CN106771428A - Do not have a power failure the method for changing single-phase electric energy meter - Google Patents

Do not have a power failure the method for changing single-phase electric energy meter Download PDF

Info

Publication number
CN106771428A
CN106771428A CN201611225090.XA CN201611225090A CN106771428A CN 106771428 A CN106771428 A CN 106771428A CN 201611225090 A CN201611225090 A CN 201611225090A CN 106771428 A CN106771428 A CN 106771428A
Authority
CN
China
Prior art keywords
electric energy
energy meter
plug
short
power failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611225090.XA
Other languages
Chinese (zh)
Inventor
刘洪儒
谢树聪
王德麟
陈利民
陈荣会
孙宏宇
陈伟
吴敏华
汤海侠
金亮光
温群
周步盛
周小杰
吴郑河
施亦治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Pingyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Pingyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201611225090.XA priority Critical patent/CN106771428A/en
Publication of CN106771428A publication Critical patent/CN106771428A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Details Of Connecting Devices For Male And Female Coupling (AREA)

Abstract

本发明提供了不停电更换单相电能表的方法,属于电力设备领域,包括:如果安装在单相电能表接插件上的待更换电能表的运行状态正常,使用短路组件依次连接待更换电能表的零线和火线;依次断开待更换电能表的进线和出线,取下待更换电能表;将待安装电能表安装在单相电能表接插件上;依次移除连接在火线和零线上的短路组件,抄录待更换电能表的历史数据和短路电量计量电能表的数据,然后将短路电量计量电能表的数据清零。通过使用单相电能表接插件与短路组件,使得在更换电能表时可以将待更换的单相电能表进行短路,从而在不停电的基础上完成单相电能表的更换,提升了使用体验。

The invention provides a method for replacing a single-phase electric energy meter without power failure, belonging to the field of electric equipment, including: if the operating state of the electric energy meter to be replaced installed on the connector of the single-phase electric energy meter is normal, using a short-circuit component to sequentially connect the electric energy meter to be replaced Disconnect the incoming and outgoing wires of the electric energy meter to be replaced in turn, and remove the electric energy meter to be replaced; install the electric energy meter to be installed on the connector of the single-phase electric energy meter; remove the live wire and neutral wire in turn The short-circuit component on the board, copy the historical data of the electric energy meter to be replaced and the data of the short-circuit electric energy meter, and then clear the data of the short-circuit electric energy meter. By using the single-phase electric energy meter connector and the short-circuit component, the single-phase electric energy meter to be replaced can be short-circuited when replacing the electric energy meter, thereby completing the replacement of the single-phase electric energy meter on the basis of no power failure, and improving the user experience.

Description

不停电更换单相电能表的方法The Method of Replacing Single-phase Electric Energy Meter Without Power Off

技术领域technical field

本发明属于电力设备领域,特别涉及不停电更换单相电能表的方法。The invention belongs to the field of electric equipment, in particular to a method for replacing a single-phase electric energy meter without power failure.

背景技术Background technique

随着经济的发展,电能表的安装量在逐年增加。以某县供电公司为例,共有运行单相电能表385954只,每六年轮换一次,每年周期轮换单相电能表64325只;单相电能表故障率较高,约为3%左右,每年需更换故障单相电能表11587只;同时,每年执行分时电价、费用等需更换单相电能表约2000只。综上所诉,该公司每年累计更换单相电能表约78119只,换表数量巨大。With the development of the economy, the installation of electric energy meters is increasing year by year. Taking a county power supply company as an example, there are a total of 385,954 single-phase electric energy meters in operation, which are rotated every six years, and 64,325 single-phase electric energy meters are rotated every year; the failure rate of single-phase electric energy meters is relatively high, about 3%. Replacement of 11,587 faulty single-phase electric energy meters; at the same time, about 2,000 single-phase electric energy meters need to be replaced every year to implement time-of-use electricity prices and fees. To sum up, the company replaces about 78,119 single-phase electric energy meters every year, which is a huge number.

目前,现场换表采用“先断开进线开关,再更换电能表”作业模式,以四表位计量箱更换其中三只电能表为例,更换一只电能表需10分钟,更换三只电能表造成四户用户停电30分钟,停电时间较长,且造成了未换表用户的停电。因此单相电能表更换造成了大量用户较长时间的停电。在广大电力用户对供电可靠性要求越来越高的大背景下,换表停电已经严重影响了供电服务质量,甚至导致用户电气设备烧毁,造成投诉,因此实现不停电换表已经迫在眉睫。At present, the on-site meter replacement adopts the operation mode of "disconnect the incoming line switch first, and then replace the electric energy meter". Taking the four-meter metering box to replace three of the electric energy meters as an example, it takes 10 minutes to replace one electric energy meter, and three electric energy meters are replaced. The meter caused a 30-minute power outage for four households, which lasted for a long time, and caused a power outage for users who had not changed their meters. Therefore, the replacement of single-phase watt-hour meters has caused a large number of users to have a power outage for a long time. Under the background that the vast majority of power users have higher and higher requirements on the reliability of power supply, the outage of meter replacement has seriously affected the quality of power supply service, and even caused the burning of electrical equipment of users, resulting in complaints. Therefore, it is imminent to realize meter replacement without power failure.

发明内容Contents of the invention

为了解决现有技术中存在的缺点和不足,本发明提供了用于提高使用体验的不停电更换单相电能表的方法。In order to solve the shortcomings and deficiencies in the prior art, the present invention provides a method for replacing a single-phase electric energy meter without power failure for improving user experience.

为了达到上述技术目的,本发明提供了不停电更换单相电能表的方法,所述单相电能表安装在单相电能表接插件上,接插件上设有防窃电的翻转盖板,所述方法包括:In order to achieve the above-mentioned technical purpose, the present invention provides a method for replacing a single-phase electric energy meter without power failure. The methods described include:

对安装在单相电能表接插件上的待更换电能表的运行状态进行检查,如果运行状态正常,使用短路组件依次连待更换电能表的零线和火线;Check the running state of the electric energy meter to be replaced installed on the connector of the single-phase electric energy meter. If the operating state is normal, use the short-circuit component to connect the neutral wire and live wire of the electric energy meter to be replaced in sequence;

依次断开待更换电能表的进线和出线,取下待更换电能表;Disconnect the incoming and outgoing wires of the electric energy meter to be replaced in turn, and remove the electric energy meter to be replaced;

将待安装电能表安装在单相电能表接插件上;Install the watt-hour meter to be installed on the single-phase watt-hour meter connector;

依次移除连接在火线和零线上的短路组件,抄录待更换电能表的历史数据和短路电量计量电能表的数据,然后将短路电量计量电能表的数据清零。Remove the short-circuit components connected to the live wire and the neutral wire in turn, copy the historical data of the electric energy meter to be replaced and the data of the short-circuit electric energy meter, and then clear the data of the short-circuit electric energy meter electric energy meter.

可选的,所述电能表接插件包括:Optionally, the electric energy meter connector includes:

插头,以及与插头配合的底座;所述插头包括接线孔、接线柱和短路孔,在所述接线孔与进出导线采用间隙式配合,所述接线柱与电能表采用间隙式配合;A plug, and a base mated with the plug; the plug includes a wiring hole, a binding post and a short-circuit hole, and the wiring hole and the incoming and outgoing wires adopt a clearance fit, and the binding post and the electric energy meter adopt a clearance fit;

在支撑件的一端设有电能表收纳部,所述电能表收纳部包括设置在所述支撑件边缘的第一挡板和第二挡板,在所述第一挡板和所述第二挡板之间设有用于固定所述插头的固定槽;One end of the support is provided with an electric energy meter accommodating part, and the electric energy meter accommodating part includes a first baffle and a second baffle arranged on the edge of the support, and the first baffle and the second baffle Fixing grooves for fixing the plugs are provided between the plates;

其中,在所述插头上设有两个通孔,在所述固定槽上设有与所述通孔对应的固定孔。Wherein, two through holes are arranged on the plug, and fixing holes corresponding to the through holes are arranged on the fixing groove.

可选的,在所述第一挡板上设有第一凸起,在所述第二挡板上设有第二凸起,所述第一凸起与所述第二凸起呈圆柱形;在所述第一凸起和所述第二凸起上设有可拆卸的翻转盖板;在所述支撑件上设有与所述翻转盖板对应的阻挡块。Optionally, a first protrusion is provided on the first baffle, a second protrusion is provided on the second baffle, and the first protrusion and the second protrusion are cylindrical ; A detachable overturn cover is provided on the first protrusion and the second protrusion; a blocking block corresponding to the overturn cover is provided on the support.

可选的,在所述翻转盖板表面上设有用于黏贴客户户号标签的凹槽。Optionally, a groove for pasting a customer number label is provided on the surface of the flip cover.

可选的,在所述支撑件上设有至少四个固定M5螺钉孔。Optionally, at least four fixing M5 screw holes are provided on the support member.

可选的,所述短路组件包括拔插件、连接导线以及计量短路电量电能表,所述拔插件包括香蕉插头,以及与所述香蕉插头连接的导线连接件;Optionally, the short-circuit assembly includes a plug-in, a connecting wire, and an electric energy meter for measuring short-circuit electricity, and the plug-in includes a banana plug, and a wire connector connected to the banana plug;

在所述香蕉插头的前部设有轴向沟槽,在所述香蕉插头的尾部设有旋紧区域,在所述旋紧区域的端面上设有凸起;在所述导线连接件的前端设有固定平面,在所述固定平面上设有用于所述凸起穿过的固定孔,所述固定孔与所述凸起采用硬压接配合;An axial groove is arranged at the front of the banana plug, a tightening area is provided at the tail of the banana plug, and a protrusion is provided on the end face of the tightening area; at the front end of the wire connector A fixing plane is provided, and a fixing hole for the protrusion to pass is arranged on the fixing plane, and the fixing hole and the protrusion adopt a hard crimp fit;

在所述导线连接件的后端面设有用于连接导线焊接固定的接线孔。A wiring hole for connecting wires to be welded and fixed is provided on the rear end surface of the wire connector.

可选的,所述前部的横截面为圆形,所述后部的横截面为正N边形,N≥4。Optionally, the cross-section of the front part is circular, and the cross-section of the rear part is a regular N-gon, where N≥4.

可选的,所述前部包括具有第一截面直径的第一柱体,以及具有第二截面直径的第二柱体,所述第一截面直径大于所述第二截面直径。Optionally, the front portion includes a first cylinder with a first cross-sectional diameter, and a second cylinder with a second cross-sectional diameter, and the first cross-sectional diameter is larger than the second cross-sectional diameter.

可选的,所述轴向沟槽为截面呈十字形的沟槽,所述沟槽的开槽宽度至少为0.5mm。Optionally, the axial groove is a cross-section groove, and the groove width of the groove is at least 0.5 mm.

本发明提供的技术方案带来的有益效果是:The beneficial effects brought by the technical scheme provided by the invention are:

通过使用单相电能表接插件与短路组件,使得在更换电能表时可以将待更换的电能表进行短路,从而在不停电的基础上完成电能表的更换,从而提升了使用体验。By using the single-phase electric energy meter connector and the short-circuit component, the electric energy meter to be replaced can be short-circuited when the electric energy meter is replaced, so that the electric energy meter can be replaced without power failure, thereby improving the user experience.

附图说明Description of drawings

为了更清楚地说明本发明的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solution of the present invention more clearly, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. Ordinary technicians can also obtain other drawings based on these drawings on the premise of not paying creative work.

图1是本发明提供的不停电更换单相电能表的方法的流程示意图;Fig. 1 is the schematic flow chart of the method for replacing single-phase electric energy meter without power failure provided by the present invention;

图2是本发明提供的不停电更换单相电能表的连接关系示意图;Fig. 2 is a schematic diagram of the connection relationship of replacing a single-phase watt-hour meter provided by the present invention;

图3是本发明提供的插头的具体结构示意图;Fig. 3 is a specific structural schematic diagram of the plug provided by the present invention;

图4是本发明提供的底座的结构示意图;Fig. 4 is a schematic structural view of the base provided by the present invention;

图5是本发明提供的翻转盖板的结构示意图;Fig. 5 is a schematic structural view of the flip cover provided by the present invention;

图6是本发明提供的插头、翻转盖板及保护套安装到底座上的效果示意图;Fig. 6 is a schematic diagram of the installation of the plug, flip cover and protective cover provided by the present invention on the base;

图7是本发明提供的拔插件中香蕉插头的结构示意图;Fig. 7 is the structural representation of the banana plug in the plug-in plug provided by the present invention;

图8是本发明提供的拔插件中导线连接件的结构示意图;Fig. 8 is a schematic structural view of the wire connector in the plug-in plug provided by the present invention;

图9是本发明提供的拔插件的结构示意图;Fig. 9 is a schematic structural view of the plug-in plug provided by the present invention;

图10是本发明提供的带有绝缘部分的拔插件的结构示意图;Fig. 10 is a schematic structural view of a plug-in with an insulating part provided by the present invention;

图11是本发明提供的进行不带电更换电能表是的连接关系示意图。Fig. 11 is a schematic diagram of the connection relationship for replacing the electric energy meter provided by the present invention.

具体实施方式detailed description

为使本发明的结构和优点更加清楚,下面将结合附图对本发明的结构作进一步地描述。In order to make the structure and advantages of the present invention clearer, the structure of the present invention will be further described below in conjunction with the accompanying drawings.

实施例一Embodiment one

本发明提供了不停电更换单相电能表的方法,所述单相电能表安装在接插件上,接插件上设有防窃电的翻转盖板,如图1所示,所述方法包括:The present invention provides a method for replacing a single-phase electric energy meter without power failure. The single-phase electric energy meter is installed on a connector, and the connector is provided with an anti-stealing flip cover, as shown in Figure 1. The method includes:

11、对安装在单相电能表接插件上的待更换电能表的运行状态进行检查,如果运行状态正常,使用短路组件依次连待更换电能表的零线和火线;11. Check the running state of the electric energy meter to be replaced installed on the connector of the single-phase electric energy meter. If the operating state is normal, use the short-circuit component to connect the zero line and live wire of the electric energy meter to be replaced in turn;

12、依次断开待更换电能表的进线和出线,取下待更换电能表;12. Disconnect the incoming and outgoing lines of the electric energy meter to be replaced in turn, and remove the electric energy meter to be replaced;

13、将待安装电能表安装在单相电能表接插件上;13. Install the electric energy meter to be installed on the single-phase electric energy meter connector;

14、依次移除连接在火线和零线上的短路组件,抄录待更换电能表的历史数据和短路电量计量电能表的数据,然后将短路电量计量电能表的数据清零。14. Remove the short-circuit components connected to the live wire and the neutral wire in turn, copy the historical data of the electric energy meter to be replaced and the data of the short-circuit electric energy meter, and then clear the data of the short-circuit electric energy meter.

在实施中,短路组件中设有短路电量计量电能表,从而使得待更换电能表处于短路时,短路电量计量电能表能够获取该段时间内原本应该流经待更换电能表的电量,从而在电能表更换期间,实现了不停电以及电量计量的效果,更换现场的连接关系示意图如图2所示,图2中左侧为待更换电能表,右侧为短路电量计量电能表。具体的在实际操作时的步骤如下:In practice, the short-circuit component is provided with a short-circuit electric energy meter, so that when the electric energy meter to be replaced is short-circuited, the short-circuit electric energy meter can obtain the amount of electricity that should have flowed through the electric energy meter to be replaced during this period, so that the electric energy During the meter replacement, the effect of non-stop power supply and electricity metering is realized. The connection diagram of the replacement site is shown in Figure 2. The left side of Figure 2 is the electric energy meter to be replaced, and the right side is the short-circuit electric energy metering electric energy meter. The specific steps in actual operation are as follows:

a)拆除计量箱及电能表封印,用移动作业平台将拆除封印信息录入营销系统;a) Remove the metering box and the seal of the electric energy meter, and use the mobile operation platform to input the information of the removed seal into the marketing system;

b)打开电能表表尾盖及单相电能表接插件翻转盖板,检查接线是否正确,待更换电能表运行状态是否有正常;b) Open the tail cover of the electric energy meter and the flip cover of the single-phase electric energy meter connector, check whether the wiring is correct, and whether the operating state of the electric energy meter to be replaced is normal;

c)确认短路组件电能表已清零,确认短路组件接线正确;c) Confirm that the electric energy meter of the short-circuit component has been cleared, and confirm that the short-circuit component is connected correctly;

d)按照“先零线后火线”的原则,使用短路组件短接被换电能表,短路组件与单相电能表接插件的具体连接顺序为“4‐3‐2‐1”,同时观察两只电能表电流变化,确认短路组件接触良好;d) According to the principle of "neutral wire first, then live wire", use the short-circuit component to short-circuit the replaced electric energy meter. Only the electric energy meter current changes, confirm that the short-circuit components are in good contact;

e)断开待更换电能表的进行,使用移动作业平台抄读待更换电能表止度,再断开出线(留有电源,防止待更换电能表电池故障无法红外抄录);e) Disconnect the electric energy meter to be replaced, use the mobile operation platform to read the reading of the electric energy meter to be replaced, and then disconnect the outgoing line (keep the power supply to prevent the battery failure of the electric energy meter to be replaced and cannot be recorded by infrared);

f)取下要待更换电能表,安装待安装电能表,同时利用移动作业平台将电能表拆装信息录入营销系统;f) Remove the electric energy meter to be replaced, install the electric energy meter to be installed, and use the mobile operation platform to input the disassembly and assembly information of the electric energy meter into the marketing system;

g)按照“先火线后零线”的原则,拆除短路组件,短路组件与单相电能表接插件的具体拆除顺序为“1‐2‐3‐4”,同时观察待安装电能表电流,确认待安装电能表安装良好;g) According to the principle of "fire wire first, then neutral wire", remove the short-circuit components. The specific removal sequence of the short-circuit components and single-phase electric energy meter connectors is "1-2-3-4". At the same time, observe the current of the electric energy meter to be installed and confirm The electric energy meter to be installed is installed well;

h)检查接线是否正确,待安装电能表运行是否正常;h) Check whether the wiring is correct and whether the electric energy meter to be installed is operating normally;

i)长按短路电量计量电能表按键3秒钟,记录当前电量及清理时刻,用移动作业平台将短路电量及清理时刻录入营销系统;i) Press and hold the short-circuit power meter button for 3 seconds to record the current power and cleaning time, and use the mobile operating platform to enter the short-circuit power and cleaning time into the marketing system;

j)对电能表、计量箱施封,并用移动作业平台拆将施封信息录入营销系统;j) Seal the electric energy meter and metering box, and use the mobile operation platform to dismantle and enter the sealing information into the marketing system;

为了实现上述方法,本发明提供了具有不停电换表功能的单相电能表接插件,所述电能表接插件包括:In order to realize the above method, the present invention provides a single-phase electric energy meter connector with the function of changing the meter without power failure, and the electric energy meter connector includes:

插头,以及与插头配合的底座;所述插头包括接线孔、接线柱和短路孔,在所述接线孔与进出导线采用间隙式配合,所述接线柱与电能表采用间隙式配合;A plug, and a base mated with the plug; the plug includes a wiring hole, a binding post and a short-circuit hole, and the wiring hole and the incoming and outgoing wires adopt a clearance fit, and the binding post and the electric energy meter adopt a clearance fit;

在底座的一端设有电能表收纳部,所述电能表收纳部包括设置在所述底座边缘的第一挡板和第二挡板,在所述第一挡板和所述第二挡板之间设有用于固定所述插头的固定槽;One end of the base is provided with an electric energy meter storage part, and the electric energy meter storage part includes a first baffle plate and a second baffle plate arranged on the edge of the base, between the first baffle plate and the second baffle plate A fixing groove for fixing the plug is provided between them;

其中,在所述插头上设有两个通孔,在所述固定槽上设有与所述通孔对应的固定孔。Wherein, two through holes are arranged on the plug, and fixing holes corresponding to the through holes are arranged on the fixing groove.

在实施中,该单相电表接插件包括插头1以及与插头配合的底座2。具体的,插头1的具体结构如图3所示,包括接线孔11、接线柱12以及短路孔13,接线柱12作为插头1的主体,在接线柱12的一端设有插入到电能表接口的接头,在接线柱12的另一端的端面设有接线孔11,用于连接导线。在接线柱12的侧面设有两个通孔14,用于通过螺丝与底座2上的固定槽连接。In practice, the single-phase electric meter connector includes a plug 1 and a base 2 matched with the plug. Specifically, the specific structure of the plug 1 is shown in Figure 3, including a wiring hole 11, a terminal 12, and a short-circuit hole 13. The terminal 12 is used as the main body of the plug 1, and one end of the terminal 12 is provided with a plug inserted into the electric energy meter interface. The connector has a wiring hole 11 on the end face of the other end of the terminal 12 for connecting wires. Two through holes 14 are provided on the side of the terminal 12 for connecting with the fixing slots on the base 2 through screws.

对应的如图4所示,在底座2上设有电能表收纳部,该电能表收纳部包括设置在底座2边缘的第一挡板21跟第二挡板22,二者共同围成电能表收纳部。为了更好的与插头1相配合,在第一挡板21和第二挡板22之间设有固定槽23,固定槽23用于容纳插头1,并且为了将插头1固定在底座2上,在固定槽23上设有与通孔13对应的固定孔24。Correspondingly, as shown in Figure 4, an electric energy meter storage part is provided on the base 2, and the electric energy meter storage part includes a first baffle plate 21 and a second baffle plate 22 arranged on the edge of the base 2, and the two jointly form an electric energy meter. storage department. In order to better match the plug 1, a fixing groove 23 is provided between the first baffle 21 and the second baffle 22, the fixing groove 23 is used to accommodate the plug 1, and in order to fix the plug 1 on the base 2, A fixing hole 24 corresponding to the through hole 13 is provided in the fixing slot 23 .

在实际操作时,将插头1插入到底座2中的固定槽23中,使得通孔13与固定孔24在位置上对应,此时使用M5螺钉将插头1与固定槽23进行固定,进而将电能表插在插头1中的接线柱11上,以便完成不停电更换电能表的操作。In actual operation, insert the plug 1 into the fixing groove 23 in the base 2, so that the through hole 13 corresponds to the fixing hole 24 in position. At this time, use M5 screws to fix the plug 1 and the fixing groove 23, and then the electric energy The meter is inserted on the terminal 11 in the plug 1, so as to complete the operation of replacing the electric energy meter without power failure.

可选的,在所述第一挡板上设有第一凸起,在所述第二挡板上设有第二凸起,所述第一凸起与所述第二凸起呈圆柱形,在所述第一凸起和所述第二凸起上设有可拆卸的翻转盖板。Optionally, a first protrusion is provided on the first baffle, a second protrusion is provided on the second baffle, and the first protrusion and the second protrusion are cylindrical , a detachable overturn cover is provided on the first protrusion and the second protrusion.

在实施中,在第一挡板21和第二挡板22上分别设有第一凸起和第二凸起,在第一凸起和第二凸起上设有翻转盖板3。具体的翻转盖板3的结构如图5所示。为了令翻转盖板3能够更好的绕第一凸起和第二凸起转动,将第一凸起和第二凸起设为圆柱形。图4中还能看出在电能表收纳部内设有与翻转盖板3对应的阻挡块25,用于对翻转盖板3的转动角度进行限制。In practice, a first protrusion and a second protrusion are respectively provided on the first baffle plate 21 and the second baffle plate 22 , and an overturn cover 3 is provided on the first protrusion and the second protrusion. The specific structure of the flip cover 3 is shown in FIG. 5 . In order to allow the flip cover 3 to better rotate around the first protrusion and the second protrusion, the first protrusion and the second protrusion are configured as cylinders. It can also be seen from FIG. 4 that a blocking block 25 corresponding to the flip cover 3 is provided in the storage part of the electric energy meter for limiting the rotation angle of the flip cover 3 .

翻转盖板用于在电能表正常运行时,将与插头1相连接的M5螺钉进行遮挡,防止人为短路电能表进出线进行窃电。为了能够令电力工作人员可以清晰的区分电能表所属客户,还可以在翻转盖板3表面上设有用于黏贴客户户号标签的凹槽。图6为将插头1、翻转盖板3及保护套9安装到底座2上的效果示意图。The flip cover is used to cover the M5 screw connected to the plug 1 when the electric energy meter is running normally, so as to prevent artificial short-circuiting of the incoming and outgoing lines of the electric energy meter to steal electricity. In order to enable the electric staff to clearly distinguish the customer to which the electric energy meter belongs, a groove for pasting a label of the customer's account number can also be provided on the surface of the flip cover 3 . FIG. 6 is a schematic diagram showing the effect of installing the plug 1 , the flip cover 3 and the protective cover 9 on the base 2 .

可选的,在所述支撑件上设有至少四个固定M5螺钉孔。Optionally, at least four fixing M5 screw holes are provided on the support member.

在实施中,为了将底座2固定在墙壁或用电箱的内壁上,在底座2上还设有至少四个固定M5螺钉孔,以便在实际使用过程中通过使用M5螺钉将进行固定。In practice, in order to fix the base 2 on the wall or the inner wall of the electrical box, at least four fixing M5 screw holes are provided on the base 2, so as to be fixed by using M5 screws during actual use.

可选的,在所述插头1还设有防触电的保护套9。Optionally, the plug 1 is also provided with a protective cover 9 for preventing electric shock.

在实施中,在插头1上还设有保护套9,防止工作人员在更换电能表时勿碰带电部位造成触电。In practice, a protective cover 9 is also provided on the plug 1 to prevent workers from touching live parts and causing electric shock when replacing the electric energy meter.

通过将插头插入到底座中的固定槽中,使得通孔与固定孔在位置上对应,此时使用螺栓将插头与固定槽进行固定,进而将单相电能表插在插头中的接线柱上,以便完成不停电更换电能表的操作。By inserting the plug into the fixing slot in the base, so that the through hole corresponds to the fixing hole in position, at this time, use the bolt to fix the plug and the fixing slot, and then insert the single-phase electric energy meter into the terminal in the plug, In order to complete the operation of replacing the energy meter without power failure.

与单相电能表接插件相对应的是,本发明还提供了具有短路电量计量功能的短路组件,所述短路组件包括拔插件、连接导线以及计量短路电量电能表,所述拔插件包括香蕉插头,以及与所述香蕉插头连接的导线连接件;Corresponding to the single-phase electric energy meter connector, the present invention also provides a short-circuit assembly with a short-circuit electricity metering function. The short-circuit assembly includes a plug-in, a connecting wire, and an electric energy meter for measuring short-circuit electricity. The plug-in includes a banana plug , and a wire connector connected to the banana plug;

在所述香蕉插头的前部设有轴向沟槽,在所述香蕉插头的尾部设有旋紧区域,在所述旋紧区域的端面上设有凸起;在所述导线连接件的前端设有固定平面,在所述固定平面上设有用于所述凸起穿过的固定孔,所述固定孔与所述凸起采用硬压接配合;An axial groove is arranged at the front of the banana plug, a tightening area is provided at the tail of the banana plug, and a protrusion is provided on the end face of the tightening area; at the front end of the wire connector A fixing plane is provided, and a fixing hole for the protrusion to pass is arranged on the fixing plane, and the fixing hole and the protrusion adopt a hard crimp fit;

在所述导线连接件的后端面设有用于连接导线焊接固定的接线孔。A wiring hole for connecting wires to be welded and fixed is provided on the rear end surface of the wire connector.

在实施中,如图7所示,香蕉插头4分为前部和后部,前部的横截面为圆形,为了使得香蕉插头4前部具有一定程度的弹性,特在前部沿香蕉插头4的轴向开设有轴向沟槽41,典型的该轴向沟槽为截面呈十字形的沟槽。考虑到具体的使用场景,沟槽的开槽宽度至少为0.5mm,用以保证在足够小的空间内仍然具有一定的弹性。In practice, as shown in Figure 7, the banana plug 4 is divided into a front part and a rear part, and the cross section of the front part is circular. 4 is provided with an axial groove 41 in the axial direction, and the typical axial groove is a cross-sectional groove. Considering the specific usage scenario, the slot width of the groove is at least 0.5mm to ensure a certain degree of flexibility in a small enough space.

为了便于将香蕉插头4旋紧至导线连接件5上,在香蕉插头1的尾部设有旋紧区域42,并且在旋紧区域42的端面上设有凸起43,该凸起43用于与导线连接件5进行连接。In order to facilitate the banana plug 4 to be screwed onto the wire connector 5, a tightening area 42 is provided at the tail of the banana plug 1, and a protrusion 43 is provided on the end face of the tightening area 42, and the protrusion 43 is used for connecting with the wire connector 5. The wire connector 5 is connected.

将香蕉插头4的尾部旋紧区域42的横截面设为正N边形,N≥4,考虑到实际安装环境中使用到的工具类型,将后部的横截面设为正六边形,以便提高实际安装时的方便程度。The cross-section of the tail tightening area 42 of the banana plug 4 is set as a regular N-gon, N≥4, considering the type of tool used in the actual installation environment, the cross-section of the rear is set as a regular hexagon, so as to improve Ease of installation.

为了实现香蕉插头4与导线连接件5之间的紧密连接,在香蕉插头4的尾部设有凸起43,如图8所示,在导线连接件5的前端设有固定平面51,在固定平面51上设有固定孔52,这样通过将香蕉插头4尾端的凸起43直接插入到固定孔52中,即可实现香蕉插头4与导线连接件5的相对固定。In order to realize the tight connection between the banana plug 4 and the wire connector 5, a protrusion 43 is provided at the tail of the banana plug 4, as shown in Figure 8, a fixed plane 51 is provided at the front end of the wire connector 5, and a fixed plane 51 is arranged on the fixed plane. 51 is provided with a fixing hole 52, so that by directly inserting the protrusion 43 at the tail end of the banana plug 4 into the fixing hole 52, the relative fixing of the banana plug 4 and the wire connector 5 can be realized.

在导线连接件5上除了设有与香蕉插头4连接的固定区域51外,还设有固定区域53,与香蕉插头4的尾部结构类似,固定区域的横截面也为正多边形,考虑到实际安装环境中使用到的工具类型,将固定区域的横截面设为正六边形,以便提高实际安装时的方便程度。In addition to being provided with a fixed area 51 connected to the banana plug 4 on the wire connector 5, a fixed area 53 is also provided. Similar to the tail structure of the banana plug 4, the cross section of the fixed area is also a regular polygon, considering the actual installation. The type of tools used in the environment, the cross-section of the fixed area is set to a regular hexagon, so as to improve the convenience of actual installation.

在旋紧区域中设有接线孔54,用于将连接导线与导线连接件5焊接在一起,从而在导线连接件5与香蕉插头4旋在一起时,实现插头与连接导线的导通,最终配合电能表接插件实现不停电更换电能表的操作。为了增强连接导线的抗拉拽性能,实际使用的连接导线为双股线。香蕉插头4和导线连接件5结合在一起时的外观如图9所示。Wiring holes 54 are provided in the tightening area, which are used to weld the connecting wire and the wire connector 5 together, so that when the wire connector 5 and the banana plug 4 are screwed together, the conduction between the plug and the connecting wire is realized, and finally Cooperate with the electric energy meter connector to realize the operation of replacing the electric energy meter without power failure. In order to enhance the tensile performance of the connecting wire, the actually used connecting wire is a double-strand wire. The appearance of the banana plug 4 and the wire connector 5 when they are combined is shown in FIG. 9 .

可选的,所述前部包括具有第一截面直径的第一柱体,以及具有第二截面直径的第二柱体,所述第一截面直径大于所述第二截面直径。Optionally, the front portion includes a first cylinder with a first cross-sectional diameter, and a second cylinder with a second cross-sectional diameter, and the first cross-sectional diameter is larger than the second cross-sectional diameter.

在实施中,香蕉插头4的前部并不是一个单纯的圆柱体,而是包括具有第一截面直径的第一柱体以及具有第二截面直径的第二柱体。考虑到实际使用过程中需要对插头进行插拔操作,因此令位于香蕉插头4中部的第二柱体的第二截面直径小于第一柱体的第一截面直径。为了与连接导线以及电能表接插件相配合,第一截面直径低于6mm。In practice, the front part of the banana plug 4 is not a simple cylinder, but includes a first cylinder with a first cross-sectional diameter and a second cylinder with a second cross-sectional diameter. Considering that the plug needs to be plugged and pulled out during actual use, the second cross-sectional diameter of the second cylinder located in the middle of the banana plug 4 is made smaller than the first cross-sectional diameter of the first cylinder. In order to cooperate with the connecting wire and the electric energy meter connector, the diameter of the first section is lower than 6mm.

如图10所示,为了提高该拔插件的易用程度,该拔插件还包括安装在所述拔插件外侧、用于容纳所述拔插件的绝缘部分6,除了用于容纳短路由香蕉插头4和导线连接件5构成的拔插件外,该绝缘部分6还具有被设计成具有凹陷部的拉手,方便工作人员对拔插件进行插拔操作。As shown in Figure 10, in order to improve the ease of use of the plug-in, the plug-in also includes an insulating part 6 installed on the outside of the plug-in for accommodating the plug-in, except for accommodating the short-circuit banana plug 4 In addition to the plug-in plug formed by the wire connector 5, the insulating part 6 also has a handle designed to have a concave part, which is convenient for the staff to perform plug-in and pull-out operations on the plug-in plug.

如图11所示,短路组件包括拔插件01、连接导线02以及计量短路电量电能表03,插拔件01的一端通过连接导线02与计量短路电量电能表03连接,插拔件01的另一端连接在待更换电能表上,从而将待更换电能表进行短路处理,并且令计量短路电量电能表对短路期间本应流经待更换电能表的电量进行计量,从而实现不停电更换电能表的效果。As shown in Figure 11, the short-circuit assembly includes a plug-in plug 01, a connecting wire 02, and a meter 03 for measuring short-circuit electricity. It is connected to the electric energy meter to be replaced, so that the electric energy meter to be replaced is short-circuited, and the electric energy meter measuring the short-circuit electric energy is measured by the electric energy that should have flowed through the electric energy meter to be replaced during the short circuit, so as to realize the effect of replacing the electric energy meter without power failure .

本发明提供了不停电更换电能表的方法,包括:如果安装在单相电能表接插件上的待更换电能表的运行状态正常,使用短路组件依次连接待更换电能表的零线和火线;依次断开待更换电能表的进线和出线,取下待更换电能表;将待安装电能表安装在单相电能表接插件上;依次移除连接在火线和零线上的短路组件,抄录待更换电能表的历史数据和短路电量计量电能表的数据,然后将短路电量计量电能表的数据清零。通过使用单相电能表接插件与短路组件,使得在更换电能表时可以将待更换的单相电能表进行短路,从而在不停电的基础上完成单相电能表的更换,提升了使用体验。The invention provides a method for replacing the electric energy meter without power failure, comprising: if the operating state of the electric energy meter to be replaced installed on the connector of the single-phase electric energy meter is normal, using a short-circuit component to sequentially connect the zero wire and the live wire of the electric energy meter to be replaced; Disconnect the incoming and outgoing wires of the electric energy meter to be replaced, and remove the electric energy meter to be replaced; install the electric energy meter to be installed on the connector of the single-phase electric energy meter; Replace the historical data of the electric energy meter with the data of the short-circuit electric energy meter, and then clear the data of the short-circuit electric energy meter. By using the single-phase electric energy meter connector and the short-circuit component, the single-phase electric energy meter to be replaced can be short-circuited when replacing the electric energy meter, thereby completing the replacement of the single-phase electric energy meter on the basis of no power failure, and improving the user experience.

上述实施例中的各个序号仅仅为了描述,不代表各部件的组装或使用过程中的先后顺序。The serial numbers in the above embodiments are for description only, and do not represent the sequence of the components during assembly or use.

以上所述仅为本发明的实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention Inside.

Claims (9)

1. do not have a power failure the method for changing single-phase electric energy meter, it is characterised in that the single-phase electric energy meter connects installed in single-phase electric energy meter On plug-in unit, connector is provided with anti-electricity-theft upset cover plate, and methods described includes:
Running status to the electric energy meter to be replaced on single-phase electric energy meter connector is checked, if running status is just Often, the zero line and live wire of electric energy meter to be replaced are connected successively using short-circuit component;
Inlet wire and the outlet of electric energy meter to be replaced are disconnected successively, remove electric energy meter to be replaced;
Electric energy meter to be installed is arranged on single-phase electric energy meter connector;
The short-circuit component being connected on live wire and zero line is removed successively, makes a copy of the historical data and short-circuit electricity of electric energy meter to be replaced The data of metering electric energy meter, then by the zeros data of short-circuit electric quantity metering electric energy meter.
2. it is according to claim 1 do not have a power failure change electric energy meter method, it is characterised in that the electric energy meter connector bag Include:
Plug, and the base coordinated with plug;The plug includes wiring hole, binding post and short circuit hole, in the wiring hole Coordinated using clearance-type with turnover wire, the binding post is coordinated with electric energy meter using clearance-type;
Electric energy meter incorporating section is provided with one end of support member, the electric energy meter incorporating section includes being arranged on the support member edge First baffle and second baffle, are provided with the fixation for fixing the plug between the first baffle and the second baffle Groove;
Wherein, two through holes are provided with the plug, fixing hole corresponding with the through hole is provided with the fixing groove.
3. it is according to claim 2 do not have a power failure change single-phase electric energy meter method, it is characterised in that in the first baffle The first projection is provided with, the second projection is provided with the second baffle, it is in cylinder that first projection is raised with described second Shape;Dismountable upset cover plate is provided with the described first raised and described second projection;Set in the electric energy meter incorporating section There is stopper corresponding with the upset cover plate.
4. it is according to claim 2 do not have a power failure change single-phase electric energy meter method, it is characterised in that in the upset cover plate Surface is provided with the groove for pasting client family label.
5. it is according to claim 2 do not have a power failure change single-phase electric energy meter method, it is characterised in that on the support member It is provided with least four fixation M5 screw holes.
6. it is according to claim 1 do not have a power failure change single-phase electric energy meter method, it is characterised in that the short-circuit component bag Include plug part, connecting wire and the short-circuit electricity electric energy meter of metering, the plug part includes banana plug, and with the banana The wire connector of plug connection;
Axial groove is provided with the front portion of the banana plug, is provided with the afterbody of the banana plug and is screwed region, described The end face for screwing region is provided with projection;Fixed pan is provided with the front end of the wire connector, on the fixed pan The fixing hole passed through for the projection is provided with, the fixing hole is raised using hard press fit with described;
The wiring hole being welded and fixed for connecting wire is provided with the rear end face of the wire connector.
7. the method for changing single-phase electric energy meter that do not have a power failure according to claim 6, it is characterised in that described anterior transversal Face is circle, and the cross section at the rear portion is n-shaped, N >=4.
8. the method for changing single-phase electric energy meter that do not have a power failure according to claim 6, it is characterised in that described anterior to include tool There are the first cylinder of the first diameter of section, and the second cylinder with the second diameter of section, first diameter of section is more than Second diameter of section.
9. the method for changing single-phase electric energy meter that do not have a power failure according to claim 6, it is characterised in that the axial groove is Section is in criss-cross groove, and the groove width of the groove is at least 0.5mm.
CN201611225090.XA 2016-12-27 2016-12-27 Do not have a power failure the method for changing single-phase electric energy meter Pending CN106771428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611225090.XA CN106771428A (en) 2016-12-27 2016-12-27 Do not have a power failure the method for changing single-phase electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611225090.XA CN106771428A (en) 2016-12-27 2016-12-27 Do not have a power failure the method for changing single-phase electric energy meter

Publications (1)

Publication Number Publication Date
CN106771428A true CN106771428A (en) 2017-05-31

Family

ID=58921011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611225090.XA Pending CN106771428A (en) 2016-12-27 2016-12-27 Do not have a power failure the method for changing single-phase electric energy meter

Country Status (1)

Country Link
CN (1) CN106771428A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445268A (en) * 2018-05-18 2018-08-24 上海振浩电子科技有限公司 A kind of three-phase electric energy meter does not have a power failure more changing device
CN110007587A (en) * 2019-03-27 2019-07-12 国网上海市电力公司 A kind of electric system time synchronization clock apparatus does not have a power failure the method for replacement
CN110082576A (en) * 2019-06-20 2019-08-02 国网江苏省电力有限公司无锡供电分公司 Single-phase intelligent electric energy meter pedestal
CN110763884A (en) * 2019-11-26 2020-02-07 云南电网有限责任公司临沧供电局 Method for rapidly plugging and unplugging on-load replacement metering device
CN113611519A (en) * 2021-07-29 2021-11-05 国网重庆市电力公司营销服务中心 Terminal box

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201676Y (en) * 1994-08-24 1995-06-21 林宏进 Electric energy displaying field converting terminal box
JPH0875788A (en) * 1994-09-05 1996-03-22 Tokyo Kiki Seisaku Kk Uninterruptibly exchanging tool for watt meter
JP2009047651A (en) * 2007-08-22 2009-03-05 Chugoku Electric Power Co Inc:The Connection adapter of watt hour meter, and replacement work method for watt hour meter
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter
CN205384319U (en) * 2016-03-10 2016-07-13 国网山东省电力公司济宁供电公司 Trade table electric quantity gauge device
CN205608043U (en) * 2016-01-22 2016-09-28 上海赛璞乐电力科技有限公司 Single -phase smart electric meter's base and do not cut off power supply and change smart electric meter's base system
CN106093502A (en) * 2016-07-19 2016-11-09 国网上海市电力公司 A kind of power failure changes the device of single-phase intelligent electric energy meter

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201676Y (en) * 1994-08-24 1995-06-21 林宏进 Electric energy displaying field converting terminal box
JPH0875788A (en) * 1994-09-05 1996-03-22 Tokyo Kiki Seisaku Kk Uninterruptibly exchanging tool for watt meter
JP2009047651A (en) * 2007-08-22 2009-03-05 Chugoku Electric Power Co Inc:The Connection adapter of watt hour meter, and replacement work method for watt hour meter
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter
CN205608043U (en) * 2016-01-22 2016-09-28 上海赛璞乐电力科技有限公司 Single -phase smart electric meter's base and do not cut off power supply and change smart electric meter's base system
CN205384319U (en) * 2016-03-10 2016-07-13 国网山东省电力公司济宁供电公司 Trade table electric quantity gauge device
CN106093502A (en) * 2016-07-19 2016-11-09 国网上海市电力公司 A kind of power failure changes the device of single-phase intelligent electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐金亮 等: "《业扩与变更用电》", 30 June 2013, 中国电力出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445268A (en) * 2018-05-18 2018-08-24 上海振浩电子科技有限公司 A kind of three-phase electric energy meter does not have a power failure more changing device
CN108445268B (en) * 2018-05-18 2024-05-14 上海振浩智能科技有限公司 Uninterrupted power change device for three-phase electric energy meter
CN110007587A (en) * 2019-03-27 2019-07-12 国网上海市电力公司 A kind of electric system time synchronization clock apparatus does not have a power failure the method for replacement
CN110082576A (en) * 2019-06-20 2019-08-02 国网江苏省电力有限公司无锡供电分公司 Single-phase intelligent electric energy meter pedestal
CN110763884A (en) * 2019-11-26 2020-02-07 云南电网有限责任公司临沧供电局 Method for rapidly plugging and unplugging on-load replacement metering device
CN113611519A (en) * 2021-07-29 2021-11-05 国网重庆市电力公司营销服务中心 Terminal box

Similar Documents

Publication Publication Date Title
CN106771428A (en) Do not have a power failure the method for changing single-phase electric energy meter
CN104090138A (en) Binding post enabling single-phase watt-hour meter to be replaced without power cut
CN206321678U (en) Electric energy meter connector
CN105527476A (en) Device and method for plugging and unplugging electric energy meter without power-off
CN103116051A (en) Pluggable electric meter box
KR20150113004A (en) Electric connector and movable devices using the same
CN114236205B (en) Electric energy meter base and corresponding method for replacing electric energy meter without power failure
CN214669234U (en) Device for noninductive replacement of ammeter
CN204008766U (en) A kind of power failure changed the connection terminal of single-phase electric energy meter
CN113687120B (en) Nondestructive meter changing device and meter changing method
CN207765529U (en) A kind of lithium battery module with fuse assembly
CN202153582U (en) an ethernet connector
CN215070436U (en) Puncture deconcentrator for replacing electric energy meter
CN215812960U (en) Lossless meter changing device
CN210037872U (en) Plug-in type wiring device for replacing lightning arrester monitor
CN211014375U (en) Modular electrical installation connection system
CN210867270U (en) An intelligent power supply and distribution distribution unit
CN202034694U (en) Dual power supply 10kV power distribution device
CN114236246A (en) System and method for detecting backup capability of FTU (fiber to the Unit) super capacitor
CN209709395U (en) A kind of high-voltage fixing cabinet
JP2009139284A (en) Switch-type uninterruptible terminal and bypass plug with switch
CN207183704U (en) A kind of batteries monitoring line integrated form connector
CN202034695U (en) Single power supply 10kV power distribution unit
CN219627066U (en) A multi-purpose plug
CN205791043U (en) DC power cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication