CN106801425A - 围堰吸泥下沉方法 - Google Patents

围堰吸泥下沉方法 Download PDF

Info

Publication number
CN106801425A
CN106801425A CN201710067895.4A CN201710067895A CN106801425A CN 106801425 A CN106801425 A CN 106801425A CN 201710067895 A CN201710067895 A CN 201710067895A CN 106801425 A CN106801425 A CN 106801425A
Authority
CN
China
Prior art keywords
cofferdam
mud
sinking
inhaled
during
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710067895.4A
Other languages
English (en)
Inventor
刘海涛
张强
张义君
梅人俊
吴胜红
周川岭
周琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN201710067895.4A priority Critical patent/CN106801425A/zh
Publication of CN106801425A publication Critical patent/CN106801425A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Abstract

本发明公开了一种围堰吸泥下沉方法,采用空气吸泥机吸泥,在吸泥的过程中向吸泥口处高压射水,在吸泥的过程中,基坑内的围堰逐渐下沉;在围堰下沉的过程中根据围堰位移和倾斜情况调整空气吸泥机在基坑内的吸泥位置,以保证围堰在允许范围内稳定的下沉;在吸泥过程中时刻观察围堰内、外水位差,并随时补水,保证水位差足够小,避免大的翻砂;随着围堰入水深度的增加,适当调整围堰的拉缆受力状态,使围堰始终保持垂直;在围堰下沉过程中,安排潜水员对围堰刃脚的土质情况进行监测,如遇孤石或岩层地质,则进行局部水下松动爆破;在围堰下沉到位后,解除围堰上的拉缆。与现有技术相比,本发明方法能够加快围堰下沉施工进度,整体上节约了施工成本。

Description

围堰吸泥下沉方法
技术领域
本发明涉及桥梁建造技术领域,具体为一种围堰吸泥下沉方法。
背景技术
随着中国桥梁建设事业的蓬勃发展,许多水下基础施工问题也变的越来越重要。伴着科学技术的发展和施工经验的不断积累,水下基础的施工技术也在不断发展着,从沉井、沉箱技术到桩基础、管柱基础、钢板桩围堰技术的应用等,后来又出现的双承台钢管桩基础等,这些技术都相应的解决了一些水下基础施工的一些问题,而桥梁基础双壁钢围堰施工技术作为水下施工的一种新技术,在近些年得到了迅速的发展,现有的围堰吸泥下沉技术进度仍然较慢,以至于施工成本较高。
发明内容
本发明的目的就在于为了解决上述问题而提供一种双壁钢围堰吸泥下沉方法。
本发明通过以下技术方案来实现上述目的:
一种围堰吸泥下沉方法,包括以下步骤:
1)采用空气吸泥机吸泥,空气吸泥机的吸泥口位于基坑内,在吸泥的过程中向吸泥口处高压射水,在吸泥的过程中,基坑内的围堰逐渐下沉;
2)在围堰下沉的过程中根据围堰位移和倾斜情况调整空气吸泥机在基坑内的吸泥位置,以保证围堰在允许范围内稳定的下沉;
3)在吸泥过程中时刻观察围堰内、外水位差,并随时补水,保证水位差足够小,避免大的翻砂;
4)随着围堰入水深度的增加,适当调整围堰的拉缆受力状态,使围堰始终保持垂直;
5)在围堰下沉过程中,安排潜水员对围堰刃脚的土质情况进行监测,如遇孤石或岩层地质,则进行局部水下松动爆破;
6)在围堰下沉到位后,解除围堰上的拉缆。
进一步地,在对孤石或岩层地质进行爆破前,应将围堰内的水向外抽出一部分,使围堰上浮一定距离,减小爆破对围堰的影响。
本发明的有益效果在于:
与现有技术相比,本发明方法能够加快围堰下沉施工进度,整体上节约了施工成本。
具体实施方式
下面对本发明作进一步说明:
实施例:
金沙江某处河床底为卵石土和粉沙质粘土,金沙江水流湍急,基坑开挖后,再围堰拼装过程,基坑中有部分回流沉淀层出现,导致基坑深度不够,围堰着床后需采用吸泥法进行局部清理基坑底部,确保围堰下沉到设计标高。
采用空气吸泥机将基坑内的泥吸出,在吸泥的过程中,向空气吸泥机的吸泥管口高压射水,基坑内的围堰逐渐下沉;
在围堰下沉的过程中,围堰多次发生倾斜,在多次调整基坑内的吸泥位置后,围堰在允许速度范围内稳定下沉;
通过补水连通器向围堰内自流补水,从而围堰内、外水位差值始终在允许范围内,整个过程中没有出现大的翻砂;
在围堰入水深度增加的过程中,多次对围堰的拉缆受力状态进行了适当调整,围堰一直保持垂直下沉;
在围堰下沉过程中,我们安排了潜水员对围堰刃脚的土质情况进行实时监测,发现了孤石和岩层地质,之后将围堰内的水向外抽出一部分,使围堰上浮了一定距离,然后进行局部水下松动爆破,再爆破过程中围堰基本没有受到影响;
在围堰下沉到位后,解除了围堰上的拉缆。
在围堰吸泥下沉的过程中所采用到硬件设备规格如下:
空气吸泥机的吸泥管采用Φ219mm钢管制作,吸泥机采用了4台离心泵吸泥,吸泥管端部设有高压水管和供气管,配备了一台20m3/min的空压机供气,高压水管选用Φ60mm*3.5mm的钢管,围堰壁水面下设置2个Φ600mm补水连通器进行自流补水。
以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围内。

Claims (2)

1.一种围堰吸泥下沉方法,其特征在于,包括以下步骤:
1)采用空气吸泥机吸泥,空气吸泥机的吸泥口位于基坑内,在吸泥的过程中向吸泥口处高压射水,在吸泥的过程中,基坑内的围堰逐渐下沉;
2)在围堰下沉的过程中根据围堰位移和倾斜情况调整空气吸泥机在基坑内的吸泥位置,以保证围堰在允许范围内稳定的下沉;
3)在吸泥过程中时刻观察围堰内、外水位差,并随时补水,保证水位差足够小,避免大的翻砂;
4)随着围堰入水深度的增加,适当调整围堰的拉缆受力状态,使围堰始终保持垂直;
5)在围堰下沉过程中,安排潜水员对围堰刃脚的土质情况进行监测,如遇孤石或岩层地质,则进行局部水下松动爆破;
6)在围堰下沉到位后,解除围堰上的拉缆。
2.根据权利要求1所述围堰吸泥下沉方法,其特征在于:在对孤石或岩层地质进行爆破前,应将围堰内的水向外抽出一部分,使围堰上浮一定距离,减小爆破对围堰的影响。
CN201710067895.4A 2017-02-07 2017-02-07 围堰吸泥下沉方法 Pending CN106801425A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710067895.4A CN106801425A (zh) 2017-02-07 2017-02-07 围堰吸泥下沉方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710067895.4A CN106801425A (zh) 2017-02-07 2017-02-07 围堰吸泥下沉方法

Publications (1)

Publication Number Publication Date
CN106801425A true CN106801425A (zh) 2017-06-06

Family

ID=58987491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710067895.4A Pending CN106801425A (zh) 2017-02-07 2017-02-07 围堰吸泥下沉方法

Country Status (1)

Country Link
CN (1) CN106801425A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605430A (zh) * 2021-08-24 2021-11-05 中国建筑第二工程局有限公司 一种利用连通器的沉箱施工结构及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018229A (ja) * 1996-06-28 1998-01-20 Fujita Corp 既設水中構造物の水域仮締切り施工法
CN101003974A (zh) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 大型深水沉井基础施工方法
CN101994319A (zh) * 2010-05-06 2011-03-30 中交第二公路工程局有限公司 一种陆地超大规模沉井下沉施工方法
CN106088125A (zh) * 2016-06-06 2016-11-09 中铁大桥局集团有限公司 沉井的刃脚正下方土体水下爆破取土装置及其方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018229A (ja) * 1996-06-28 1998-01-20 Fujita Corp 既設水中構造物の水域仮締切り施工法
CN101003974A (zh) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 大型深水沉井基础施工方法
CN101994319A (zh) * 2010-05-06 2011-03-30 中交第二公路工程局有限公司 一种陆地超大规模沉井下沉施工方法
CN106088125A (zh) * 2016-06-06 2016-11-09 中铁大桥局集团有限公司 沉井的刃脚正下方土体水下爆破取土装置及其方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605430A (zh) * 2021-08-24 2021-11-05 中国建筑第二工程局有限公司 一种利用连通器的沉箱施工结构及其施工方法
CN113605430B (zh) * 2021-08-24 2022-05-24 中国建筑第二工程局有限公司 一种利用连通器的沉箱施工结构及其施工方法

Similar Documents

Publication Publication Date Title
CN102094425B (zh) 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法
CN104805854B (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN104846787B (zh) 一种采用绞吸式挖泥船进行浅海区域吹砂填海造陆施工方法
CN102644293B (zh) 桩基桶形基础的施工方法
CN210086275U (zh) 一种双壁中空沉井基础
CN102561404B (zh) 一种型钢混凝土柱式接头及采用该接头的地下连续墙的施工方法
CN107700511A (zh) 一种高地下水位条件下沉井及其施工方法
CN107905221A (zh) 一种精确定位冲击钻孔灌注桩的方法
CN107023026A (zh) 一种封底式沉井井壁及施工方法
CN109385992A (zh) 在人工填石层中成孔的施工方法
CN104314092A (zh) 一种置换法沉井施工方法
CN105714748A (zh) 一种碎石沙土层中的调压井开挖施工方法
CN106088126A (zh) 一种沉井纠偏施工方法
CN103643690A (zh) 一种深基坑勘探孔涌水处理方法
JP5787834B2 (ja) 取放水路の構造と構築方法
CN104711968A (zh) 一种负压立体导流扰动冲击固结吹填土方法
CN106801425A (zh) 围堰吸泥下沉方法
CN203213131U (zh) 一种排水下沉与不排水下沉相结合的沉井
CN104727325B (zh) 一种海涂围垦用海堤的建造方法
CN205000251U (zh) 一种单桩独柱墩河道浅水中全埋置圆形承台施工结构
CN105155421B (zh) 一种单桩独柱墩河道浅水中全埋置圆形承台施工方法
CN108411934B (zh) 浮式管桩、堤坝挡土结构及其施工方法
CN107165121B (zh) 浅插式钢圆筒护岸结构施工方法
CN112627212B (zh) 一种临水围堰内管井降水法干挖施工方法
CN113668587A (zh) 一种适用于富水地层深大沉井开挖及压沉施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170606

RJ01 Rejection of invention patent application after publication