bridge high dismantles tower crane attached wall pull bar.
The purpose of the present invention is achieved through the following technical solutions:A kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar, bag Include following steps:
A, first making suspension bridge platform, by suspension bridge stage+module to tower crane jacking stock bottom;
B, suspension bridge platform is transferred to attached wall frame bottom, one end is connected using 2 M24 high-strength bolts and standard section main string;
C, suspension bridge one end is sling, by suspension bridge platform and standard knot into an angle of 90 degrees, locking steel wire rope;
D, the platform that will be folded launch, and termination steel wire rope are fixed to the side of stock;
E, peace are torn personnel station open and tower crane attached wall pull bar are dismantled on suspension bridge platform;
After F, dismounting attached wall, folding platform is packed up, suspension bridge platform is hung and tower body parastate, unclamp suspension bridge platform and tower crane Standard knot connecting bolt;Suspension bridge platform declines and lands with tower crane stock.
The present invention has the characteristics that compared with prior art:
Method is simple, easy to use, is not take up space, and security performance is high.
Specific embodiment:
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, the implementation Example is only used for explaining the present invention, is not intended to limit the scope of the present invention..
A kind of specific embodiment of the method for utilization suspension bridge dismounting tower crane attached wall pull bar of the present invention:Comprise the following steps:
A, first making suspension bridge platform, by suspension bridge stage+module to tower crane jacking stock bottom;
B, suspension bridge platform is transferred to attached wall frame bottom, one end is connected using 2 M24 high-strength bolts and standard section main string;
C, suspension bridge one end is sling, by suspension bridge platform and standard knot into an angle of 90 degrees, locking steel wire rope;
D, the platform that will be folded launch, and termination steel wire rope are fixed to the side of stock;
E, peace are torn personnel station open and tower crane attached wall pull bar are dismantled on suspension bridge platform;
After F, dismounting attached wall, folding platform is packed up, suspension bridge platform is hung and tower body parastate, unclamp suspension bridge platform and tower crane Standard knot connecting bolt;Suspension bridge platform declines and lands with tower crane stock.
The inventive method is simple, easy to use, is not take up space, and security performance is high.
The another statement of applicant, the present invention illustrates implementation method of the invention and apparatus structure, but this by above-described embodiment Invention is not limited to above-mentioned implementation method, that is, do not mean that the present invention has to rely on the above method and structure and could implement.Institute Category those skilled in the art are it will be clearly understood that any improvement in the present invention, equivalent to implementation method selected by the present invention to replace Change and step addition, the selection of concrete mode etc., all fall within protection scope of the present invention and scope of disclosure.
The present invention is not limited to above-mentioned implementation method, it is all using and similar structure of the invention and its method realize the object of the invention All modes, within protection scope of the present invention.

Claims (2)

1. a kind of method that utilization suspension bridge dismantles tower crane attached wall pull bar, it is characterised in that:Comprise the following steps:
A, first making suspension bridge platform, by suspension bridge stage+module to tower crane jacking stock bottom;
B, suspension bridge platform is transferred to attached wall frame bottom, one end is connected using 2 M24 high-strength bolts and standard section main string;
C, suspension bridge one end is sling, by suspension bridge platform and standard knot into an angle of 90 degrees, locking steel wire rope;
D, the platform that will be folded launch, and termination steel wire rope are fixed to the side of stock;
E, peace are torn personnel station open and tower crane attached wall pull bar are dismantled on suspension bridge platform;
After F, dismounting attached wall, folding platform is packed up, suspension bridge platform is hung and tower body parastate, unclamp suspension bridge platform and tower crane Standard knot connecting bolt.
2. the method that a kind of utilization suspension bridge according to claim 1 dismantles tower crane attached wall pull bar, it is characterised in that:Suspension bridge is put down Platform declines and lands with tower crane stock.
CN201710117905.0A 2017-03-01 2017-03-01 A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge Active CN106829739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710117905.0A CN106829739B (en) 2017-03-01 2017-03-01 A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710117905.0A CN106829739B (en) 2017-03-01 2017-03-01 A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge

Publications (2)

Publication Number Publication Date
CN106829739A true CN106829739A (en) 2017-06-13
CN106829739B CN106829739B (en) 2017-12-29

Family

ID=59138382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710117905.0A Active CN106829739B (en) 2017-03-01 2017-03-01 A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge

Country Status (1)

Country Link
CN (1) CN106829739B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2772675A1 (en) * 2009-09-15 2011-03-24 Andresen Towers A/S Tubular building structure with hingedly connected platform segment
CN102583163A (en) * 2012-03-20 2012-07-18 西安市第四建筑工程公司 Steel wire rope symmetrically disassembling process flow for tower crane attachment device
US20130228397A1 (en) * 2012-03-02 2013-09-05 Tom D. Horn Wind tower maintenance platforms and techniques
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN204081434U (en) * 2014-07-18 2015-01-07 武汉天蝎建筑装备有限公司 A kind of opening and closing type suspension bridge frame
CN205114902U (en) * 2015-11-21 2016-03-30 广东庞源工程机械有限公司 Device of demolising that attaches wall pull rod of high void tower formula hoist

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2772675A1 (en) * 2009-09-15 2011-03-24 Andresen Towers A/S Tubular building structure with hingedly connected platform segment
US20130228397A1 (en) * 2012-03-02 2013-09-05 Tom D. Horn Wind tower maintenance platforms and techniques
CN102583163A (en) * 2012-03-20 2012-07-18 西安市第四建筑工程公司 Steel wire rope symmetrically disassembling process flow for tower crane attachment device
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN204081434U (en) * 2014-07-18 2015-01-07 武汉天蝎建筑装备有限公司 A kind of opening and closing type suspension bridge frame
CN205114902U (en) * 2015-11-21 2016-03-30 广东庞源工程机械有限公司 Device of demolising that attaches wall pull rod of high void tower formula hoist

Also Published As

Publication number Publication date
CN106829739B (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN102720448A (en) Device and method for connecting drill rod with three-joint unit
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN103711078A (en) Temporary girder-type support for bridge construction and dismantling method thereof
CN104326356A (en) Construction platform hanger with clear stress and adjustable hanging point
US12264045B2 (en) Construction system
CN102659017A (en) Steel column hoisting system
CN207863871U (en) A kind of derrick for repairing equipment for petroleum drilling
CN101016827A (en) 18 m hydraulic pressure rise and fall retractable drill tower
CN106829739B (en) A kind of method that tower crane attached wall pull bar is dismantled using suspension bridge
CN207728025U (en) A kind of safety climbing ladder for bridge construction
CN102556850A (en) Hoisting adjusting device and component hoisting method
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN207256100U (en) Back-up tong spanner fixes catching
CN208120600U (en) A kind of quick provision for disengagement of large size inside-climbing tower crane
CN106285517A (en) Oil-well rig sets up root system and method with double rat hole off-lines
CN104727228A (en) Telescopic landing leg device for tunnel bridge construction machine
CN206059992U (en) A kind of 10kV distribution box operating platforms with folding ladder
CN205932883U (en) Shaft construction cage
CN103979442A (en) Method for lifting Fischer-Tropsch reactor by 6400t hydraulic combined crane
CN201062431Y (en) Lifting device of cantilever scaffold
CN102733612A (en) Mounting method of electric hoist orbit
CN209723570U (en) Steel column docking installation operation platform
CN206156604U (en) Portal crane prevent wind fixed connection device
CN105480861A (en) Turnover lifting tool
CN207402705U (en) Sunpender Fast Installation spanner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant