CN106812265B - Roof skylight structure leakage treatment structure and construction method - Google Patents

Roof skylight structure leakage treatment structure and construction method Download PDF

Info

Publication number
CN106812265B
CN106812265B CN201710182848.4A CN201710182848A CN106812265B CN 106812265 B CN106812265 B CN 106812265B CN 201710182848 A CN201710182848 A CN 201710182848A CN 106812265 B CN106812265 B CN 106812265B
Authority
CN
China
Prior art keywords
roof
post
skylight
roof skylight
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710182848.4A
Other languages
Chinese (zh)
Other versions
CN106812265A (en
Inventor
轩元
管秀发
刘卉
曹华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Gongda Construction Technology Co ltd
Zhenjiang Construction Engineering Earthquake-Resistace And Safety Assessment Office
Original Assignee
Nanjing Gongda Construction Technology Co ltd
Zhenjiang Construction Engineering Earthquake-Resistace And Safety Assessment Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Gongda Construction Technology Co ltd, Zhenjiang Construction Engineering Earthquake-Resistace And Safety Assessment Office filed Critical Nanjing Gongda Construction Technology Co ltd
Priority to CN201710182848.4A priority Critical patent/CN106812265B/en
Publication of CN106812265A publication Critical patent/CN106812265A/en
Application granted granted Critical
Publication of CN106812265B publication Critical patent/CN106812265B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/03Sky-lights; Domes; Ventilating sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Abstract

The invention discloses a roof skylight structure leakage treatment structure and a construction method, wherein firstly, a roof surface protection layer, a waterproof layer and a heat insulation layer are chiseled to reach a base layer within the range of 10-20 cm around a roof skylight; roughening the base layer; cleaning a base layer, and coating cement-based infiltration crystallization; embedding reinforcing steel bars into the roof panel at the position of the chiseled section, and arranging distribution ribs; then, filling with hand-throwing early-strength impervious concrete, wherein the filling thickness is 10-12 cm, the top is closed by adopting a slope, and a post-pouring belt which is not less than 10cm is reserved at the joint of the new material and the old material of the roof; sticking water-swelling rubber water stop strips on the corresponding surfaces of the upper side and the lower side of the post-pouring strip away from the reinforcing steel bar; after the concrete is finally set, filling a plugging agent into the post-cast strip; and finally, capping with a capping material. The roof skylight has the advantages of reasonable design, low cost, convenience in construction, convenience in operation, structural reinforcement, long service life, resource saving, leakage risk reduction, high construction safety and capability of effectively solving the problem of leakage of the existing roof skylight.

Description

Roof skylight structure leakage treatment structure and construction method
Technical Field
The invention relates to the technical field of building waterproof leakage repair, in particular to a roof skylight structure leakage treatment structure and a construction method.
Background
At present, most of roof skylights adopt parallel skylights, the edge joint of the roof skylights is a big difficulty of waterproof construction, in recent years, the problem of leakage around the roof skylights is serious, and an anti-leakage structure is adopted for solving the leakage problem fundamentally and considering the safety and convenience of construction. The roof skylight needs to be very careful in the construction process, leakage is easy to cause if construction errors occur, and the requirements are difficult to meet in the current construction management; meanwhile, after the material is put into use, the spliced part is cracked due to the influence of temperature change, the durability of the material and other factors, so that leakage is caused; the leakage control of the roof skylight is always a problem which is difficult to completely solve in the engineering.
Disclosure of Invention
The invention aims to overcome the defects of the prior art by aiming at the water leakage phenomenon of a roof skylight, and provides a roof skylight structure leakage treatment structure and a construction method, which can treat the roof skylight leakage, reinforce the roof skylight structure, have strong adaptability and lower cost and are environment-friendly.
The technical scheme adopted by the invention is as follows: a roof skylight structure leakage treatment structure comprises hand-throwing early-strength anti-permeability concrete, implanted reinforcing steel bars, a roof skylight, a leakage plugging agent, a roof panel, a water-swelling rubber water stop strip, cement-based infiltration crystals and a capping material;
chiseling a surface protection layer, a waterproof layer and a heat insulation layer of the roof panel within a range of 10-20 cm around the roof skylight until a gap is formed on a structural base layer;
the bottom of the chiseled notch is coated with cement-based infiltration crystals, and embedded steel bars are arranged in the roof panel at the chiseled notch position and serve as distribution ribs; the periphery of the roof skylight is filled with hand-throwing early-strength anti-permeability concrete in the vertical direction, the filling thickness is 10-12 cm, the top of the roof skylight is closed by adopting a slope, a post-pouring belt is arranged at the joint of the lower part of the hand-throwing early-strength anti-permeability concrete and a new and old material of a roof, and the height of the post-pouring belt is not less than 10 cm; sticking water-swelling rubber water stop strips on the corresponding surfaces of the upper side and the lower side of the post-cast strip away from the reinforcing steel bar, and filling a plugging agent in the post-cast strip; and the roof skylight is capped by capping materials.
Preferably, distributed reinforcements are arranged in the roof panel in a reinforcing steel bar implanting mode, holes are drilled firstly, then glue is injected, and the depth of implanted reinforcing steel bars is not less than 20d (d is the diameter of the reinforcing steel bars), so that the integrity and the structural strength can be improved.
Preferably, the capping material is toughened glass, an open skylight or a buckled cement cover plate and the like, and can be selected according to different requirements.
The hand-throwing type early-strength anti-permeability concrete is filled in a manual hand-throwing mode, has the advantages of micro-swelling, early strength, anti-permeability, anti-aging, structural reinforcement, no need of a template, convenient construction, environmental protection and low slump constant and does not flow automatically, and the initial setting time and the final setting time can be adjusted according to the change of the admixture in the mixing ratio so as to meet the construction requirement.
A construction method of the roof skylight structure leakage treatment structure comprises the following steps:
1) chiseling the surface protection layer, the waterproof layer and the heat insulation layer of the roof panel within 10-20 cm of the periphery of the roof skylight until the structural base layer forms a gap;
2) roughening the structural base layer;
3) cleaning the structural base layer, and painting cement-based infiltration crystallization;
4) drilling holes on the roof panel, injecting glue, implanting reinforcing steel bars, arranging distribution ribs and improving the structural strength;
5) after the implanted steel bar colloid is cured, hand-throwing early-strength anti-permeability concrete is filled, the top is closed by a slope, the top is smooth, a post-pouring strip with the joint of new and old materials not less than 10cm is formed, and the hand-throwing early-strength anti-permeability concrete is convenient to construct and operate;
6) sticking water-swelling rubber water stop strips on the corresponding surfaces of the upper side and the lower side of the post-pouring strip, which are away from the reinforcing steel bar;
7) after the concrete is finally set, filling a plugging agent into the post-cast strip;
8) finally, capping with capping material; finally, the roof skylight is reinforced by embedding reinforcing steel bars and manually throwing early-strength impervious concrete, a post-cast strip at the joint of the new material and the old material is filled with cement-based permeable crystals, water-swelling rubber water-stop strips and plugging agents to block and prevent water, the top of the roof skylight is closed by a slope for drainage, and a capping material is used for capping.
Preferably, the hand-throwing type early-strength impervious concrete in the step 5) is filled in a semi-dry state by hand throwing, a formwork is not required to be supported, the mixing proportion is adjusted, the initial setting time is shortened, the hand-throwing type early-strength impervious concrete is pressed upwards along the reinforcing mesh, and the filling sequence is as follows: the whole area is filled and filled from the bottom to the top from two sides to the middle.
The water-swelling rubber water stop strip is adhered to the periphery of the chiseled part. The water-swelling rubber water stop rod generates 2-3 times of swelling deformation after meeting water, fills all irregular surfaces, cavities and gaps in the groove, generates huge contact pressure to prevent leakage, can eliminate the characteristic of elastic fatigue caused by excessive compression of general elastic materials, and is matched with a plugging agent and the like to form a plurality of waterproof layers.
Has the advantages that: compared with the prior art, the invention has the following advantages:
(1) the periphery of the roof skylight is blocked, so that the roof is prevented from flowing in parallel with a water source, and the roof skylight is green and environment-friendly, long in service life and high in safety;
(2) according to the invention, a method of embedding reinforcing steel bars and filling hand-throwing type early-strength anti-permeability concrete is adopted, so that the external periphery of the roof skylight is blocked, the structure is integrated, the construction is convenient, a formwork is not required, the reinforcement is realized, the adaptability is strong, and the cost is lower;
(3) the construction process is simple, the design is scientific and reasonable, the hand-throwing type early-strength anti-permeability concrete is formed in the final enclosure area to be matched with the reinforcing steel bar for reinforcement and water prevention, the grooves reserved on the periphery are waterproof by adopting cement-based permeation crystallization, water-swelling water-stopping rubber strips and plugging agents, the top is closed by adopting slopes for drainage, and the top is sealed by a capping material;
(4) the construction process adopts hand-falling type early-strength anti-permeability concrete filling, is convenient to construct, does not need formwork erecting, saves materials and is environment-friendly;
(5) the invention has the advantages of strong practicability, high safety, convenient construction and easy popularization.
Drawings
FIG. 1 is a front view of the structure of the present invention;
fig. 2 is a sectional view taken along line a-a of fig. 1.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
As shown in fig. 1-2, a roof skylight structure leakage management structure comprises hand-throwing early-strength anti-permeability concrete 1, implanted reinforcing steel bars 2, a roof skylight 3, a plugging agent 4, a roof panel 5, a water-swelling rubber water stop strip 6, cement-based infiltration crystals 7 and a capping material 8;
within the range of 10-20 cm around the roof skylight 3, chiseling a surface protection layer, a waterproof layer and a heat insulation layer of the roof panel 5 until reaching a structural base layer; the bottom of the chiseled notch is coated with cement-based permeable crystals 7, and implanted steel bars 2 are arranged in the roof panel 5 at the chiseled notch position and serve as distribution ribs; the periphery of the roof skylight 3 is filled with hand-throwing type early-strength anti-permeability concrete 1 in the vertical direction, the filling thickness is 10-12 cm, the top is closed by adopting a slope, and a post-pouring belt which is not less than 10cm is reserved at the joint of new and old materials of the roof; sticking water-swelling rubber water stop strips 6 on the corresponding surfaces of the upper side and the lower side of the post-pouring strip away from the reinforcing steel bar; after the concrete is finally set, filling a plugging agent 4 into the post-cast strip; and finally, capping by using a capping material 8, such as tempered glass, an open skylight or a buckled cement cover plate.
The mode of implanting the reinforcing steel bars 2 into the roof panel 5 is to arrange distribution ribs, firstly drill holes and then inject glue, wherein the depth of implanting the reinforcing steel bars 2 is not less than 20d (d is the diameter of the reinforcing steel bars), and the mode can improve the integrity and the structural strength.
A construction method of the roof skylight structure leakage treatment structure comprises the following steps:
1) and chiseling a surface protection layer, a waterproof layer and a heat insulation layer of the roof panel 5 to a structural base layer within a range of 5-10 cm around the roof skylight 3;
2) roughening the structural base layer;
3) cleaning the structural base layer, and coating a cement-based infiltration crystal 7;
4) the chiseling part drills holes in the roof panel 5, injects glue, implants the reinforcing steel bars 2, arranges distribution ribs and improves the structural strength;
5) after the implanted steel bar 2 colloid is cured, the hand-throwing early-strength anti-permeability concrete 1 is filled, the top is closed by a slope, the top is smooth, a post-pouring belt is formed at the joint of the new material and the old material, the joint of the new material and the old material is not less than 10cm, and the hand-throwing early-strength anti-permeability concrete is convenient to construct and convenient to operate; the impervious concrete of early strong of formula that falls into semi-dry state hand is thrown away and is filled, need not formwork, and the adjustment mix proportion shortens initial set time, and it is upwards to hold between the fingers the concrete along the reinforcing bar net with the hand, filling order: the lower part is arranged at the first, the upper part is arranged at the second, the two sides are arranged at the middle part, and the whole area is filled fully;
6) sticking water-swelling rubber water stop strips 6 on the corresponding surfaces of the upper side and the lower side of the post-pouring strip away from the reinforcing steel bars;
7) after the concrete is finally set, filling a plugging agent 4 into the post-cast strip;
8) finally, a capping material 8 is used for capping, such as toughened glass, an open skylight or a buckled cement cover plate; finally, the roof skylight is subjected to leakage repairing and reinforcement by adopting implanted reinforcing steel bars 2 and hand-throwing type early-strength anti-permeability concrete 1, a post-pouring belt at the joint of the new material and the old material is filled with cement-based permeable crystals 7, water-swelling rubber water stop bars 6 and a plugging agent 4 for plugging and waterproofing, the top of the roof skylight is subjected to slope closing for drainage, and a capping material 8 is used for capping.
The embodiments of the present invention are described in detail above with reference to the drawings, but the present invention is not limited to the described embodiments. It will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in the embodiments without departing from the spirit and scope of the invention.

Claims (2)

1. A construction method of a roof skylight structure leakage treatment structure comprises hand-throwing early-strength impervious concrete, implanted reinforcing steel bars, a roof skylight, a leakage plugging agent, a roof panel, a water-swelling rubber water stop strip, cement-based infiltration crystals and a capping material; chiseling a surface protection layer, a waterproof layer and a heat insulation layer of the roof panel within a range of 10-20 cm around the roof skylight until a gap is formed on a structural base layer; the bottom of the chiseled notch is coated with cement-based infiltration crystals, and embedded steel bars are arranged in the roof panel at the chiseled notch position and serve as distribution ribs; the periphery of the roof skylight is filled with hand-throwing early-strength anti-permeability concrete in the vertical direction, the filling thickness is 10-12 cm, the top of the roof skylight is closed by adopting a slope, a post-pouring belt is arranged at the joint of the lower part of the hand-throwing early-strength anti-permeability concrete and a new and old material of a roof, and the height of the post-pouring belt is not less than 10 cm; sticking water-swelling rubber water stop strips on the corresponding surfaces of the upper side and the lower side of the post-cast strip away from the reinforcing steel bar, and filling a plugging agent in the post-cast strip; the roof skylight is capped by capping materials;
the depth of the implanted reinforcing steel bar implanted into the roof panel is not less than 20d, and d is the diameter of the reinforcing steel bar;
the capping material adopts toughened glass, an open skylight or a buckled cement cover plate;
the construction method of the roof skylight structure leakage treatment structure comprises the following steps:
1) chiseling the surface protection layer, the waterproof layer and the heat insulation layer of the roof panel within 10-20 cm of the periphery of the roof skylight until the structural base layer forms a gap;
2) roughening the structural base layer;
3) cleaning the structural base layer, and painting cement-based infiltration crystallization;
4) drilling holes on the roof panel, injecting glue, implanting reinforcing steel bars, arranging distribution ribs and improving the structural strength;
5) after the implanted steel bar colloid is cured, filling the hand-throwing early-strength anti-permeability concrete, closing the top by adopting a slope, finishing and smoothing, and post-pouring the strip with the joint of the new material and the old material not less than 10 cm;
6) sticking water-swelling rubber water stop strips on the corresponding surfaces of the upper side and the lower side of the post-pouring strip, which are away from the reinforcing steel bar;
7) after the concrete is finally set, filling a plugging agent into the post-cast strip;
8) finally, capping with capping material; finally, the roof skylight is reinforced by embedding reinforcing steel bars and manually throwing early-strength impervious concrete, a post-cast strip at the joint of the new material and the old material is filled with cement-based permeable crystals, water-swelling rubber water-stop strips and plugging agents to block and prevent water, the top of the roof skylight is closed by a slope for drainage, and a capping material is used for capping.
2. The construction method of the roof skylight structure leakage treatment structure according to claim 1, characterized in that: the hand-throwing type early-strength impervious concrete in the step 5) is in a semi-dry state and is thrown and filled, a formwork is not required to be erected, the mix proportion is adjusted, the initial setting time is shortened, the hand-throwing type early-strength impervious concrete is pinched upwards along the reinforcing mesh, and the filling sequence is as follows: the whole area is filled and filled from the bottom to the top from two sides to the middle.
CN201710182848.4A 2017-03-24 2017-03-24 Roof skylight structure leakage treatment structure and construction method Active CN106812265B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710182848.4A CN106812265B (en) 2017-03-24 2017-03-24 Roof skylight structure leakage treatment structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710182848.4A CN106812265B (en) 2017-03-24 2017-03-24 Roof skylight structure leakage treatment structure and construction method

Publications (2)

Publication Number Publication Date
CN106812265A CN106812265A (en) 2017-06-09
CN106812265B true CN106812265B (en) 2022-04-29

Family

ID=59115881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710182848.4A Active CN106812265B (en) 2017-03-24 2017-03-24 Roof skylight structure leakage treatment structure and construction method

Country Status (1)

Country Link
CN (1) CN106812265B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708504B (en) * 2018-07-06 2024-04-02 中铁第四勘察设计院集团有限公司 Roof smoke-discharging skylight and buried structure thereof
CN110792235A (en) * 2018-08-03 2020-02-14 淮安市淮宁钢结构有限公司 Roof steel structure lighting skylight construction method
CN109138284A (en) * 2018-09-30 2019-01-04 田间 A kind of precast prestressed T plate and preparation method thereof with skylight
CN113529693B (en) * 2021-06-03 2023-02-03 中建一局集团建设发展有限公司 Construction method for penetrating pipeline through cutter-suction type corner amplitude diaphragm wall
CN113738066B (en) * 2021-08-24 2022-05-24 北京城建六建设集团有限公司 Construction method of special-shaped combined patio structure for top of movable chamber of wind and rain playground

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6672020B1 (en) * 2002-03-15 2004-01-06 The Bilco Company Universal roof scuttle
CN102979303A (en) * 2012-12-07 2013-03-20 中国十七冶集团有限公司 Plugging and leakage-proof construction method of kitchen and toilet flue and water supply and drainage pipeline edge
CN203475769U (en) * 2013-08-13 2014-03-12 叶香雄 Roof discharge flue structure
CN204299054U (en) * 2014-11-27 2015-04-29 中国电建集团贵阳勘测设计研究院有限公司 A kind of femerell formula hole protection against leakage structure
CN106480993A (en) * 2016-12-08 2017-03-08 东南大学 Administration structure and construction method in a kind of exterior wall mending-leakage reinforcement of construction
CN206752868U (en) * 2017-03-24 2017-12-15 镇江市建设工程抗震和安全鉴定办公室 A kind of femerell constructs treating seepage structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9151057B2 (en) * 2013-11-05 2015-10-06 Standard Sheet metal, Inc. Roof curb

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6672020B1 (en) * 2002-03-15 2004-01-06 The Bilco Company Universal roof scuttle
CN102979303A (en) * 2012-12-07 2013-03-20 中国十七冶集团有限公司 Plugging and leakage-proof construction method of kitchen and toilet flue and water supply and drainage pipeline edge
CN203475769U (en) * 2013-08-13 2014-03-12 叶香雄 Roof discharge flue structure
CN204299054U (en) * 2014-11-27 2015-04-29 中国电建集团贵阳勘测设计研究院有限公司 A kind of femerell formula hole protection against leakage structure
CN106480993A (en) * 2016-12-08 2017-03-08 东南大学 Administration structure and construction method in a kind of exterior wall mending-leakage reinforcement of construction
CN206752868U (en) * 2017-03-24 2017-12-15 镇江市建设工程抗震和安全鉴定办公室 A kind of femerell constructs treating seepage structure

Also Published As

Publication number Publication date
CN106812265A (en) 2017-06-09

Similar Documents

Publication Publication Date Title
CN106812265B (en) Roof skylight structure leakage treatment structure and construction method
CN103233520B (en) Self-waterproof construction method of building external wall structure
CN108252530B (en) Parapet leakage water repairing process
CN106284425B (en) Basement in high rise building roof deformation stitches water proof structure construction method
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN108374566B (en) Repairing process for leakage water on back water surface
CN208203305U (en) A kind of tunnel-liner is reinforced and leakage water cure combined type construction
CN111877596B (en) Miscellaneous-masonry antique wall structure and construction method thereof
KR101958451B1 (en) Underground outside waterproofing method of concrete structure
CN205117073U (en) A anti anti -percolator that splits for building outer windowsill position
CN108049651B (en) Concrete crack plugging method
CN203977368U (en) Pressure-bearing reinforced concrete structure leakage repair device
CN210341998U (en) Novel post-cast strip structure
KR102387546B1 (en) Waterpoof method of widow frame and outer wall
CN104863273B (en) The method and construction of a kind of use strength cement-based grouting material sealing wall splicing seams
CN207812699U (en) A kind of waterproof construction on toilet doorway
CN109778916A (en) A kind of poured band of outer wall of basement Antiseep method based on water resistant plate
CN110607921B (en) Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure
CN110552546B (en) Method for building underground parking lot waterproof facility by using tower crane
CN113089648A (en) Waterproof construction method for newly-built outer wall of old basement in limited space
CN113356887A (en) Single-layer well wall with grouting water-stopping connecting piece and construction method thereof
CN114197915B (en) Minimally invasive self-healing waterproof method for roof
CN217998198U (en) Prefabricated assembled concrete underground structure waterproof system
CN114059796B (en) Repair structure and repair method for brick masonry parapet
CN212926759U (en) Waterproof structure of prefabricated parapet joint department of assembled

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant