- Prior art keywords
- oil
- gas pipeline
- showering guilding
- valve
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/005—Pipe-line systems for a two-phase gas-liquid flow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
- F17D3/14—Arrangements for supervising or controlling working operations for eliminating water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Pipeline Systems (AREA)
Abstract
Description
技术领域technical field
本发明涉及油气管线局部维修处理工艺,适用于长距离油气管线发生损坏的工艺处理。The invention relates to a local maintenance and treatment process for oil and gas pipelines, which is suitable for the process treatment of damage to long-distance oil and gas pipelines.
背景技术Background technique
投入运行使用的油气管线,局部发生损坏,需要电气焊动火维修。现有油气管线动火维修作业,需要将整条管线在有阀门的位置隔离后进行工艺处理,如管线系统比较长,管线上无隔离阀门,只针对管线上一个维修点而需要将整条管线进行工艺处理,如此操作,费用过高。另外如果生产运行影响,无法对整条管线进行工艺处理,达不到动火维修条件,存在安全隐患。The oil and gas pipelines put into operation were partially damaged, requiring electric welding and hot fire repairs. For hot maintenance of existing oil and gas pipelines, it is necessary to isolate the entire pipeline at the position with valves and then carry out process treatment. If the pipeline system is relatively long and there is no isolation valve on the pipeline, the entire pipeline needs to be isolated for only one maintenance point on the pipeline. Carry out technological treatment, so operation, expense is too high. In addition, if the production operation is affected, the entire pipeline cannot be processed, and the hot maintenance conditions cannot be met, posing a safety hazard.
发明内容Contents of the invention
为了弥补上述技术缺陷,本发明的目的是提供一种油气管线局部维修处理工艺,实现管线局部建立水封,具备动火作业条件,节省费用,对装置生产运行影响较小。In order to make up for the above-mentioned technical defects, the purpose of the present invention is to provide a local maintenance treatment process for oil and gas pipelines, which can realize the partial establishment of water seals in the pipelines, meet the hot working conditions, save costs, and have little impact on the production and operation of the equipment.
为了实现上述目的,本发明所采用的技术方案是:油气管线局部维修处理工艺,包括油气管线、设置在油气管线上动火作业点所在管段的导淋阀、设置在油气管线上动火作业点两侧排列分布的三组导淋阀,所述的三组导淋阀以动火作业点为中心分别为第一导淋阀a、第一导淋阀a-1、第二导淋阀b、第二导淋阀b-1、第三导淋阀c、第三导淋阀c-1;In order to achieve the above purpose, the technical solution adopted in the present invention is: the local maintenance and treatment process of the oil and gas pipeline, including the oil and gas pipeline, the drain valve installed on the pipeline section where the hot work point is located on the oil and gas pipeline, and the hot work point set on the oil and gas pipeline. There are three sets of drain valves arranged on both sides, and the three sets of drain valves are respectively the first drain valve a, the first drain valve a-1, and the second drain valve b with the hot work point as the center. , the second drenching valve b-1, the third drenching valve c, the third drenching valve c-1;
所述的油气管线为若干U型管段形状组成的整体管段;The oil and gas pipeline is an integral pipe section composed of several U-shaped pipe sections;
所述的三组导淋阀设置于管线上以动火作业点为中心两侧分布的U型管段的下端;The three sets of deluge valves are arranged at the lower end of the U-shaped pipe section distributed on both sides of the pipeline with the hot work point as the center;
所述的三组导淋阀及三组导淋阀所在的各U型管段以动火作业点所在U型管段呈一一对应关系。The three sets of shower valves and the U-shaped pipe sections where the three sets of shower valves are located are in a one-to-one correspondence with the U-shaped pipe section where the hot work point is located.
具体维修处理工艺为:The specific repair process is as follows:
油气管线经过水顶线处理后,以动火作业点为中心两侧的三组U型管段通过导淋阀,将管线内存水排净;在动火作业点为中心两侧第二组U型管段建立水封,通过导淋阀加水;再通过以动火作业点为中心两侧第一组U型管段导淋阀给蒸汽,在动火作业点处所在U型管段通过导淋阀排气,然后蒸煮此段管线,取气体样分析合格后,具备动火作业条件,可以进行局部动火维修作业。After the oil and gas pipeline has been treated by the water top line, the three sets of U-shaped pipe sections on both sides centered on the hot operation point pass through the drain valve to drain the water in the pipeline; the second set of U-shaped pipe sections on both sides of the hot work point The pipe section establishes a water seal, and water is added through the shower valve; then steam is supplied through the first set of U-shaped pipe section shower valves on both sides centered on the hot work point, and the U-shaped pipe section at the hot work point is exhausted through the shower valve , and then cook this section of the pipeline. After the gas sample is qualified for analysis, it is qualified for hot work and can be used for partial hot maintenance.
本发明的有益效果是:针对较长的油气管线的局部损坏进行水封动火作业维修,避免进行整条管线处理,省时省力;局部水封工艺具备动火作业条件,节省费用,对装置生产运行影响较小;工艺处理难度小。The beneficial effects of the present invention are: for the local damage of the long oil and gas pipeline, the water seal and hot work maintenance is carried out, avoiding the whole pipeline treatment, saving time and labor; The impact on production operation is small; the difficulty of process treatment is small.
附图说明Description of drawings
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图中,1、油气管线、2、导淋阀、3、U型管段、4、第一导淋阀a、5、第一导淋阀a-1、6、第二导淋阀b、7、第二导淋阀b-1、8、第三导淋阀c、9、第三导淋阀c-1、10、动火作业点。In the figure, 1. Oil and gas pipeline, 2. Deluge valve, 3. U-shaped pipe section, 4. First deluge valve a, 5, First deluge valve a-1, 6, Second deluge valve b, 7 , Second drench valve b-1, 8, third drench valve c, 9, third drench valve c-1, 10, hot work point.
具体实施方式detailed description
下面结合附图及实施例对本发明进行详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
实施例Example
2016年7月份某公司码头至公用工程混苯转料线全长2千米,在中间部位发现一个弯头焊缝出现裂纹隐患,采取此方法进行局部管线建立水封工艺处理,对此弯头进行动火更换新弯头作业。In July 2016, a company’s wharf to public works mixed benzene material transfer line was 2 kilometers long, and a hidden danger of cracks in the weld of an elbow was found in the middle part. This method was used to establish a water seal process for local pipelines. For this elbow Carry out hot work to replace the elbow with a new one.
整套油气管线包括:油气管线1,设置在油气管线1上动火作业点10所在管段的导淋阀2、设置在油气管线上动火作业点两侧排列分布的三组导淋阀,所述的三组导淋阀以动火作业点10为中心分别为第一导淋阀a(4)、第一导淋阀a-1(5)、第二导淋阀b(6)、第二导淋阀b-1(7)、第三导淋阀c(8)、第三导淋阀c-1(9);The whole set of oil and gas pipelines includes: oil and gas pipeline 1, deluge valve 2 arranged on the pipe section where the hot operation point 10 is located on the oil and gas pipeline 1, and three sets of drench valves arranged on both sides of the hot operation point on the oil and gas pipeline. The three groups of deluge valves centered on the hot work point 10 are the first deluge valve a (4), the first deluge valve a-1 (5), the second deluge valve b (6), the second Drain valve b-1 (7), third drench valve c (8), third drench valve c-1 (9);
所述的油气管线1为若干U型管段3形状组成的整体管段;The oil and gas pipeline 1 is an integral pipe section composed of several U-shaped pipe sections 3;
所述的三组导淋阀设置于管线上以动火作业点10为中心两侧分布的U型管段3的下端;The three sets of deluge valves are arranged at the lower end of the U-shaped pipe section 3 distributed on both sides of the pipeline with the hot work point 10 as the center;
所述的三组导淋阀及三组导淋阀所在的各U型管段3以动火作业点10所在U型管段呈一一对应关系。The three sets of shower valves and the U-shaped pipe sections 3 where the three sets of shower valves are located are in a one-to-one correspondence with the U-shaped pipe section where the hot work point 10 is located.
具体维修处理工艺为:The specific repair process is as follows:
油气管线1经过水顶线处理后,以动火作业点10为中心两侧的三组U型管段通过导淋阀2,将管线内存水排净;在动火作业点10为中心两侧第二组U型管段3建立水封,通过第二导淋阀b(6)、第二导淋阀b-1(7)加水;再通过以动火作业点10为中心两侧第一组U型管段的第一导淋阀a(4)、第一导淋阀a-1(5)给蒸汽,在动火作业点10处所在U型管段3通过导淋阀2排气,然后蒸煮此段管线,取气体样分析合格后,具备动火作业条件,可以进行局部动火维修作业。After the oil and gas pipeline 1 has been treated by the water top line, the three sets of U-shaped pipe sections on both sides centered on the hot operation point 10 pass through the drain valve 2 to drain the water in the pipeline; Two sets of U-shaped pipe sections 3 establish water seals, add water through the second drench valve b (6) and second drench valve b-1 (7); The first decoy valve a (4) and the first decoy valve a-1 (5) of the U-shaped pipe section supply steam, and the U-shaped pipe section 3 at the hot fire operation point 10 exhausts through the decoy valve 2, and then cooks this For a section of the pipeline, after the gas sample is taken and analyzed to pass the analysis, it is qualified for hot work, and local hot repair work can be carried out.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611133543.6A CN106764427A (en) | 2016-12-10 | 2016-12-10 | Oil and Gas Pipeline Partial Maintenance Treatment Process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611133543.6A CN106764427A (en) | 2016-12-10 | 2016-12-10 | Oil and Gas Pipeline Partial Maintenance Treatment Process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106764427A true CN106764427A (en) | 2017-05-31 |
Family
ID=58875924
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611133543.6A Pending CN106764427A (en) | 2016-12-10 | 2016-12-10 | Oil and Gas Pipeline Partial Maintenance Treatment Process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106764427A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2135886C1 (en) * | 1997-11-11 | 1999-08-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Method of device for preliminary disposal of water in gathering systems of oil production wells |
| CN201028293Y (en) * | 2007-02-01 | 2008-02-27 | 武汉都市环保工程技术股份有限公司 | Safe cut-off device for low-pressure gas pipe |
| CN103016893A (en) * | 2011-09-21 | 2013-04-03 | 中国建筑第七工程局有限公司 | Hot tapping plugging construction method of long natural gas delivery pipeline |
| CN103075640A (en) * | 2013-02-01 | 2013-05-01 | 济钢集团有限公司 | Anti-clogging type water seal device for coke oven gas conveying pipeline |
| CN104214364A (en) * | 2014-07-22 | 2014-12-17 | 张寒军 | Pipeline safety construction suite and method |
| CN105081592A (en) * | 2014-05-14 | 2015-11-25 | 中国石油天然气股份有限公司 | Hot-fire modification method of natural gas pressure induction device without replacement |
-
2016
- 2016-12-10 CN CN201611133543.6A patent/CN106764427A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2135886C1 (en) * | 1997-11-11 | 1999-08-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Method of device for preliminary disposal of water in gathering systems of oil production wells |
| CN201028293Y (en) * | 2007-02-01 | 2008-02-27 | 武汉都市环保工程技术股份有限公司 | Safe cut-off device for low-pressure gas pipe |
| CN103016893A (en) * | 2011-09-21 | 2013-04-03 | 中国建筑第七工程局有限公司 | Hot tapping plugging construction method of long natural gas delivery pipeline |
| CN103075640A (en) * | 2013-02-01 | 2013-05-01 | 济钢集团有限公司 | Anti-clogging type water seal device for coke oven gas conveying pipeline |
| CN105081592A (en) * | 2014-05-14 | 2015-11-25 | 中国石油天然气股份有限公司 | Hot-fire modification method of natural gas pressure induction device without replacement |
| CN104214364A (en) * | 2014-07-22 | 2014-12-17 | 张寒军 | Pipeline safety construction suite and method |
Non-Patent Citations (1)
| Title |
|---|
| 王庆等: "浅谈对输气管道动火天然气切断隔离的技术措施", 《海峡科技与产业》 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105018664A (en) | Rapid repairing technology of blast furnace hot blast stove pipeline | |
| CN104438249A (en) | Online gas pipeline cleaning device and method | |
| CN104450301A (en) | High-voltage charged moss removing detergent | |
| CN103996984B (en) | A kind of method of the dismounting high-power transformer sleeve pipe of not draining the oil | |
| CN204901200U (en) | Novel pipeline rehabilitation device | |
| CN104070271A (en) | Dissimilar steel welding method of 15 Cr1Mo1V valve body and WB 36 piping | |
| CN106312251A (en) | Build-up welding method of flanges | |
| CN201059400Y (en) | a sealing flange | |
| CN103245222B (en) | Pipeline configuration structure of triple-inlet air cooler system for hydrogenation reaction effluents | |
| CN204852752U (en) | Pipeline companion heat structure | |
| CN107327319A (en) | The Quick steam blowing method and device of steam turbine admission line | |
| CN202024088U (en) | Gas injection replacement device | |
| CN104988254B (en) | Online maintenance process for blast furnace slag processing granulation equipment | |
| CN204644258U (en) | Dry coke quenching ring-shaped flue air imports and the new system of bypass gases introducting interface | |
| CN203798196U (en) | Vacuum tower condensation circulating system easy to overhaul | |
| CN202302383U (en) | High-pressure rubber hose with water cooling device | |
| CN205024149U (en) | Two steam pocket coke oven tedge waste heat recovery utilize system | |
| CN101871576B (en) | Helium leak detection tool of MSR (Missile Site Radar) reheater pipe system | |
| CN105271643A (en) | Top purging method for improving working conditions of molten tin bath | |
| TWI649472B (en) | Mobile supercritical fluid anhydrous dyeing and finishing test cup | |
| CN107366780B (en) | A method for replacing the water outlet pipeline of a coke oven high-pressure ammonia pump | |
| CN204043174U (en) | A kind of welding wire surface process conduction oil flue gas utilization device | |
| CN103245466A (en) | Pigging and pressure testing method for long distance pipeline coal transportation | |
| CN204326675U (en) | A kind of anticorrosion transformer substation framework | |
| CN203672165U (en) | Dust removal system of submerged arc furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
| RJ01 | Rejection of invention patent application after publication |